2 BRAC Program Management Office.
Update Topics
• Past Sampling Activities
• Site Background
• 2017 Sampling Scope
• Tiering Response Summary
• Future Activities
3 BRAC Program Management Office.
Site Background
Schematic of Vapor Intrusion Pathway
4 BRAC Program Management Office.
Site Background
IR INavy Area of Responsibility (yellow)
5 BRAC Program Management Office.
Past Sampling Activities
• May - June 2012: Indoor Air Sampling
• May - June 2013: Soil Gas and Groundwater Investigation
• February 2014: Indoor Air Sampling
• September 2015: Groundwater Investigation
• January 2016: Indoor Air Sampling
• January 2017: Indoor Air Sampling
• Building 10 – Sampled Quarterly
6 BRAC Program Management Office.
Building Surveys
• Prior to air sampling, 23 industrial/commercial buildings
were surveyed for any recent modifications in the layout
and operations of the HVAC systems
• Collected real-time readings for volatile organic
compounds using a hand-held photoionization detector
(PID) during building surveys
• PID readings used to optimize air sampling locations
• Interviewed building managers regarding building use,
operations, work hours of occupants, chemical use and
storage
7 BRAC Program Management Office.
2017 Air Sampling
• A total of 211 samples were collected:
– 169 indoor air samples (first floor and basements)
– 13 pathway samples (i.e. crawl spaces, elevator shaft)
– 29 outdoor ambient air samples (background)
– Includes 8 samples from Building 10
• Samples collected with 6-liter canisters placed 36” to 60” above the
floor and analyzed for COCs by EPA Method TO-15 SIM (selected
ion monitoring)
• Buildings were sampled for 8, 10, or 24 hours, depending on use and
occupancy
• Buildings with an HVAC system were sampled twice:
– During work hours with the HVAC system operating
– 36 to 48 hours after the building ventilation system had been shut
down (following Martin Luther King Day weekend)
8 BRAC Program Management Office.
2017 Air Sampling Photos
Outdoor Ambient Sample Pathway Sample Indoor Sample
9 BRAC Program Management Office.
Indoor Air Cleanup Levels for
Long-Term Exposure
ROD Amendment for the Vapor Intrusion Pathway (EPA, 2010)
Chemical of Concern
Indoor Air Cleanup Level (μg/m3)
Commercial for Long-Term Exposure
Trichloroethene 5
Tetrachloroethene 2
cis-1,2-Dichloroethene 210
trans-1,2-Dichloroethene 210
Vinyl Chloride 2
1,1-Dichloroethane 6
1,1-Dichloroethene 700
10 BRAC Program Management Office.
SUMMARY OF TIERING SYSTEM AND RESPONSE
ACTIONS FOR EXISTING COMMERCIAL BUILDINGS
Tier Description Response Action
1 Building with indoor air concentrations
greater than outdoor (background) air
concentrations and indoor air cleanup
levels.
• Implement selected remedy to meet indoor air cleanup levels.
• Once indoor air cleanup level is achieved and confirmed, building is
recategorized as Tier 2.
• Implement governmental, proprietary, and information institutional controls.
2 Building with indoor air concentrations
below the indoor air cleanup levels, while
an engineering control is in place or in
operation. Also, former Tier 1 buildings
with confirmed indoor air concentrations
that are below the indoor air cleanup
levels.
• Ensure continued operation and maintenance of active ventilation system or
other selected engineered remedy to meet remedial action objectives.
• Develop and implement long-term monitoring and institutional controls
implementation plan.
• Where remedy is achieved through operation of an active ventilation system,
agreement of property owner must be contained in a recorded agreement.
3A Building sampled without engineering
control in place or operating with indoor
air concentrations below indoor air
cleanup levels, but greater than outdoor
(background) concentrations.
• No engineered remedy required. Develop and implement long-term
monitoring plan. Implement governmental institutional controls.
3B Building sampled without engineering
control in place or operating with indoor
air concentrations at or within outdoor air
(background) concentrations.
• No engineered remedy or long-term monitoring required. Implement
governmental institutional controls.
4 Buildings where converging lines of
evidence demonstrate that there is no
longer the potential for vapor intrusion
into the building exceeding indoor air
cleanup levels.
• No action required after performance of all necessary confirmation sampling
and documentation approved by USEPA that no action is necessary.
11 BRAC Program Management Office.
Draft 2016 Tier Evaluation
• Tier 1: Buildings 45, 126, 567
• Tier 3A: 2, 3, 10, 12, 13, 14, 15, 16, 29, 67, 76, 107, N210,
N239, N239A, N243, N243A, 510, 555, 566
12 BRAC Program Management Office.
Future Activities
• A detailed building tiering evaluation will be included in the
Draft 2017 IR Site 28 Air Sampling and Vapor Intrusion Tier
Response Evaluation Report (scheduled for June/July 2017)
• Continue with CERCLA process
13 BRAC Program Management Office.
Air Sampling for Vapor Intrusion
QUESTIONS ?

