HIGHEST NO. OF RESORTS
s
w
FURNITURE CLEARANCES:
•To assure adequate space for convenient use of
furniture in the bedroom, not less than the following
clearances should be observed.
•42 in at one side or foot of bed for dressing.
•6 in between side of bed and side of dresseror chest.
•36 in in front of dresser, closet, and chest ofdrawers.
•24 in for major circulation path (door to closet,etc .)
•22 in on one side of bed for circulation.
•12 in on least used side of double bed . The
least-used side of a single or twin bed can
be placed against the wall except in bedrooms
for the elderly.
PRIMARY BED ROOM.
PRIMARY BED ROOM.
PRIMARY BED ROOM WITHOUT CRIB.
SINGLE OCCUPANCY BED ROOM FOR
ELDERLY.
BED ROOM:
BED ROOM:
WARD ROBES:
WARD ROBES:
BATHROOMS:
BATHROOMS:
SHOWERS AND TUBS
BATHROOMS:
BATHROOM FITTINGS:
BATHROOM FITTINGS:
BATHROOM FITTINGS:
RECREATIONAL ACTIVITIES:
Indoor recreational activities invariably require definite spaces for equipment and clearances for using it . Not all games
occupy floor areas indicated as necessary for those diagramed on this page . But if interiors are planned to accommodate large units
of equipment such as that required for table tennis, and provide necessary playing clearances, spaces will be adequate for many
other uses as well . Dimensions of game equipment and floor areas required for its use are both subject to variation. Sizes noted
here are comfortable averages, not absolute minima .
POOL AND BILLIARDS
POOL AND BILLIARD TABLE SIZES
CARROM AND CARDS PLAYING AREA
PLAY ROOM
GYMNASSIUM
BASKET BALL COURT:
BACK BOARDS OF BASKET BALL COURT:
BADMINTON COURT
BADMINTON ISOMETRIC SHOWING NET
Badminton is a racquet SPORT played by either two opposing players (singles) or two opposing pairs (doubles), who
take positions on opposite halves of a rectangular court that is divided by a net. Players score points by striking a shuttlecock with
their racquet so that it passes over the net and lands in their opponents' half of the court. A rally ends once the shuttlecock has
struck the ground, and each side may only strike the shuttlecock once before it passes over the net.
CARROM:
The game is played on a board of lacquered plywood, normally with a 29
inch (74 cm) square playing surface. The edges of the playing surface are bounded by
bumpers of wood, and the bottom of the board is covered by a net with a 10 cm2 or
larger capacity.
BILLIARDS OR SNOOKER
LIGHTING:
The lights over a pool, snooker or billiard table must be at least 520 lux and the minimum height of the fixture is no lower
than 1.016m above the bed of the table. The lights must be placed around the table so that any lighting is not directed at the players.
SNOOKER:
Snooker is played on an english billiards table using 15 red, 6 coloured and on e white cue ball. Points are scored by
pocketing balls and forcing an opponent to give away points thro ugh ‘snookers’. It may be played by two persons, pairs or a team.
THE TABLE:
The playing area of a snooker table is 3.57m x 1.778m. Height of the table from the floor to top of the cushion is 88.1cm
to 87.6cm. There is a tolerance of +/-13mm for both dimensions. There are six pockets, the same as a pool table.
Equipment
Cue must be at least 91.4cm in length.
POOL :
pool is played on a pocket billiard table with one white cue ball
and 15 numbered object balls. It can be played by two individuals, pairs or
teams. Points are scored for pocketing designated balls in designated pockets.
The first player or side to reach an agreed number of points wins the game.
SPACE ABOUT TABLE:
Recommended minimum space about the table is 2.5m (absolute
minimum is 1.6m)
BILLIARD TABLE
TABLE:
A ‘9 foot’ pool table has a playing surface of 2.54m long and 1.27m wide and an ‘8 foot’ pool table is 2.34m long and
1.17m wide. The length of a pool table is always twice the width.
Billiard, snooker and pool tables are covered in a fabric with a minimum of 85 per cent combined worsted wool and no
more than 15 per cent nylon. Yellow-green, blue-green and electric blue are acceptable for competition.
