M.S.VENKATA RAMAYYA*
                                                                LOLLA SUDHAKAR**
                                                               M.V.RAMANA RAO***


DESIGN OF LONG WALL PANEL – A CASE STUDY
 FOR NO.2 SEAM OF RAMAGUNDAM AREA, SCCL

ABSTRACT: Singareni Collieries Company Limited (SCCL) is a jointly owned Coal
Company by govt. of Andhra Pradesh and govt. of India. In view of its strategic location
and being the only coal producing company in South India, SCCL has the onerous
responsibility of catering to the coal requirements of consumers within the Godavari
Valley.

        GDK.10A Incline is one of the most mechanized underground mines in SCCL.
There are total 7 seams (No.1A, 1, 2, 3B, 3A, 3 & 4) present within the mine boundaries
out of which No.1A & 3B are proved inconsistent. No.1 & 2 seams are considered for
extraction from GDK.10A Incline and seam no.3& 4 are being worked by GDK.10.
Incline. No.1 seam having 2 clay bands has been worked by Long wall technology. No.2
seam is 18-20m below No.1 seam, This seam was developed near the out crop and
abandoned due to the presence of thick clay band.

        With the experience of working No.1 seam with two clay bands and development
in scientific estimation of proper roof supports, the authors are of the opinion that the
No.2 seam can be extracted by mechanized Long wall technology with an extraction
height of 2.0m. The present paper explores the possibility of working No.2 seam of
GDK.10A Incline with Long wall Technology by thorough study of Geo-technical data
and Physico-mechanical properties of overlying roof rocks to estimate the caving and
required support resistance.

1. INTRODUCTION:

       The Singareni Collieries Company Limited is operating 58 underground mines
and 12 opencast mines catering to the needs of coal consumers in South India. SCCL has
introduced suitable mechanization in mines wherever conditions favour to improve
production capacity, productivity and percentage of extraction.

        GDK.10A Incline and GDK.10 Incline mines are the glittering examples of
successful underground mines mechanization in SCCL. Long wall technology was
introduced in No.1 seam of GDK.10A Incline in 1994. Since then six panels have been
extracted with total output of 3.63 Million tones.



* Dy.GM (5Group of Mines) ** Dy.Mgr (Project Planning) *** GME, No.5 Incline
The Singareni Collieries Company Limited, Kothagudem –507119
Blasting Gallery technology was introduced in No.3 seam of GDK.10 Incline in
the year 1989. The project is considered as trendsetter in thick seam underground mining
in India. No.3 seam lying below GDK.10A Incline property is being proposed for
Blasting gallery. No.1 Seam is worked successfully by Long wall method even though it
contains two clay bands.

2. EXPERIENCE OF WORKING NO.1 SEAM:

       No.1 seam in GDK.10A Incline of Ramagundam area block is intercalated with
two distinct clay bands. These clay bands have restricted the development and extraction
by Bord and Pillar where percentage of recovery was poor and created strata control
problems. These seams have been developed by Road headers and extracted by Long
wall for the past 8 years in GDK.10A Incline. Nearly 10Km of roadways have been
developed and 3.5 Million tones of coal has been extracted. But for Long wall system this
seam could not have been recovered much.

       Experience of development in top section, bottom section and extraction by Long
wall and allowing both clay bands to fall in goaf is ensuring ‘E’ grade from the No.1
seam. With all this a definite procedure is established in dealing with Clay bands in
No.1 seam and extraction of the same safely.

3. POSSIBILITY OF WORKING NO.2 SEAM:

       With the valuable experience gained while working No.1 seam. It is proposed to
work No.2 seam with Long wall technology. In Ramagundam region of SCCL this No.2
seam is developed by Bord and Pillar in the past with heights as low as 1.5m to 2.0m in
GDK.3 Incline, GDK.2A Incline and GDK.5A Incline. In GDK.6B Incline this 2 seam is
being worked presently. In opencast mines, it is in completely worked.

        Presently seams thinner than 1.5m are worked in OC mines and in underground
mines they are declared non-vendible5, since they are not workable, by the preset mining
methods. This concept should be changed and all the thin seams of good quality have to
be exploited. UK/Germany/Poland which had no reserves in thick seam have developed/
worked Long wall in thin seams to sustain their coal mining industry at the fag end of
their reserves. Double face system and dual usage of gate roadways for simultaneous
working of two contiguous seams/thick seam with clay band in middle section of the
seam can be adopted with German Collaboration6.

        The main problem in the working of No.2 seam is presence of clay band, which
created strata control and quality related problems. No.1 seam of GDK.10A Incline is
developed in top section with 1.0m clay band and the gate roadways are driven in bottom
section leaving 0.3 to 0.5m coal against the clay. This in turn supported by roof bolting.
Roof support was initially difficult but after studies conducted by scientific agencies, roof
support was designed and is well established now.

       Keeping in view the extent of II-seam efforts were put in for the development of
No.2 seam. The studies conducted on the boreholes drilled from GDK.10A Incline
revealed the following.
1. Bore hole No.1038 drilled from surface for shaft sinking. This borehole seam
          section shows that No.2 seam can be developed along stone floor with an
          height 1.8-2.0m. The grade of coal would be ‘D’ grade.
       2. Bore holes (2 No.s) have been drilled from No.1 seam floor to No.II seam
          floor at 35L/3D & 40L/2D. The borehole section and Lithology shows that
          No.2 seam can be comfortably developed along floor with a height of 2.0m.
       3. Further No.2 seam is being developed from 48L X-cut by drivage of level
          tunnel. The seam section of various boreholes in deep shaft block indicate its
          workability with a height of extraction 2.0m with low ‘D’ grade.