Weitere ähnliche Inhalte

Was ist angesagt?

Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Ralph Simon, P.G.
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityFairfax County
 
Case Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen LagoonCase Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen LagoonLPE Learning Center
 
Sv eand ssd_vimitigation_mar2015_final
Sv eand ssd_vimitigation_mar2015_finalSv eand ssd_vimitigation_mar2015_final
Sv eand ssd_vimitigation_mar2015_finalChris Lutes
 
Phased Sequential Soil Gas Investigation
Phased Sequential Soil Gas InvestigationPhased Sequential Soil Gas Investigation
Phased Sequential Soil Gas InvestigationHarryONeill
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 UpdateSteve Williams
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryDaljit Brar
 
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...Steve Williams
 
Calibration and validation o s air quality
Calibration and validation o s air qualityCalibration and validation o s air quality
Calibration and validation o s air qualityECRD IN
 
STAGR Technology
STAGR TechnologySTAGR Technology
STAGR Technologykt-energy
 
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Steve Williams
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Steve Williams
 
Production optimization using bean size selection
Production optimization using bean size selectionProduction optimization using bean size selection
Production optimization using bean size selectionDr. Elnori Elhaddad
 
Navy 5 year review presentation
Navy 5 year review presentationNavy 5 year review presentation
Navy 5 year review presentationSteve Williams
 
Aquifer Characterization Using Multilevel Samplers in Rotasonic Boreholes
Aquifer Characterization Using Multilevel Samplers in Rotasonic BoreholesAquifer Characterization Using Multilevel Samplers in Rotasonic Boreholes
Aquifer Characterization Using Multilevel Samplers in Rotasonic BoreholesJeff Steiner
 
Life Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteLife Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteeAmbiente
 

Was ist angesagt? (20)

Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
Focusing a Mineral Spirit LNAPL Investigation Towards Remedial Design Using U...
 
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...Record of Environmental Consideration for the PCAPP Demilitarization Activi...
Record of Environmental Consideration for the PCAPP Demilitarization Activi...
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste Facility
 
Case Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen LagoonCase Study: Closure of an Earthen Lagoon
Case Study: Closure of an Earthen Lagoon
 
Policy for Malad and Bear River Drainages
Policy for Malad and Bear River DrainagesPolicy for Malad and Bear River Drainages
Policy for Malad and Bear River Drainages
 
Sv eand ssd_vimitigation_mar2015_final
Sv eand ssd_vimitigation_mar2015_finalSv eand ssd_vimitigation_mar2015_final
Sv eand ssd_vimitigation_mar2015_final
 
Phased Sequential Soil Gas Investigation
Phased Sequential Soil Gas InvestigationPhased Sequential Soil Gas Investigation
Phased Sequential Soil Gas Investigation
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 Update
 
K5 4 Wells Portal Success Story
K5 4 Wells Portal Success StoryK5 4 Wells Portal Success Story
K5 4 Wells Portal Success Story
 
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
20 Years and 20Mt, Statoil Storage Experience, Andrew Cavanagh - Geophysical ...
 
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
Navy presentation to the Moffett Field Restoration Advisory Board on May 15, ...
 
Calibration and validation o s air quality
Calibration and validation o s air qualityCalibration and validation o s air quality
Calibration and validation o s air quality
 
STAGR Technology
STAGR TechnologySTAGR Technology
STAGR Technology
 
Gec pest
Gec pestGec pest
Gec pest
 
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
Five-Year Review Report for Moffett Sites 1, 22, 26, and 28
 
Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009Moffett Base-Wide Groundwater Update, September 10, 2009
Moffett Base-Wide Groundwater Update, September 10, 2009
 
Production optimization using bean size selection
Production optimization using bean size selectionProduction optimization using bean size selection
Production optimization using bean size selection
 
Navy 5 year review presentation
Navy 5 year review presentationNavy 5 year review presentation
Navy 5 year review presentation
 
