The document provides an overview of SAP Plant Maintenance (SAP PM) including:
1) It discusses the organizational structure for maintenance planning including centralized vs decentralized structures.
2) It outlines the key master data used in SAP PM such as technical objects, work centers, maintenance plans, and tasks lists.
3) It describes some of the main maintenance processing scenarios in SAP PM like maintenance notifications, maintenance orders, and preventative maintenance planning.
How AI, OpenAI, and ChatGPT impact business and software.
SAP Plant Maintenance Overview
1. SAP Plant Maintenance
Presentation By:
Mr. Subhrajyoti Bhattacharjee
B.E., P.G.D.M., PMP®, Certified SAP PM Solution
Consultant
2. Brief Background of Presenter
Subhra works as SAP Systems Analyst at Iluka
Resources Limited, Perth, Western Australia
He has a Net experience of around 7.8 years with around
6 years of SAP Consulting Experience in SAP PM &
CS, MM modules. He has also has standard configuration
knowledge of SAP PS, DMS and integration aspects of
other SAP modules & applications
He has worked in multiple SAP
Implementation, Upgrade, Support & Audit assignments in
Australia, USA, India and Middle East and is an ex-
employee of PwC India Ltd, T.C.S. Limited
He also possesses Core Industry experience of 1.8 years
in Maintenance & Inbound Logistics
3. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
4. Government
& Authorities
Vendors Organization Customers
Environment
5. External
Vendors
Environment
Organizational ERP
System
Finance &
Controllin
g
Purchasin
Projects
g
Productio
n
Planning
HR &
Payroll
Sales &
Distributio
Maintena n
nce
Government & Customers
Authorities
6. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
7. Maintenance is a Support Function within an Organization and Maintenance
costs generally constitute a part of Production overhead costs except when
Maintenance is carried out on Customer Assets to earn revenue.
Primary Objective of Maintenance is to maintain a high level of
Availability, preventing degeneration and maintaining optimal utilization life of an
Organization’s Physical Assets.
Physical Assets primarily comprise:
Fixed assets such as Plant & Machinery, Buildings & Properties, Vehicles and
so on. Usually such assets have a Long useful life (usually > 1 year) over which
they are depreciated
Operating Assets which may not be treated as Assets in Financial Module nor
depreciated, but having a long term utilization
High valued current assets such as High valued spares/operating
supplies/machine parts which are subject to Refurbishments with their condition
based values maintained accurately
Key Performance objectives in Maintenance include
Maintaining a high level of OEE (Overall Equipment Effectiveness)
Maintaining and Optimal balance between Cost of Breakdown vs. Cost of
Prevention
Utilizing concepts such as TPM, RCM etc. to contribute in Lowering Operating
costs and minimize adverse effects on Equipment ,Operating resources and
8. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
10. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
11. Technical
Objects
SAP
Work PM: Planning
Centres Master Objects
Data
Others
12. Work
Centre Work Centre Hierarchy is a
Hierarch Grouping of Work centres
y comprising Maintenance Task
Force
Work
Capacity
Centre
Capacity
information
includes: PM Work Centre
Category “0005”
Comprises: Basic
data, Default
values, Capacity
Unit of capacity view, Scheduling
Start/End times view, HR
Assignments, Costing
Utilizations view
Shift schedules etc.
15. Functional Locations Structured into Hierarchical
Levels using Structure
Indicators
Equipment Serial Number
Sub Equipment Material No
Equipment Bill of Material
Component material parts
16.
17. Plan
Top Down Bottom up
planning planning
Task List
Maintenance item
18. • Single cycle Plans
• Strategy Based Plans
Plans • Counter Based Plans (Single/Multi Counter)
• General Task Lists
• Functional Location Task Lists
Task Lists • Equipment Task Lists
• Standard items
• Strategy based items
Items
19. Other Master
Data
Measuring
Points/Counters
Class/
Characteristi
cs
Permits
20. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
21. Maintenance Notifications vs. Maintenance
Orders
Maintenance Maintenance Orders
Notifications are are a complete record
Reporting objects to of:
record: Operations performed
Maintenance requirement Components used
Cause, Object (Stock/Non stock)
Impacted, Tasks due & Services hired
Activities Performed Time and costs posted
Types: Maintenance
Settlements executed
Request, Malfunction
(Breakdown) Types: Breakdown
Report, Activity Orders, Planned
Report, Service Orders, Predictive
Notifications Orders, Calibrations
Orders, Refurbishment
Maintenance Notifications
Orders, Capital Work
22.
23.
24. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Advanced scenarios, Interfaces & Reports
25.
