 INTRODUCTION
 SCHEMATIC POWER SYSTEM DAIGRAM
 CLASSIFICATION OF SUBSTATION
 MAIN EQUIPMENTS OF SUBSTATION
 TYPE OF INSTRUMENT TRANSFORMER
 TYPES OF CIRCUIT BREAKERS
 EARTHING SWITCH
 LIGHTING ARRESTOR
 BUS BAR
 FUSE
 INTRODUCTION OF PROTECTION SCHEME
 PF IMPROVEMENT
 MINIMUM CLEARANCE
 CONCLUSION
 Chhattisgarh State Electricity Board was Formed in Accordance
with the section 5 of the Electricity Supply Act 1948 as Per the
Notification Published in the gazette of the Government of
Chhattisgarh Dated 15th November 2000. Chhattisgarh State
Electricity Board (CSEB)became functional w.e.f. 01.12.2000.
 Chhattisgarh State Electricity Board has been reorganized into
following Five Companies in accordance with the provisions
contained in the section 131-134 of Electricity Act 2003 by the
Government of Chhattisgarh vide notification dated 19.12.2008
33 KV
Bus P.T
11 KV
33/11 KV sub
station
LA
ES
ISO
CT
CB
CB
LA
LA
T/F
CB
CT
CT CT
CT
According to Design.
1.Indoor type
Sub-station.
2.Out door type
Sub-station.
(a) Pole mounted
Sub-station.
(b) Foundation mounted
Sub-station.
 1) Power transformer
 2) Circuit breaker
 3) Isolator
 4) Earthing switch
 5) lightning arrestor
 6) BusBar
 7) Current transformer
 8) Potential transformer
 9) Protective relay
 10) DC battery set
 11)Capacitor bank
 12)Fire fighting system
 Transformer is used to step down the voltage from 33 kv voltage
to 11kv voltage .
 Generally 3.15 MVA, 5 MVA, 10 MVA 33/11kv, Δ / Y transformer
are used in 33/11kv .
 Check Oil level in main tank & OLTC tank.
 Check the color of silica gel in breather ;it must
be blue in color .if it is turned pink then
recondition it or replace it.
 Check On load Tap Changer Lower/Raise trail
by Local & Remote.
 Trip trail by draining oil in Buchholz relay
 Check Earth resistance ,provide watering
arrangement for earthling pits.
 Tight all connections.
 Check breakdown voltage of oil.
 Clean the bushings.
 Attend the oil leakages
 Note Temperature of Oil & leakage.
 Check cooling system & confirm fan control
operation w.r.to temperature variation.
 33/11 KV, Δ / Y , 3.15 MVA, 5 MVA, 10 MVA
CURRENT
TRANSFORMER
POTENTIAL
TRANSFORMER
 Current T/F is used for protection and
metering purposes.
 It steps down the current level of the line for
following purposes.
1) Measurement :- ammeter , kw meter , kwh
meter , power factor meter
2) control and protection :- current when exceeds
the set value operates the relay which senses
the faulty condition .
 300 -150 / 5 A
 200-100 / 5 A
 100-50 / 5 A
 50-25 / 5 A
It steps down the voltage level of line for -
1) Measurement : voltmeter, frequency meter ,kw
meter, kwh meter ,power factor meter
2) Control & protection : used in directional over
current protection and under frequency relay
operation (48.8 Hz , df/dt relay)
 For 33 KV :- 33 KV / 110 V/√3
 For 11 KV :- 11 KV / 110 V/√3
 Circuit Breaker can switch automatically
during normal and abnormal conditions .
during faulty condition the fault is sensed by
the relay and operates the circuit breaker to
isolate the fault.
In 33kv substation generally vacuum circuit
breaker are used where are quenching medium
is vacuum
 Low voltage air circuit breaker.
 Oil circuit breaker.
 Air blast circuit breaker.
 SF6 circuit breaker.
 Vacuum circuit breaker.
11 KV 33 KV
Rated
Voltage
12 KV 36 KV
Normal
Current
400 A 630 A
S.C Breaking
Current
8 & 12.5 KA 12.5 KA (750
MVA)
DC Voltage 24 V 24 V
 High resistance interruption.
(1) Arc lengthening.
(2) Arc cooling.
(3) Arc splitting.
(4) Arc constraining.
 Low resistance interruption.
(1) Cooling.
(2) Gap lengthening.
(3) Blast effect.
 1) no oil is required for are quenching
 2) least maintenance
 3) compact size
 4) light in weight
Maintenance of circuit breaker
 1) close/trip through local/remote control
 2) trip trial through auto closer relay
 4) oiling & greasing of moving parts
 5) vermin proofing
 6) heater healthy
 Isolator is used to isolate the equipment.
 Isolator is operate at no load.
Maintenance of isolator:-
1) Oiling &greasing of moving parts.
2) check contact firmness .
3) check open / close trials.
4) Earthing switch .
 It is operated on No Load Only.
 Rated Voltage :- 12 KV
 Normal Current :- 400 A
 Rated Voltage :- 36 V
 Normal Current :- 630 A
 Earthing switch discharges the voltage an
deadline to earth . it is connected between line
unit of isolator to earth .
NOTE:- it there is breakdown at line then for
measurement of resistance by megger do not
close earth switch .
11 KV 33 KV
Voltage Rating 9 KV 30 KV
Normal
Discharge
Current
5 KA 10 KA
 Busbar are conducting rod to which a number
incoming and outgoing feeders are connected
in 33kv S/S there are 33kv bus & 11kv bus .
VARIOUS TYPES OF BUS BAR
ARRANGE- MENT SYSTEM:-
 Single bus bar system used in D.C. and A.C.
power station.
