Green field Mining Project Legal Flow
1. Legal Flow Schemes Related to Green field Mining Projects Venkat
2. Information Collection about land record, surface features, village maps Coal Block Allocation Apply PL Exploration Mining Plan Approval GR ML Approval Environment Clearance Forest Clearance R&R + Land Acquisition Mining Permissions Start Mining Statutory Clearances – Green field Mining Project 3 M 3 M -15 M 18 M -24 M 1 M 24 M -30 M 24 M - 48 M Mining Plan Preparation 3 M 4 M MoU 18 M -24 M 3 M -6 M PL Approval ML application
3.
4.
5.
6.
7.
8. Environment Clearance for ‘A’ Category Projects 6 month base line data collection job order Selection of site / coal block Application for EC in form 1to MoEF 1 M 8 M Scoping by EAC of MoEF and issue of TOR for EIA/EMP preparation EIA / EMP preparation as per TOR including fresh data collection 2 M 6M Draft EIA / EMP Report Submission of draft EIA/EMP as per TOR to MoEF 1M 1M Application for NOC for water and air to SPCB Technical meeting of the SPCB and recommendations Public Hearing and Consultation Make changes in the EIA/EMP and submit to MoEF 1M 1M 3M 1M SPCB grants NOC and send report of PH to MoEF Appraisal of final EIA/EMP and form I by EAC MoEF grants EC on the recommendation of EAC 1M 1M 3M 1M
9.
10.
11. Forest Clearance Apply for FC to CCF (nodal) in the state in Form A and send a copy to DFO as well as MoEF Identify / survey Forest land and make a draft forest Diversion Proposal Completion of Pre-Feasibility Study of the coal block Proposal examined by nodal officer and sent to DFO for further scrutiny. 3M 3M 1M Examination by DFO about feasibility of the proposal, site verification, map verification, enumeration of trees etc and forwarding the same to nodal officer 3M Nodal Officer forwards the proposal to PCCF PCCF nodal forwards the proposal to state Env & forest dept 0.5M 0.5M State Env & Forest Dept forwards the proposal and recommendations to MoEF, Delhi 1M PCCF Central to inspect and submit report to MoEF FAC meeting held and recommends the proposal to MoEF MoEF forwards proposal the CEC CEC recommends stage 1 clearance 1M 1M 1M 1M Stage 1 conditions communicated to applicant Applicant complies with stage 1 conditions Applicant coveys compliance to stage 1 conditions DFO & CF verify and report compliance of stage 1 conditions PCCF Nodal to recommend to state Env & Forest dept State Env & Forest Dept send compliance report to MoEF MoEF forwards FDP to CEC for recommendation CEC recommends forest clearance SG issues final forest clearance Applicant writes to DFO for felling trees DFO raises demand for felling trees Applicant complies with demand note DFO arranges for felling of trees and transfer forest land 1M 2M 1M 2M 1M 1M 1M 1M 1M 0.5M 1M 1M Break Forest land 2M Non forest land identified for compensatory
12.
13. Land Acquisition Certified RORs obtained from the district office Identification of stakeholders, land type, village maps etc Submission of application to IPICOL Recommendation from IPICOL to IDCO for land acquisition. 4 M 3M 1M 3M IDCO raises demand for LA Social audit 3M Applicant deposits charges to IDCO. Scrutiny by IDCO and forwarding for adm approval Adm Approval by Dept of Steel & Mines Collector verifies records and submits proposal to RDC (Central) RDC forwards proposal to Rev Dept Rev Dept grants approval for issue of 4(1) Govt Issues 4(1) notification Identify l& buy and for R&R township. Construction of R&R colony. Community Development Applicant deposits compensation demand Hearing of objections and preparation of report by collector under section 5A Declaration under section 6(1) for intended acquisition Collector to issue demand notice for compensation Collector to recommend for section 7(1) notification SG issues 7(1) notification for LA order Collector to issue notification u/s 8 & 9 (land measurement & claims for compensation Collector to issue award u/s 11(1) Collector to arrange for payment of compensation Collector to take possession of land u/s 16(1) Lease deed finalized between collector & IDCO Collector deed between collector & IDCO Applicant takes possession of land R&R of displaced persons 1M 1M 3M 1M 2M 1M 1M 1M 2M 2M 1M 1M 1M 1M 3M 3M 12M 3M 3M 1M 1M 1M 3M 6M 6M 6M