       Internal studies conducted and proposals made by various scientific agencies
suggested extraction of II-seam by Long wall. No.II Seam was finally considered to be
worked with only Long wall technology2.

4. DESIGN OF LONG WALL PANEL IN NO.2 SEAM:

        For proper understanding of caving behaviour an estimation was made basing on
the Plate theory of failure proposed by Prof. Qian Ming-gao and Prof. He Fulian, China.

                            TABLE.1
           PHYSICO-MECHANICAL PROPERTIES OF ROOF ROCK
                           BH NO.637

   Depth from BoreHole        Thickness     Density    Tensile Str. Youngs Mod
   Surface(m)   637              (m)        (gr/cc)    (kg/sq.cm) x105(Kg/sq.cm)
      163.4                      0.1          1.4


      164.57                      1.17        2.12        15.92          0.23




                                 10.43        2.12        17.07          0.35

        175

                                  8.2         2.21        25.31          0.41

       183.2

                                  4.13        1.56        36.72
      187.53                     IMM
                                    2          1.4        23.93
      189.33
TABLE.2
                        BORE HOLE LITHOLOGY
                              BHNO.637
Depth from BoreHole Thickn  Lithology   Bulking Bulk-up Cumu.       Cumu.
Surface(m)   637     (m)               Factor(m) Height Bulk-up Ht. Thickn
  163.4              0.1      Coal


   164.57                   1.17 Carb sandy Shale     1.4       1.638


                               Grey Sandstone
                         10.43   (Medium -            1.15     11.9945     27.04        24.76
                                  Grained)
    175

                             8.2     Grey Sandstone   1.13      9.266     15.048        14.33
                                    (Fine &Medium -
   183.2                                Grained)

                             4.13     Shaly Coal      1.4       5.782      5.782        6.13
   187.53                   IMM
                               2      COAL                                               2
   189.33                            Working Sec.

REMARKS :
      Caving Height = 14.33m
      Working Sec. = 2.0m
      Immediate Roof = 4.13m
         ( Which caves in as the supports are advanced)
      SSt which is expected to cave = 8.2m


4.1. CALCULATION FOR FIRST FALL DISTANCE FOR A FACE LENGTH OF
150 m:

1. Vertical Pressure (Pv)      = e1 x t1 + e’ x H
        Where,
                e1 – Density of bed which is expected to cave.
                t1 - thickness of bed which is expected to cave
                e’ – Density of the bed which is lying above the expected cavable bed
                H – Depth upto the bed.

                       Pv      = 2.21 x 8.2*+ 2.12 x 175
                               = 389.122 t/sq.m                (* from Table.2)
                               = 3.89 Mpa
2. m : Virgin Horizontal Stress:
                              = 175/d + 0.3
                              = 175/183.2+0.3
                              = 1.255


3. Horizontal Stress on (σh) = m x Pv
                              = 1.255 x 3.89
                              = 4.881 Mpa
4. Weight per Unit Thickness of Beds w = e1 x t1
                                         = 2.21 x 8.2
                                      w = 18.122 t/sq.m
5. Instiu Tensile Strength σt = 0.9 x 2.531
                              = 2.278 Mpa


      BY TRAIL ERROR PROCESS…

a) Let a= 66m          b=150m          t = Thickness of Sandstone expected to cave in m
                                         = 8.2 m      (from Table.2)
       a/b = 0.44
       f(a/b) = 0.01991

       Bending Stress (σ’)     = f(a/b) x w x 1502 x 6 / t2
                               = 0.0199 x 18.122 x 1502x 6 / (8.2) 2
                               = 726.2t/sq.m.
                               = 7.262 Mpa

       σt       = σ’ – σh
                = 7.262 – 4.881
                = 2.385 Mpa

         The tensile Strength of the Rock is 2.278Mpa. Hence it can be concluded the first
fall will occur after a retreat of 66m.

4.2. PERIODIC FALL :

       Thickness of Bed1 (t1)        = 8.2m
       Tensile strength σt           = 2.278 Mpa
       Density            e1         = 2.21 t/sq.m.
       Acceleration due to gravity(g)= 9.81 m/sec2

       L12      = t1 x σt / 3 x e1 x g
                = 8.2 x 2.278 x 103 / 3 x 2.21 x 9.81
       L1       = 17 m
4.3. ESTIMATION OF RESISTANCE REQUIRED:

a. AT MAIN FALL:




       Weight of immediate Roof            Wi       = ei x 4.9 x ti x Sp
                                                    = 1.56 x 4.9 x 4.13 x 1.5
                                                    = 47 T

       Weight of bed 1                     W1       = e1 x t1 x 33 x Sp
                                                    = 2.21 x 8.2 x 33 x 1.5
                                                    = 897 T

a.1. TAKING MOMENTS ABOUT FACE LINE:

       Pxp               = Wi x [4.9/2] + W1 [33/2]
       P x 3.7           = 47 x [4.9/2] + 897 [33/2]
       P x 3.7           = 115.15 + 14800.5
       P                 = 4031 T

This is very momentary (just at the moment of break of main bed). There will be bleeding
of supports and the 33m of block will rotate about face line and will touch goaf waste.
This overhang of 33m can be treated as simply supported beam with one end on goaf and
the other end on rear of support with a length of (33-4.9) = 28.1

       ________________________________
       |-----------------------------------------------|
                         28.1m                             = e1 t1 x 1.5
                                                           = 2.21 x 8.2 x 1.5
                                                    W      = 27 t/m

Maximum Bending movement                   = W l2 /8
           B.M.                            = 27 x (28.1)2 /8
                                           = 2665 tm

        M        =       f
      -----            -----
        I                y
F         = (M / I) y
                 = B.M. x 6 / Sp x t12
                 = 2665 x 6 / 1.5 x (8.2)2
                 = 158.53 t/sq.m.
                 = 1.59 Mpa.

