SlideShare ist ein Scribd-Unternehmen logo
1 von 16
Downloaden Sie, um offline zu lesen
ATR Consulting Limited




   Category Strategy Development & Implementation



   Tahir Rafiq




 April 2013


 Applying automotive best practice in the Banking Industry.....
Author : Tahir Rafiq
Project Start Date:




atr
Contents




      Category strategies & supplier relationship management                    1

      Baseline :- Portfolio analysis                                            2

      Ideal positioning (Using PFA)                                             3

      Adopting a strategy based on power regimes (Hexagon Analysis)             4

      Commodity strategy matrix using the hexagon analysis                      5

      Adopting a strategy based on power regimes                                6

      Developing the right commodity strategy                                   7

      Assessing the gap between ideal sourcing strategy and current practices   8
      Implementing strategy & action plans                                      9
      Appendix A                                                                10
      Appendix B. Glossary                                                      11




atr                                                          1
Category strategies & supplier relationship management
 Portfolio analysis workshop out put


      Out put of workshop                                                            Category positioning matrix ( tool)
                                                                             10.00
      An analytical (excel) tool was used to Position the
      material groups on the Portfolio Matrix.
                                                                              9.00
      Based on the following weighted variables
         Spend
                                                                              8.00
         Number of Suppliers
         The level of competition
         Number of Buyers                                                    7.00

         The Buyers Search Cost
         The Buyers Switching Cost                                           6.00

         The Suppliers Switching Cost                           Value ($)
                                                                 of Spend
         Product Complexity                                                  5.00
         Number of Substitutes
         Buyers Spend as % of Suppliers T/O
         The level of Importance to Supplier                                 4.00



      A workshop was held with the Contracts
      Department & The Purchasing Department to                               3.00

      determine the position of each material group
      A workshop was held with the Contracts                                  2.00

      Department & The Purchasing Department to
      determine the position of each material group on
                                                                              1.00
      the material
      This is an iterative process and this exercise should be
      conducted on a regular basis i.e. The more times it is                  0.00
                                                                                     0.00       1.00   2.00   3.00   4.00       5.00      6.00   7.00   8.00   9.00   10.00
      performed the more accurate the out put will be.
                                                                                                                            Supply Risk



atr                                                                                         2                                                                                 1
Baseline :- Portfolio analysis
 Examining buyer – supplier power dynamics



  Potential approaches to buyer supplier                 High

  relationship management
                                                                                                       B=S Buyer Supplier Inter-
                                                            B>S Buyer Dominance
                                                                        2. B > S           3. B = S         dependence
  Leverage – Focus on Short Term Relationship

  Use competitive tendering to reduce cost and
  consolidate volume
                                                                       Leverage                            Strategic
  Strategic - Focus on Long Term Relationship

  Ensure availability of supply, focus on relationship   Buyer
                                                         Power
  building, process integration and innovation
                                                                       Tactical                            Bottleneck
  Tactical – Focus on Short Term Quick Wins

  Simplify and streamline purchasing process, reduce
  number of suppliers and simplify ordering
                                                                 B0S Buyer Supplier                     B<S Supplier Dominance
  Bottleneck - Focus on Long Term Security of
                                                                   Independence
  Supply

  Search for alternatives, seek new suppliers, reduce
  dependency on current supplier                          Low

                                                                 Low                  Supplier Power                    High




atr                                                                    3                                                           2
Ideal positioning
 Adopting strategies to optimize power



  Adopt following strategies.....                  High




           The best place to be                                  2. B > S            3. B = S
      L
           Maintain position

                                                                            L                    S
      S   The second best place to be
          Maintain position but shift
          Long term to leverage
                                                   Buyer
                                                   Power
          Consolidate with other
      T
          Material groups & shift up


      B   Reduce dependency on the current
          Supplier base .
             changing the specification
             Finding alternative suppliers                                 T                        B
             Encouraging new suppliers into the
             market
             Consolidating with other material
                                                    Low
             groups
                                                           Low                  Supplier Power           High




atr                                                              4                                              3
Adopting a strategy based on power regimes (Hexagon Analysis)
 Example of typical levers have been identified for the various sourcing approaches

 Exploit Buying Power                                                                           Create An Advantage
                                              Exploit                         Create An
                                           Buying Power                       Advantage
 Consolidation                                                                                  Specification
 • Supplier Rationalization                                                                     • Rationalise/standardise product(s)
 • Consolidate volume across Business                                                           • Product Substitution
 • Redistribute volume among suppliers                                                          • Apply product value analysis
 • Combine volume from different                                                                • Apply product value engineering
  commodity group                                                                               • Use functional/ output specification
 • Rationalize/standardise parts                                                                • Examine life cycle costs
                                                  Consolidation         Specification
 Cost Leadership                                                                                Joint Process Improvement
 • Benchmark prices regularly                                                                   • Optimise physical material flow
 • Renegotiate/rollback prices                                                                  • Support supplier operations improvement
 • Un-bundle prices                            Cost                             Joint Process
                                                                                                • Develop long-term contracts
 • Use competitive bidding                  Leadership         Strategy                         • Share productivity gains
                                                                               Improvement
 • Use commodity hedging/trading                                                                • Integrate logistics
 • Compare total cost among potential                                                           • Cost reductions
   suppliers                                                                                    • Product Innovation / Development
 • Base pricing on profitability                     Global             Relationship
                                                    Sourcing                Mgt
 Global Sourcing                                                                                Relationship Mgt

 • Expand geographic supply base                                                                • Analyse core competencies
 • Examine new suppliers                                                                        • Employ strategic alliances/partnering
 • Capitalise on currency fluctuations                                                          • Co Investment
 • Take advantage of trade incentives                                                           • Vertical Integration
 • Low cost country sourcing



atr                                                                 5                                                                       4
Commodity strategy matrix using the hexagon analysis
 Category strategy matrix


