M.S.VENKATA RAMAYYA*
                                                                    LOLLA SUDHAKAR**
                                                                    M.V.RAMANA RAO***


             PREDICTION OF SURFACE SUBSIDENCE
                 WITH INTERACTION OF GOAF
                       (PRESS WING)
ABSTRACT :

        India has a long history of commercial coal mining covering nearly 220 years
starting from 1774 by M/s Sumner and Heatly of East India Company in the Raniganj
Coal field along the western bank of river Damodar. The Singareni Collieries Company
Limited (SCCL) is one of the biggest public sector companies in India fulfilling the coal
need of South India since 1945. The different technologies are adopted for extracting
coal from underground dealing with many problems. One of the major problems in every
technology is ‘Subsidence’.

        Different scientific agencies suggested different formulae for predicting maximum
subsidence for different regions of SCCL. For Kothagudem region of SCCL None of them
explained the interaction of goaf in different seams. For Kothagudem region of SCCL, a
number of panels including Bord & Pillar and Longwall have been studied for correct
estimation of surface subsidence. This paper deals with the procedures for prediction of
subsidence with interaction of goaf in different seams. The estimate is made from the
field data after thorough study of strata properties and the conditions existing here.

        Padmavathikhani (PVK) project has worked 9 longwall panels of which 8 have
been completed. These panels were worked in upper seam after the depillaring of lower
seams. The partition between upper and lower seams is 45m. Normally, the system of
extraction by caving is by descending order, where as in this mine it has been done in the
ascending order. The system of extraction in the lower seam was predominantly by Bord
and Pillar with caved, stowed goaves in 2 to 3 sections. The system of subsidence
prediction by actual measurements in the field and co-relation to the established theories
was made in this project. A number of discrepancies have been observed in the analysis,
which were not co-related to the established theories. Since Subsidence depends on
different factors like width of extraction, depth, strata properties, angle of draw, time…
etc. An attempt has been made in this paper to understand the actual behaviour of the
strata in relation to the extracted area and the actual amount of Subsidence. The
analysis made is found to be site specific to this project in the geo-mining conditions of
PVK. Similar studies can be conducted based on the above theory to analyze subsidence
in multi-section and multi-seam workings with different technologies.

* Dy.GM (5Group of Mines)                           ** Dy.Mgr (Project Planning)
*** Under Manager, No.5 Incline

The Singareni Collieries Company Limited, Kothagudem – 507 119, Andhra Pradesh,
INDIA.
INTRODUCTION :

        Padmavathi Khani (PVK) mine is the part of No.5 Incline, opened mainly for
coal extraction by Long wall method in Top seam of 9.75m thickness. Till now 8 Long
wall panels are extracted successfully with 150m face length and 9th panel with 60m face
length is under extraction, the face length is reduced from 150m to 60m due to shallow
depth of the panel. (worked out longwall panels and presently working panel is shown in
PLAN-1).

        Since from the beginning of the PVK project, lot of study has been conducted by
the mine management and different scientific agencies in predicting the surface
subsidence. NIRM has studied extensively and arrived at some empirical relation to
calculate the maximum subsidence value for different regions of SCCL. But the predicted
subsidence profile using NIRM formula for Kothagudem region is giving different results
than the actual, is due to the existence of caved and stowed goaves of King seam beneath
the longwall panels of Top seam.

        The observed surface profiles of worked out panels (shown in Annexure-I)
clearly indicating that the subsidence profiles are asymmetrical to their central axis as the
angle of draw and subsidence are generally more on the starting side of the panel than the
finishing side. This is because of the fact that the energy released in the first break will be
higher than the energy released in the subsequent break1. Also the subsidence value is
more than the normal, whenever any goaf is encountered in below seam beneath the
panel.

        This paper places the subsidence prediction process in proper perspective by
through study of already obtained profiles of worked out panels and arrives at an
empirical formula to predict the maximum subsidence. In this paper, an attempt has made
to formulate the effect of goaf on subsidence for this particular geo-mining condition of
Kothagudem area. From this curve, the proper correction factor is to be applied to the
predicted value of subsidence depending on the existence of percentage of goaf beneath
the panel to obtain the correct value.

SUBSIDENCE PREDICTION TECHNIQUES:

       Existing subsidence prediction techniques fall under two basic categories.
              • Empirical methods
              • Phenomenological methods

        The empirical theories are principally based on observations and experience from
field subsidence studies. Some of the empirical methods have proved sufficiently reliable
for subsidence prediction, at least for a given region. Many of these have been
successfully applied in a number of countries, especially in Europe.

        The empirical profile function method involves the derivation of a mathematical
function that can be fitted to plot a complete profile. The constants employed in the
profile function are empirically derived from observed data. Once a function is
established through the use of actual field data, it can be used to predict subsidence
profiles over future areas of mining. Profile functions have been successfully used in
Hungary, Poland and Russia.
Phenomenological techniques are based on equivalent material modeling
principles where the subsiding strata are mathematically represented as idealized
materials that obey the laws of continuum mechanics. Unlike empirical methods, the
procedures used in the latter category have not achieved much success to date, mainly
due to the difficulty of representing complex geological properties of the strata in simple
mathematical terms.

