Introduction
 This technology is invented by a Japanese company named Daikin in 1982.
 Daikin called this technology by the name of ”VRV” i.e. Variable
refrigerant flow and this name is trademark of Daikin so other company are
calling this technology as “VRF” (Variable refrigerant flow).Both the things
are same but their name is different.
 It is also called as multi split type air conditioning because with one outdoor
you can use multiple indoor unit.
 In this technology cooling/heating is adjusted by adjusting refrigerant flow
and which is achieved by changing the speed compressor .
 Number of VRF user are goes on increasing in in recent years due to its
advantages like less energy consumption , take very less space etc.
 Daikin , Blue Star , Voltas , Mitsubishi ,Carrier (Toshiba & Midea) ,Hitachi
,LG , Samsung are the front runner Air conditioning company who are selling
their VRF machine in INDIA.
Types of VRF systems
1.Cooling only systems – Only cooling is possible in his type of
system
2.Heat Pump systems – Heating and cooling both possible in this
system but at a time system can only cool or heat. Both are not possible
at same time. All the indoor units can either heat or cool .
3.Heat Recovery systems – In this type of system cooling and heating
both possible at the same time. This is also called as three pipe system
VRFV/SSplitAC
WhyVRFisUsed?
VRF /VRV Split AC
1.Single ODU with multiple ODU. 1.Single IDU with single ODU.
2.Power consumption is around 30 % (claimed) less
then as compare to Split system.
2.Power Consumption is higher then VRF System.
3.VRF HVAC system is designed to run only when
needed and under partial-load conditions.
3. It run only on full load.
4.It uses very less space because in this system
many indoor can be connected with single outdoor.
4.It uses higher space because in Split system odu numbers
are same as no of indoor unit.
5.Installation Cost is higher but running cost is
lower because it take very less power as compare
to split system.
5 . Installation Cost is lower but running cost is higher it
take very more power as compare to VRF system..
6.Maintenance cost is higher because it require
very skilled technician and require regular checkup
6.Maintenance cost is lower.
7.Entire system can be operated from one place
using central remote control.
7.Central remote is not used because individual remote is
used for individual unit .
VRF CircuitDiagram
VRF Block Diagram
DESIGNFEATURES
• Separation tubes and Header (Refnet)
• Piping Design
8
TechnologyusedinVRF
 It uses Inverter compressor which run on various speed as compare to other
compressor which can run only on full speed.
 Multi stage fan speed operation available.
 Entire system can be monitor from one location
 It uses a sophisticated Microprocessor which allow to compressor to run on multiple
speed as per load requirement. First AC supply passes through noise filter which
maintain & filter the current (remove impurity) and give it to Bridge rectifier which
convert AC in to DC supply. Capacitor bank stores the DC supply and inverter driven
PCB convert this DC supply into variable AC supply. And using this variable AC supply
compressor speed is changing.
ADVANTAGESOFVRFSYSTEM
• Energy Saving claimed up to 30 %.
• High COP.
• Space saving.
• Long piping possible & Complete Control Offering
• Lesser Noise.
• Precise temperature control according to zone.
• Simultaneous heating and cooling (three-pipe VRF heat recovery system only)
• Zoned comfort
• Diversity
IDU Capacity-10 TR
ODUCapacity = 8 TR (10HP), with 125% Diversity
The maximum amount of cooling that can ever be provided at a single instant is 8 tons
DisadvantagesofVRFSystem
• Initial cost is High.
• Refrigerant Piping.
• For high rise & Big building the system cannot be used.
• Maintenance cost is also high.
• Very skilled person require.
AnyDoubt??????????????????
vrfppt-170330164842-170907022145.pdf

Weitere ähnliche Inhalte

Ähnlich wie vrfppt-170330164842-170907022145.pdf

Energy Conservation Energy ConservationEnergy Conservation
Energy Conservation Energy ConservationEnergy ConservationEnergy Conservation Energy ConservationEnergy Conservation
Energy Conservation Energy ConservationEnergy Conservation
AkshVashist1
 
EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016
Tina Damos
 

Ähnlich wie vrfppt-170330164842-170907022145.pdf (20)

Module (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apexModule (1.3) types of ac units-hvac-apex
Module (1.3) types of ac units-hvac-apex
 
Aircondition energy saver
Aircondition energy saverAircondition energy saver
Aircondition energy saver
 
Dekon vrf system brief introduction
Dekon vrf system brief introductionDekon vrf system brief introduction
Dekon vrf system brief introduction
 
Mechanical systems
Mechanical systemsMechanical systems
Mechanical systems
 
Condensers,expansiondevices,evaporators types
Condensers,expansiondevices,evaporators typesCondensers,expansiondevices,evaporators types
Condensers,expansiondevices,evaporators types
 