 Single bus bar system with sectionalization .
 Ring bus bar system.
 Duplicate bus bar system.
Copper.
Tin
Lead.
Silver.
TYPES OF MATERIAL USED IN FUSE WIRE:-
 Rewireable fuse.
 Cartridge type fuse.
 Drop out fuse.
 High capacity H.R.C. fuse.
 High voltage H.R.C. fuse.
Types of Fuse element
 Rewireable fuse.
 Cartridge type fuse.
 Drop out fuse.
 High capacity H.R.C. fuse.
 High voltage H.R.C. fuse.
TYPES OF FUSES:-
 11 KV , 50 HZ.
 Rated Voltage :- 12 KV
 Rated Normal Current:- 100 A.
 DESIRED CHARECTERISTICS OF PROTECTION SYSTEM:-
Characteristics of protection system.
1.Reliability
2.Sensitivity.
3.Selectivity.
4.Descrimination.
5.Speed.
6.Simplicity.
7.Economy.
FUNCTION OF PROTECTIVE RELAYS:-
 The relay is used to cut off the power supply,
promptly to any element of power system which
undergoes short –circuit it starts operating
abnormally.
Main features of a good protective relay.
1.Reliability
2.Sensitivity.
3.Selectivity.
4.Quickness.
5.Non interference
With future extension.
1) Differential Relay
2) Over Current Earth Fault Relay
3) Buchholz Relay
 This is the main protection provided to the transformer. This takes
care of all the internal faults within the protection zone at this
relay it from hv, ct to lv ct ,it is also called as Differential zone.
Fault lying within this zone are called as external fault or through
fault.
 Details of the relay
 Transformer Differential protection relay
 Percentage Bias type
 Suitable for 2 winding transformer ,CTR-iA,
 operating current 20-100%
 Bias setting 20-30% , operating time less than msec for time setting
contact 2 nos
 Over current earth fault protection is also
called as back up protection . It two
transformers are used in parallel than
directional Over Current Earth fault relay
should be used.
 These relay are provided on 33kv hv side of
the transformer ,11kv (lv) side of the
transformer and on 11kv feeders.
 It is used to provide protection against internal
faults in transformer . Incipient faults are due to
the arcing in the oil because of the failure of the
inter -lamination or core bolt insulation or poor
electrical connection causing spark in the oil.
These fault occurs the gas in the main tank
rushes upwards and gets accumulated in the
relay chamber . initially it initiates buchholz
alarm it the fault persist then buchholz trip
command is extended to the CB.
 Generally for 33kv S/S
 Auxiliary DC volt is 30 v DC , 15 nos of cells are used
 DC voltage supply is used for following control circuit
1) Tripping circuit of CB
2) Closing circuit of CB
3) Alarm circuit , (buchholz alarm, winding temp alarm, trip alarm
,DC fail alarm)
4) Semaphore indicator (indicators the close/open position of isobar
and CB)
5) Breaker on/off indicates (indication bulbs are used )
6) Trip circuit healthy indication (indication bulb is used )
 Specific Gravity of electrolyte and amount of
charged
 Hydrometer :- it is the device used for
measurement of specific gravity of electrolyte
range is 1150 to 1433.
100 75 50 25 Discharged
Specific Gravity
At 27o C
1200-1230 1200-1210 1170-1185 1150-1160 Below 1150
 3 ph Capacitor bank is used for improvement
of power factor . It is normally connected to 11
kv bus . VCB is used for Capacitor bank
switching .
 Normally capacitor banks are connected in star.
 12 KV , 1200 KVAr, 2400 KVAr , 3600 KVAr
The advantages of power factors improvement by
Capacitor addition:-
 a) Reactive component of the network is
reduced and so also the total current in the
system from the source end
 b) I2R power losses are reduced in the system
because of reduction in current
 c) voltage level at the load end is increased
 Reduced kvA (maximum demand ) charges in
utility bill.
 Reduced distribution losses (kwh) within the
plant network.
 Better voltage and improved performance of
system.
 A high power factor eliminates penalty charges
imposed when operating with a low power
factor.
ISO ABISO
AB
AB
3PH SUPPLY
ISO
ISO
ISO
ISO
ISO
ISO
ISO
ISO
AB
AB
R Y B
R Y B
R
Y
B
R
Y
B
R
Y
B
POWER X’MER
INCOMING BUSBAR OUTGOING BUSBAR
Voltage
level
(kV)
Standar
d bay
widths
(in
Mtrs.)
For equipments
and rigid
conductors in air
Phase to Phase spacing in
isolators and switches
Phase
to
phase
(mm)
Phase to
earth
(mm)
Isolator
(mm)
Switches with
Arc Horns
(mm)
132 9.5 1700 1000 2135 3050
66 7 1220 750 1525 2135
33 4.6 915 610 765 1220
11 3.5 560 305 610 915
0.415 -- 380 305 -- --
 The training session was very educational and
very informative this CSPDCL Office have
good harmonic relation and co-ordination
between staff members. As the vocational
training seems laborious job to gate in touch
with the activities. It was nobility of the people
to provide the information and the required
theoretical background at there continuous job
hour.
C.S.P.D.C.L.AMBIKAPUR (TOWN)