PREDICTION OF MAXIMUM SUBSIDENCE - NIRM:

       After collection and study of subsidence data from 111 previous worked out
panels (both longwall and bord & pillar panels) of Kothagudem region, NIRM scientists2
has suggested a Non-Linear equation relating the width to depth ratio (W/H) and
subsidence factor (Maximum subsidence/ height of extraction) of the following type.

                S = h x a /(1+ ((W/H)/b)-c)

Where,
         S = Maximum subsidence, m
         h = Effective height of Extraction ( height of extraction x % of extraction), m
         W = Width of the panel, m
         H = Depth of the panel, m

         a, b, c = Constants, The values for Kothagudem region are given as
                        a = 0.66
                        b = 0.8
                        c=7

Therefore,      S = h x 0.66 /(1+ ((W/H)/0.8)-7)

         The results obtained by applying the above formula to the already worked out
longwall panels at different W/H ratios are showing different profiles than the actual
profiles (predicted and actual profiles in detail form is given in Annexure-II). The
starting part of the profile is somewhat co-in siding with the actual profile but there
onwards it is showing incorrect value and at the end it is not closing with the ground
profile.

PREDICTION MODEL :
(for Kothagudem Area)

   Methodology followed in arriving an empirical formula for prediction of maximum
subsidence is given below.

   1. Surface subsidence profiles of different worked out longwall panels are drawn
      from the survey results conducted on the surface over them.
   2. For each profile the subsidence values are co-related with different W/H ratios of
      that particular panel by marking W/H ratio along the horizontal axis.
   3. The polynomial equation with the relation between W/H ratio and subsidence for
      each of the subsidence profile is obtained by using the computer.
4. The combined statistical average of all the polynomial equations is calculated to
      arrive at a final equation.
   5. Thus obtained equation gives the relation between subsidence and W/H ratio and
      can be used for predicting the maximum subsidence.

By following the above mentioned method, the following equation is obtained, which is
specific to Kothagudem area, because it covers the geological conditions of this area
only.

                S = 0.1508 (W/H)2-0.8248(W/H)-0.5292         ---------- (Eq. 1)

       Where,
                S = Maximum subsidence, m
                W = Width of the panel, m
                H = Depth of the panel, m

        The subsidence profiles obtained for different panels using the above formula
(shown in Annexure-III) are more or less co-in siding with the actual profiles, but at
some points the variation is more and it is observed from the working plan of the mine,
the difference is due to the presence of goaves in King seam beneath the longwall panels
of Topseam.


INTRODUCING THE GOAF FACTOR :




       The percentage of goaf area present beneath each sub part of the panel or between
the two consecutive subsidence stations present on the surface is calculated as shown in
above figure. The variation between the predicted subsidence (using Eq.1) and the actual
subsidence of worked out panels is co-related with the percentage of goaf areas present
beneath the panels and arrived at a solution (Variance Vs Goaf percentage curve is shown
in Annexure-IV) given below.
Gf      = 0.0001(P)2-0.0128(P)-0.3265        ---------         (Eq. 2)

       Where,
                Gf      =     Goaf Factor.
                P       =     Percentage of Goaf area.

After calculating the goaf factor, just add it to the predicted subsidence (using Eq.1) to
get the actual subsidence, which almost co-in sides with the original subsidence value.
  Thus,
     Subsidence = Eq.1 +Eq.2
     Subsidence = [0.1508(W/H)2-0.8248(W/H)-0.5292]+[0.0001(P)2-0.0128(P)-0.3265]

In case of a stowed goaf, add 1-(P/100) to the final subsidence. The corrected profiles
after applying the goaf factor and the original profiles of worked out panels are given in
Annexure-V.

ACCURACY / VALIDITY:

        Since the predictions are made based on a vast data available with wide
variations, it is not possible to accurately predict any value, but can be predicted with in
the permissible limits. Mining is such an activity that is affected by different factors and
these factors takes part in accuracy also. Some of the factors affecting subsidence
prediction are given below.

       Geological factors     -       Geological disturbances,
                                      Faults, folds, dykes,
                                      Topography, surface cover, …

       Mining factors         -       Seam thickness, depth, dip,
                                      Extraction width, Goaves,
                                      Rate of extraction, Technology…

       Strata factors         -       Physical properties, bedding, jointing,
                                      Seam roof and floor condition, nature, …

        In Britain, a maximum variation of plus or minus 10 percent was considered
acceptable in subsidence3 and in many cases a high degree of accuracy is not required. If
any important structure is to be protected strictly, then the need of accuracy arises, which
is very rare in mining. Comparison statement of the predicted and actual subsidence for
the worked out panels is given below.

        Panel                 Max. Subsidence (mm)
                              Actual      Predicted           Diff.       %
       Panel no.2             2545         2385              +160        +7
       Panel no.3             1930         2221              -291        -13
       Panel no.4             1790         2112              -322        -15
       Panel no.5             2196         2265              -69         -3
The difference between the actual and the predicted subsidence varied between
3% and 15%. As the negative side of subsidence is more, indicating that the predicted
value is more than the actual and covers the other possible dangers due to subsidence.

CONCLUSION:

       Prediction of surface subsidence, finds its use mainly for
          • The planning of surface land use in coal bearing areas in cases when
               surface development precedes mining.

           •   The design of mine layouts for mining coal from underneath existing
               surface developments.