Aquifer Characterization Using Multilevel Samplers in Rotasonic Boreholes
Aquifer Characterization Using Multilevel Samplers in Rotasonic BoreholesAquifer Characterization Using Multilevel Samplers in Rotasonic Boreholes
Aquifer Characterization Using Multilevel Samplers in Rotasonic Boreholes
 
Life Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green SiteLife Cycle Assessment (LCA) del progetto Green Site
Life Cycle Assessment (LCA) del progetto Green Site
 

Ähnlich wie RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28

Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateSteve Williams
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddixAll4 Inc.
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES / IAQM
 
Moffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion UpdateMoffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion UpdateSteve Williams
 
Hazardous Materials Assessments for Renovation/Demolition Projects
Hazardous Materials Assessments for Renovation/Demolition ProjectsHazardous Materials Assessments for Renovation/Demolition Projects
Hazardous Materials Assessments for Renovation/Demolition ProjectsGuy Sylvester
 
12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdfIES / IAQM
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industryMarcello Pasquazzo
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample MemoChad Colton
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyHydroTerra Pty Ltd
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116All4 Inc.
 
Lab Design Sustainability
Lab Design SustainabilityLab Design Sustainability
Lab Design SustainabilityDIv CHAS
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanroomsnetomoney
 
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdf
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdfIntro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdf
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdfLidiyaBatrisyia1
 
Clean Room Pharmaceutical Good Manufacturing Process.pdf
Clean Room Pharmaceutical Good Manufacturing Process.pdfClean Room Pharmaceutical Good Manufacturing Process.pdf
Clean Room Pharmaceutical Good Manufacturing Process.pdfHananZayed4
 
Clean Room Pharmaceutical_ GMP Procedures
Clean Room Pharmaceutical_ GMP ProceduresClean Room Pharmaceutical_ GMP Procedures
Clean Room Pharmaceutical_ GMP ProceduresHananZayed4
 
Utilizing Energy Recovery and Optimizing Air
Utilizing Energy Recovery and Optimizing AirUtilizing Energy Recovery and Optimizing Air
Utilizing Energy Recovery and Optimizing AirCannonDesign
 
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...The Business Council of Mongolia
 

Ähnlich wie RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28 (20)

Moffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion UpdateMoffett RAB: Navy Vapor Intrusion Update
Moffett RAB: Navy Vapor Intrusion Update
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddix
 
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
IES Webinar: Land & Groundwater Remediation Options & Scoping - The Decision ...
 
Portfolio
PortfolioPortfolio
Portfolio
 
Moffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion UpdateMoffett RAB Presentation: Vapor Intrusion Update
Moffett RAB Presentation: Vapor Intrusion Update
 
Hazardous Materials Assessments for Renovation/Demolition Projects
Hazardous Materials Assessments for Renovation/Demolition ProjectsHazardous Materials Assessments for Renovation/Demolition Projects
Hazardous Materials Assessments for Renovation/Demolition Projects
 
12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf12.15 Indoor air quality monitoring study in modern offices.pdf
12.15 Indoor air quality monitoring study in modern offices.pdf
 
Ispe the energy saving in the pharmaceutical industry
Ispe   the energy saving in the pharmaceutical industryIspe   the energy saving in the pharmaceutical industry
Ispe the energy saving in the pharmaceutical industry
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
Landfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term EfficiencyLandfill Compliance Monitoring: Achieving Long Term Efficiency
Landfill Compliance Monitoring: Achieving Long Term Efficiency
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
 
Indoor air quality monitoring presentation pdf
Indoor air quality monitoring presentation pdfIndoor air quality monitoring presentation pdf
Indoor air quality monitoring presentation pdf
 
Lab Design Sustainability
Lab Design SustainabilityLab Design Sustainability
Lab Design Sustainability
 
Risk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of CleanroomsRisk Issues Environmental Monitoring of Cleanrooms
Risk Issues Environmental Monitoring of Cleanrooms
 
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdf
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdfIntro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdf
Intro_to_the_Environ_Quality_Regulations_2014_and_Compliance_Requirements.pdf
 
Clean Room Pharmaceutical Good Manufacturing Process.pdf
Clean Room Pharmaceutical Good Manufacturing Process.pdfClean Room Pharmaceutical Good Manufacturing Process.pdf
Clean Room Pharmaceutical Good Manufacturing Process.pdf
 
Clean Room Pharmaceutical_ GMP Procedures
Clean Room Pharmaceutical_ GMP ProceduresClean Room Pharmaceutical_ GMP Procedures
Clean Room Pharmaceutical_ GMP Procedures
 
Utilizing Energy Recovery and Optimizing Air
Utilizing Energy Recovery and Optimizing AirUtilizing Energy Recovery and Optimizing Air
Utilizing Energy Recovery and Optimizing Air
 
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
28.11.2013, JICA’s capacity building project for air pollution control, Keiko...
 