More Related Content

What's hot

BREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDSBREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDSNiraj Solanki
 
Protection against over voltage
Protection against over voltageProtection against over voltage
Protection against over voltageMuhammedArifTanoli
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Voltage sag and it’s mitigation
Voltage sag and it’s mitigationVoltage sag and it’s mitigation
Voltage sag and it’s mitigationMayur Dhande
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoringash08031996
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesRaja Adapa
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...Jobin Abraham
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission linesfiraoltemesgen1
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric driveVijay Krishna
 

What's hot (20)

BREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDSBREAKDOWN IN LIQUIDS_NDS
BREAKDOWN IN LIQUIDS_NDS
 
Protection against over voltage
Protection against over voltageProtection against over voltage
Protection against over voltage
 
Unit 6 power quality
Unit 6 power qualityUnit 6 power quality
Unit 6 power quality
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
auto-reclosure
auto-reclosureauto-reclosure
auto-reclosure
 
Electric substation
Electric substation Electric substation
Electric substation
 
Voltage sag and it’s mitigation
Voltage sag and it’s mitigationVoltage sag and it’s mitigation
Voltage sag and it’s mitigation
 
Overcurrent Protection
Overcurrent ProtectionOvercurrent Protection
Overcurrent Protection
 
Buchholz relay
Buchholz relayBuchholz relay
Buchholz relay
 
Power Quality and Monitoring
Power Quality and MonitoringPower Quality and Monitoring
Power Quality and Monitoring
 
Sssc
SsscSssc
Sssc
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
Chapter 02- Breakdown in Gases (part-2)
Chapter 02- Breakdown in Gases (part-2)Chapter 02- Breakdown in Gases (part-2)
Chapter 02- Breakdown in Gases (part-2)
 
Loading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission LinesLoading Capability Limits of Transmission Lines
Loading Capability Limits of Transmission Lines
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
POWER SYSTEM PLANNING AND DESIGN. DESIGN OF EHV TRANSMISSION LINES & BUNDLED ...
 