The tensile strength of rock is 2. 278Mpa as this bending stress is 1.59 Mpa. It can be
concluded that there is no further break in the middle of block of 28.1m length.

a.2. TAKING MOMENTS ABOUT GOAF LINE:

       P x (33-3.7)             = 47 x [ 33- (4.9/2) ] + 897 [ 33/2 ]
       P x 29.3                 = 1435.85 + 14800.5
       P x 29.3                 = 16236.35
              P                 = 554 T

b. AT PERIODIC FALL:




       Weight of immediate Roof         Wi     = ei x 4.9 x ti x Sp
                                               = 1.56 x 4.9 x 4.13 x 1.5
                                               = 47 T

Weight of Periodic weight block         W1     = e1 x t1 x (17+4.9) x Sp
      (17m length)                             = 2.21 x 8.2 x 21.9 x 1.5
                                               = 595 T

b.1. TAKING MOMENTS ABOUT FACE LINE:

       Pxp           = Wi x [ 4.9 / 2 ] + W1 [ 4.9+17 / 2 ]
       P x 3.7       = 47 x [ 4.9 / 2 ] + 897 [ 21.9 / 2 ]
       P x 3.7       = 115.15 + 9822.15
              P      = 2686 T
This is momentary load and the over hang will touch the goaf waste after bleeding and
subsequent lowering of supports.
b.2. TAKING MOMENTS ABOUT GOAF LINE:

       P x [ (4.9+17) - 3.7 ]        = Wi x [ (4.9+17) - (4.9/2) ] + W1 [ (4.9+17)/2 ]
       P x [ (4.9+17) - 3.7 ]        = 47 x [ 21.9 - (4.9/2) ] + 595 [ 21.9/2 ]
       P x 18.2                      = 914.15 + 6515.25
       P x 18.2                      = 7429.4
               P                     = 408 T

4.4. SUMMARY OF ALL THE ABOVE CALCULATIONS:

 The following points can be drawn from above calculations.
      1. The main fall will occur after a retreat of about 66m for a face length of 150m
      2. The periodic fall will occur at an interval of 17m
      3. The required support resistance at the time of main fall is 554 t
      4. The required support resistance at the time of periodic fall is 408 t

       In view of the experience gained while working under settled goaf at JK-5 Incline
of SCCL and Jhanjra mine of ECL4, it is most likely that the capacity of support required
would be less compared to the calculations made treating the strata above as virgin.
Further work is in progress in this regard.

5. CONCLUSIONS:

   It is concluded that,

    No.2 seam that is lying 18-20m below the No.1 seam can be worked by Long wall
     method comfortably with better control of strata.

    For economic viability and conservation of coal it is essential that the extraction
     of II-seam is taken up though there are some difficulties in regard to low height
     working.

    Working of II-seam will be better in regard to strata control as the upper seam is
     distressed after liquidation of I-seam.

    In II-seam, Anchorage with resign capsules at the top of the hole can be done for
     immediate anchorage and avoid bed separation. Fore-poling bolts with cement
     capsules and W-straps in conjuction with linked wire mesh of 50mm x 50mm x
     8mm gauge should be used. In case of bed separation shot-create over the linked
     wire mesh should be rested. With this type of support development can be done
     below the goaf, which is the distressed zone.

    The support capacity of around 4 x 600 t is sufficient for easy working of the
     seam with Long wall technology with out keeping in-view the effects of
     distressed phenomena.
6. ACKNOWLEDGEMENT:

       The authors are grateful to the SCCL management for permitting to publish this
paper. The views expressed by the authors in this article are of their own and not
necessarily of the organization to which they belong.

7. REFERENCES:

       1. Prof. Qian Ming-gao, Prof. He Fulian – technical paper on “ The behaviour
          of the main roof in Long wall mining – weighting span, fracture and
          disturbance.
       2. Goutham Benarjee, Scientist & Head Long wall & Short wall Division,
          CMRI, Dhanbad – Report on possibility of working II-seam at GDK.10A
          Incline, Ramagundam.
       3. Peng.S - Long wall Strata Control.
       4. S.K.Varma, P.K.Mandol, S.Dasgupta, a paper on “ Fire at AW1 Long wall
          panel in 1&2 Incline, Jhanjra area, ECL an unique experience”, Journal of
          CMTM, pg.no.5 to 14,Vol.6, No.5 May, 2001,
       5. D.L.R.Prasad, M.S.Vanka Ramayya, a paper on “Sustainable Mining
          Technology- past, present and future of Long wall mining in Godavari valley
          coalfield, Andhra Pradesh”, National Symposium on “Sustainable Mining
          Technology: Present and Future”, conducted by Dept. of Mining, Anna
          University., pg.no.143 to 151, March 14-15, 2002,
       6. DBT Mining Engineers (2001), Double face system and Dual usage of gate
          roads, Paper on “The experiences of simultaneous working of two seams at
          Cayirhan (Turkey), Saar Brucken, Germany.

Weitere ähnliche Inhalte

Was ist angesagt?