        As these curves are site specific, they cannot be applied to the other regions of
coal mining having different geo-mining conditions, but the similar study can be done
with the available large data and empirical formulae can be developed for predicting the
surface profiles above the future working panels.

ACKNOWLEDGEMENT:

       The authors are grateful to the Singareni Management in particular and
Sri P Vasudeva Rao Dir (Opr) and Sri CH Krishiah GM, KGM for encouraging in
bringing out this paper. The views expressed by the authors are of their own and not
necessarily of the organization.

REFERENCES:

   1. Dhar B.B. (1995), Status of subsidence research in India, Acourse on Subsidence
      prediction and management in mining areas by CMRI, 18 th-22nd November,
      1995.,pp.1-11.

   2. NIRM Report, “Subsidence studies at SCCL”.

   3. Orchard R.J., (1964), Surface subsidence resulting from alternate treatment of
      colliery goaf, Colliery Engineering, October, pp.428-435.

   4. Holla L., (1991), Reliability of Subsidence prediction methods for use in Mining
      Decisions in New South Wales.
PLAN –
1
ANNEXURE –I

OBSERVED SUBSIDENCE PROFILES OF DIFFERENT LONGWALL PANELS




                        Panel no.2
                                                            0
     6        5         4    W/H 3         2   1        0
                                                            -0.5


                                                            -1




                                                                     Subsidence (m)
                                                            -1.5


                                                            -2


                                                            -2.5


                                                            -3




                            Panel no. 3
                                                                     0
 6        5         4          3           2       1             0
                                     W/H

                                                                     -0.5




                                                                                      Subsidence (m)
                                                                     -1



                                                                     -1.5



                                                                     -2



                                                                     -2.5
OBSERVED SUBSIDENCE PROFILES OF DIFFERENT LONGWALL PANELS



                         Panel no.4
                                                                   0
      5         4        3                   2       1           0 -0.2
                                 W/H
                                                                     -0.4
                                                                     -0.6




                                                                             Subsidence (m)
                                                                     -0.8
                                                                     -1
                                                                     -1.2
                                                                     -1.4
                                                                     -1.6
                                                                     -1.8
                                                                     -2




                          Panel no.5
                                                                     0
 6        5         4        3                   2   1           0
                                       W/H
                                                                     -0.5




                                                                            Subsidence (m)
                                                                     -1



                                                                     -1.5



                                                                     -2



                                                                     -2.5




                                                         ANNEXURE-II
OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE
                 WITH NIRM FORMULA




                            PANEL NO.2
                                                           0
7       6               5   4   W/H   3   2    1       0
                                                           -0.5

                                                           -1




                                                                  Subsidence (m)
                                                           -1.5

                                                           -2

                                                           -2.5
    NIRM-Formula
    Actual Subsidence                                      -3




                                              ANNEXURE-III
OBSERVED SUBSIDENCE                 Vs   PREDICTED SUBSIDENCE WITH EQ.1


                      S = 0.1508 (W/H)2-0.8248(W/H)-0.5292             ---------- (Eq. 1)




                                    Panel no.2
                                                                                     0
    6             5             4        W/H 3      2            1               0
                                                                                     -0.5


                                                                                     -1




                                                                                              Subsidence (m)
                                                                                     -1.5

                                                                                     -2


                                                             act.sub                 -2.5

                                                             Pr.Sub
                                                                                     -3




                                      Panel no. 3
                                                                                               0
6        5                  4              3 W/H    2                  1                  0

                                                                                               -0.5




                                                                                                               Subsidence (m)
                                                                                               -1


                                                                                               -1.5


        act.sub                                                                                -2

        pr.sub
                                                                                               -2.5




OBSERVED SUBSIDENCE                 Vs    PREDICTED SUBSIDENCE WITH EQ.1
Panel no.4
                                                                     0
    5                4          3             2       1            0 -0.2
                                      W/H
                                                                     -0.4
                                                                     -0.6




                                                                              Subsidence (m)
                                                                     -0.8
                                                                     -1
                                                                     -1.2
                                                                     -1.4
                                                                     -1.6
        act.sub
                                                                     -1.8
        pr.sub
                                                                     -2




                                    Panel no.5
                                                                          0
6            5              4         3     W/H   2       1           0

                                                                          -0.5




                                                                                               Subsidence (m)
                                                                          -1


                                                                          -1.5


                                                                          -2

                  act.sub
                                                                          -2.5
                  pr.sub




                                                              ANNEXURE-IV
CURVE FOR FINDING THE GOAF FACTOR

              0.4




              0.2




                0
                     0   5   10   15   20   25   30   35   40   45   50   55   60   65   70   75    80    85      90   95   100

                                                                 goaf%
Goaf Factor




              -0.2
                                                                               y = 0.0001x2 - 0.0128x - 0.3265



              -0.4




              -0.6


                                                                                              Goaf.fact
                                                                                              Poly. (Goaf.fact)
              -0.8




                                                                                               ANNEXURE-V
OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE AFTER
                   APPLYING GOAF FACTOR



                                   Panel no.2
                                                                0
      6               5       4   W/H 3             2   1   0
                                                                -0.5


                                                                -1




                                                                         Subsidence (m)
                                                                -1.5