There are six pockets in snooker and pool tables — two at the top end called the ‘top’ pockets, one each at the
middle of the longer sides called ‘centre’ pockets and two at the bottom end called ‘bottom’ pockets.
EQUIPMENT:
Cue sticks used at competitions must be a minimum length of 1.016m and a maximum weight of 708.75g. The tip
must be no wider than 14mm.
BALLS:
A set of pool balls consists of one white cue ball and 15 colour-coded numbered balls. The balls numbered 1
through 8 have solid colours and the balls numbered 9 thorough 15 are white with a centre band of colour. The balls are 52.5mm
in diameter and are coloured and numbered as follows
• Yellow - 1 And 9 Orange – 5 and 13
 Blue - 2 And 10 Green – 6 and 14
 Red - 3 And 11 Maroon – 7 and 15
 Purple - 4 And 12 Black - 8
 Orange - 5 And 13
 Green - 6 And 14
SWIMMING POOL:
All artificially constructed swimming pools other than residential pools shall be deemed to be public swimming pools.
This shall not be applicable to residential pools as defined or wading or spray pools, which shall be covered under separate sections.
The technical data presented here gives basic requirement, for public and semipublic pool design, systems and
equipment . It is intended by the NSPI to serve as recommended minimum standards, and not as a model code.
STRUCTURAL FEATURES, MATERIALS, MARKINGS:
Structural Stability: All public pools shall be constructed of an inert and enduring material, designed to withstand all
anticipated loading for both pool empty and pool full conditions . Working stresses shall be based upon predetermined ultimate
strengths of materials used, with a factor of safety of not less than 2 1/2 .
DIVING POOL:
Standard pool Water attractions
Size Kidney to olympic Widely varied
Depth 2.5 – 9 feet Zero depth to 5 ft
Drain 12”x12”, 9”x9” Many larger than 18”x23” (unblockable)
Drain sq ft 10+ square feet Up to 1000 square feet
Uses Swimming & wading Sliding, playing, jumping, floating, wave riding
The term "swimming pool" means any outdoor or indoor structure intended for swimming or recreational bathing,
including in-ground and above-ground structures, and includes hot tubs, spas, portable spas, and non-portable wading pools."
SWIMMING POOL:
OLYMPIC SWIMMING POOL RESORT SWIMMING POOL
OLYMPIC SWIMMING POOL (MIN SIZE IS 300 SQM)
TYPES AND SIZES OF TABLE ARRANGEMENTS
TYPES AND SIZES OF TABLE ARRANGEMENTS
DESIGN CRITERIA AND SPACE REQUIREMENT
SIX SEATER RECTANGLE DINING TABLE
SIX SEATER CIRCULAR DINING TABLE
Aisles serving accessible seating should provide a path atleast
3’0” numbers in parentheses dimensions in centimetres.
BAR SECTION DETAILS
BAR COUNTER DETAILS
COCK TAIL TABLES/SEATING FOR 2
CURVELINEAR BAR/25 SEATERS 500 SFT
CURVELINEAR BAR/9 SEATERS 176 SFT
KITCHEN PLATFORM MANAGEMENT:
•U shape kitchen plat form.
•L shape kitchen plat form.
•Straight kitchen which are generally found common in small size flats.
•Corridor management in kitchen.
TYPICAL LAY OUTS OF KITCHEN
PARKING:
INTRODUCTION:
There continues to be an increase in vehicle numbers, with a corresponding demand for facilities to serve the car and the owner:
petrol garages, high-road service stations, car parks, car showrooms and repair garages.
PARKING CONFIGURATION:
•Dimensions of vehicle parking spaces in parking bays range from 1.80x4.60 m to 2.50x 6.00m.But slightly longer for longer
parking.
•While the 90 degrees parking is more economical in space requirements (20-22 sq. per car), 45 degrees parking (23-26 sq.
m) can be more convenient.
EXTERNAL WIDTH DIMENSION EXTERNAL LENGTH DIMENSIONEXTERNAL HEIGHT DIMENSION
TURNING RADIUS FOR LARGE VEHICLE (BUS)
• Parallel parking.
• Parallel parking requires experience, confidence and patience.
• Parking spaces (min);7.5 meters long and 2.75 meters wide.