          Strategy                                            Core Activities                  1      2       3       4        5
                                                                                              0-20   20-40   40-60   60-80   80-100
        Consolidation         a   Purchasing is Coordinated through a central Point            O       √       √       √       √
                              b   Percentage of Spend Negotiated by Volume Leverage            O       √       √       √       √
                              c   Combining Volumes from Other Material Groups                 O       O       O       √       √
                              d   Redistributing Volumes Across Suppliers                      O       O       √       √       √
                              e   Pooling Volumes Across Business                              O       √       √       √       √
                              f   Future Volumes through Demand Forecasting                    O       O       O       √       √
       Cost Leadership        a   Competitive Bidding                                          √       √       √       √       √
                              b   Total Life Costing                                           O       O       O       √       √
                              c   Continuous Benchmark                                         O       √       √       √       √
                              d   Renegotiate & Rollback Pricing                               O       O       √       √       √
                              e   Unbundle Prices                                              O       O       O       √       √
                              f   Commodity Hedging & Trading                                  O       O       O       O       √
       Global Sourcing        a   Multi Region Sourcing                                        O       √       √       √       √
                              b   Taking Advantage of Trade Incentives                         O       O       O       √       √
                              c   Capitalising on Currency Fluctuations                        O       O       O       O       √
                              d   Alternatives sourced from broad Gloabl Supply Markets        O       O       O       √       √
                              e   Taking Advantage of Low Cost Country Sourcing                O       O       √       √       √
        Specification         a   Change or improve Specification                              O       √      √        √       √
                              b   Apply Product Value Analsysis                                O       O      O        √       √
                              c   Use of Out Put / Functional Specification                    O       O      √        √       √
                              d   Standardise Specification                                    O       √      √        √       √
                              e   Jointly Optimise Specification with suppliers                O       O      O        √       √
  Joint Process Improvement   a   Level of Information Sharing                                 O       √      √        √       √
                              b   Structured Improvement Process with 1/4 Reviews              O       O      √        √       √
                              c   Joint Process Teams working to reduce costs in SC            O       O      O        √       √
                              d   Level of Support Given to Supplier Operations Improvement    O       √      √        √       √
                              e   Integration of Processes & Systems                           O       O      √        √       √
                              f   Integration of Losgistics                                    O       O      O        √       √
                              g   Product Innovation & Development                             O       O      O        O       V




atr                                                                             6                                                     5
Adopting a strategy based on power regimes
 Typical levers identified for various sourcing approaches


      Relationship Type                                              Category Positioning    1       2       3       4       5
                                                                                            100 %   100 %   100 %   100 %   100 %
           Transactional
                      No Supply Arrangements
                      No Contracts in Place
                      Spot Purchasing
                      Playing the Market                                                     √       O       O       O       O
           Short Term Opportunistic
                      Buying Power is leveraged to get Lowest Cost
                      Short Term Supply Arrangements are in Place
                      Exploit Market Competition
                                                                                             O       √       O       O       O
           Collaborative Relationship
                      Minimise Cost & Maximise Service Levels
                      Medium Term Relationship
                      Ensure Supply Continuity
                                                                                             O       O       √       O       O
           Partnering
                     Medium to Long Term Relationship
                     Maximise Benefits to Both Supplier & Buyer
                                                                                             O       O       O       √       O

           Interdependent Strategic Alliance
                    Long Term Relationship
                    Risk Sharing
                    Co Investment
                    Committing Volumes
                                                                                             O       O       O       O       √


atr                                                                         7                                                       6
Developing the right commodity strategy
 Selection criteria ( matrix)


      Best Fit

       Commodity Strategy                Exploit Buying Power                Create an Advantage


      Scoring Matrix
      5 = High value        1
      = Low value
                                  Tactical                Leverage   Bottleneck              Strategic

      Consolidation                  3                          5        1                         2

      Cost Leadership                5                          5        2                         2

      Global Sourcing                3                          5        2                         2

      Specification                  1                          2        5                         4

      Joint Process Improvement      2                          2        4                         5

      Relationship Mgt               1                          2        3                         5




atr                                                             8                                        7
Assessing the gap between ideal sourcing strategy and current practices
 Gap analysis



      Commodity A                                             Current Approach              Target Approach               Gap Analysis
      Consolidation                                                      3                            5                        2

      Cost Leadership                                                    2                            5                        3

      Global Sourcing                                                    2                            5                        3

      Specification                                                      2                            2                        0

      Joint Process Improvement                                          1                            2                        1

      Relationship Mgt                                                   2                            2                        0



      Overall Score                                                      9                            21

      Rating                                                            43 %

      Category Scale                                                                                                         20-40%



        0%      0 – 20 %
                                  Low gap   Small Strategic Gap Ratio – All applicable approaches have been applied and
        20 %    20 – 40 %                   have yielded considerable results already
        40 %    40 – 60 %
        60 %    60 – 80 %                   Large Strategic Gap Ratio – There are a number of applicable approaches
                              Very high     which have not been applied, or which have been applied without success
        80 %    80 – 100 %       gap




atr                                                                 9                                                                    8
Implementing strategy & action plans
 Standardized tracking tool


  Example . Electrical Category


      Material                                                                                                                          Joint Process                   Relationship
       Group Sub Material Group          Consolidation       Cost Leadership       Global Sourcing          Specification              Improvement                          Mgt
                                         1   2   3   4   5   1   2   3   4    5    1    2   3   4   5   1       2     3   4    5       1     2   3   4       5      1     2   3   4    5
                                                 A               C            T         C   T           T       C                      C     T                      A
  Electrical   Hand Tools
                                                 C               C            T         C           T           A                      C     T                            A
  Electrical   Automatic Hand Tools
                                                 C               C            T         C           T           A                      C     T                            A
  Electrical   Alkaline Batteries
                                         C       C       T       A                      A                       C              T       C             T                    A
  Electrical   Rechargeable Batteries
                                                 A       T       C            T         C   T           T       C                      C     T                      C         T
  Electrical   Accessories
                                             T   C               A                      A                             C   T                  C               T      C
  Electrical   LED Flash Light
                                                 C   T           C            T         C   T           T       C                      C     T                            C            T
  Electrical   Flashlight
                                             T   A               C            T         C   T           T       C                      C     T                      A
  Electrical   Standard Wires
                                                 C       T       A                      A                             C   T                  C               T      A
  Electrical   Energy Savings Lighting
                                                 C       T       C            T         C           T           T     C                      A                            C            T
  Electrical   Switches
                                             C   A               C            T         C   T           T       C                      C     T                            A
  Electrical   Diodes
                                                     C   T       C       T                  C       T                 C   T            C     T                      A
  Electrical   Connectors

                                                                             Current position                   Target Position                          Objective Achieved

                                                                                                            A       Achieved       T       Target        C       Current Position


atr                                                                                10                                                                                                      9
Appendix A
 Action Plan (How to use the tool)
                    Conduct a Portfolio Analysis Exercise on        a. The Material Group
      Start Point                                                   b. On The Sub Material Group



                    For each Material Group / Sub Material Group determine the current approach against each of the six criteria in the Hexagon using
        Step 1      “The Commodity Group Positioning Tool” This activity should be conducted jointly with SRS and Purchasing / Contracting




                    Determine the type of Supplier Relationship (Consult the Portfolio Analysis to see where the commodity is positioned) that you need to
        Step 2      have with the supplier of this particular Commodity Group / Sub Group. Use the “Supplier Relationship Tool” to establish this.