                                                                -2


                                                                -2.5
          act-sub
          pred-sub                                              -3




                                  Panel no. 3
                                                                    0
6             5           4         3           2       1       0
                                        W/H                         -0.5


                                                                    -1




                                                                                  Subsidence (m)
                                                                    -1.5

                                                                    -2


                                                                    -2.5
               p3
               pred                                                 -3




    OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE AFTER
                   APPLYING GOAF FACTOR
Panel no.4
                                                                 0
     5          4       3                2       1           0
                                 W/H
                                                                 -0.5




                                                                                   Subsidence (m)
                                                                 -1


                                                                 -1.5


                                                                 -2
     p4
     pred                                                        -2.5




                            Panel no.5
                                                         0
6           5       4        3           2   1       0
                                   W/H
                                                         -0.5




                                                                  Subsidence (m)
                                                         -1


                                                         -1.5



    p5                                                   -2

    pred
                                                         -2.5

Weitere ähnliche Inhalte

Was ist angesagt?

Numerical simulation of laterally loaded pile
Numerical simulation of laterally loaded pileNumerical simulation of laterally loaded pile
Numerical simulation of laterally loaded pileDr. Naveen BP
 
Robust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyRobust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyFF Explore 3D
 
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...ijiert bestjournal
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaHossam Shafiq II
 
Seismic Analysis for Safety of Dams
Seismic Analysis for Safety of DamsSeismic Analysis for Safety of Dams
Seismic Analysis for Safety of DamsIOSR Journals
 
DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL
  DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL  DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL
DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOILIAEME Publication
 
Evaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineEvaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineSafdar Ali
 
10 simple mathematical approach for granular fill
10  simple mathematical approach for granular fill 10  simple mathematical approach for granular fill
10 simple mathematical approach for granular fill Ahmed Ebid
 
Mathematical approach-to-simulate-soil-behavior-under-shallow-compaction
Mathematical approach-to-simulate-soil-behavior-under-shallow-compactionMathematical approach-to-simulate-soil-behavior-under-shallow-compaction
Mathematical approach-to-simulate-soil-behavior-under-shallow-compactionAhmed Ebid
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...IEI GSC
 
Structure-metric method FOR PREDICTIVE ESTIMATION of NATURAL RESOURCES
Structure-metric method FOR  PREDICTIVE ESTIMATION  of NATURAL RESOURCESStructure-metric method FOR  PREDICTIVE ESTIMATION  of NATURAL RESOURCES
Structure-metric method FOR PREDICTIVE ESTIMATION of NATURAL RESOURCESKaterinaKaritskaya
 
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresIJAEMSJORNAL
 
Mine water risk in open pit slope stability
Mine water risk in open pit slope stabilityMine water risk in open pit slope stability
Mine water risk in open pit slope stabilitySafdar Ali
 
Prediction of uplift capacity using genetic programming
Prediction of uplift capacity using genetic programmingPrediction of uplift capacity using genetic programming
Prediction of uplift capacity using genetic programmingAhmed Ebid
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyAlexASquare1
 

Was ist angesagt? (16)

Numerical simulation of laterally loaded pile
Numerical simulation of laterally loaded pileNumerical simulation of laterally loaded pile
Numerical simulation of laterally loaded pile
 
Robust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is KeyRobust 3D Geological Models: Hard Data is Key
Robust 3D Geological Models: Hard Data is Key
 
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...
STRESSES BELOW EXISTING STRUCTURES DURING TUNNEL EXCAVATION USING TUNNEL BORI...
 
The Influence of Concrete Roads on Safety and Energy Saving in Tunnels
The Influence of Concrete Roads on Safety and Energy Saving in TunnelsThe Influence of Concrete Roads on Safety and Energy Saving in Tunnels
The Influence of Concrete Roads on Safety and Energy Saving in Tunnels
 
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-AghaBasics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
Basics of Foundation Engineering هندسة الأساسات & Eng. Ahmed S. Al-Agha
 
Seismic Analysis for Safety of Dams
Seismic Analysis for Safety of DamsSeismic Analysis for Safety of Dams
Seismic Analysis for Safety of Dams
 
DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL
  DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL  DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL
DYNAMIC RESPONSE OF CONCRETE GRAVITY DAM ON RANDOM SOIL
 
Evaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mineEvaluation of slope stability for waste rock dumps in a mine
Evaluation of slope stability for waste rock dumps in a mine
 
10 simple mathematical approach for granular fill
10  simple mathematical approach for granular fill 10  simple mathematical approach for granular fill
10 simple mathematical approach for granular fill
 
Mathematical approach-to-simulate-soil-behavior-under-shallow-compaction
Mathematical approach-to-simulate-soil-behavior-under-shallow-compactionMathematical approach-to-simulate-soil-behavior-under-shallow-compaction
Mathematical approach-to-simulate-soil-behavior-under-shallow-compaction
 
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
Integrated Geophysical Approach for Rapid & Cost Effective Site Investigation...
 