Mehr von Steve Williams

RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community PresentationSteve Williams
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Steve Williams
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanSteve Williams
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldSteve Williams
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateSteve Williams
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesSteve Williams
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013Steve Williams
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Steve Williams
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...Steve Williams
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesSteve Williams
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Steve Williams
 
Site 28 Supplemental Investigation
Site 28 Supplemental InvestigationSite 28 Supplemental Investigation
Site 28 Supplemental InvestigationSteve Williams
 
Laser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringLaser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringSteve Williams
 
Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Steve Williams
 
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Steve Williams
 
Moffett RAB Hangar One Update
Moffett RAB Hangar One UpdateMoffett RAB Hangar One Update
Moffett RAB Hangar One UpdateSteve Williams
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 UpdateSteve Williams
 
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012EPA Vapor Intrusion Update to Moffett RAB May 10, 2012
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012Steve Williams
 
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012Steve Williams
 

Mehr von Steve Williams (20)

RAB NASA Update
RAB NASA UpdateRAB NASA Update
RAB NASA Update
 
RAB Community Presentation
RAB Community PresentationRAB Community Presentation
RAB Community Presentation
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
Moffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management PlanMoffett RAB: EPA Update on Environmental Issues Management Plan
Moffett RAB: EPA Update on Environmental Issues Management Plan
 
NASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett FieldNASA Update on Planetary Ventures Lease of Moffett Field
NASA Update on Planetary Ventures Lease of Moffett Field
 
Moffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion UpdateMoffett RAB: Navy EPA Intrusion Update
Moffett RAB: Navy EPA Intrusion Update
 
Moffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental ActivitiesMoffett RAB: 2014 Planned Environmental Activities
Moffett RAB: 2014 Planned Environmental Activities
 
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013EPA MEW Sampling Update, Moffett RAB, November 14, 2013
EPA MEW Sampling Update, Moffett RAB, November 14, 2013
 
Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013Site 28 Update, Moffett RAB, November 14, 2013
Site 28 Update, Moffett RAB, November 14, 2013
 
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
US Army Corps of Engineers BUILDING STRONG® Air Sampling at the Former Orion ...
 
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and OpportunitiesHazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
Hazardous Substances at Moffett Field’s Hangar One: Challenges and Opportunities
 
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
Hangar One and Moffett Federal Airfield Leasing Opportunity Request for Propo...
 
Site 28 Supplemental Investigation
Site 28 Supplemental InvestigationSite 28 Supplemental Investigation
Site 28 Supplemental Investigation
 
Laser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs MonitoringLaser based Spectrometer for VOCs Monitoring
Laser based Spectrometer for VOCs Monitoring
 
Site 25 rab nov 29 2012
Site 25 rab nov 29 2012Site 25 rab nov 29 2012
Site 25 rab nov 29 2012
 
Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012Hangar 1 rab update nov 29 2012
Hangar 1 rab update nov 29 2012
 
Moffett RAB Hangar One Update
Moffett RAB Hangar One UpdateMoffett RAB Hangar One Update
Moffett RAB Hangar One Update
 
Moffett RAB Site 25 Update
Moffett RAB Site 25 UpdateMoffett RAB Site 25 Update
Moffett RAB Site 25 Update
 
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012EPA Vapor Intrusion Update to Moffett RAB May 10, 2012
EPA Vapor Intrusion Update to Moffett RAB May 10, 2012
 
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012
Co-Chair NASA/GSA Presentation to Moffett RAB May 10, 2012
 

Kürzlich hochgeladen

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 

Kürzlich hochgeladen (20)