                    Using “The Best Fit Strategy Tool” compare the current approach against each of the six criteria with Best Practice.
        Step 3



                    Using “The Gap Analysis Tool” determine the size of the Strategic Gap, between the current approach and Best Practice.
        Step 4



                    Using the “Commodity Tracking Tool” plot the current position, the target position and monitor the progress on a monthly basis.
        Step 5




atr                                                                        11                                                                                10
Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis)


Term                                   Explanation
Supplier Rationalization               Reducing the number of suppliers

Consolidate volume across Business     Add all the requirements together from different parts of the business i.e. Manufacturing, maintenance, IT etc to increase the volume
                                       of spend.
Redistribute volume among suppliers    Change the level of spend with existing suppliers i.e. Split the business 75% to 25% between two suppliers to increase competition

Combine volume from different          Adding together several related commodity groups to increase volume of spend, reduce the number of suppliers
commodity groups
Rationalize / Standardise Parts        Reduce the number of parts , by using standard sizes / specs i.e. Use one standard bearing instead of several different bearings which
                                       may all be similar. This will help to consolidate volumes and increase leverage when negotiating with the supplier base.

Cost Leadership                        Is when price is the main focus for a particular commodity group

Benchmark Prices Regularly             Compare the prices on an annual basis by going out to the market and getting other suppliers to quote for the business

Renegotiate / Rollback Prices          Renegotiate with existing suppliers, if the market conditions are hard and the company’s profit margin is being reduced. i.e. ask for
                                       cost reductions. Rollback Prices, ask the supplier to reduce the costs so they are the same as two years ago for example.

Un-bundle Prices                       Ask the supplier to break the suppliers costs down into components i.e. raw material, logistics, manpower, admin, etc. This is so that
                                       you can determine the level of profit they are making, if it is too much then they are taking advantage, if it is too little then they could
                                       be making a loss.
Competitive Bidding                    Getting more than two suppliers to compete for the quote / business

Commodity Hedging / Trading            Agreeing to buy from the supplier so much of a product, at an agreed price at a fixed point of time in the future. Trading is when you
                                       buy a commodity for your own needs plus some extra, that you can sell to other buyers for a profit
Compare total cost amongst suppliers   Comparing prices between several suppliers, based on the cost of goods, the maintenance and after care support, the servicing costs,
                                       the replacement cost, the life and the usage of the product (i.e. How long will it last and how much use will get from it)




atr                                                                                 12                                                                                                11
Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis)


Term                                  Explanation
Base pricing on profitability         Set a limit for an acceptable profit margin for the supplier i.e. 10% and agree that the supplier will only make 10% and no more. You
                                      will have to be very careful and analyse the suppliers costs to make sure that he is making only the agreed profit margin and no more.

Expand Geographic Supply Base         I.e. If you are only buying from one region, then you need to include other regions, i.e. From western province, increase to eastern
                                      province. If you are only buying from one country in Europe increase the area to the whole of Europe.
Examine new suppliers                 Look for other suppliers, examine their products etc

Capitalise on currency fluctuations   Look out for the exchange rates going up or down, it is best to buy when the exchange rate is high and in your favour, this way you will
                                      have greater purchasing power (i.e. You can buy more things)
Take advantage of trade incentives    Some countries have special arrangements with Saudi Arabia, i.e. They do not charge tax, or tariffs, they do not charge the
                                      manufacturers export duties if they export to KSA etc. Or some other benefit, you need to investigate these benefits .

Low cost country sourcing             Countries that have cheap labour rates, or access to cheap resources, that can manufacture goods at lower rates than other countries.

Product Substitution                  Change one similar product with another one, could be based on Brand, specification, or a different product altogether that does the
                                      same job
Product value analysis                Is looking at the function(s) of a product and the cost of achieving that function, the functions are broken down into primary and
                                      secondary, primary functions are the ones that the product must have and the secondary ones are the one that we can delete as they
                                      are not necessary , the ideas is that by deleting the secondary functions we will reduce also the cost.
Product value engineering             Similar to the one above, but the emphasis here is on optimising the performance of the product, to increase its life, increase its quality
                                      and also to reduce its cost, through technical / engineering teams.

Functional / Output Specification     Only concentrate on what the product is required to do and the job it should perform and not the make up of that material, leave that
                                      to the supplier, we are only interested in the use of the product.
Examine Life Cycle Costs              Life Cycle Cost is the total cost of ownership over the life of the product, it includes, the acquisition cost, the logistics cost,
                                      maintenance, repair, the amount of usage, etc.



atr                                                                                 13                                                                                              12
Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis)


 Term                                      Explanation
 Optimise Physical Material Flow           Improving the coordination of logistics between us and the buyer, looking at how the material is passed through the suppliers
                                           organisation and the transformation process (manufacturing process) then out to us and then how does it pass through our
                                           organisation
 Support supplier operations improvement   Looking at ways of working with the supplier to improve their systems and processes together as a team

 Develop long-term contracts               Long term contracts are typically more than three years

 Share productivity gains                  By working as a team with the supplier to reduce costs, or improve quality, or knowledge , the benefits should be shared with the
                                           supplier.
 Integrate Logistics                       Better coordination of transport of goods between us and the supplier



 Cost Reductions                           Working with the supplier to reduce costs

 Product Innovation / Development          Working with the supplier to develop or design new products




atr                                                                                    14                                                                                      13
End of presentation




Tahir Rafiq
Feedback would be greatly received and appreciated




atr                                                  15   14

Weitere ähnliche Inhalte

Was ist angesagt?

