PRESENTATION ON
“FORMWORK”
CONSTRUCTION
TECHNIQUES
BY
K.SNEHA
ROlL NO: 131564
M.Tech 1st year
What is Formwork?
o It should be capable of carrying all imposed dead and live loads
apart from its own weight.
o Formwork is a mould including all supporting structures, used to
shape and support the concrete until it attains sufficient strength to
carry its own weight.
Formwork is commonly made of
o Steel
o Timber
TIMBER FORMWORK
STEEL FORMWORK
 Formwork has been in use since the beginning of concrete
construction.
 New materials such as steel, plastics and fibreglass are used in
formwork.
 Greater attention is being given to the design, fabrication,
erection and dismantling of formwork
 Formwork is designed according to The ACI document SP-4.
Qualities of Formwork
 It should be water tight.
 It should be strong.
 It can be reusable.
 Its contact surface should be uniform.
 It should be according to the size of member.
• In order to successfully carry out
its function, formwork must achieve
a balance of following requirements:
• Containment
• Strength
• Resistance To Leakage
• Accuracy
• Ease Of Handling
• Finish And Reuse Potential
• Access For Concrete
• Economy
• Containment: formwork must be capable of shaping and
supporting the fluid concrete until it cures.
• Strength: formwork must be capable of safely withstanding
without distortion or danger the dead weight of the fluid
concrete is placed on it, labour weight, equipment weight and
any environmental loadings.
• Ease of Handling: form panels and units should be designed
so that their maximum size does not exceed that which can be
easily handled by hand or mechanical means.
– In addition all formwork must also be designed and
constructed to include facilities for adjustments, levelling,
easing and striking without damage to the form work or
concrete.
• Economy: all the formwork is very expensive. On average about 35%
of the total cost of any finished concrete unit or element can be
attributed to its formwork; of this just over 40% can be taken for
material for formwork and 60% for labour.
– The formwork designer must therefore not only consider the
maximum number of times that any form can be reused, but also
produce a design that will minimize the time taken for erection and
striking.
Major objectives considered
in formwork:
 Quality
 Safety
 Economy
 Quality:
Forms must be designed and built with sufficient stiffness and accuracy so that
the size, shape, position, and finish of the cast concrete are maintained.
Safety:
Forms must be built sufficient strength and factor of safety so that they have
the capable of all supporting loads.
 Economy:
Forms must be built efficiently, minimizing time and cost.
Requirements of
formwork: Material should be cheap and re usable,
 It should be practically water proof, so that it should not
absorb water from concrete,
 Swelling and shrinkage should be minimum,
 Strong enough to with stand all external loads,
 Deflection should be minimum,
 Surface should be smooth, and afford easy striping,
 Light in weight, so that easy to transfer,
 Joints should be stiff, so that lateral deformation and leak is
minimum .
Three stages in the process :
a) Assembly and erection .
b) Concrete placement.
c) Stripping and dismantling.
• Formwork detail for different
structural members
In concrete construction formwork is
commonly provided for the following structural
members.
o Wall
o Column
o Slabs & Beams
o Stairs
o Chimneys
o Water tanks
o Cooling Towers
• Formwork for Wall
 It consists of
• Timber sheeting
• Vertical posts
• Horizontal members
• Rackers
• Stakes
• Wedges
 After completing one side of
formwork reinforcement is
provided at the place then the
second side formwork is
provided.
• Formwork for Column
• It consists of the following
– Side & End Planks
– Yoke
– Nut & Bolts
• Two end & two side planks
are joined by the yokes and
bolts.
• Formwork for columns
• Formwork for Slabs & beams:• It consists of
– Sole plates
– Wedges
– Props
– Head tree
– Planks
– Batten
– Ledgers
• Beam formwork rests
on head tree
• Slab form work rests on
battens and joists
• If prop height are more
than 8’ provide
horizontal braces.
• Lintel or Beam Formwork:
• FORMWORK FOR SLAB:
• FORMWORK FOR STAIRS:
• It consists of
– Vertical & inclined
posts
– Inclined members
-- Wooden Planks or
sheeting
– Stringer
– Riser Planks
• FORMWORK FOR STAIRS:
• FORMWORK FOR SPIRAL STAIRS :
• FORMWORK FOR CHIMNEYS:
For tall chimneys two types of forms
techniques are in generally use in our country
a) Jump form
b) Slip form
• Removal of formwork:
 Time of formwork removal depends on the following factors
1. Type of Cement
1. Rapid hardening cements require lesser time as compared to OPC
(Ordinary Portland Cement)
2. Ratio of concrete mix
1. Rich ratio concrete gain strength earlier as compared to weak
ratio concrete.
3. Weather condition
1. Hydration process accelerates in hot weather conditions as
compared to cold and humid weather conditions.
Time of Removal of formwork:
• First free end's support
should be removed.
• And then from right to left it
should be proceed.
• If we are removing from the
mid span then it will act as a
prop cantilever.
Cantilever slab
• In simply supported we
have to remove the
support from the mid
span to the ends.
• To meet the design
behavior.
Simply supported slab
• Maintenance of formwork:
• Due to continuous use wooden planks & steel plates
surfaces become uneven and require maintenance.
• For wooden formwork use cardboard or plastic fiber
board. Bolt hole places must also be repaired.
• For steel formwork plates must be leveled by mallet
and loose corners must be welded.
• Cost of formwork
 For normal works cost of formwork is about 30%-40% of the concrete cost.
 For special works cost of formwork is about 50%-60% of the concrete cost.
 Formwork cost is controlled by the following factors
• Formwork Material cost
• Formwork erecting cost
• Formwork removal cost
• Formwork jointing cost (Nails and Cables)
• Labor charges.
• Advantages of steel form work:
 It can be used for a no. of times.
 It is non absorbent.
 Smooth finish surface obtained.
 No shrinkage of formwork occurs.
 Easy to use.
 Its volume is less
 Its strength is more.
• LOADS ON FORMWORK:
• Dead load
 Self weight of formwork
 Pressure and loads from fresh concrete
 Reinforcement
• Imposed load
 Construction workers
 Stacking of materials
• Horizontal loads
• Environmental loads
 Accidental loads
 Wind loads
• References
• R.C.C Design by B.C.Punmia
• R.C.C Design by H.J.Shah
• Formwork Design Section 1500
• Doka Formwork Design
• Design of safe timber structures by Eva
and Tomi Torrati
Thank you
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Formwork
FormworkFormwork
Formwork
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction Technology
 
