Terminology
BENCH: Ledge that forms a single level
of operation above which mineral or
waste materials are mined from the
bench face.




                                         2
Terminology
BENCH HEIGHT: Vertical distance between the
highest point on the bench (crest) and the lowest
point or the bench (toe). It is influenced by size of
the equipment, mining selectivity, government
regulations and safety.




                                                        2
Terminology

BENCH SLOPE or BANK ANGLE :
Horizontal angle of the line connecting
bench toe to the bench crest.




                                          2
Terminology
BERM: Horizontal shelf or ledge within the ultimate pit
wall slope left to enhance the stability of the a slope
within the pit and improve the safety. Berm interval,
berm width and berm slope angle are determined by the
geotechnical investigation.




                                                          5
Terminology
OVERALL PIT SLOPE ANGLE: The angle measured
from the bottom bench toe to the top bench crest. It is
the angle at which the wall of an open pit stands and it
is determined by rock strength, geologic structures and
water conditions.




                                                           5
Terminology

The overall pit slope angle is affected by the width and
grade of the haul road.




                                                           5
Terminology

HAUL ROADS: During the
life of the pit a haul road
must be maintained for
access.


HAUL ROAD - SPIRAL
SYSTEM: Haul road is
arranged spirally along the
perimeter walls of the pit.



                                    8
Terminology

HAUL ROAD – SWITCH BACK SYSTEM: Zigzag pattern on
one side of the pit.

HAUL ROAD WIDTH:
Function of capacity of
the road and the size
of the equipment. Haul
road width must be
considered      in  the
overall pit design.



                                                    9
Haul Road Effect on Pit Limits




                                 10
Terminology

ANGLE OF REPOSE: Maximum slope of the
broken material.

SUBCROP OR ORE DEPTH: Depth of waste
removed to reach initial ore.

PRE-PRODUCTION STRIPPING:     Stripping
done to reach initial ore.


                                          11
Terminology
ULTIMATE PIT LIMITS: Vertical and lateral extend of
the economically mineable pit boundary. Determined on
the basis of cost of removing overburden or waste
material vs. the mineable value of the ore.

PIT SCHEDULING: Material may be mined from the pit
either in:
1) sequential push backs
2) conventional push backs.




                                                        12
Terminology
STRIPPING RATIO: Expressed in tons of waste to tons
of ore in hard rock open pit operations. Critical and
important parameter in pit design and scheduling.

AVERAGE STRIP RATIO: Total waste divided by total
ore within the ultimate pit.

CUTOFF STRIPPING RATIO: Costs of mining a ton of
ore and associated waste equals to net revenue from the
ton of Ore.
Single Working Bench




                       14
Shovel in Working Bench




                          15
Two Working Benches




                      16
Final
 Pit
Limit



        17
Example Mine
2001         2007     2011




                             18
Pit
Sequence
   (1)




           21
Pit
Sequence
   (2)




           22
Pit
Sequence
   (3)




           23
Pit
Sequence
   (4)




           24
Section of Pit Sequence




                          25
25

More Related Content

What's hot (20)

Open pit mining
Open pit miningOpen pit mining
Open pit mining
 
Drilling and blasting
Drilling and blastingDrilling and blasting
Drilling and blasting
 
Square set stoping
Square set stopingSquare set stoping
Square set stoping
 
Mining Methods
Mining MethodsMining Methods
Mining Methods
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling
 
Subsidence in coal mines
Subsidence in coal minesSubsidence in coal mines
Subsidence in coal mines
 
Subsidence
SubsidenceSubsidence
Subsidence
 
Rock blasting for mining
Rock blasting  for miningRock blasting  for mining
Rock blasting for mining
 
Mine planning
Mine planning Mine planning
Mine planning
 
Underground mining methods
Underground mining methodsUnderground mining methods
Underground mining methods
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 
Rock burst presentation
Rock burst presentationRock burst presentation
Rock burst presentation
 
Blast design in opencast mining
Blast design in opencast miningBlast design in opencast mining
Blast design in opencast mining
 