Dynamic loading in the longwall face
Dynamic loading in the longwall faceDynamic loading in the longwall face
Dynamic loading in the longwall faceMD.Suresh Kumar
 
Study on properties of concrete with different levels of replacement of cemen...
Study on properties of concrete with different levels of replacement of cemen...Study on properties of concrete with different levels of replacement of cemen...
Study on properties of concrete with different levels of replacement of cemen...eSAT Journals
 
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ash
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly AshModified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ash
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ashijtsrd
 
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...AM Publications
 
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry Units
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry UnitsEvaluation of Mechanical Properties of Concrete Hollow Block Masonry Units
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry UnitsEditorIJAERD
 
Concrete mix design using copper slag as fine aggregate
Concrete mix design using copper slag as fine aggregateConcrete mix design using copper slag as fine aggregate
Concrete mix design using copper slag as fine aggregateIAEME Publication
 
An approach in evaluating of flexible pavement in permanent deformation of pa...
An approach in evaluating of flexible pavement in permanent deformation of pa...An approach in evaluating of flexible pavement in permanent deformation of pa...
An approach in evaluating of flexible pavement in permanent deformation of pa...Alexander Decker
 
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...IRJET Journal
 
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...IRJET Journal
 
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...irjes
 
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDY
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDYUSE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDY
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDYijiert bestjournal
 
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...IRJET Journal
 
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...IRJET Journal
 
IRJET- Comparitive Study of Different Types of Slags in Concrete
IRJET- Comparitive Study of Different Types of Slags in ConcreteIRJET- Comparitive Study of Different Types of Slags in Concrete
IRJET- Comparitive Study of Different Types of Slags in ConcreteIRJET Journal
 
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
IRJET-  	  Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...IRJET-  	  Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...IRJET Journal
 
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...IRJET Journal
 
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...IRJET Journal
 
Design of a portable hydraulic water borehole drilling rig
Design of a portable hydraulic water borehole drilling rigDesign of a portable hydraulic water borehole drilling rig
Design of a portable hydraulic water borehole drilling rigAlexander Decker
 

Was ist angesagt? (20)

Warm ROLLING of steels.pptx
Warm ROLLING of steels.pptxWarm ROLLING of steels.pptx
Warm ROLLING of steels.pptx
 
Dynamic loading in the longwall face
Dynamic loading in the longwall faceDynamic loading in the longwall face
Dynamic loading in the longwall face
 
Study on properties of concrete with different levels of replacement of cemen...
Study on properties of concrete with different levels of replacement of cemen...Study on properties of concrete with different levels of replacement of cemen...
Study on properties of concrete with different levels of replacement of cemen...
 
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ash
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly AshModified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ash
Modified Behaviour of Concrete by Replacing Fine Aggregates with Coal Fly Ash
 
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...
UTILIZATION OF COPPER SLAG AS A PARTIAL REPLACEMENT OF FINE AGGREGATE IN CONC...
 
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry Units
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry UnitsEvaluation of Mechanical Properties of Concrete Hollow Block Masonry Units
Evaluation of Mechanical Properties of Concrete Hollow Block Masonry Units
 
Concrete mix design using copper slag as fine aggregate
Concrete mix design using copper slag as fine aggregateConcrete mix design using copper slag as fine aggregate
Concrete mix design using copper slag as fine aggregate
 
An approach in evaluating of flexible pavement in permanent deformation of pa...
An approach in evaluating of flexible pavement in permanent deformation of pa...An approach in evaluating of flexible pavement in permanent deformation of pa...
An approach in evaluating of flexible pavement in permanent deformation of pa...
 
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...
IRJET- Experimental Study on Strength Improvement of Base Course of Flexible ...
 
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
 
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...
Comparative Study of Pre-Engineered and Conventional Steel Frames for Differe...
 
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDY
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDYUSE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDY
USE OF COPPER SLAG AS FINE AGGREGATE ‐ A CASE STUDY
 
Ijciet 06 08_001
Ijciet 06 08_001Ijciet 06 08_001
Ijciet 06 08_001
 
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...
IRJET-An Experimental Study on Effect of Partial Replacement of Normal Weight...
 
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...
IRJET- Effect of Relative Stiffness of Beam-Column Joint on Internal Forces i...
 
IRJET- Comparitive Study of Different Types of Slags in Concrete
IRJET- Comparitive Study of Different Types of Slags in ConcreteIRJET- Comparitive Study of Different Types of Slags in Concrete
IRJET- Comparitive Study of Different Types of Slags in Concrete
 
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
IRJET-  	  Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...IRJET-  	  Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
 
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...
IRJET-Study on the Mechanical Properties of Concrete by Replacement of Coal B...
 
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...
Effect of Partial Replacement of Sand by Iron Ore Tailings on the Compressive...
 
Design of a portable hydraulic water borehole drilling rig
Design of a portable hydraulic water borehole drilling rigDesign of a portable hydraulic water borehole drilling rig
Design of a portable hydraulic water borehole drilling rig
 

Ähnlich wie Design of Longwall for 2 seam of Ramagundam

Experience of working p8
Experience of working p8Experience of working p8
Experience of working p8MD.Suresh Kumar
 
Ug mine planning
Ug mine planningUg mine planning
Ug mine planningOgala Oscar
 
Gabion structures ppt
Gabion  structures pptGabion  structures ppt
Gabion structures pptswetass8
 
gabionppt-151104071437-lva1-app6892.pdf
gabionppt-151104071437-lva1-app6892.pdfgabionppt-151104071437-lva1-app6892.pdf
gabionppt-151104071437-lva1-app6892.pdfCscDigitalIndia1
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptxBenjaminSebastian10
 