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.orgFuji tu dong hoa catalog frenic-hvac-dienhathe.org
Fuji tu dong hoa catalog frenic-hvac-dienhathe.org
 
VRV IV
VRV IVVRV IV
VRV IV
 
LECTURE 6 ZONING IN HVAC.ppt
LECTURE  6 ZONING IN HVAC.pptLECTURE  6 ZONING IN HVAC.ppt
LECTURE 6 ZONING IN HVAC.ppt
 
VRV-A-DIDVA1808B.pdf
VRV-A-DIDVA1808B.pdfVRV-A-DIDVA1808B.pdf
VRV-A-DIDVA1808B.pdf
 
High Efficiency Solutions EEV & Monitoring Systems
High Efficiency Solutions  EEV & Monitoring SystemsHigh Efficiency Solutions  EEV & Monitoring Systems
High Efficiency Solutions EEV & Monitoring Systems
 
IRJET- Comfort Cooling Application using Fixed Focus Solar Parabolic Dish...
IRJET-  	  Comfort Cooling Application using Fixed Focus Solar Parabolic Dish...IRJET-  	  Comfort Cooling Application using Fixed Focus Solar Parabolic Dish...
IRJET- Comfort Cooling Application using Fixed Focus Solar Parabolic Dish...
 
Maximizing energy efficiency in hotel HVAC systems: An energy modelling appro...
Maximizing energy efficiency in hotel HVAC systems: An energy modelling appro...Maximizing energy efficiency in hotel HVAC systems: An energy modelling appro...
Maximizing energy efficiency in hotel HVAC systems: An energy modelling appro...
 
hvac-systems.ppt
hvac-systems.ppthvac-systems.ppt
hvac-systems.ppt
 
Energy Efficient Air Conditioning System
Energy Efficient Air Conditioning SystemEnergy Efficient Air Conditioning System
Energy Efficient Air Conditioning System
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Ventilating systems for electrical machines
Ventilating systems for electrical machinesVentilating systems for electrical machines
Ventilating systems for electrical machines
 
Air preheater hot air generator manufacturer
Air preheater   hot air generator manufacturerAir preheater   hot air generator manufacturer
Air preheater hot air generator manufacturer
 
Energy Conservation Energy ConservationEnergy Conservation
Energy Conservation Energy ConservationEnergy ConservationEnergy Conservation Energy ConservationEnergy Conservation
Energy Conservation Energy ConservationEnergy Conservation
 
Life Cycle Analysis of Multi Split VRF System
Life Cycle Analysis of Multi Split VRF SystemLife Cycle Analysis of Multi Split VRF System
Life Cycle Analysis of Multi Split VRF System
 
EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016EWE - Sales Presentation March 2016
EWE - Sales Presentation March 2016
 

Mehr von AnkitSharma892379

controlling.ppt
controlling.pptcontrolling.ppt
controlling.ppt
AnkitSharma892379
 
Heat and Work (1).pptx
Heat and Work (1).pptxHeat and Work (1).pptx
Heat and Work (1).pptx
AnkitSharma892379
 
Unit-3.1 Testing and Performance.pptx
Unit-3.1 Testing and Performance.pptxUnit-3.1 Testing and Performance.pptx
Unit-3.1 Testing and Performance.pptx
AnkitSharma892379
 
Agricultural sprayer.pptx
Agricultural sprayer.pptxAgricultural sprayer.pptx
Agricultural sprayer.pptx
AnkitSharma892379
 
Aman Khan's PPT FILE.pptx
Aman Khan's PPT FILE.pptxAman Khan's PPT FILE.pptx
Aman Khan's PPT FILE.pptx
AnkitSharma892379
 
45555099-LaserCutting-RTantra.ppt
45555099-LaserCutting-RTantra.ppt45555099-LaserCutting-RTantra.ppt
45555099-LaserCutting-RTantra.ppt
AnkitSharma892379
 
SUMMER TRAINING (1).pptx
SUMMER TRAINING (1).pptxSUMMER TRAINING (1).pptx
SUMMER TRAINING (1).pptx
AnkitSharma892379
 
V - Project presentation Template for VII Semester.pptx
V - Project presentation Template for VII Semester.pptxV - Project presentation Template for VII Semester.pptx
V - Project presentation Template for VII Semester.pptx
AnkitSharma892379
 
Ankittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptxAnkittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptx
AnkitSharma892379
 
saurabhfinal-141209091925-conversion-gate01 (1).pptx
saurabhfinal-141209091925-conversion-gate01 (1).pptxsaurabhfinal-141209091925-conversion-gate01 (1).pptx
saurabhfinal-141209091925-conversion-gate01 (1).pptx
AnkitSharma892379
 

Mehr von AnkitSharma892379 (10)

controlling.ppt
controlling.pptcontrolling.ppt
controlling.ppt
 
Heat and Work (1).pptx
Heat and Work (1).pptxHeat and Work (1).pptx
Heat and Work (1).pptx
 