Mine waste dump
Mine waste dumpMine waste dump
Mine waste dump
 
Lecture 4: Underground Mining
Lecture 4: Underground MiningLecture 4: Underground Mining
Lecture 4: Underground Mining
 
Shrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat StopingShrinkage and Vertical Crater Retreat Stoping
Shrinkage and Vertical Crater Retreat Stoping
 
Surface mining
Surface miningSurface mining
Surface mining
 
Underground metal mining methods
Underground metal mining methodsUnderground metal mining methods
Underground metal mining methods
 
Underground mining system
Underground mining systemUnderground mining system
Underground mining system
 
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)Caving Underground Mining Methods (longwall, Sublevel caving, &  Block caving)
Caving Underground Mining Methods (longwall, Sublevel caving, & Block caving)
 

Similar to Openpit fundamentals

Presentazione Per Delegazione Metro Quing Dao
Presentazione Per Delegazione Metro Quing DaoPresentazione Per Delegazione Metro Quing Dao
Presentazione Per Delegazione Metro Quing Daogifanta
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana missSHAMJITH KM
 
BLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.pptBLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.pptAnshul Yadav
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiHamed Zarei
 
4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecturegefyra-rion
 
THIẾT KẾ ĐƯỜNG ỐNG
THIẾT KẾ ĐƯỜNG ỐNGTHIẾT KẾ ĐƯỜNG ỐNG
THIẾT KẾ ĐƯỜNG ỐNGhieudk53
 
Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Lahmeyer International, UAE
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blastingpartha sharma
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Abner Silva
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessityShashank Gaurav
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1John Latilla
 
Basics of Logging - Revised.pptx
Basics of Logging - Revised.pptxBasics of Logging - Revised.pptx
Basics of Logging - Revised.pptxjavacob
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfssuserca460e
 
Mining Practices With Objective Of Sustainability
Mining Practices With Objective Of SustainabilityMining Practices With Objective Of Sustainability
Mining Practices With Objective Of Sustainabilitypartha sharma
 
Chapter 2 sub-surface investigation
Chapter 2 sub-surface investigationChapter 2 sub-surface investigation
Chapter 2 sub-surface investigationKHUSHBU SHAH
 
Basics of peroleum engineering
Basics of peroleum engineeringBasics of peroleum engineering
Basics of peroleum engineeringShivam Yadav
 

Similar to Openpit fundamentals (20)

Presentazione Per Delegazione Metro Quing Dao
Presentazione Per Delegazione Metro Quing DaoPresentazione Per Delegazione Metro Quing Dao
Presentazione Per Delegazione Metro Quing Dao
 
Site inveswtigation vandana miss
Site inveswtigation vandana missSite inveswtigation vandana miss
Site inveswtigation vandana miss
 
BLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.pptBLOCK CAVING ATRI.ppt
BLOCK CAVING ATRI.ppt
 
Overview of foundation design for the burj dubai
Overview of foundation design for the burj dubaiOverview of foundation design for the burj dubai
Overview of foundation design for the burj dubai
 
4th athenian lecture
4th athenian lecture4th athenian lecture
4th athenian lecture
 
THIẾT KẾ ĐƯỜNG ỐNG
THIẾT KẾ ĐƯỜNG ỐNGTHIẾT KẾ ĐƯỜNG ỐNG
THIẾT KẾ ĐƯỜNG ỐNG
 
Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01Techniquescontrolledblasting 091217003405-phpapp01
Techniquescontrolledblasting 091217003405-phpapp01
 
Techniques of Controlled Blasting
Techniques of Controlled BlastingTechniques of Controlled Blasting
Techniques of Controlled Blasting
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015Hybrid epb tunnelling in rio de janeiro 2015
Hybrid epb tunnelling in rio de janeiro 2015
 
tunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessitytunnelling scope, construction techniques and necessity
tunnelling scope, construction techniques and necessity
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1
 
Basics of Logging - Revised.pptx
Basics of Logging - Revised.pptxBasics of Logging - Revised.pptx
Basics of Logging - Revised.pptx
 