ANGLE 90 PARKING
• Efficient in low turnover rate or long term parking areas, the perpendicular, or 90 degree parking configuration is the most vehicles
per linear meter.
Standard dimensions for this configuration are:
• Parking space width 2.75 meters.
• Parking space length 6 meters.
• Driving aisle width (2-way)7 meters.
• Two rows plus aisle width 19 meters.
• Vehicles per 100 linear meter double row 82.
ANGLE 60 DEGREE PARKING
• It is ideal for a fast turn over rate for predominately.
• short term use .
• Often offset by difficulties of inefficient circulation.
• patterns and one-way aisles.
PARKING LAYOUT:
ANGLE 45 DEGREE PARKING:
• The 45 degree angled parking configuration displace similar benefits and limitations as the 60 degree.
Standard dimensions for this configuration are:
• Parking space width 2.75 meters.
• Parking space length 6 meters.
• Driving aisle width (1-way) 4.5 meters.
• Two rows plus aisle width 14 meters.
• Vehicles per 100 linear meter double row 52.5.
ANGLE 30 DEGREE PARKING
Standard dimension for this configuration are:
• Parking space width 2.75 meters.
• Parking space length 6 meters.
• Driving aisle width (1-way) 7 meters.
• Two rows plus aisle width 19 meters.
• Vehicle per 100 linear meter double row 39.4.
Standard dimensions for this configuration are:
•Parking space width 2.75 meters.
•Parking space length 6 meters.
•Driving aisles width (1-way)5.5 meters.
•Two rows plus width 16.5 meters.
•Vehicles per 100 linear meter double row 65.6.
Proper design of the reception area is Critical in communicating an organization's Desired corporate image.
Reception spaces Are both the first and last areas with which The visitor interacts and, accordingly, have Considerable visual
impact in communicating That image .
RECEPTION AREAS
RECEPTIONIST WORK STATION/ COUNTER
HEIGHT
RECEPTIONIST WORK STATION/ DESK
HEIGHT
The seating arrangements illustrated here provide some typical conditions that the designer must address . individual
seats are preferred over sofas .Corner seating arrangements must always consider leg clearance . circulation between low tables and
the edges of chairs must be adequate to allow for the Legs of persons seated in the chairs . convenient locations for side tables, so
that magazines, ashtrays, artwork, or portable lighting can be placed on them, Are important .
SEATING ARRANGEMENTS IN RECEPTION AREAS.
EXAMPLE OF AUDIO VISUAL ROOM
CONFERENCE ROOM
RECTANGULAR CONFERENCE TABLE
CIRCULAR CONFERENCE TABLE
REQUIREMENTS AND AREA REQUIRED:
Public space and administration block :
Entrance lobby 41 sq m
Managers cabin 20 sq m
Accounts and administration 10 sq m
Record room 10 sq m
Waiting cum lobby 56.5 sq m
Reception 16 sq m
Luggage room 11.6 sq m
Conference room for 15 persons 38.5 sq m
Pantry 11.6 sq m
Directors cabin with toilet 18.6 sq m
Audio visual room for 72 persons 103.2 sq m
Dining space 208 sq m
Serving area and pantry 26.5 sq m
Common toilets Ladies and gents 27 sq m
Dining spaces:
Restaurant (veg dining) 151.36 sq m
Restaurant (non-veg dining) 151.36 sq m
Service area 15.21 sq m
Pantries 31.98 sq m
Cash counters 23.8 sq m
Waiting and reception 21 sq m
Bar section 302.72 sq m
Washing area and toilets 25 sq m
REQUIREMENTS AND AREA REQUIRED:
Food service area:
Kitchen (non veg food preparation area) 36.85 sq m
Kitchen (veg food preparation area) 36.85 sq m
Pantry 12.66 sq m
Cold storage (veg) 6 sq m
Cold storage (non-veg) 7.5 sq m
Store with utensil store 29.25 sq m
Utensil washing area 13.2 sq m
Gas room 7.8 sq m
Changing room for workers 6.6 sq m
Office 13.2 sq m
Staff dormitory (4 beds) 17.82 sq m
Toilet 12.35 sq m
ACCOMMODATIONS:
Deluxe suits:
Entrance verandah 3.5 sq m
Lobby 5.5 sq m
Living 22.8 sq m
Pantry cum utility 11.88 sq m
Master bed 20.68 sq m
Toilet 17.2 sq m
Deck 15.36 sq m
Staircase 12.1 sq m
REQUIREMENTS AND AREA REQUIRED:
Family cottages:
Entrance verandah 2.16 sq m
Living 29.57 SQ M
Pantry 3.78 sq m
Master bed 18.47 sq m
Toilet 11.4 sq m
Stair case 12.1 sq m
Single room lodging:
Entrance lobby 5.88 sq m
Room 23 sq m
Toilet 4.2 sq m
RECREATIONAL SPACES:
Entrance verandah 3.72 sq m
Entrance lobby with waiting 5.5 sq m
Indoor games: 72 sq m
Table tennis, billiards, card ,chess
And carrom.