26. Master Data
Functional Material Work center
Equipment
Location (Stock parts) (PM & PP)
Production personnel Permits (If Activity Service
follows up on work done
against existing
applicable) Type Master record
Notification
Yes
Further work done is
recorded in
SAP Notification mail to
Existing Notification Notification&
initiator of work
(Report IW29)? Notification Tasks
Technically completed
No
No
SAP Notification mail to Notification user PM Oredr
Maintenance designated Person status changed to Planning done
Equipment breaks Convert to PM Order (Type
Notification (Type responsible in Yes ALWD and (Operation,
down Order? PM01) created
“M2”) created Notification header notification Components,
released Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
purchase Purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated converted to created within Yes
part planned?
PM order Purchase order PM order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center)
Approved
Service acceptance Purchase
purchase
throughService entry requisition Is Extenal Is further planning
requisitions
sheet against Service PO created within service required?
converted to
posts costs to associated PM order planned?
Purchase order
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Malfunction end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
27. Master Data
Functional Material Work center Service
Equipment
Location (Stock parts) (PM & PP) Master record
Counter (For
Permits (If Activity Maintenance Maintenance
counter based
applicable) Type Task List Plan
plans)
Measurement Planned Due
document posting dates for order
for Counter Based creation are set in
plans system
Orders generated
Maintenance Plan Scheduling overview for the periodare
Maintenance plan Is next call object – Preventive
created (Single report generated by planned further
Maintenance Task
cycle/Strategy
scheduled Maintenance Order Yes Maintenance order maintenance
List created (Background job/ due? (Type”PM02") (Operation,
based/Counter personnel on a Components,
Manual) generated
based) periodic basis Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center) Approved
Service acceptance purchase Purchase
throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Start/end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
28. Master Data
Functional Material Work center Service
Equipment
Location (Stock parts) (PM & PP) Master record
Counter (For
Permits (If Activity Maintenance Maintenance
counter based
applicable) Type Task List Plan
plans)
Measurement Planned Due
document posting dates for order
for Counter Based creation are set in
plans system
Maintenance Task Maintenance Plan Scheduling overview Calibration Orders auto
Maintenance plan Is next call object – Preventive
List created created (Single report generated by generated and released
(Inspection point cycle/Strategy
scheduled Maintenance Order Yes Maintenance order maintenance (Operation,
(Background job/ due? (Type”PM02")
300, MIC’s based/Counter personnel on a Components, Service,
Manual) generated
entered) based) periodic basis Permits)
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Shop papers
printed from
PM order
Approved purchase Purchase
requisitions converted to requisition created Quality Inspection Lot
Is stock part Is Stock part
Purchase order (MM side) No Yes Generated
available? planned?
Order settled to relevant No
settlement receiver (Quality
Cost Center) Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
No Yes
Result recording done Approved
against Inspection Lot, Order Service acceptance purchase Purchase
Technically completed throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Time confirmation
for Internal
Settlement rule set in Is Maintenance
Manhours with Yes No
Calibration order work completed?
suitable Activity
Type In SAP
Outside SAP
29. Master Data
Functional Material Work center
Equipment
Location (Stock parts) (PM & PP)
Permits (If Activity Service
Requestor checks on work
progress
applicable) Type Master record
Yes
Work detailed in
SAP Notification mail to
Notification and Tasks
Existing Notification initiator of work
Technically completed
(Report IW29)?
No
No
Notification user PM Oredr
Scope for correction/ Maintenance SAP Notification mail to
status changed to Planning done
predictive maintenance Notification (Type designated Person Convert to PM Order (Type
Yes ALWD and (Operation,
identified by Operator/ “M1” Maintenance responsible in Order? PM01) created
notification Components,
Maintenance person request) created Notification header
released Service, Permits)
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase
requisitions converted to requisition created Order user status Assigned permits if
Is stock part Is Stock part
Purchase order (MM side) No Yes changed to PLND any are issued by
available? planned?
and order released relevant personnel
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
Order settled to relevant No Yes
settlement receiver (Cost
Center)
Approved
Service acceptance purchase Purchase
throughService entry requisitions requisition Is Extenal Is further planning
sheet against Service PO converted to created within service required?
posts costs to associated Purchase order PM order planned?
PM order
No
Production
Settlement rule defined in User status of
personnel to Time confirmation
order & Order Technically Maintenance order
confirm Order for Manhours with Is Maintenance
completed with details of changed to MTCO – Yes No
completion by suitable Activity work completed?