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 

RAB Vapor Intrusion Update, Installation Restoration (IR) Site 28

  • 1. ACTIVITY NAME Vapor Intrusion Update Former Naval Air Station Moffett Field Restoration Advisory Board Meeting May 12, 2017 Vapor Intrusion Update Installation Restoration (IR) Site 28 Former Naval Air Station Moffett Field Restoration Advisory Board Meeting May 11, 2017 Wilson Doctor Navy Project Manager
  • 2. 2 BRAC Program Management Office. Update Topics • Past Sampling Activities • Site Background • 2017 Sampling Scope • Tiering Response Summary • Future Activities
  • 3. 3 BRAC Program Management Office. Site Background Schematic of Vapor Intrusion Pathway
  • 4. 4 BRAC Program Management Office. Site Background IR INavy Area of Responsibility (yellow)
  • 5. 5 BRAC Program Management Office. Past Sampling Activities • May - June 2012: Indoor Air Sampling • May - June 2013: Soil Gas and Groundwater Investigation • February 2014: Indoor Air Sampling • September 2015: Groundwater Investigation • January 2016: Indoor Air Sampling • January 2017: Indoor Air Sampling • Building 10 – Sampled Quarterly
  • 6. 6 BRAC Program Management Office. Building Surveys • Prior to air sampling, 23 industrial/commercial buildings were surveyed for any recent modifications in the layout and operations of the HVAC systems • Collected real-time readings for volatile organic compounds using a hand-held photoionization detector (PID) during building surveys • PID readings used to optimize air sampling locations • Interviewed building managers regarding building use, operations, work hours of occupants, chemical use and storage
  • 7. 7 BRAC Program Management Office. 2017 Air Sampling • A total of 211 samples were collected: – 169 indoor air samples (first floor and basements) – 13 pathway samples (i.e. crawl spaces, elevator shaft) – 29 outdoor ambient air samples (background) – Includes 8 samples from Building 10 • Samples collected with 6-liter canisters placed 36” to 60” above the floor and analyzed for COCs by EPA Method TO-15 SIM (selected ion monitoring) • Buildings were sampled for 8, 10, or 24 hours, depending on use and occupancy • Buildings with an HVAC system were sampled twice: – During work hours with the HVAC system operating – 36 to 48 hours after the building ventilation system had been shut down (following Martin Luther King Day weekend)
  • 8. 8 BRAC Program Management Office. 2017 Air Sampling Photos Outdoor Ambient Sample Pathway Sample Indoor Sample
  • 9. 9 BRAC Program Management Office. Indoor Air Cleanup Levels for Long-Term Exposure ROD Amendment for the Vapor Intrusion Pathway (EPA, 2010) Chemical of Concern Indoor Air Cleanup Level (μg/m3) Commercial for Long-Term Exposure Trichloroethene 5 Tetrachloroethene 2 cis-1,2-Dichloroethene 210 trans-1,2-Dichloroethene 210 Vinyl Chloride 2 1,1-Dichloroethane 6 1,1-Dichloroethene 700
  • 10. 10 BRAC Program Management Office. SUMMARY OF TIERING SYSTEM AND RESPONSE ACTIONS FOR EXISTING COMMERCIAL BUILDINGS Tier Description Response Action 1 Building with indoor air concentrations greater than outdoor (background) air concentrations and indoor air cleanup levels. • Implement selected remedy to meet indoor air cleanup levels. • Once indoor air cleanup level is achieved and confirmed, building is recategorized as Tier 2. • Implement governmental, proprietary, and information institutional controls. 2 Building with indoor air concentrations below the indoor air cleanup levels, while an engineering control is in place or in operation. Also, former Tier 1 buildings with confirmed indoor air concentrations that are below the indoor air cleanup levels. • Ensure continued operation and maintenance of active ventilation system or other selected engineered remedy to meet remedial action objectives. • Develop and implement long-term monitoring and institutional controls implementation plan. • Where remedy is achieved through operation of an active ventilation system, agreement of property owner must be contained in a recorded agreement. 3A Building sampled without engineering control in place or operating with indoor air concentrations below indoor air cleanup levels, but greater than outdoor (background) concentrations. • No engineered remedy required. Develop and implement long-term monitoring plan. Implement governmental institutional controls. 3B Building sampled without engineering control in place or operating with indoor air concentrations at or within outdoor air (background) concentrations. • No engineered remedy or long-term monitoring required. Implement governmental institutional controls. 4 Buildings where converging lines of evidence demonstrate that there is no longer the potential for vapor intrusion into the building exceeding indoor air cleanup levels. • No action required after performance of all necessary confirmation sampling and documentation approved by USEPA that no action is necessary.
  • 11. 11 BRAC Program Management Office. Draft 2016 Tier Evaluation • Tier 1: Buildings 45, 126, 567 • Tier 3A: 2, 3, 10, 12, 13, 14, 15, 16, 29, 67, 76, 107, N210, N239, N239A, N243, N243A, 510, 555, 566
  • 12. 12 BRAC Program Management Office. Future Activities • A detailed building tiering evaluation will be included in the Draft 2017 IR Site 28 Air Sampling and Vapor Intrusion Tier Response Evaluation Report (scheduled for June/July 2017) • Continue with CERCLA process