About mivan technology
About mivan technologyAbout mivan technology
About mivan technology
 
GUNITING
GUNITINGGUNITING
GUNITING
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
SCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNINGSCAFFOLDING SHORING & UNDERPINNING
SCAFFOLDING SHORING & UNDERPINNING
 
Buildng construction report
Buildng construction reportBuildng construction report
Buildng construction report
 
Shoring
ShoringShoring
Shoring
 
Diaphragm Wall
 Diaphragm Wall Diaphragm Wall
Diaphragm Wall
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Shuttering (Formwork)
Shuttering (Formwork)Shuttering (Formwork)
Shuttering (Formwork)
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Maintenance of concrete structures
Maintenance of concrete structuresMaintenance of concrete structures
Maintenance of concrete structures
 
Top down construction presentation
Top down construction presentationTop down construction presentation
Top down construction presentation
 

Ähnlich wie Formwork

formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
FaizanSolanki
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
kuldeep361335
 

Ähnlich wie Formwork (20)

Formwork
FormworkFormwork
Formwork
 
FORMWORK.pptx
FORMWORK.pptxFORMWORK.pptx
FORMWORK.pptx
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Formwork
FormworkFormwork
Formwork
 
FormWork
FormWork FormWork
FormWork
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
Gurme santoshkumar
Gurme santoshkumarGurme santoshkumar
Gurme santoshkumar
 
Formwork
FormworkFormwork
Formwork
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
8-formworksandscaffoldings-120525181221-phpapp02 (1).pdf
 
Form Work
Form Work Form Work
Form Work
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
 
formwork.pdf
formwork.pdfformwork.pdf
formwork.pdf
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 

Kürzlich hochgeladen

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Kürzlich hochgeladen (20)