Supply Chain Risk
Supply Chain RiskSupply Chain Risk
Supply Chain RiskJan Husdal
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzDerek Hendrikz
 
Supply chain management Collaboration
Supply chain management CollaborationSupply chain management Collaboration
Supply chain management Collaborationbosp1
 
Supply Chain Integration
Supply Chain IntegrationSupply Chain Integration
Supply Chain Integration3abooodi
 
Supply Chain Collaboration
Supply Chain CollaborationSupply Chain Collaboration
Supply Chain Collaborationjkirchner
 
Total cost of ownership
Total cost of ownershipTotal cost of ownership
Total cost of ownershipChaand Raina
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing StrategiesShaikh Mahmood
 
Category management and procurement planning
Category management and procurement planningCategory management and procurement planning
Category management and procurement planningMohamed Azzam
 
Indirect procurement
Indirect procurementIndirect procurement
Indirect procurementWGroup
 
Strategic Sourcing
Strategic SourcingStrategic Sourcing
Strategic SourcingBrett Allen
 
aggregate planning in the supply chain
aggregate planning in the supply chainaggregate planning in the supply chain
aggregate planning in the supply chainManish Kaushik
 
Inventory management in supply chain
Inventory management in supply chain Inventory management in supply chain
Inventory management in supply chain Sonia Peri
 
Procurement Powerpoint Presentation Slides
Procurement Powerpoint Presentation SlidesProcurement Powerpoint Presentation Slides
Procurement Powerpoint Presentation SlidesSlideTeam
 
Strategic sourcing for optimal gscm
Strategic sourcing for optimal gscmStrategic sourcing for optimal gscm
Strategic sourcing for optimal gscmNMTBus
 
CHAPTER 1 introd to strategic procurement.pptx
CHAPTER 1  introd to strategic  procurement.pptxCHAPTER 1  introd to strategic  procurement.pptx
CHAPTER 1 introd to strategic procurement.pptxruthnyiramahoro
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain ManagementEdureka!
 
INTRODUCTION TO THE CONCEPT OF SOURCING
INTRODUCTION TO THE CONCEPT OF SOURCINGINTRODUCTION TO THE CONCEPT OF SOURCING
INTRODUCTION TO THE CONCEPT OF SOURCINGNGANG PEREZ
 

Was ist angesagt? (20)

Supply Chain Risk
Supply Chain RiskSupply Chain Risk
Supply Chain Risk
 
Purchasing ~Sourcing
Purchasing ~SourcingPurchasing ~Sourcing
Purchasing ~Sourcing
 
Procurement Strategy by Derek Hendrikz
Procurement Strategy by Derek HendrikzProcurement Strategy by Derek Hendrikz
Procurement Strategy by Derek Hendrikz
 
Supply chain management Collaboration
Supply chain management CollaborationSupply chain management Collaboration
Supply chain management Collaboration
 
Supply Chain Integration
Supply Chain IntegrationSupply Chain Integration
Supply Chain Integration
 
Supply Chain Collaboration
Supply Chain CollaborationSupply Chain Collaboration
Supply Chain Collaboration
 
Total cost of ownership
Total cost of ownershipTotal cost of ownership
Total cost of ownership
 
Procurement and Sourcing Strategies
Procurement and Sourcing StrategiesProcurement and Sourcing Strategies
Procurement and Sourcing Strategies
 
Category management and procurement planning
Category management and procurement planningCategory management and procurement planning
Category management and procurement planning
 
Indirect procurement
Indirect procurementIndirect procurement
Indirect procurement
 
Supply Chain Risk Management
Supply Chain Risk ManagementSupply Chain Risk Management
Supply Chain Risk Management
 
Strategic Sourcing
Strategic SourcingStrategic Sourcing
Strategic Sourcing
 
aggregate planning in the supply chain
aggregate planning in the supply chainaggregate planning in the supply chain
aggregate planning in the supply chain
 
DEMAND MANAGEMENT IN SUPPLY CHAIN
DEMAND MANAGEMENT IN SUPPLY CHAINDEMAND MANAGEMENT IN SUPPLY CHAIN
DEMAND MANAGEMENT IN SUPPLY CHAIN
 
Inventory management in supply chain
Inventory management in supply chain Inventory management in supply chain
Inventory management in supply chain
 
Procurement Powerpoint Presentation Slides
Procurement Powerpoint Presentation SlidesProcurement Powerpoint Presentation Slides
Procurement Powerpoint Presentation Slides
 
Strategic sourcing for optimal gscm
Strategic sourcing for optimal gscmStrategic sourcing for optimal gscm
Strategic sourcing for optimal gscm
 
CHAPTER 1 introd to strategic procurement.pptx
CHAPTER 1  introd to strategic  procurement.pptxCHAPTER 1  introd to strategic  procurement.pptx
CHAPTER 1 introd to strategic procurement.pptx
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
INTRODUCTION TO THE CONCEPT OF SOURCING
INTRODUCTION TO THE CONCEPT OF SOURCINGINTRODUCTION TO THE CONCEPT OF SOURCING
INTRODUCTION TO THE CONCEPT OF SOURCING
 

Andere mochten auch

Category management ppt
Category management pptCategory management ppt
Category management pptDivya Singh
 
Point Of View Category Management v1.0 final
Point Of View Category Management v1.0 finalPoint Of View Category Management v1.0 final
Point Of View Category Management v1.0 finalMarjolein Dijkshoorn
 
Marketing Strategy - Digital - For Refurbished Wearable Category
Marketing Strategy - Digital - For Refurbished Wearable CategoryMarketing Strategy - Digital - For Refurbished Wearable Category
Marketing Strategy - Digital - For Refurbished Wearable CategoryArjoon Mehra
 
Présentation ecr lsa category management 160310 v5 pour ecrall
Présentation ecr lsa category management 160310 v5 pour ecrallPrésentation ecr lsa category management 160310 v5 pour ecrall
Présentation ecr lsa category management 160310 v5 pour ecrallecrfrance
 
Cross channel 2
Cross channel 2Cross channel 2
Cross channel 2Tyler Tate
 
Top 10 assistant category manager interview questions and answers
Top 10 assistant category manager interview questions and answersTop 10 assistant category manager interview questions and answers
Top 10 assistant category manager interview questions and answerstonychoper4406
 
Strategic Sourcing - A High level overview
Strategic Sourcing - A High level overviewStrategic Sourcing - A High level overview
Strategic Sourcing - A High level overviewRam Raghuraman
 
Gb tgi 2014 q4 updated
Gb tgi 2014 q4 updatedGb tgi 2014 q4 updated
Gb tgi 2014 q4 updatedKantar
 
Category owner presentaion
Category owner presentaionCategory owner presentaion
Category owner presentaionPraveen Kumar
 
Certificate - PRINCE 2
Certificate - PRINCE 2Certificate - PRINCE 2
Certificate - PRINCE 2FGB
 
My Aha Moment: Business Innovation Process
My Aha Moment: Business Innovation ProcessMy Aha Moment: Business Innovation Process
My Aha Moment: Business Innovation ProcessPurnima Thakre
 