HVDC vs HVAC ppt
HVDC vs HVAC pptHVDC vs HVAC ppt
HVDC vs HVAC ppt
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Chapter 4 mechanical design of transmission lines
Chapter 4  mechanical design of transmission linesChapter 4  mechanical design of transmission lines
Chapter 4 mechanical design of transmission lines
 
Control of electric drive
Control of electric driveControl of electric drive
Control of electric drive
 

Similar to C.S.P.D.C.L.AMBIKAPUR (TOWN)

220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protectionJayashree Behera
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvamitietlko
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)FunExplode
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
power house training seminar
power house training seminarpower house training seminar
power house training seminarParas kumar
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarBhushan Kumbhalkar
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTSCIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTSDigantaSinha1
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSatish Pydimarla
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxRAJKIRANR3
 

Similar to C.S.P.D.C.L.AMBIKAPUR (TOWN) (20)

220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Equipments in switchyard and its protection
Equipments in switchyard and its protectionEquipments in switchyard and its protection
Equipments in switchyard and its protection
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
training at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kvtraining at uppcl khurram nagar 132/33 kv
training at uppcl khurram nagar 132/33 kv
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
power house training seminar
power house training seminarpower house training seminar
power house training seminar
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
Ashish.pptx
Ashish.pptxAshish.pptx
Ashish.pptx
 
220kv substation
220kv substation220kv substation
220kv substation
 
Generator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkarGenerator protection by bhushan kumbhalkar
Generator protection by bhushan kumbhalkar
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTSCIRCUIT BREAKER USED IN THERMAL POWER PLANTS
CIRCUIT BREAKER USED IN THERMAL POWER PLANTS
 
Substation_equipment_ (1).pptx
Substation_equipment_ (1).pptxSubstation_equipment_ (1).pptx
Substation_equipment_ (1).pptx
 
Presentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptxPresentation OutDoorSwithGear(AIS) .pptx
Presentation OutDoorSwithGear(AIS) .pptx
 

Recently uploaded

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

Recently uploaded (20)

Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 

C.S.P.D.C.L.AMBIKAPUR (TOWN)