Structural Properties of Laterite - Quarry Dust Cement Blocks
Structural Properties of Laterite - Quarry Dust Cement BlocksStructural Properties of Laterite - Quarry Dust Cement Blocks
Structural Properties of Laterite - Quarry Dust Cement BlocksQUESTJOURNAL
 
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfSupport system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfpraanyakishore
 
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...eSAT Publishing House
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall miningBoeut Sophea
 
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...ijsrd.com
 
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...IRJET Journal
 
Comparative study on compressive strength of normal mix and
Comparative study on compressive strength of normal mix andComparative study on compressive strength of normal mix and
Comparative study on compressive strength of normal mix andpradip patel
 

Ähnlich wie Design of Longwall for 2 seam of Ramagundam (20)

Experience of working p8
Experience of working p8Experience of working p8
Experience of working p8
 
Ug mine planning
Ug mine planningUg mine planning
Ug mine planning
 
Gabion structures ppt
Gabion  structures pptGabion  structures ppt
Gabion structures ppt
 
gabionppt-151104071437-lva1-app6892.pdf
gabionppt-151104071437-lva1-app6892.pdfgabionppt-151104071437-lva1-app6892.pdf
gabionppt-151104071437-lva1-app6892.pdf
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
68254fb9-e555-4275-91bd-16e4c9550bdc.pptx
 
Structural Properties of Laterite - Quarry Dust Cement Blocks
Structural Properties of Laterite - Quarry Dust Cement BlocksStructural Properties of Laterite - Quarry Dust Cement Blocks
Structural Properties of Laterite - Quarry Dust Cement Blocks
 
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdfSupport system (Underground Coal Mining) by Prof. S Jayantu.pdf
Support system (Underground Coal Mining) by Prof. S Jayantu.pdf
 
Ceramic Materials.ppt
Ceramic Materials.pptCeramic Materials.ppt
Ceramic Materials.ppt
 
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
Mechanical properties of heavy weight concrete using heavy weight coarse aggr...
 
270 .pdf
270 .pdf270 .pdf
270 .pdf
 
Gulshan rahangdale
Gulshan rahangdaleGulshan rahangdale
Gulshan rahangdale
 
Design of Auger highwall mining
Design of Auger highwall miningDesign of Auger highwall mining
Design of Auger highwall mining
 
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...
EXPERIMENTAL INVESTIGATION OF FERROCEMENT DEEP BEAMS WITH PARTIAL REPLACEMENT...
 
power point presentation in Abuja
power point presentation in Abujapower point presentation in Abuja
power point presentation in Abuja
 
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
EXPERIMENTAL STUDY ON REPLACING FINE AGGREGATE IN MORTAR WITH CONSTRUCTION AN...
 
Pillar design
Pillar designPillar design
Pillar design
 
Pillar design
Pillar designPillar design
Pillar design
 
Comparative study on compressive strength of normal mix and
Comparative study on compressive strength of normal mix andComparative study on compressive strength of normal mix and
Comparative study on compressive strength of normal mix and
 
R 20030113 Si2N2O ECERRS
R 20030113 Si2N2O ECERRSR 20030113 Si2N2O ECERRS
R 20030113 Si2N2O ECERRS
 

Mehr von VR M

Dragline Planning
Dragline PlanningDragline Planning
Dragline PlanningVR M
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialVR M
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling processVR M
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)VR M
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mineVR M
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01VR M
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)VR M
 
Haul road design
Haul road designHaul road design
Haul road designVR M
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design FundasVR M
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentalsVR M
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ RussiaVR M
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovationVR M
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineVR M
 
Top ten in world
Top ten in worldTop ten in world
Top ten in worldVR M
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining TechnologyVR M
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectVR M
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetmsVR M
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersVR M
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesVR M
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidenceVR M
 

Mehr von VR M (20)

Dragline Planning
Dragline PlanningDragline Planning
Dragline Planning
 
Spry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - TutorialSpry Scheduling and Haulage model - Tutorial
Spry Scheduling and Haulage model - Tutorial
 
Mine scheduling process
Mine scheduling processMine scheduling process
Mine scheduling process
 
Energy - India (11th Plan)
Energy - India (11th Plan)Energy - India (11th Plan)
Energy - India (11th Plan)
 
Methods of extraction in Opencast mine
Methods of extraction in Opencast mineMethods of extraction in Opencast mine
Methods of extraction in Opencast mine
 
Vulcan tutorial 01
Vulcan tutorial 01Vulcan tutorial 01
Vulcan tutorial 01
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
Haul road design
Haul road designHaul road design
Haul road design
 
Openpit Design Fundas
Openpit Design FundasOpenpit Design Fundas
Openpit Design Fundas
 
Openpit fundamentals
Openpit fundamentalsOpenpit fundamentals
Openpit fundamentals
 
Bolter miner @ Russia
Bolter miner @ RussiaBolter miner @ Russia
Bolter miner @ Russia
 
Longwall AFC changing - innovation
Longwall AFC changing - innovationLongwall AFC changing - innovation
Longwall AFC changing - innovation
 
Statutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mineStatutory clearances required to start a greenfield captive opencast coal mine
Statutory clearances required to start a greenfield captive opencast coal mine
 
Top ten in world
Top ten in worldTop ten in world
Top ten in world
 
Highwall Mining Technology
Highwall Mining TechnologyHighwall Mining Technology
Highwall Mining Technology
 
Legal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining projectLegal flow schemes for a greenfield mining project
Legal flow schemes for a greenfield mining project
 
Mine communication sysetms
Mine communication sysetmsMine communication sysetms
Mine communication sysetms
 