Unit-3.1 Testing and Performance.pptx
Unit-3.1 Testing and Performance.pptxUnit-3.1 Testing and Performance.pptx
Unit-3.1 Testing and Performance.pptx
 
Agricultural sprayer.pptx
Agricultural sprayer.pptxAgricultural sprayer.pptx
Agricultural sprayer.pptx
 
Aman Khan's PPT FILE.pptx
Aman Khan's PPT FILE.pptxAman Khan's PPT FILE.pptx
Aman Khan's PPT FILE.pptx
 
45555099-LaserCutting-RTantra.ppt
45555099-LaserCutting-RTantra.ppt45555099-LaserCutting-RTantra.ppt
45555099-LaserCutting-RTantra.ppt
 
SUMMER TRAINING (1).pptx
SUMMER TRAINING (1).pptxSUMMER TRAINING (1).pptx
SUMMER TRAINING (1).pptx
 
V - Project presentation Template for VII Semester.pptx
V - Project presentation Template for VII Semester.pptxV - Project presentation Template for VII Semester.pptx
V - Project presentation Template for VII Semester.pptx
 
Ankittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptxAnkittttttttttttttttttttttt.pptx
Ankittttttttttttttttttttttt.pptx
 
saurabhfinal-141209091925-conversion-gate01 (1).pptx
saurabhfinal-141209091925-conversion-gate01 (1).pptxsaurabhfinal-141209091925-conversion-gate01 (1).pptx
saurabhfinal-141209091925-conversion-gate01 (1).pptx
 

Kürzlich hochgeladen

一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
AS
 
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
trthhgf
 
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
egfdgfd
 
原版定制英国格鲁斯特大学毕业证原件一模一样
原版定制英国格鲁斯特大学毕业证原件一模一样原版定制英国格鲁斯特大学毕业证原件一模一样
原版定制英国格鲁斯特大学毕业证原件一模一样
AS
 
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
AD
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理
AS
 
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
fsdfdsgf
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
joshuaclack73
 
Vina Score and Vin Min for almost all the models 2024
Vina Score and Vin Min for almost all the models 2024Vina Score and Vin Min for almost all the models 2024
Vina Score and Vin Min for almost all the models 2024
jipohal318
 
原版制作加州理工学院毕业证成绩单原件一模一样
原版制作加州理工学院毕业证成绩单原件一模一样原版制作加州理工学院毕业证成绩单原件一模一样
原版制作加州理工学院毕业证成绩单原件一模一样
hbgfewda
 
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
fsdfdsgf
 

Kürzlich hochgeladen (20)

Why Won't Your Audi A3 Shift Into Reverse Gear Let's Investigate
Why Won't Your Audi A3 Shift Into Reverse Gear Let's InvestigateWhy Won't Your Audi A3 Shift Into Reverse Gear Let's Investigate
Why Won't Your Audi A3 Shift Into Reverse Gear Let's Investigate
 
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
一比一原版(Auburn毕业证书)奥本大学毕业证原件一模一样
 
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
原版制作(NUA毕业证书)英国诺里奇艺术大学毕业证成绩单原件一模一样
 
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
一比一定制加拿大安大略理工大学毕业证(UOIT毕业证书)学位证书
 
Preparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop PerspectivePreparing for Transportation Electrification: The Electric Coop Perspective
Preparing for Transportation Electrification: The Electric Coop Perspective
 
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
Charging Forward: Bringing Electric Vehicle Charging Infrastructure to Rural ...
 
原版定制英国格鲁斯特大学毕业证原件一模一样
原版定制英国格鲁斯特大学毕业证原件一模一样原版定制英国格鲁斯特大学毕业证原件一模一样
原版定制英国格鲁斯特大学毕业证原件一模一样
 
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
一比一原版(Cumbria毕业证书)英国坎布里亚大学毕业证成绩单学位证书
 
一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理一比一原版英国哈珀亚当斯大学毕业证如何办理
一比一原版英国哈珀亚当斯大学毕业证如何办理
 
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
一比一原版曼彻斯特城市大学毕业证成绩单原件一模一样
 
mechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbxmechanical vibrations pebbles.pptbbbbbbbbx
mechanical vibrations pebbles.pptbbbbbbbbx
 
Vina Score and Vin Min for almost all the models 2024
Vina Score and Vin Min for almost all the models 2024Vina Score and Vin Min for almost all the models 2024
Vina Score and Vin Min for almost all the models 2024
 
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It IndicateWhy Is The Glow Plug Light Flashing In My VW & What Does It Indicate
Why Is The Glow Plug Light Flashing In My VW & What Does It Indicate
 