Session 4 It And Competitive Strategy
Session 4 It And Competitive StrategySession 4 It And Competitive Strategy
Session 4 It And Competitive StrategyYoungjin Yoo
 
FMCG Category Growth
FMCG Category GrowthFMCG Category Growth
FMCG Category GrowthSquid Ink
 
Liquid Dish Detergent2
Liquid Dish Detergent2Liquid Dish Detergent2
Liquid Dish Detergent2Andrew Thao
 
Consumer centric category management
Consumer centric category managementConsumer centric category management
Consumer centric category managementValerii Kosenko
 

Andere mochten auch (18)

Category management ppt
Category management pptCategory management ppt
Category management ppt
 
Category Management
Category Management Category Management
Category Management
 
Point Of View Category Management v1.0 final
Point Of View Category Management v1.0 finalPoint Of View Category Management v1.0 final
Point Of View Category Management v1.0 final
 
Marketing Strategy - Digital - For Refurbished Wearable Category
Marketing Strategy - Digital - For Refurbished Wearable CategoryMarketing Strategy - Digital - For Refurbished Wearable Category
Marketing Strategy - Digital - For Refurbished Wearable Category
 
Category management
Category managementCategory management
Category management
 
Présentation ecr lsa category management 160310 v5 pour ecrall
Présentation ecr lsa category management 160310 v5 pour ecrallPrésentation ecr lsa category management 160310 v5 pour ecrall
Présentation ecr lsa category management 160310 v5 pour ecrall
 
Cross channel 2
Cross channel 2Cross channel 2
Cross channel 2
 
Top 10 assistant category manager interview questions and answers
Top 10 assistant category manager interview questions and answersTop 10 assistant category manager interview questions and answers
Top 10 assistant category manager interview questions and answers
 
Strategic Sourcing - A High level overview
Strategic Sourcing - A High level overviewStrategic Sourcing - A High level overview
Strategic Sourcing - A High level overview
 
Gb tgi 2014 q4 updated
Gb tgi 2014 q4 updatedGb tgi 2014 q4 updated
Gb tgi 2014 q4 updated
 
Category owner presentaion
Category owner presentaionCategory owner presentaion
Category owner presentaion
 
Certificate - PRINCE 2
Certificate - PRINCE 2Certificate - PRINCE 2
Certificate - PRINCE 2
 
My Aha Moment: Business Innovation Process
My Aha Moment: Business Innovation ProcessMy Aha Moment: Business Innovation Process
My Aha Moment: Business Innovation Process
 
Session 4 It And Competitive Strategy
Session 4 It And Competitive StrategySession 4 It And Competitive Strategy
Session 4 It And Competitive Strategy
 
ADM Sevilla: Aerolia sourcing strategy 2014
ADM Sevilla: Aerolia sourcing strategy 2014ADM Sevilla: Aerolia sourcing strategy 2014
ADM Sevilla: Aerolia sourcing strategy 2014
 
FMCG Category Growth
FMCG Category GrowthFMCG Category Growth
FMCG Category Growth
 
Liquid Dish Detergent2
Liquid Dish Detergent2Liquid Dish Detergent2
Liquid Dish Detergent2
 
Consumer centric category management
Consumer centric category managementConsumer centric category management
Consumer centric category management
 

Ähnlich wie Category strategy development & implementation

Low cost supply chain
Low cost supply chainLow cost supply chain
Low cost supply chainentrapnet
 
Supply market analysis
Supply market analysisSupply market analysis
Supply market analysissonictwinkler
 
Chap003 the purchasing function
Chap003 the purchasing functionChap003 the purchasing function
Chap003 the purchasing functionHee Young Shin
 
Ariba Commerce Summit 2012: Growing Your B2B Business
Ariba Commerce Summit 2012: Growing Your B2B BusinessAriba Commerce Summit 2012: Growing Your B2B Business
Ariba Commerce Summit 2012: Growing Your B2B BusinessSAP Ariba
 
Delivering Value Beyond Savings_Cubist Pharmaceuticals
Delivering Value Beyond Savings_Cubist PharmaceuticalsDelivering Value Beyond Savings_Cubist Pharmaceuticals
Delivering Value Beyond Savings_Cubist PharmaceuticalsZycus
 
What Can Bond Do For Your Company
What Can Bond Do For Your CompanyWhat Can Bond Do For Your Company
What Can Bond Do For Your Companybirney.james
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseMike Romeri
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertisesstein90
 
Price Benchmarking of Outsourced Services
Price Benchmarking of Outsourced ServicesPrice Benchmarking of Outsourced Services
Price Benchmarking of Outsourced ServicesEverest Group
 
Bricks Matter Webinar Sponsored by Kinaxis
Bricks Matter Webinar Sponsored by KinaxisBricks Matter Webinar Sponsored by Kinaxis
Bricks Matter Webinar Sponsored by KinaxisLora Cecere
 
Aged Care Presentation 251011
Aged Care Presentation 251011Aged Care Presentation 251011
Aged Care Presentation 251011newstadt
 
Purchasi
PurchasiPurchasi
Purchasijasween
 
Porter genericstrategies
Porter genericstrategiesPorter genericstrategies
Porter genericstrategiesfarh82
 
Financial Tools for Product Managers
Financial Tools for Product ManagersFinancial Tools for Product Managers
Financial Tools for Product ManagersSVPMA
 
Channel design-advanced
Channel design-advancedChannel design-advanced
Channel design-advancedSaurabh Sharma
 
Integrated Supply Chain
Integrated Supply ChainIntegrated Supply Chain
Integrated Supply ChainSSA KPI
 
Time to Tell Your CPOs to Collaborate with Suppliers
Time to Tell Your CPOs to Collaborate with SuppliersTime to Tell Your CPOs to Collaborate with Suppliers
Time to Tell Your CPOs to Collaborate with SuppliersMelih ÖZCANLI
 

Ähnlich wie Category strategy development & implementation (20)

Low cost supply chain
Low cost supply chainLow cost supply chain
Low cost supply chain
 
Supply market analysis
Supply market analysisSupply market analysis
Supply market analysis
 
Chap003 the purchasing function
Chap003 the purchasing functionChap003 the purchasing function
Chap003 the purchasing function
 
Ariba Commerce Summit 2012: Growing Your B2B Business
Ariba Commerce Summit 2012: Growing Your B2B BusinessAriba Commerce Summit 2012: Growing Your B2B Business
Ariba Commerce Summit 2012: Growing Your B2B Business
 
Management Supply Chain
Management Supply ChainManagement Supply Chain
Management Supply Chain
 