Mine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of PapersMine Tech Seminar '10 - Gist of Papers
Mine Tech Seminar '10 - Gist of Papers
 
Reduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal minesReduction of risk from roof and side fall in Indian coal mines
Reduction of risk from roof and side fall in Indian coal mines
 
goaves effect on subsidence
goaves effect on subsidencegoaves effect on subsidence
goaves effect on subsidence
 

Kürzlich hochgeladen

Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observabilityitnewsafrica
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...itnewsafrica
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Nikki Chapple
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesKari Kakkonen
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPathCommunity
 

Kürzlich hochgeladen (20)

Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security ObservabilityGlenn Lazarus- Why Your Observability Strategy Needs Security Observability
Glenn Lazarus- Why Your Observability Strategy Needs Security Observability
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...Abdul Kader Baba- Managing Cybersecurity Risks  and Compliance Requirements i...
Abdul Kader Baba- Managing Cybersecurity Risks and Compliance Requirements i...
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
Microsoft 365 Copilot: How to boost your productivity with AI – Part one: Ado...
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Testing tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examplesTesting tools and AI - ideas what to try with some tool examples
Testing tools and AI - ideas what to try with some tool examples
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
UiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to HeroUiPath Community: Communication Mining from Zero to Hero
UiPath Community: Communication Mining from Zero to Hero
 