  • 1.
  • 2. PRESENTATION ON VOCATIONAL TRAINING TRANING PLACE :- C.S.P.D.C.L.AMBIKAPUR TRAINING STARTING ON 07.05.2013 TO 06.06.2013  SUPERVISION BY:-  MR.D.K.SHARMA A.E.IN CSPDCL(O&M) (AMBIKAPUR TOWN)  SUBMITTED TO :-  MR.P.R.MISHRA H.O.D. E.E. VEC LAKHANPUR
  • 3.  INTRODUCTION  SCHEMATIC POWER SYSTEM DAIGRAM  CLASSIFICATION OF SUBSTATION  MAIN EQUIPMENTS OF SUBSTATION  TYPE OF INSTRUMENT TRANSFORMER  TYPES OF CIRCUIT BREAKERS  EARTHING SWITCH  LIGHTING ARRESTOR  BUS BAR  FUSE  INTRODUCTION OF PROTECTION SCHEME  PF IMPROVEMENT  MINIMUM CLEARANCE  CONCLUSION
  • 4.  Chhattisgarh State Electricity Board was Formed in Accordance with the section 5 of the Electricity Supply Act 1948 as Per the Notification Published in the gazette of the Government of Chhattisgarh Dated 15th November 2000. Chhattisgarh State Electricity Board (CSEB)became functional w.e.f. 01.12.2000.  Chhattisgarh State Electricity Board has been reorganized into following Five Companies in accordance with the provisions contained in the section 131-134 of Electricity Act 2003 by the Government of Chhattisgarh vide notification dated 19.12.2008
  • 5. 33 KV Bus P.T 11 KV 33/11 KV sub station LA ES ISO CT CB CB LA LA T/F CB CT CT CT CT
  • 6. According to Design. 1.Indoor type Sub-station. 2.Out door type Sub-station. (a) Pole mounted Sub-station. (b) Foundation mounted Sub-station.
  • 7.  1) Power transformer  2) Circuit breaker  3) Isolator  4) Earthing switch  5) lightning arrestor  6) BusBar  7) Current transformer  8) Potential transformer  9) Protective relay  10) DC battery set  11)Capacitor bank  12)Fire fighting system
  • 8.  Transformer is used to step down the voltage from 33 kv voltage to 11kv voltage .  Generally 3.15 MVA, 5 MVA, 10 MVA 33/11kv, Δ / Y transformer are used in 33/11kv .
  • 9.
  • 10.
  • 11.  Check Oil level in main tank & OLTC tank.  Check the color of silica gel in breather ;it must be blue in color .if it is turned pink then recondition it or replace it.  Check On load Tap Changer Lower/Raise trail by Local & Remote.  Trip trail by draining oil in Buchholz relay
  • 12.  Check Earth resistance ,provide watering arrangement for earthling pits.  Tight all connections.  Check breakdown voltage of oil.  Clean the bushings.  Attend the oil leakages  Note Temperature of Oil & leakage.
  • 13.  Check cooling system & confirm fan control operation w.r.to temperature variation.
  • 14.  33/11 KV, Δ / Y , 3.15 MVA, 5 MVA, 10 MVA
  • 16.  Current T/F is used for protection and metering purposes.  It steps down the current level of the line for following purposes. 1) Measurement :- ammeter , kw meter , kwh meter , power factor meter 2) control and protection :- current when exceeds the set value operates the relay which senses the faulty condition .
  • 17.
  • 18.  300 -150 / 5 A  200-100 / 5 A  100-50 / 5 A  50-25 / 5 A
  • 19. It steps down the voltage level of line for - 1) Measurement : voltmeter, frequency meter ,kw meter, kwh meter ,power factor meter 2) Control & protection : used in directional over current protection and under frequency relay operation (48.8 Hz , df/dt relay)
  • 20.
  • 21.  For 33 KV :- 33 KV / 110 V/√3  For 11 KV :- 11 KV / 110 V/√3
  • 22.  Circuit Breaker can switch automatically during normal and abnormal conditions . during faulty condition the fault is sensed by the relay and operates the circuit breaker to isolate the fault. In 33kv substation generally vacuum circuit breaker are used where are quenching medium is vacuum
  • 23.  Low voltage air circuit breaker.  Oil circuit breaker.  Air blast circuit breaker.  SF6 circuit breaker.  Vacuum circuit breaker.
  • 24. 11 KV 33 KV Rated Voltage 12 KV 36 KV Normal Current 400 A 630 A S.C Breaking Current 8 & 12.5 KA 12.5 KA (750 MVA) DC Voltage 24 V 24 V
  • 25.  High resistance interruption. (1) Arc lengthening. (2) Arc cooling. (3) Arc splitting. (4) Arc constraining.  Low resistance interruption. (1) Cooling. (2) Gap lengthening. (3) Blast effect.
  • 26.  1) no oil is required for are quenching  2) least maintenance  3) compact size  4) light in weight Maintenance of circuit breaker  1) close/trip through local/remote control  2) trip trial through auto closer relay  4) oiling & greasing of moving parts  5) vermin proofing  6) heater healthy
  • 27.  Isolator is used to isolate the equipment.  Isolator is operate at no load. Maintenance of isolator:- 1) Oiling &greasing of moving parts. 2) check contact firmness . 3) check open / close trials. 4) Earthing switch .
  • 28.  It is operated on No Load Only.  Rated Voltage :- 12 KV  Normal Current :- 400 A
  • 29.  Rated Voltage :- 36 V  Normal Current :- 630 A
  • 30.  Earthing switch discharges the voltage an deadline to earth . it is connected between line unit of isolator to earth . NOTE:- it there is breakdown at line then for measurement of resistance by megger do not close earth switch .
  • 31.
  • 32. 11 KV 33 KV Voltage Rating 9 KV 30 KV Normal Discharge Current 5 KA 10 KA