Delivering Value Beyond Savings_Cubist Pharmaceuticals
Delivering Value Beyond Savings_Cubist PharmaceuticalsDelivering Value Beyond Savings_Cubist Pharmaceuticals
Delivering Value Beyond Savings_Cubist Pharmaceuticals
 
Supply chain
Supply chainSupply chain
Supply chain
 
What Can Bond Do For Your Company
What Can Bond Do For Your CompanyWhat Can Bond Do For Your Company
What Can Bond Do For Your Company
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertise
 
Introduction to ops rules transformation expertise
Introduction to ops rules transformation expertiseIntroduction to ops rules transformation expertise
Introduction to ops rules transformation expertise
 
Price Benchmarking of Outsourced Services
Price Benchmarking of Outsourced ServicesPrice Benchmarking of Outsourced Services
Price Benchmarking of Outsourced Services
 
Bricks Matter Webinar Sponsored by Kinaxis
Bricks Matter Webinar Sponsored by KinaxisBricks Matter Webinar Sponsored by Kinaxis
Bricks Matter Webinar Sponsored by Kinaxis
 
Aged Care Presentation 251011
Aged Care Presentation 251011Aged Care Presentation 251011
Aged Care Presentation 251011
 
Purchasi
PurchasiPurchasi
Purchasi
 
Porter genericstrategies
Porter genericstrategiesPorter genericstrategies
Porter genericstrategies
 
Financial Tools for Product Managers
Financial Tools for Product ManagersFinancial Tools for Product Managers
Financial Tools for Product Managers
 
Channel design-advanced
Channel design-advancedChannel design-advanced
Channel design-advanced
 
Agile Contracts
Agile ContractsAgile Contracts
Agile Contracts
 
Integrated Supply Chain
Integrated Supply ChainIntegrated Supply Chain
Integrated Supply Chain
 
Time to Tell Your CPOs to Collaborate with Suppliers
Time to Tell Your CPOs to Collaborate with SuppliersTime to Tell Your CPOs to Collaborate with Suppliers
Time to Tell Your CPOs to Collaborate with Suppliers
 

Mehr von FGB

Certificate - Master of Business Administration (MBA)
Certificate - Master of Business Administration (MBA)Certificate - Master of Business Administration (MBA)
Certificate - Master of Business Administration (MBA)FGB
 
Order to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) LibyaOrder to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) LibyaFGB
 
Supplier award program june 2014
Supplier award program june 2014Supplier award program june 2014
Supplier award program june 2014FGB
 
Stakeholder mapping & communication policy dec 2010
Stakeholder mapping & communication policy dec 2010Stakeholder mapping & communication policy dec 2010
Stakeholder mapping & communication policy dec 2010FGB
 
Save definitions & benefits tracking 2012
Save definitions & benefits tracking 2012Save definitions & benefits tracking 2012
Save definitions & benefits tracking 2012FGB
 
Procurement & supply chain kpi benchmark 2010
Procurement & supply chain kpi benchmark 2010Procurement & supply chain kpi benchmark 2010
Procurement & supply chain kpi benchmark 2010FGB
 
P2P lean management transformation 2012
P2P lean management transformation 2012P2P lean management transformation 2012
P2P lean management transformation 2012FGB
 

Mehr von FGB (7)

Certificate - Master of Business Administration (MBA)
Certificate - Master of Business Administration (MBA)Certificate - Master of Business Administration (MBA)
Certificate - Master of Business Administration (MBA)
 
Order to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) LibyaOrder to Cash (Time To Invoice) Libya
Order to Cash (Time To Invoice) Libya
 
Supplier award program june 2014
Supplier award program june 2014Supplier award program june 2014
Supplier award program june 2014
 
Stakeholder mapping & communication policy dec 2010
Stakeholder mapping & communication policy dec 2010Stakeholder mapping & communication policy dec 2010
Stakeholder mapping & communication policy dec 2010
 
Save definitions & benefits tracking 2012
Save definitions & benefits tracking 2012Save definitions & benefits tracking 2012
Save definitions & benefits tracking 2012
 
Procurement & supply chain kpi benchmark 2010
Procurement & supply chain kpi benchmark 2010Procurement & supply chain kpi benchmark 2010
Procurement & supply chain kpi benchmark 2010
 
P2P lean management transformation 2012
P2P lean management transformation 2012P2P lean management transformation 2012
P2P lean management transformation 2012
 

Kürzlich hochgeladen

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfASGITConsulting
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 

Kürzlich hochgeladen (20)

1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Types of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdfTypes of Cyberattacks - ASG I.T. Consulting.pdf
Types of Cyberattacks - ASG I.T. Consulting.pdf
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 