Design of Longwall for 2 seam of Ramagundam

  • 1. M.S.VENKATA RAMAYYA* LOLLA SUDHAKAR** M.V.RAMANA RAO*** DESIGN OF LONG WALL PANEL – A CASE STUDY FOR NO.2 SEAM OF RAMAGUNDAM AREA, SCCL ABSTRACT: Singareni Collieries Company Limited (SCCL) is a jointly owned Coal Company by govt. of Andhra Pradesh and govt. of India. In view of its strategic location and being the only coal producing company in South India, SCCL has the onerous responsibility of catering to the coal requirements of consumers within the Godavari Valley. GDK.10A Incline is one of the most mechanized underground mines in SCCL. There are total 7 seams (No.1A, 1, 2, 3B, 3A, 3 & 4) present within the mine boundaries out of which No.1A & 3B are proved inconsistent. No.1 & 2 seams are considered for extraction from GDK.10A Incline and seam no.3& 4 are being worked by GDK.10. Incline. No.1 seam having 2 clay bands has been worked by Long wall technology. No.2 seam is 18-20m below No.1 seam, This seam was developed near the out crop and abandoned due to the presence of thick clay band. With the experience of working No.1 seam with two clay bands and development in scientific estimation of proper roof supports, the authors are of the opinion that the No.2 seam can be extracted by mechanized Long wall technology with an extraction height of 2.0m. The present paper explores the possibility of working No.2 seam of GDK.10A Incline with Long wall Technology by thorough study of Geo-technical data and Physico-mechanical properties of overlying roof rocks to estimate the caving and required support resistance. 1. INTRODUCTION: The Singareni Collieries Company Limited is operating 58 underground mines and 12 opencast mines catering to the needs of coal consumers in South India. SCCL has introduced suitable mechanization in mines wherever conditions favour to improve production capacity, productivity and percentage of extraction. GDK.10A Incline and GDK.10 Incline mines are the glittering examples of successful underground mines mechanization in SCCL. Long wall technology was introduced in No.1 seam of GDK.10A Incline in 1994. Since then six panels have been extracted with total output of 3.63 Million tones. * Dy.GM (5Group of Mines) ** Dy.Mgr (Project Planning) *** GME, No.5 Incline The Singareni Collieries Company Limited, Kothagudem –507119
  • 2. Blasting Gallery technology was introduced in No.3 seam of GDK.10 Incline in the year 1989. The project is considered as trendsetter in thick seam underground mining in India. No.3 seam lying below GDK.10A Incline property is being proposed for Blasting gallery. No.1 Seam is worked successfully by Long wall method even though it contains two clay bands. 2. EXPERIENCE OF WORKING NO.1 SEAM: No.1 seam in GDK.10A Incline of Ramagundam area block is intercalated with two distinct clay bands. These clay bands have restricted the development and extraction by Bord and Pillar where percentage of recovery was poor and created strata control problems. These seams have been developed by Road headers and extracted by Long wall for the past 8 years in GDK.10A Incline. Nearly 10Km of roadways have been developed and 3.5 Million tones of coal has been extracted. But for Long wall system this seam could not have been recovered much. Experience of development in top section, bottom section and extraction by Long wall and allowing both clay bands to fall in goaf is ensuring ‘E’ grade from the No.1 seam. With all this a definite procedure is established in dealing with Clay bands in No.1 seam and extraction of the same safely. 3. POSSIBILITY OF WORKING NO.2 SEAM: With the valuable experience gained while working No.1 seam. It is proposed to work No.2 seam with Long wall technology. In Ramagundam region of SCCL this No.2 seam is developed by Bord and Pillar in the past with heights as low as 1.5m to 2.0m in GDK.3 Incline, GDK.2A Incline and GDK.5A Incline. In GDK.6B Incline this 2 seam is being worked presently. In opencast mines, it is in completely worked. Presently seams thinner than 1.5m are worked in OC mines and in underground mines they are declared non-vendible5, since they are not workable, by the preset mining methods. This concept should be changed and all the thin seams of good quality have to be exploited. UK/Germany/Poland which had no reserves in thick seam have developed/ worked Long wall in thin seams to sustain their coal mining industry at the fag end of their reserves. Double face system and dual usage of gate roadways for simultaneous working of two contiguous seams/thick seam with clay band in middle section of the seam can be adopted with German Collaboration6. The main problem in the working of No.2 seam is presence of clay band, which created strata control and quality related problems. No.1 seam of GDK.10A Incline is developed in top section with 1.0m clay band and the gate roadways are driven in bottom section leaving 0.3 to 0.5m coal against the clay. This in turn supported by roof bolting. Roof support was initially difficult but after studies conducted by scientific agencies, roof support was designed and is well established now. Keeping in view the extent of II-seam efforts were put in for the development of No.2 seam. The studies conducted on the boreholes drilled from GDK.10A Incline revealed the following.
  • 3. 1. Bore hole No.1038 drilled from surface for shaft sinking. This borehole seam section shows that No.2 seam can be developed along stone floor with an height 1.8-2.0m. The grade of coal would be ‘D’ grade. 2. Bore holes (2 No.s) have been drilled from No.1 seam floor to No.II seam floor at 35L/3D & 40L/2D. The borehole section and Lithology shows that No.2 seam can be comfortably developed along floor with a height of 2.0m. 3. Further No.2 seam is being developed from 48L X-cut by drivage of level tunnel. The seam section of various boreholes in deep shaft block indicate its workability with a height of extraction 2.0m with low ‘D’ grade. Internal studies conducted and proposals made by various scientific agencies suggested extraction of II-seam by Long wall. No.II Seam was finally considered to be worked with only Long wall technology2. 4. DESIGN OF LONG WALL PANEL IN NO.2 SEAM: For proper understanding of caving behaviour an estimation was made basing on the Plate theory of failure proposed by Prof. Qian Ming-gao and Prof. He Fulian, China. TABLE.1 PHYSICO-MECHANICAL PROPERTIES OF ROOF ROCK BH NO.637 Depth from BoreHole Thickness Density Tensile Str. Youngs Mod Surface(m) 637 (m) (gr/cc) (kg/sq.cm) x105(Kg/sq.cm) 163.4 0.1 1.4 164.57 1.17 2.12 15.92 0.23 10.43 2.12 17.07 0.35 175 8.2 2.21 25.31 0.41 183.2 4.13 1.56 36.72 187.53 IMM 2 1.4 23.93 189.33