Start/ end date/time Completed by
changing user Type
status to PRCO
Maintenance In SAP
Outside SAP
30. Master Data
Asset Master –
Functional Material Work center
AuC/FxA (As
Location (Stock parts) (PM & PP)
relevant)
Permits (If Activity Service Equipment
applicable) Type Master record (Associated to
FxA)
Asset under Maintenance Team Functional Location (for asset
construction created intimated on the AuC build up created) as reference
New Asset buildup
by Business SAP Number Technical object
Finance Team
Capital work –
New asset build up
or Enhancement
Order Planning
Capital work Order (Type done (Operation,
Existing Equipment No (with
“PM06”) created – with Components,
Asset Enhancement assigned Fixed asset) would
relevant Maintenance Service, Permits),
be identified
Activity type assigned Settlement rule
defined
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Yes
Stock part
Functional Location Structure Approved purchase Purchase
requisitions converted to requisition created Is stock part Assigned permits if
completed with assigned No Is Stock part Capital order
Purchase order (MM side) available? Yes any are issued by
Equipment tagged to FxA planned? released
relevant personnel
number
No
Approved
Purchase
purchase
Maintenance Team Goods receipt against PO requisition
intimated on the FxA
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
Number PM order PM order
Purchase order
Y
No Yes
Approved
Service acceptance Purchase
In case of Asset buildup work, purchase
throughService entry requisition Is Extenal Is further planning
Finance finally settles AuC to requisitions
sheet against Service PO created within Yes service required?
a FxA ( created) converted to
posts costs to associated PM order planned?
Purchase order
PM order
No
Time confirmation
On completion of work Order Periodic settlement
for Manhours with Is Maintenance
Technically completed with executed to relevant Yes No
suitable Activity work completed?
necessary details receiver (AuC/FxA)
Type
In SAP
Outside SAP
31. Master Data
Ref. Material (with PM Work center
valuation types Serial
Equipment (For Internal
C1, C2, C3) Number Refurbishment)
Batch Numbers for C1, Asset No
Service Activity
C2, C3 states of Ref (Tagged to
material Master record Type
Equipment ID)
Refurbishment order type Order Planning done
“PM04" created for Material (Operation – Internal or
Need for Refurbishment
No, to convert from C3 - External Services, Additional
identified
Damaged to C2 - Components if any),
Refurbished state Settlement rule defined
Shop papers
printed from
PM order
Goods receipt to Storage Issue stock part to Reservation No
location assigned to PM Order
Stock part Yes
Approved purchase Purchase Additional
requisitions converted to requisition created Damaged Material part
Available in Stock parts Order released
Purchase order (MM side) No Yes (valuation type C3) issued to
stock? required/
reservation no. in order
planned?
No
Approved
Purchase
purchase
Goods receipt against PO requisition
requisitions Is Non – stock
posts costs to associated created within Yes
converted to part planned?
PM order PM order
Purchase order
Y
No Yes
Approved
Service acceptance Purchase
Settlement executed to settle purchase Is Extenal
throughService entry requisition Is further planning
order costs (As per business requisitions Refurbishment
sheet against Service PO created within required?
requirement to FxA) converted to service
posts costs to associated PM order
Purchase order planned?
PM order
No
Time confirmation
for Manhours with
On completion of work Order Goods receipt of
suitable Activity Is Maintenance
Technically completed with Refurbished part (val. Type Yes No
Type – In case of work completed?
necessary details “C2") to store
internal manhour
consumed
In SAP
Outside SAP
32. ERP Systems: An Overview
Plant Maintenance: An Overview
Organizational Structure
Master Data in SAP PM
Maintenance Processing: Objects
Maintenance Processing: Scenarios
Integrations, Advanced scenarios, Interfaces & Reports
33. Plant Maintenance Controlling
QM Master Employe
Equipments e
Sender Cost Activity
Functional Planned
Notification PM Work Center Types
Location Rates /hr
Financial Center
Accounting Receiver
Cost Center
Maintenance Order
G/L Fixed Equipment Plan Header
Account Asset Material Management
Operation
- Internal
Shutdown Operation
– Services Service Master
PP Work BOM Spares Compone
Center - nt
Machine Material Master
Costs
34. PM - Customer Service Scenarios
PM - Work Clearance Management
PM – Fleet Management
PM – Mobile Asset Management
** PM – Project Oriented Maintenance
** PM – Linear Asset Management
** PM – Rotables Subcontracting
** PM – Inspection Rounds
** PM – Take over- Hand over of Equipments
** Functionalities available only in ECC 6.0 and in specific EHP versions
35. SCADA SAP
BW
SAP Plant Maintenance
Others
SAP MI