Structure-metric method FOR PREDICTIVE ESTIMATION of NATURAL RESOURCES
Structure-metric method FOR  PREDICTIVE ESTIMATION  of NATURAL RESOURCESStructure-metric method FOR  PREDICTIVE ESTIMATION  of NATURAL RESOURCES
Structure-metric method FOR PREDICTIVE ESTIMATION of NATURAL RESOURCES
 
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing StructuresRates of Soft Ground Tunneling in Vicinity of Existing Structures
Rates of Soft Ground Tunneling in Vicinity of Existing Structures
 
Mine water risk in open pit slope stability
Mine water risk in open pit slope stabilityMine water risk in open pit slope stability
Mine water risk in open pit slope stability
 
Prediction of uplift capacity using genetic programming
Prediction of uplift capacity using genetic programmingPrediction of uplift capacity using genetic programming
Prediction of uplift capacity using genetic programming
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 

Andere mochten auch

Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in IndiaVR M
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectationsVR M
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCLUlimella Siva Sankar
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCLUlimella Siva Sankar
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall MiningVR M
 

Andere mochten auch (6)

Future Longwalls in India
Future Longwalls in IndiaFuture Longwalls in India
Future Longwalls in India
 
Longwall exp india-expectations
Longwall exp india-expectationsLongwall exp india-expectations
Longwall exp india-expectations
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Longwall mining
Longwall miningLongwall mining
Longwall mining
 
Longwall technology in india, SCCL
Longwall technology in india, SCCLLongwall technology in india, SCCL
Longwall technology in india, SCCL
 
Longwall Mining
Longwall MiningLongwall Mining
Longwall Mining
 

Ähnlich wie Press wing

A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...Mehran Naghizadeh
 
Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...IRJET Journal
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...IRJET Journal
 
Wind Load Analysis on High Rise Chimney using Computational Fluid Dynamics
Wind Load Analysis on High Rise Chimney using Computational Fluid DynamicsWind Load Analysis on High Rise Chimney using Computational Fluid Dynamics
Wind Load Analysis on High Rise Chimney using Computational Fluid DynamicsIRJET Journal
 
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...CrimsonPublishersAMMS
 
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICS
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICSPIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICS
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICSBrett Johnson
 
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...IRJET Journal
 
Prediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringPrediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringVR M
 
Changes in dam break hydrodynamic modelling practice - Suter et al
Changes in dam break hydrodynamic modelling practice - Suter et alChanges in dam break hydrodynamic modelling practice - Suter et al
Changes in dam break hydrodynamic modelling practice - Suter et alStephen Flood
 
5460be7c0cf27487b4525bb0
5460be7c0cf27487b4525bb05460be7c0cf27487b4525bb0
5460be7c0cf27487b4525bb0emreyz
 
FEM based Seepage Analysis of Earth Dam
FEM based Seepage Analysis of Earth DamFEM based Seepage Analysis of Earth Dam
FEM based Seepage Analysis of Earth DamMd. Saidur Rahman
 
A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...Mehran Naghizadeh
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for differenteSAT Publishing House
 
Post Earthquack Slope Stability Analysis of Rubble Mound Breakwater
Post Earthquack Slope Stability Analysis of Rubble Mound BreakwaterPost Earthquack Slope Stability Analysis of Rubble Mound Breakwater
Post Earthquack Slope Stability Analysis of Rubble Mound BreakwaterIJERA Editor
 
Open channel flow velocity profiles for different reynolds numbers and roughn...
Open channel flow velocity profiles for different reynolds numbers and roughn...Open channel flow velocity profiles for different reynolds numbers and roughn...
Open channel flow velocity profiles for different reynolds numbers and roughn...eSAT Journals
 

Ähnlich wie Press wing (20)

A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...
 
NUMGE2023-423.pdf
NUMGE2023-423.pdfNUMGE2023-423.pdf
NUMGE2023-423.pdf
 
paper mikrotremor
paper mikrotremorpaper mikrotremor
paper mikrotremor
 
Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...Implementation of a Finite Element Model to Generate Synthetic data for Open ...
Implementation of a Finite Element Model to Generate Synthetic data for Open ...
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Download
DownloadDownload
Download
 
Wind Load Analysis on High Rise Chimney using Computational Fluid Dynamics
Wind Load Analysis on High Rise Chimney using Computational Fluid DynamicsWind Load Analysis on High Rise Chimney using Computational Fluid Dynamics
Wind Load Analysis on High Rise Chimney using Computational Fluid Dynamics
 
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...
Model Study of Slope Stability in Open Pit by Numerical Modeling Using the Fi...
 
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICS
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICSPIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICS
PIPELINE PLANNING WITH AIRBORNE ELECTROMAGNETICS
 
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
PERFORMANCE EVALUATION OF DEEP EXCAVATION UNDER STATIC AND SEISMIC LOAD CONDI...
 
Prediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its MonitoringPrediction of Surface Subsidence and Its Monitoring
Prediction of Surface Subsidence and Its Monitoring
 
ملزمة
ملزمةملزمة
ملزمة
 
Changes in dam break hydrodynamic modelling practice - Suter et al
Changes in dam break hydrodynamic modelling practice - Suter et alChanges in dam break hydrodynamic modelling practice - Suter et al
Changes in dam break hydrodynamic modelling practice - Suter et al
 
5460be7c0cf27487b4525bb0
5460be7c0cf27487b4525bb05460be7c0cf27487b4525bb0
5460be7c0cf27487b4525bb0
 
FEM based Seepage Analysis of Earth Dam
FEM based Seepage Analysis of Earth DamFEM based Seepage Analysis of Earth Dam
FEM based Seepage Analysis of Earth Dam
 
A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...A full experimental and numerical modelling of the practicability of thin foa...
A full experimental and numerical modelling of the practicability of thin foa...
 
