10. Geometrical Considerations
Minimum width drop cut
geometry with shovel
alternating from side to side.
10
11. Geometrical Considerations
Diagrammatic
representation of the
expanding mining front.
Isometric view of the ramp in
waste approaching the
orebody.
11
29. Geometrical Considerations
Overall slope angle with
one working bench an a ramp section.
Interramp slope angles for a slope containing
a working bench and a ramp.
30