How to Reset BMW Brake Pad Warning Light A Step-by-Step Guide
How to Reset BMW Brake Pad Warning Light A Step-by-Step GuideHow to Reset BMW Brake Pad Warning Light A Step-by-Step Guide
How to Reset BMW Brake Pad Warning Light A Step-by-Step Guide
 
Benefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet ManagementBenefits of Load Planning in Fleet Management
Benefits of Load Planning in Fleet Management
 
原版制作加州理工学院毕业证成绩单原件一模一样
原版制作加州理工学院毕业证成绩单原件一模一样原版制作加州理工学院毕业证成绩单原件一模一样
原版制作加州理工学院毕业证成绩单原件一模一样
 
Toyota Yaris service manual Free.pdf Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf  Toyota Yaris Service manualToyota Yaris service manual Free.pdf  Toyota Yaris Service manual
Toyota Yaris service manual Free.pdf Toyota Yaris Service manual
 
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
一比一原版(Temple毕业证书)美国天普大学毕业证成绩单原件一模一样
 
5 Signs Your VW Key Fob Battery Needs Replacement
5 Signs Your VW Key Fob Battery Needs Replacement5 Signs Your VW Key Fob Battery Needs Replacement
5 Signs Your VW Key Fob Battery Needs Replacement
 
What Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise ControlWhat Might Be Behind Your Mercedes' Inoperative Cruise Control
What Might Be Behind Your Mercedes' Inoperative Cruise Control
 

vrfppt-170330164842-170907022145.pdf

  • 2. Introduction  This technology is invented by a Japanese company named Daikin in 1982.  Daikin called this technology by the name of ”VRV” i.e. Variable refrigerant flow and this name is trademark of Daikin so other company are calling this technology as “VRF” (Variable refrigerant flow).Both the things are same but their name is different.  It is also called as multi split type air conditioning because with one outdoor you can use multiple indoor unit.  In this technology cooling/heating is adjusted by adjusting refrigerant flow and which is achieved by changing the speed compressor .  Number of VRF user are goes on increasing in in recent years due to its advantages like less energy consumption , take very less space etc.  Daikin , Blue Star , Voltas , Mitsubishi ,Carrier (Toshiba & Midea) ,Hitachi ,LG , Samsung are the front runner Air conditioning company who are selling their VRF machine in INDIA.
  • 3. Types of VRF systems 1.Cooling only systems – Only cooling is possible in his type of system 2.Heat Pump systems – Heating and cooling both possible in this system but at a time system can only cool or heat. Both are not possible at same time. All the indoor units can either heat or cool .
  • 4. 3.Heat Recovery systems – In this type of system cooling and heating both possible at the same time. This is also called as three pipe system
  • 5. VRFV/SSplitAC WhyVRFisUsed? VRF /VRV Split AC 1.Single ODU with multiple ODU. 1.Single IDU with single ODU. 2.Power consumption is around 30 % (claimed) less then as compare to Split system. 2.Power Consumption is higher then VRF System. 3.VRF HVAC system is designed to run only when needed and under partial-load conditions. 3. It run only on full load. 4.It uses very less space because in this system many indoor can be connected with single outdoor. 4.It uses higher space because in Split system odu numbers are same as no of indoor unit. 5.Installation Cost is higher but running cost is lower because it take very less power as compare to split system. 5 . Installation Cost is lower but running cost is higher it take very more power as compare to VRF system.. 6.Maintenance cost is higher because it require very skilled technician and require regular checkup 6.Maintenance cost is lower. 7.Entire system can be operated from one place using central remote control. 7.Central remote is not used because individual remote is used for individual unit .
  • 8. DESIGNFEATURES • Separation tubes and Header (Refnet) • Piping Design 8
  • 9. TechnologyusedinVRF  It uses Inverter compressor which run on various speed as compare to other compressor which can run only on full speed.  Multi stage fan speed operation available.  Entire system can be monitor from one location  It uses a sophisticated Microprocessor which allow to compressor to run on multiple speed as per load requirement. First AC supply passes through noise filter which maintain & filter the current (remove impurity) and give it to Bridge rectifier which convert AC in to DC supply. Capacitor bank stores the DC supply and inverter driven PCB convert this DC supply into variable AC supply. And using this variable AC supply compressor speed is changing.
  • 10. ADVANTAGESOFVRFSYSTEM • Energy Saving claimed up to 30 %. • High COP. • Space saving. • Long piping possible & Complete Control Offering • Lesser Noise. • Precise temperature control according to zone. • Simultaneous heating and cooling (three-pipe VRF heat recovery system only) • Zoned comfort • Diversity IDU Capacity-10 TR ODUCapacity = 8 TR (10HP), with 125% Diversity The maximum amount of cooling that can ever be provided at a single instant is 8 tons
  • 11. DisadvantagesofVRFSystem • Initial cost is High. • Refrigerant Piping. • For high rise & Big building the system cannot be used. • Maintenance cost is also high. • Very skilled person require.