Open channel flow velocity profiles for different
Open channel flow velocity profiles for differentOpen channel flow velocity profiles for different
Open channel flow velocity profiles for different
 
Post Earthquack Slope Stability Analysis of Rubble Mound Breakwater
Post Earthquack Slope Stability Analysis of Rubble Mound BreakwaterPost Earthquack Slope Stability Analysis of Rubble Mound Breakwater
Post Earthquack Slope Stability Analysis of Rubble Mound Breakwater
 
Open channel flow velocity profiles for different reynolds numbers and roughn...
Open channel flow velocity profiles for different reynolds numbers and roughn...Open channel flow velocity profiles for different reynolds numbers and roughn...
Open channel flow velocity profiles for different reynolds numbers and roughn...
 

Mehr von VR M

Dragline Planning
Dragline PlanningDragline Planning
Dragline PlanningVR M
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)VR M
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mineVR M
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01VR M
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design FundasVR M
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineVR M
 
Top ten in world
Top ten in worldTop ten in world
Top ten in worldVR M
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetmsVR M
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidenceVR M
 

Mehr von VR M (20)

Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mine
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Haul road design
Haul road designHaul road design
Haul road design
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design Fundas
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mine
 
Top ten in world
Top ten in worldTop ten in world
Top ten in world
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetms
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidence
 

Kürzlich hochgeladen

Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 

Kürzlich hochgeladen (20)

Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 

Press wing

  • 1. M.S.VENKATA RAMAYYA* LOLLA SUDHAKAR** M.V.RAMANA RAO*** PREDICTION OF SURFACE SUBSIDENCE WITH INTERACTION OF GOAF (PRESS WING) ABSTRACT : India has a long history of commercial coal mining covering nearly 220 years starting from 1774 by M/s Sumner and Heatly of East India Company in the Raniganj Coal field along the western bank of river Damodar. The Singareni Collieries Company Limited (SCCL) is one of the biggest public sector companies in India fulfilling the coal need of South India since 1945. The different technologies are adopted for extracting coal from underground dealing with many problems. One of the major problems in every technology is ‘Subsidence’. Different scientific agencies suggested different formulae for predicting maximum subsidence for different regions of SCCL. For Kothagudem region of SCCL None of them explained the interaction of goaf in different seams. For Kothagudem region of SCCL, a number of panels including Bord & Pillar and Longwall have been studied for correct estimation of surface subsidence. This paper deals with the procedures for prediction of subsidence with interaction of goaf in different seams. The estimate is made from the field data after thorough study of strata properties and the conditions existing here. Padmavathikhani (PVK) project has worked 9 longwall panels of which 8 have been completed. These panels were worked in upper seam after the depillaring of lower seams. The partition between upper and lower seams is 45m. Normally, the system of extraction by caving is by descending order, where as in this mine it has been done in the ascending order. The system of extraction in the lower seam was predominantly by Bord and Pillar with caved, stowed goaves in 2 to 3 sections. The system of subsidence prediction by actual measurements in the field and co-relation to the established theories was made in this project. A number of discrepancies have been observed in the analysis, which were not co-related to the established theories. Since Subsidence depends on different factors like width of extraction, depth, strata properties, angle of draw, time… etc. An attempt has been made in this paper to understand the actual behaviour of the strata in relation to the extracted area and the actual amount of Subsidence. The analysis made is found to be site specific to this project in the geo-mining conditions of PVK. Similar studies can be conducted based on the above theory to analyze subsidence in multi-section and multi-seam workings with different technologies. * Dy.GM (5Group of Mines) ** Dy.Mgr (Project Planning) *** Under Manager, No.5 Incline The Singareni Collieries Company Limited, Kothagudem – 507 119, Andhra Pradesh, INDIA.
  • 2. INTRODUCTION : Padmavathi Khani (PVK) mine is the part of No.5 Incline, opened mainly for coal extraction by Long wall method in Top seam of 9.75m thickness. Till now 8 Long wall panels are extracted successfully with 150m face length and 9th panel with 60m face length is under extraction, the face length is reduced from 150m to 60m due to shallow depth of the panel. (worked out longwall panels and presently working panel is shown in PLAN-1). Since from the beginning of the PVK project, lot of study has been conducted by the mine management and different scientific agencies in predicting the surface subsidence. NIRM has studied extensively and arrived at some empirical relation to calculate the maximum subsidence value for different regions of SCCL. But the predicted subsidence profile using NIRM formula for Kothagudem region is giving different results than the actual, is due to the existence of caved and stowed goaves of King seam beneath the longwall panels of Top seam. The observed surface profiles of worked out panels (shown in Annexure-I) clearly indicating that the subsidence profiles are asymmetrical to their central axis as the angle of draw and subsidence are generally more on the starting side of the panel than the finishing side. This is because of the fact that the energy released in the first break will be higher than the energy released in the subsequent break1. Also the subsidence value is more than the normal, whenever any goaf is encountered in below seam beneath the panel. This paper places the subsidence prediction process in proper perspective by through study of already obtained profiles of worked out panels and arrives at an empirical formula to predict the maximum subsidence. In this paper, an attempt has made to formulate the effect of goaf on subsidence for this particular geo-mining condition of Kothagudem area. From this curve, the proper correction factor is to be applied to the predicted value of subsidence depending on the existence of percentage of goaf beneath the panel to obtain the correct value. SUBSIDENCE PREDICTION TECHNIQUES: Existing subsidence prediction techniques fall under two basic categories. • Empirical methods • Phenomenological methods The empirical theories are principally based on observations and experience from field subsidence studies. Some of the empirical methods have proved sufficiently reliable for subsidence prediction, at least for a given region. Many of these have been successfully applied in a number of countries, especially in Europe. The empirical profile function method involves the derivation of a mathematical function that can be fitted to plot a complete profile. The constants employed in the profile function are empirically derived from observed data. Once a function is established through the use of actual field data, it can be used to predict subsidence profiles over future areas of mining. Profile functions have been successfully used in Hungary, Poland and Russia.
  • 3. Phenomenological techniques are based on equivalent material modeling principles where the subsiding strata are mathematically represented as idealized materials that obey the laws of continuum mechanics. Unlike empirical methods, the procedures used in the latter category have not achieved much success to date, mainly due to the difficulty of representing complex geological properties of the strata in simple mathematical terms. PREDICTION OF MAXIMUM SUBSIDENCE - NIRM: After collection and study of subsidence data from 111 previous worked out panels (both longwall and bord & pillar panels) of Kothagudem region, NIRM scientists2 has suggested a Non-Linear equation relating the width to depth ratio (W/H) and subsidence factor (Maximum subsidence/ height of extraction) of the following type. S = h x a /(1+ ((W/H)/b)-c) Where, S = Maximum subsidence, m h = Effective height of Extraction ( height of extraction x % of extraction), m W = Width of the panel, m H = Depth of the panel, m a, b, c = Constants, The values for Kothagudem region are given as a = 0.66 b = 0.8 c=7 Therefore, S = h x 0.66 /(1+ ((W/H)/0.8)-7) The results obtained by applying the above formula to the already worked out longwall panels at different W/H ratios are showing different profiles than the actual profiles (predicted and actual profiles in detail form is given in Annexure-II). The starting part of the profile is somewhat co-in siding with the actual profile but there onwards it is showing incorrect value and at the end it is not closing with the ground profile. PREDICTION MODEL : (for Kothagudem Area) Methodology followed in arriving an empirical formula for prediction of maximum subsidence is given below. 1. Surface subsidence profiles of different worked out longwall panels are drawn from the survey results conducted on the surface over them. 2. For each profile the subsidence values are co-related with different W/H ratios of that particular panel by marking W/H ratio along the horizontal axis. 3. The polynomial equation with the relation between W/H ratio and subsidence for each of the subsidence profile is obtained by using the computer.