  • 4. TABLE.2 BORE HOLE LITHOLOGY BHNO.637 Depth from BoreHole Thickn Lithology Bulking Bulk-up Cumu. Cumu. Surface(m) 637 (m) Factor(m) Height Bulk-up Ht. Thickn 163.4 0.1 Coal 164.57 1.17 Carb sandy Shale 1.4 1.638 Grey Sandstone 10.43 (Medium - 1.15 11.9945 27.04 24.76 Grained) 175 8.2 Grey Sandstone 1.13 9.266 15.048 14.33 (Fine &Medium - 183.2 Grained) 4.13 Shaly Coal 1.4 5.782 5.782 6.13 187.53 IMM 2 COAL 2 189.33 Working Sec. REMARKS : Caving Height = 14.33m Working Sec. = 2.0m Immediate Roof = 4.13m ( Which caves in as the supports are advanced) SSt which is expected to cave = 8.2m 4.1. CALCULATION FOR FIRST FALL DISTANCE FOR A FACE LENGTH OF 150 m: 1. Vertical Pressure (Pv) = e1 x t1 + e’ x H Where, e1 – Density of bed which is expected to cave. t1 - thickness of bed which is expected to cave e’ – Density of the bed which is lying above the expected cavable bed H – Depth upto the bed. Pv = 2.21 x 8.2*+ 2.12 x 175 = 389.122 t/sq.m (* from Table.2) = 3.89 Mpa
  • 5. 2. m : Virgin Horizontal Stress: = 175/d + 0.3 = 175/183.2+0.3 = 1.255 3. Horizontal Stress on (σh) = m x Pv = 1.255 x 3.89 = 4.881 Mpa 4. Weight per Unit Thickness of Beds w = e1 x t1 = 2.21 x 8.2 w = 18.122 t/sq.m 5. Instiu Tensile Strength σt = 0.9 x 2.531 = 2.278 Mpa BY TRAIL ERROR PROCESS… a) Let a= 66m b=150m t = Thickness of Sandstone expected to cave in m = 8.2 m (from Table.2) a/b = 0.44 f(a/b) = 0.01991 Bending Stress (σ’) = f(a/b) x w x 1502 x 6 / t2 = 0.0199 x 18.122 x 1502x 6 / (8.2) 2 = 726.2t/sq.m. = 7.262 Mpa σt = σ’ – σh = 7.262 – 4.881 = 2.385 Mpa The tensile Strength of the Rock is 2.278Mpa. Hence it can be concluded the first fall will occur after a retreat of 66m. 4.2. PERIODIC FALL : Thickness of Bed1 (t1) = 8.2m Tensile strength σt = 2.278 Mpa Density e1 = 2.21 t/sq.m. Acceleration due to gravity(g)= 9.81 m/sec2 L12 = t1 x σt / 3 x e1 x g = 8.2 x 2.278 x 103 / 3 x 2.21 x 9.81 L1 = 17 m
  • 6. 4.3. ESTIMATION OF RESISTANCE REQUIRED: a. AT MAIN FALL: Weight of immediate Roof Wi = ei x 4.9 x ti x Sp = 1.56 x 4.9 x 4.13 x 1.5 = 47 T Weight of bed 1 W1 = e1 x t1 x 33 x Sp = 2.21 x 8.2 x 33 x 1.5 = 897 T a.1. TAKING MOMENTS ABOUT FACE LINE: Pxp = Wi x [4.9/2] + W1 [33/2] P x 3.7 = 47 x [4.9/2] + 897 [33/2] P x 3.7 = 115.15 + 14800.5 P = 4031 T This is very momentary (just at the moment of break of main bed). There will be bleeding of supports and the 33m of block will rotate about face line and will touch goaf waste. This overhang of 33m can be treated as simply supported beam with one end on goaf and the other end on rear of support with a length of (33-4.9) = 28.1 ________________________________ |-----------------------------------------------| 28.1m = e1 t1 x 1.5 = 2.21 x 8.2 x 1.5 W = 27 t/m Maximum Bending movement = W l2 /8 B.M. = 27 x (28.1)2 /8 = 2665 tm M = f ----- ----- I y
  • 7. F = (M / I) y = B.M. x 6 / Sp x t12 = 2665 x 6 / 1.5 x (8.2)2 = 158.53 t/sq.m. = 1.59 Mpa. The tensile strength of rock is 2. 278Mpa as this bending stress is 1.59 Mpa. It can be concluded that there is no further break in the middle of block of 28.1m length. a.2. TAKING MOMENTS ABOUT GOAF LINE: P x (33-3.7) = 47 x [ 33- (4.9/2) ] + 897 [ 33/2 ] P x 29.3 = 1435.85 + 14800.5 P x 29.3 = 16236.35 P = 554 T b. AT PERIODIC FALL: Weight of immediate Roof Wi = ei x 4.9 x ti x Sp = 1.56 x 4.9 x 4.13 x 1.5 = 47 T Weight of Periodic weight block W1 = e1 x t1 x (17+4.9) x Sp (17m length) = 2.21 x 8.2 x 21.9 x 1.5 = 595 T b.1. TAKING MOMENTS ABOUT FACE LINE: Pxp = Wi x [ 4.9 / 2 ] + W1 [ 4.9+17 / 2 ] P x 3.7 = 47 x [ 4.9 / 2 ] + 897 [ 21.9 / 2 ] P x 3.7 = 115.15 + 9822.15 P = 2686 T This is momentary load and the over hang will touch the goaf waste after bleeding and subsequent lowering of supports.
  • 8. b.2. TAKING MOMENTS ABOUT GOAF LINE: P x [ (4.9+17) - 3.7 ] = Wi x [ (4.9+17) - (4.9/2) ] + W1 [ (4.9+17)/2 ] P x [ (4.9+17) - 3.7 ] = 47 x [ 21.9 - (4.9/2) ] + 595 [ 21.9/2 ] P x 18.2 = 914.15 + 6515.25 P x 18.2 = 7429.4 P = 408 T 4.4. SUMMARY OF ALL THE ABOVE CALCULATIONS: The following points can be drawn from above calculations. 1. The main fall will occur after a retreat of about 66m for a face length of 150m 2. The periodic fall will occur at an interval of 17m 3. The required support resistance at the time of main fall is 554 t 4. The required support resistance at the time of periodic fall is 408 t In view of the experience gained while working under settled goaf at JK-5 Incline of SCCL and Jhanjra mine of ECL4, it is most likely that the capacity of support required would be less compared to the calculations made treating the strata above as virgin. Further work is in progress in this regard. 5. CONCLUSIONS: It is concluded that,  No.2 seam that is lying 18-20m below the No.1 seam can be worked by Long wall method comfortably with better control of strata.  For economic viability and conservation of coal it is essential that the extraction of II-seam is taken up though there are some difficulties in regard to low height working.  Working of II-seam will be better in regard to strata control as the upper seam is distressed after liquidation of I-seam.  In II-seam, Anchorage with resign capsules at the top of the hole can be done for immediate anchorage and avoid bed separation. Fore-poling bolts with cement capsules and W-straps in conjuction with linked wire mesh of 50mm x 50mm x 8mm gauge should be used. In case of bed separation shot-create over the linked wire mesh should be rested. With this type of support development can be done below the goaf, which is the distressed zone.  The support capacity of around 4 x 600 t is sufficient for easy working of the seam with Long wall technology with out keeping in-view the effects of distressed phenomena.
  • 9. 6. ACKNOWLEDGEMENT: The authors are grateful to the SCCL management for permitting to publish this paper. The views expressed by the authors in this article are of their own and not necessarily of the organization to which they belong. 7. REFERENCES: 1. Prof. Qian Ming-gao, Prof. He Fulian – technical paper on “ The behaviour of the main roof in Long wall mining – weighting span, fracture and disturbance. 2. Goutham Benarjee, Scientist & Head Long wall & Short wall Division, CMRI, Dhanbad – Report on possibility of working II-seam at GDK.10A Incline, Ramagundam. 3. Peng.S - Long wall Strata Control. 4. S.K.Varma, P.K.Mandol, S.Dasgupta, a paper on “ Fire at AW1 Long wall panel in 1&2 Incline, Jhanjra area, ECL an unique experience”, Journal of CMTM, pg.no.5 to 14,Vol.6, No.5 May, 2001, 5. D.L.R.Prasad, M.S.Vanka Ramayya, a paper on “Sustainable Mining Technology- past, present and future of Long wall mining in Godavari valley coalfield, Andhra Pradesh”, National Symposium on “Sustainable Mining Technology: Present and Future”, conducted by Dept. of Mining, Anna University., pg.no.143 to 151, March 14-15, 2002, 6. DBT Mining Engineers (2001), Double face system and Dual usage of gate roads, Paper on “The experiences of simultaneous working of two seams at Cayirhan (Turkey), Saar Brucken, Germany.