  • 33.  Busbar are conducting rod to which a number incoming and outgoing feeders are connected in 33kv S/S there are 33kv bus & 11kv bus . VARIOUS TYPES OF BUS BAR ARRANGE- MENT SYSTEM:-  Single bus bar system used in D.C. and A.C. power station.  Single bus bar system with sectionalization .  Ring bus bar system.  Duplicate bus bar system.
  • 34.
  • 35.
  • 37.  Rewireable fuse.  Cartridge type fuse.  Drop out fuse.  High capacity H.R.C. fuse.  High voltage H.R.C. fuse. Types of Fuse element
  • 38.  Rewireable fuse.  Cartridge type fuse.  Drop out fuse.  High capacity H.R.C. fuse.  High voltage H.R.C. fuse. TYPES OF FUSES:-
  • 39.  11 KV , 50 HZ.  Rated Voltage :- 12 KV  Rated Normal Current:- 100 A.
  • 40.
  • 41.  DESIRED CHARECTERISTICS OF PROTECTION SYSTEM:- Characteristics of protection system. 1.Reliability 2.Sensitivity. 3.Selectivity. 4.Descrimination. 5.Speed. 6.Simplicity. 7.Economy.
  • 42. FUNCTION OF PROTECTIVE RELAYS:-  The relay is used to cut off the power supply, promptly to any element of power system which undergoes short –circuit it starts operating abnormally.
  • 43. Main features of a good protective relay. 1.Reliability 2.Sensitivity. 3.Selectivity. 4.Quickness. 5.Non interference With future extension.
  • 44. 1) Differential Relay 2) Over Current Earth Fault Relay 3) Buchholz Relay
  • 45.  This is the main protection provided to the transformer. This takes care of all the internal faults within the protection zone at this relay it from hv, ct to lv ct ,it is also called as Differential zone. Fault lying within this zone are called as external fault or through fault.  Details of the relay  Transformer Differential protection relay  Percentage Bias type  Suitable for 2 winding transformer ,CTR-iA,  operating current 20-100%  Bias setting 20-30% , operating time less than msec for time setting contact 2 nos
  • 46.  Over current earth fault protection is also called as back up protection . It two transformers are used in parallel than directional Over Current Earth fault relay should be used.  These relay are provided on 33kv hv side of the transformer ,11kv (lv) side of the transformer and on 11kv feeders.
  • 47.  It is used to provide protection against internal faults in transformer . Incipient faults are due to the arcing in the oil because of the failure of the inter -lamination or core bolt insulation or poor electrical connection causing spark in the oil. These fault occurs the gas in the main tank rushes upwards and gets accumulated in the relay chamber . initially it initiates buchholz alarm it the fault persist then buchholz trip command is extended to the CB.
  • 48.  Generally for 33kv S/S  Auxiliary DC volt is 30 v DC , 15 nos of cells are used  DC voltage supply is used for following control circuit 1) Tripping circuit of CB 2) Closing circuit of CB 3) Alarm circuit , (buchholz alarm, winding temp alarm, trip alarm ,DC fail alarm) 4) Semaphore indicator (indicators the close/open position of isobar and CB) 5) Breaker on/off indicates (indication bulbs are used ) 6) Trip circuit healthy indication (indication bulb is used )
  • 49.  Specific Gravity of electrolyte and amount of charged  Hydrometer :- it is the device used for measurement of specific gravity of electrolyte range is 1150 to 1433. 100 75 50 25 Discharged Specific Gravity At 27o C 1200-1230 1200-1210 1170-1185 1150-1160 Below 1150
  • 50.  3 ph Capacitor bank is used for improvement of power factor . It is normally connected to 11 kv bus . VCB is used for Capacitor bank switching .  Normally capacitor banks are connected in star.
  • 51.  12 KV , 1200 KVAr, 2400 KVAr , 3600 KVAr
  • 52.
  • 53. The advantages of power factors improvement by Capacitor addition:-  a) Reactive component of the network is reduced and so also the total current in the system from the source end  b) I2R power losses are reduced in the system because of reduction in current  c) voltage level at the load end is increased
  • 54.  Reduced kvA (maximum demand ) charges in utility bill.  Reduced distribution losses (kwh) within the plant network.  Better voltage and improved performance of system.  A high power factor eliminates penalty charges imposed when operating with a low power factor.
  • 55. ISO ABISO AB AB 3PH SUPPLY ISO ISO ISO ISO ISO ISO ISO ISO AB AB R Y B R Y B R Y B R Y B R Y B POWER X’MER INCOMING BUSBAR OUTGOING BUSBAR
  • 56.
  • 57. Voltage level (kV) Standar d bay widths (in Mtrs.) For equipments and rigid conductors in air Phase to Phase spacing in isolators and switches Phase to phase (mm) Phase to earth (mm) Isolator (mm) Switches with Arc Horns (mm) 132 9.5 1700 1000 2135 3050 66 7 1220 750 1525 2135 33 4.6 915 610 765 1220 11 3.5 560 305 610 915 0.415 -- 380 305 -- --
  • 58.  The training session was very educational and very informative this CSPDCL Office have good harmonic relation and co-ordination between staff members. As the vocational training seems laborious job to gate in touch with the activities. It was nobility of the people to provide the information and the required theoretical background at there continuous job hour.