  • 4. 4. The combined statistical average of all the polynomial equations is calculated to arrive at a final equation. 5. Thus obtained equation gives the relation between subsidence and W/H ratio and can be used for predicting the maximum subsidence. By following the above mentioned method, the following equation is obtained, which is specific to Kothagudem area, because it covers the geological conditions of this area only. S = 0.1508 (W/H)2-0.8248(W/H)-0.5292 ---------- (Eq. 1) Where, S = Maximum subsidence, m W = Width of the panel, m H = Depth of the panel, m The subsidence profiles obtained for different panels using the above formula (shown in Annexure-III) are more or less co-in siding with the actual profiles, but at some points the variation is more and it is observed from the working plan of the mine, the difference is due to the presence of goaves in King seam beneath the longwall panels of Topseam. INTRODUCING THE GOAF FACTOR : The percentage of goaf area present beneath each sub part of the panel or between the two consecutive subsidence stations present on the surface is calculated as shown in above figure. The variation between the predicted subsidence (using Eq.1) and the actual subsidence of worked out panels is co-related with the percentage of goaf areas present beneath the panels and arrived at a solution (Variance Vs Goaf percentage curve is shown in Annexure-IV) given below.
  • 5. Gf = 0.0001(P)2-0.0128(P)-0.3265 --------- (Eq. 2) Where, Gf = Goaf Factor. P = Percentage of Goaf area. After calculating the goaf factor, just add it to the predicted subsidence (using Eq.1) to get the actual subsidence, which almost co-in sides with the original subsidence value. Thus, Subsidence = Eq.1 +Eq.2 Subsidence = [0.1508(W/H)2-0.8248(W/H)-0.5292]+[0.0001(P)2-0.0128(P)-0.3265] In case of a stowed goaf, add 1-(P/100) to the final subsidence. The corrected profiles after applying the goaf factor and the original profiles of worked out panels are given in Annexure-V. ACCURACY / VALIDITY: Since the predictions are made based on a vast data available with wide variations, it is not possible to accurately predict any value, but can be predicted with in the permissible limits. Mining is such an activity that is affected by different factors and these factors takes part in accuracy also. Some of the factors affecting subsidence prediction are given below. Geological factors - Geological disturbances, Faults, folds, dykes, Topography, surface cover, … Mining factors - Seam thickness, depth, dip, Extraction width, Goaves, Rate of extraction, Technology… Strata factors - Physical properties, bedding, jointing, Seam roof and floor condition, nature, … In Britain, a maximum variation of plus or minus 10 percent was considered acceptable in subsidence3 and in many cases a high degree of accuracy is not required. If any important structure is to be protected strictly, then the need of accuracy arises, which is very rare in mining. Comparison statement of the predicted and actual subsidence for the worked out panels is given below. Panel Max. Subsidence (mm) Actual Predicted Diff. % Panel no.2 2545 2385 +160 +7 Panel no.3 1930 2221 -291 -13 Panel no.4 1790 2112 -322 -15 Panel no.5 2196 2265 -69 -3
  • 6. The difference between the actual and the predicted subsidence varied between 3% and 15%. As the negative side of subsidence is more, indicating that the predicted value is more than the actual and covers the other possible dangers due to subsidence. CONCLUSION: Prediction of surface subsidence, finds its use mainly for • The planning of surface land use in coal bearing areas in cases when surface development precedes mining. • The design of mine layouts for mining coal from underneath existing surface developments. As these curves are site specific, they cannot be applied to the other regions of coal mining having different geo-mining conditions, but the similar study can be done with the available large data and empirical formulae can be developed for predicting the surface profiles above the future working panels. ACKNOWLEDGEMENT: The authors are grateful to the Singareni Management in particular and Sri P Vasudeva Rao Dir (Opr) and Sri CH Krishiah GM, KGM for encouraging in bringing out this paper. The views expressed by the authors are of their own and not necessarily of the organization. REFERENCES: 1. Dhar B.B. (1995), Status of subsidence research in India, Acourse on Subsidence prediction and management in mining areas by CMRI, 18 th-22nd November, 1995.,pp.1-11. 2. NIRM Report, “Subsidence studies at SCCL”. 3. Orchard R.J., (1964), Surface subsidence resulting from alternate treatment of colliery goaf, Colliery Engineering, October, pp.428-435. 4. Holla L., (1991), Reliability of Subsidence prediction methods for use in Mining Decisions in New South Wales.
  • 8. ANNEXURE –I OBSERVED SUBSIDENCE PROFILES OF DIFFERENT LONGWALL PANELS Panel no.2 0 6 5 4 W/H 3 2 1 0 -0.5 -1 Subsidence (m) -1.5 -2 -2.5 -3 Panel no. 3 0 6 5 4 3 2 1 0 W/H -0.5 Subsidence (m) -1 -1.5 -2 -2.5
  • 9. OBSERVED SUBSIDENCE PROFILES OF DIFFERENT LONGWALL PANELS Panel no.4 0 5 4 3 2 1 0 -0.2 W/H -0.4 -0.6 Subsidence (m) -0.8 -1 -1.2 -1.4 -1.6 -1.8 -2 Panel no.5 0 6 5 4 3 2 1 0 W/H -0.5 Subsidence (m) -1 -1.5 -2 -2.5 ANNEXURE-II
  • 10. OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE WITH NIRM FORMULA PANEL NO.2 0 7 6 5 4 W/H 3 2 1 0 -0.5 -1 Subsidence (m) -1.5 -2 -2.5 NIRM-Formula Actual Subsidence -3 ANNEXURE-III
  • 11. OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE WITH EQ.1 S = 0.1508 (W/H)2-0.8248(W/H)-0.5292 ---------- (Eq. 1) Panel no.2 0 6 5 4 W/H 3 2 1 0 -0.5 -1 Subsidence (m) -1.5 -2 act.sub -2.5 Pr.Sub -3 Panel no. 3 0 6 5 4 3 W/H 2 1 0 -0.5 Subsidence (m) -1 -1.5 act.sub -2 pr.sub -2.5 OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE WITH EQ.1
  • 12. Panel no.4 0 5 4 3 2 1 0 -0.2 W/H -0.4 -0.6 Subsidence (m) -0.8 -1 -1.2 -1.4 -1.6 act.sub -1.8 pr.sub -2 Panel no.5 0 6 5 4 3 W/H 2 1 0 -0.5 Subsidence (m) -1 -1.5 -2 act.sub -2.5 pr.sub ANNEXURE-IV
  • 13. CURVE FOR FINDING THE GOAF FACTOR 0.4 0.2 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 goaf% Goaf Factor -0.2 y = 0.0001x2 - 0.0128x - 0.3265 -0.4 -0.6 Goaf.fact Poly. (Goaf.fact) -0.8 ANNEXURE-V
  • 14. OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE AFTER APPLYING GOAF FACTOR Panel no.2 0 6 5 4 W/H 3 2 1 0 -0.5 -1 Subsidence (m) -1.5 -2 -2.5 act-sub pred-sub -3 Panel no. 3 0 6 5 4 3 2 1 0 W/H -0.5 -1 Subsidence (m) -1.5 -2 -2.5 p3 pred -3 OBSERVED SUBSIDENCE Vs PREDICTED SUBSIDENCE AFTER APPLYING GOAF FACTOR
  • 15. Panel no.4 0 5 4 3 2 1 0 W/H -0.5 Subsidence (m) -1 -1.5 -2 p4 pred -2.5 Panel no.5 0 6 5 4 3 2 1 0 W/H -0.5 Subsidence (m) -1 -1.5 p5 -2 pred -2.5