Category strategy development & implementation

  • 1. ATR Consulting Limited Category Strategy Development & Implementation Tahir Rafiq April 2013 Applying automotive best practice in the Banking Industry..... Author : Tahir Rafiq Project Start Date: atr
  • 2. Contents Category strategies & supplier relationship management 1 Baseline :- Portfolio analysis 2 Ideal positioning (Using PFA) 3 Adopting a strategy based on power regimes (Hexagon Analysis) 4 Commodity strategy matrix using the hexagon analysis 5 Adopting a strategy based on power regimes 6 Developing the right commodity strategy 7 Assessing the gap between ideal sourcing strategy and current practices 8 Implementing strategy & action plans 9 Appendix A 10 Appendix B. Glossary 11 atr 1
  • 3. Category strategies & supplier relationship management Portfolio analysis workshop out put Out put of workshop Category positioning matrix ( tool) 10.00 An analytical (excel) tool was used to Position the material groups on the Portfolio Matrix. 9.00 Based on the following weighted variables  Spend 8.00  Number of Suppliers  The level of competition  Number of Buyers 7.00  The Buyers Search Cost  The Buyers Switching Cost 6.00  The Suppliers Switching Cost Value ($) of Spend  Product Complexity 5.00  Number of Substitutes  Buyers Spend as % of Suppliers T/O  The level of Importance to Supplier 4.00 A workshop was held with the Contracts Department & The Purchasing Department to 3.00 determine the position of each material group A workshop was held with the Contracts 2.00 Department & The Purchasing Department to determine the position of each material group on 1.00 the material This is an iterative process and this exercise should be conducted on a regular basis i.e. The more times it is 0.00 0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 performed the more accurate the out put will be. Supply Risk atr 2 1
  • 4. Baseline :- Portfolio analysis Examining buyer – supplier power dynamics Potential approaches to buyer supplier High relationship management B=S Buyer Supplier Inter- B>S Buyer Dominance 2. B > S 3. B = S dependence Leverage – Focus on Short Term Relationship Use competitive tendering to reduce cost and consolidate volume Leverage Strategic Strategic - Focus on Long Term Relationship Ensure availability of supply, focus on relationship Buyer Power building, process integration and innovation Tactical Bottleneck Tactical – Focus on Short Term Quick Wins Simplify and streamline purchasing process, reduce number of suppliers and simplify ordering B0S Buyer Supplier B<S Supplier Dominance Bottleneck - Focus on Long Term Security of Independence Supply Search for alternatives, seek new suppliers, reduce dependency on current supplier Low Low Supplier Power High atr 3 2
  • 5. Ideal positioning Adopting strategies to optimize power Adopt following strategies..... High The best place to be 2. B > S 3. B = S L Maintain position L S S The second best place to be Maintain position but shift Long term to leverage Buyer Power Consolidate with other T Material groups & shift up B Reduce dependency on the current Supplier base .  changing the specification  Finding alternative suppliers T B  Encouraging new suppliers into the  market  Consolidating with other material Low  groups Low Supplier Power High atr 4 3
  • 6. Adopting a strategy based on power regimes (Hexagon Analysis) Example of typical levers have been identified for the various sourcing approaches Exploit Buying Power Create An Advantage Exploit Create An Buying Power Advantage Consolidation Specification • Supplier Rationalization • Rationalise/standardise product(s) • Consolidate volume across Business • Product Substitution • Redistribute volume among suppliers • Apply product value analysis • Combine volume from different • Apply product value engineering commodity group • Use functional/ output specification • Rationalize/standardise parts • Examine life cycle costs Consolidation Specification Cost Leadership Joint Process Improvement • Benchmark prices regularly • Optimise physical material flow • Renegotiate/rollback prices • Support supplier operations improvement • Un-bundle prices Cost Joint Process • Develop long-term contracts • Use competitive bidding Leadership Strategy • Share productivity gains Improvement • Use commodity hedging/trading • Integrate logistics • Compare total cost among potential • Cost reductions suppliers • Product Innovation / Development • Base pricing on profitability Global Relationship Sourcing Mgt Global Sourcing Relationship Mgt • Expand geographic supply base • Analyse core competencies • Examine new suppliers • Employ strategic alliances/partnering • Capitalise on currency fluctuations • Co Investment • Take advantage of trade incentives • Vertical Integration • Low cost country sourcing atr 5 4
  • 7. Commodity strategy matrix using the hexagon analysis Category strategy matrix Strategy Core Activities 1 2 3 4 5 0-20 20-40 40-60 60-80 80-100 Consolidation a Purchasing is Coordinated through a central Point O √ √ √ √ b Percentage of Spend Negotiated by Volume Leverage O √ √ √ √ c Combining Volumes from Other Material Groups O O O √ √ d Redistributing Volumes Across Suppliers O O √ √ √ e Pooling Volumes Across Business O √ √ √ √ f Future Volumes through Demand Forecasting O O O √ √ Cost Leadership a Competitive Bidding √ √ √ √ √ b Total Life Costing O O O √ √ c Continuous Benchmark O √ √ √ √ d Renegotiate & Rollback Pricing O O √ √ √ e Unbundle Prices O O O √ √ f Commodity Hedging & Trading O O O O √ Global Sourcing a Multi Region Sourcing O √ √ √ √ b Taking Advantage of Trade Incentives O O O √ √ c Capitalising on Currency Fluctuations O O O O √ d Alternatives sourced from broad Gloabl Supply Markets O O O √ √ e Taking Advantage of Low Cost Country Sourcing O O √ √ √ Specification a Change or improve Specification O √ √ √ √ b Apply Product Value Analsysis O O O √ √ c Use of Out Put / Functional Specification O O √ √ √ d Standardise Specification O √ √ √ √ e Jointly Optimise Specification with suppliers O O O √ √ Joint Process Improvement a Level of Information Sharing O √ √ √ √ b Structured Improvement Process with 1/4 Reviews O O √ √ √ c Joint Process Teams working to reduce costs in SC O O O √ √ d Level of Support Given to Supplier Operations Improvement O √ √ √ √ e Integration of Processes & Systems O O √ √ √ f Integration of Losgistics O O O √ √ g Product Innovation & Development O O O O V atr 6 5
  • 8. Adopting a strategy based on power regimes Typical levers identified for various sourcing approaches Relationship Type Category Positioning 1 2 3 4 5 100 % 100 % 100 % 100 % 100 % Transactional No Supply Arrangements No Contracts in Place Spot Purchasing Playing the Market √ O O O O Short Term Opportunistic Buying Power is leveraged to get Lowest Cost Short Term Supply Arrangements are in Place Exploit Market Competition O √ O O O Collaborative Relationship Minimise Cost & Maximise Service Levels Medium Term Relationship Ensure Supply Continuity O O √ O O Partnering Medium to Long Term Relationship Maximise Benefits to Both Supplier & Buyer O O O √ O Interdependent Strategic Alliance Long Term Relationship Risk Sharing Co Investment Committing Volumes O O O O √ atr 7 6
  • 9. Developing the right commodity strategy Selection criteria ( matrix) Best Fit Commodity Strategy Exploit Buying Power Create an Advantage Scoring Matrix 5 = High value 1 = Low value Tactical Leverage Bottleneck Strategic Consolidation 3 5 1 2 Cost Leadership 5 5 2 2 Global Sourcing 3 5 2 2 Specification 1 2 5 4 Joint Process Improvement 2 2 4 5 Relationship Mgt 1 2 3 5 atr 8 7
  • 10. Assessing the gap between ideal sourcing strategy and current practices Gap analysis Commodity A Current Approach Target Approach Gap Analysis Consolidation 3 5 2 Cost Leadership 2 5 3 Global Sourcing 2 5 3 Specification 2 2 0 Joint Process Improvement 1 2 1 Relationship Mgt 2 2 0 Overall Score 9 21 Rating 43 % Category Scale 20-40% 0% 0 – 20 % Low gap Small Strategic Gap Ratio – All applicable approaches have been applied and 20 % 20 – 40 % have yielded considerable results already 40 % 40 – 60 % 60 % 60 – 80 % Large Strategic Gap Ratio – There are a number of applicable approaches Very high which have not been applied, or which have been applied without success 80 % 80 – 100 % gap atr 9 8