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Formwork

  • 2. What is Formwork? o It should be capable of carrying all imposed dead and live loads apart from its own weight. o Formwork is a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight. Formwork is commonly made of o Steel o Timber
  • 5.  Formwork has been in use since the beginning of concrete construction.  New materials such as steel, plastics and fibreglass are used in formwork.  Greater attention is being given to the design, fabrication, erection and dismantling of formwork  Formwork is designed according to The ACI document SP-4.
  • 6. Qualities of Formwork  It should be water tight.  It should be strong.  It can be reusable.  Its contact surface should be uniform.  It should be according to the size of member.
  • 7. • In order to successfully carry out its function, formwork must achieve a balance of following requirements: • Containment • Strength • Resistance To Leakage • Accuracy • Ease Of Handling • Finish And Reuse Potential • Access For Concrete • Economy
  • 8. • Containment: formwork must be capable of shaping and supporting the fluid concrete until it cures. • Strength: formwork must be capable of safely withstanding without distortion or danger the dead weight of the fluid concrete is placed on it, labour weight, equipment weight and any environmental loadings.
  • 9. • Ease of Handling: form panels and units should be designed so that their maximum size does not exceed that which can be easily handled by hand or mechanical means. – In addition all formwork must also be designed and constructed to include facilities for adjustments, levelling, easing and striking without damage to the form work or concrete.
  • 10. • Economy: all the formwork is very expensive. On average about 35% of the total cost of any finished concrete unit or element can be attributed to its formwork; of this just over 40% can be taken for material for formwork and 60% for labour. – The formwork designer must therefore not only consider the maximum number of times that any form can be reused, but also produce a design that will minimize the time taken for erection and striking.
  • 11. Major objectives considered in formwork:  Quality  Safety  Economy
  • 12.  Quality: Forms must be designed and built with sufficient stiffness and accuracy so that the size, shape, position, and finish of the cast concrete are maintained. Safety: Forms must be built sufficient strength and factor of safety so that they have the capable of all supporting loads.  Economy: Forms must be built efficiently, minimizing time and cost.
  • 13. Requirements of formwork: Material should be cheap and re usable,  It should be practically water proof, so that it should not absorb water from concrete,  Swelling and shrinkage should be minimum,  Strong enough to with stand all external loads,  Deflection should be minimum,  Surface should be smooth, and afford easy striping,  Light in weight, so that easy to transfer,  Joints should be stiff, so that lateral deformation and leak is minimum .
  • 14. Three stages in the process : a) Assembly and erection . b) Concrete placement. c) Stripping and dismantling.
  • 15. • Formwork detail for different structural members In concrete construction formwork is commonly provided for the following structural members. o Wall o Column o Slabs & Beams o Stairs o Chimneys o Water tanks o Cooling Towers
  • 16. • Formwork for Wall  It consists of • Timber sheeting • Vertical posts • Horizontal members • Rackers • Stakes • Wedges  After completing one side of formwork reinforcement is provided at the place then the second side formwork is provided.
  • 17. • Formwork for Column • It consists of the following – Side & End Planks – Yoke – Nut & Bolts • Two end & two side planks are joined by the yokes and bolts.
  • 18. • Formwork for columns
  • 19. • Formwork for Slabs & beams:• It consists of – Sole plates – Wedges – Props – Head tree – Planks – Batten – Ledgers • Beam formwork rests on head tree • Slab form work rests on battens and joists • If prop height are more than 8’ provide horizontal braces.
  • 20. • Lintel or Beam Formwork:
  • 22. • FORMWORK FOR STAIRS: • It consists of – Vertical & inclined posts – Inclined members -- Wooden Planks or sheeting – Stringer – Riser Planks
  • 23. • FORMWORK FOR STAIRS:
  • 24. • FORMWORK FOR SPIRAL STAIRS :
  • 25. • FORMWORK FOR CHIMNEYS: For tall chimneys two types of forms techniques are in generally use in our country a) Jump form b) Slip form
  • 26.
  • 27. • Removal of formwork:  Time of formwork removal depends on the following factors 1. Type of Cement 1. Rapid hardening cements require lesser time as compared to OPC (Ordinary Portland Cement) 2. Ratio of concrete mix 1. Rich ratio concrete gain strength earlier as compared to weak ratio concrete. 3. Weather condition 1. Hydration process accelerates in hot weather conditions as compared to cold and humid weather conditions.
  • 28. Time of Removal of formwork:
  • 29. • First free end's support should be removed. • And then from right to left it should be proceed. • If we are removing from the mid span then it will act as a prop cantilever. Cantilever slab
  • 30. • In simply supported we have to remove the support from the mid span to the ends. • To meet the design behavior. Simply supported slab
  • 31. • Maintenance of formwork: • Due to continuous use wooden planks & steel plates surfaces become uneven and require maintenance. • For wooden formwork use cardboard or plastic fiber board. Bolt hole places must also be repaired. • For steel formwork plates must be leveled by mallet and loose corners must be welded.
  • 32. • Cost of formwork  For normal works cost of formwork is about 30%-40% of the concrete cost.  For special works cost of formwork is about 50%-60% of the concrete cost.  Formwork cost is controlled by the following factors • Formwork Material cost • Formwork erecting cost • Formwork removal cost • Formwork jointing cost (Nails and Cables) • Labor charges.
  • 33. • Advantages of steel form work:  It can be used for a no. of times.  It is non absorbent.  Smooth finish surface obtained.  No shrinkage of formwork occurs.  Easy to use.  Its volume is less  Its strength is more.
  • 34. • LOADS ON FORMWORK: • Dead load  Self weight of formwork  Pressure and loads from fresh concrete  Reinforcement • Imposed load  Construction workers  Stacking of materials • Horizontal loads • Environmental loads  Accidental loads  Wind loads
  • 35. • References • R.C.C Design by B.C.Punmia • R.C.C Design by H.J.Shah • Formwork Design Section 1500 • Doka Formwork Design • Design of safe timber structures by Eva and Tomi Torrati