WS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdfWS-D1-CEWRE_PPT.pdf
WS-D1-CEWRE_PPT.pdf
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Mining Practices With Objective Of Sustainability
Mining Practices With Objective Of SustainabilityMining Practices With Objective Of Sustainability
Mining Practices With Objective Of Sustainability
 
Chapter 2 sub-surface investigation
Chapter 2 sub-surface investigationChapter 2 sub-surface investigation
Chapter 2 sub-surface investigation
 
Basics of peroleum engineering
Basics of peroleum engineeringBasics of peroleum engineering
Basics of peroleum engineering
 

More from VR M

Dragline Planning
Dragline PlanningDragline Planning
Dragline PlanningVR M
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)VR M
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mineVR M
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01VR M
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design FundasVR M
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineVR M
 
Top ten in world
Top ten in worldTop ten in world
Top ten in worldVR M
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetmsVR M
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidenceVR M
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road aheadVR M
 

More from VR M (20)

Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mine
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Haul road design
Haul road designHaul road design
Haul road design
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design Fundas
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mine
 
Top ten in world
Top ten in worldTop ten in world
Top ten in world
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetms
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidence
 
Longwall - The road ahead
Longwall - The road aheadLongwall - The road ahead
Longwall - The road ahead
 

Recently uploaded

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 

Recently uploaded (20)

Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 

Openpit fundamentals

  • 2. Terminology BENCH: Ledge that forms a single level of operation above which mineral or waste materials are mined from the bench face. 2
  • 3. Terminology BENCH HEIGHT: Vertical distance between the highest point on the bench (crest) and the lowest point or the bench (toe). It is influenced by size of the equipment, mining selectivity, government regulations and safety. 2
  • 4. Terminology BENCH SLOPE or BANK ANGLE : Horizontal angle of the line connecting bench toe to the bench crest. 2
  • 5. Terminology BERM: Horizontal shelf or ledge within the ultimate pit wall slope left to enhance the stability of the a slope within the pit and improve the safety. Berm interval, berm width and berm slope angle are determined by the geotechnical investigation. 5
  • 6. Terminology OVERALL PIT SLOPE ANGLE: The angle measured from the bottom bench toe to the top bench crest. It is the angle at which the wall of an open pit stands and it is determined by rock strength, geologic structures and water conditions. 5
  • 7. Terminology The overall pit slope angle is affected by the width and grade of the haul road. 5
  • 8. Terminology HAUL ROADS: During the life of the pit a haul road must be maintained for access. HAUL ROAD - SPIRAL SYSTEM: Haul road is arranged spirally along the perimeter walls of the pit. 8
  • 9. Terminology HAUL ROAD – SWITCH BACK SYSTEM: Zigzag pattern on one side of the pit. HAUL ROAD WIDTH: Function of capacity of the road and the size of the equipment. Haul road width must be considered in the overall pit design. 9
  • 10. Haul Road Effect on Pit Limits 10
  • 11. Terminology ANGLE OF REPOSE: Maximum slope of the broken material. SUBCROP OR ORE DEPTH: Depth of waste removed to reach initial ore. PRE-PRODUCTION STRIPPING: Stripping done to reach initial ore. 11
  • 12. Terminology ULTIMATE PIT LIMITS: Vertical and lateral extend of the economically mineable pit boundary. Determined on the basis of cost of removing overburden or waste material vs. the mineable value of the ore. PIT SCHEDULING: Material may be mined from the pit either in: 1) sequential push backs 2) conventional push backs. 12
  • 13. Terminology STRIPPING RATIO: Expressed in tons of waste to tons of ore in hard rock open pit operations. Critical and important parameter in pit design and scheduling. AVERAGE STRIP RATIO: Total waste divided by total ore within the ultimate pit. CUTOFF STRIPPING RATIO: Costs of mining a ton of ore and associated waste equals to net revenue from the ton of Ore.
  • 15. Shovel in Working Bench 15
  • 18. Example Mine 2001 2007 2011 18
  • 19. Pit Sequence (1) 21
  • 20. Pit Sequence (2) 22
  • 21. Pit Sequence (3) 23
  • 22. Pit Sequence (4) 24
  • 23. Section of Pit Sequence 25
  • 24. 25