  • 11. Implementing strategy & action plans Standardized tracking tool Example . Electrical Category Material Joint Process Relationship Group Sub Material Group Consolidation Cost Leadership Global Sourcing Specification Improvement Mgt 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 A C T C T T C C T A Electrical Hand Tools C C T C T A C T A Electrical Automatic Hand Tools C C T C T A C T A Electrical Alkaline Batteries C C T A A C T C T A Electrical Rechargeable Batteries A T C T C T T C C T C T Electrical Accessories T C A A C T C T C Electrical LED Flash Light C T C T C T T C C T C T Electrical Flashlight T A C T C T T C C T A Electrical Standard Wires C T A A C T C T A Electrical Energy Savings Lighting C T C T C T T C A C T Electrical Switches C A C T C T T C C T A Electrical Diodes C T C T C T C T C T A Electrical Connectors Current position Target Position Objective Achieved A Achieved T Target C Current Position atr 10 9
  • 12. Appendix A Action Plan (How to use the tool) Conduct a Portfolio Analysis Exercise on a. The Material Group Start Point b. On The Sub Material Group For each Material Group / Sub Material Group determine the current approach against each of the six criteria in the Hexagon using Step 1 “The Commodity Group Positioning Tool” This activity should be conducted jointly with SRS and Purchasing / Contracting Determine the type of Supplier Relationship (Consult the Portfolio Analysis to see where the commodity is positioned) that you need to Step 2 have with the supplier of this particular Commodity Group / Sub Group. Use the “Supplier Relationship Tool” to establish this. Using “The Best Fit Strategy Tool” compare the current approach against each of the six criteria with Best Practice. Step 3 Using “The Gap Analysis Tool” determine the size of the Strategic Gap, between the current approach and Best Practice. Step 4 Using the “Commodity Tracking Tool” plot the current position, the target position and monitor the progress on a monthly basis. Step 5 atr 11 10
  • 13. Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis) Term Explanation Supplier Rationalization Reducing the number of suppliers Consolidate volume across Business Add all the requirements together from different parts of the business i.e. Manufacturing, maintenance, IT etc to increase the volume of spend. Redistribute volume among suppliers Change the level of spend with existing suppliers i.e. Split the business 75% to 25% between two suppliers to increase competition Combine volume from different Adding together several related commodity groups to increase volume of spend, reduce the number of suppliers commodity groups Rationalize / Standardise Parts Reduce the number of parts , by using standard sizes / specs i.e. Use one standard bearing instead of several different bearings which may all be similar. This will help to consolidate volumes and increase leverage when negotiating with the supplier base. Cost Leadership Is when price is the main focus for a particular commodity group Benchmark Prices Regularly Compare the prices on an annual basis by going out to the market and getting other suppliers to quote for the business Renegotiate / Rollback Prices Renegotiate with existing suppliers, if the market conditions are hard and the company’s profit margin is being reduced. i.e. ask for cost reductions. Rollback Prices, ask the supplier to reduce the costs so they are the same as two years ago for example. Un-bundle Prices Ask the supplier to break the suppliers costs down into components i.e. raw material, logistics, manpower, admin, etc. This is so that you can determine the level of profit they are making, if it is too much then they are taking advantage, if it is too little then they could be making a loss. Competitive Bidding Getting more than two suppliers to compete for the quote / business Commodity Hedging / Trading Agreeing to buy from the supplier so much of a product, at an agreed price at a fixed point of time in the future. Trading is when you buy a commodity for your own needs plus some extra, that you can sell to other buyers for a profit Compare total cost amongst suppliers Comparing prices between several suppliers, based on the cost of goods, the maintenance and after care support, the servicing costs, the replacement cost, the life and the usage of the product (i.e. How long will it last and how much use will get from it) atr 12 11
  • 14. Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis) Term Explanation Base pricing on profitability Set a limit for an acceptable profit margin for the supplier i.e. 10% and agree that the supplier will only make 10% and no more. You will have to be very careful and analyse the suppliers costs to make sure that he is making only the agreed profit margin and no more. Expand Geographic Supply Base I.e. If you are only buying from one region, then you need to include other regions, i.e. From western province, increase to eastern province. If you are only buying from one country in Europe increase the area to the whole of Europe. Examine new suppliers Look for other suppliers, examine their products etc Capitalise on currency fluctuations Look out for the exchange rates going up or down, it is best to buy when the exchange rate is high and in your favour, this way you will have greater purchasing power (i.e. You can buy more things) Take advantage of trade incentives Some countries have special arrangements with Saudi Arabia, i.e. They do not charge tax, or tariffs, they do not charge the manufacturers export duties if they export to KSA etc. Or some other benefit, you need to investigate these benefits . Low cost country sourcing Countries that have cheap labour rates, or access to cheap resources, that can manufacture goods at lower rates than other countries. Product Substitution Change one similar product with another one, could be based on Brand, specification, or a different product altogether that does the same job Product value analysis Is looking at the function(s) of a product and the cost of achieving that function, the functions are broken down into primary and secondary, primary functions are the ones that the product must have and the secondary ones are the one that we can delete as they are not necessary , the ideas is that by deleting the secondary functions we will reduce also the cost. Product value engineering Similar to the one above, but the emphasis here is on optimising the performance of the product, to increase its life, increase its quality and also to reduce its cost, through technical / engineering teams. Functional / Output Specification Only concentrate on what the product is required to do and the job it should perform and not the make up of that material, leave that to the supplier, we are only interested in the use of the product. Examine Life Cycle Costs Life Cycle Cost is the total cost of ownership over the life of the product, it includes, the acquisition cost, the logistics cost, maintenance, repair, the amount of usage, etc. atr 13 12
  • 15. Appendix B. Glossary (Meanings of terms used in the Hexagon Analysis) Term Explanation Optimise Physical Material Flow Improving the coordination of logistics between us and the buyer, looking at how the material is passed through the suppliers organisation and the transformation process (manufacturing process) then out to us and then how does it pass through our organisation Support supplier operations improvement Looking at ways of working with the supplier to improve their systems and processes together as a team Develop long-term contracts Long term contracts are typically more than three years Share productivity gains By working as a team with the supplier to reduce costs, or improve quality, or knowledge , the benefits should be shared with the supplier. Integrate Logistics Better coordination of transport of goods between us and the supplier Cost Reductions Working with the supplier to reduce costs Product Innovation / Development Working with the supplier to develop or design new products atr 14 13
  • 16. End of presentation Tahir Rafiq Feedback would be greatly received and appreciated atr 15 14