Spa and health club:
Massage room with shower and steam bath 2 60.46 sq m
Spa room with dry court and shower bath 30.58 sq m
Sauna room 5.9 sq m
Common toilet(ladies) 3.9 sq m
Common toilet(gents) 3.9 sq m
Gymnasium 105 sq m
Store 7.3 sq m
REQUIREMENTS AND AREA REQUIRED:
Swimming pool:
Pool area 1600 sq m
Changing rooms, showers, and toilets 45 sq m
For gents
Changing rooms, showers, and toilets 45 sq m
For ladies
Locker rooms 21.5 sq m
Pump house 25 sq m
Instructors room 25 sq m
Life guards room 25 sq m
Shopping arena:
Laundry 24 sq m
Beauty parlour 24 sq m
Mens saloon 24 sq m
Book stall 40 sq m
Clinic 40 sq m
Medical shop 24 sq m
Flower shop 24 sq m
Bakery and coffee shop 24 sq m
Party hall with exhibition area:
Entrance verandah 32 sq m
Exhibition area with party hall 90 sq m
Pantry 20.5 sq m
Utility 4.75 sq m
Store 4.5 sq m
Toilet and washing area 25 sq m
Staircase 12.1 sq m
Exhibition arena 45 sq m
Parking area:
Four wheeler 1200 sq m
Two wheeler 1000 sq m
Mini bus 650 sq m
Out door games:
Badminton court 366.54 sq m
Basket ball court 1367 sq m
Servant quarters
Generator room
Electrical house
Out door landscaped sitting
Streets and service roads
Water body
Kiosks
View towers
Children's playing area
Out door dining
Security and ATM
Ac plant
AREA ANALYSIS:
Total site area: 32 acre
1 acre = 40 gunta (4048.32 sq m)
32 acre = 129546.24 sq m
Total ground coverage: 40%
In that : building blocks : 28%(36272.88 sq m)
ALL BUILDING BLOCKS ARE SHOWN IN PERCENTAGE WISE BELOW:
Administration block:2% (2590.92 sq m)
Single rooms area : 2% (2590.92 sq m)
Deluxe suits : 8% (10363.68 sq m)
Family cottages : 10% (12954.6 sq m)
Dining and kitchen : 1% (1295.46 sq m)
Party and exhibition hall : 0.5% (647.73 sq m)
S P A and recreational : 2% (2590.92 sq m)
Shopping arena and other : 1.5% (1943.19 sq m)
Service core and servant quarters : 1% (1295.46 sq m)
TOTAL : 28% (36272.88 sq m)
Streets, parking and out door dining : 12% (15545.52 sq m)
Service roads, children's playing area : 60% (77727.6 sq m)
Out door landscaped sitting area, outdoor
Games, water bodies, kiosks, and
view towers etc.
TOTAL : 100% (129546.24 sq m)

Weitere ähnliche Inhalte

Was ist angesagt?

Case study on Resort
Case study on ResortCase study on Resort
Case study on ResortImtiaz Ahmad
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEjagrutib22
 
Windflower Hill Spa resort, Kerala
Windflower Hill Spa resort, KeralaWindflower Hill Spa resort, Kerala
Windflower Hill Spa resort, KeralaAbhiniti Garg
 
Architectural Design Thesis
Architectural Design Thesis Architectural Design Thesis
Architectural Design Thesis Keval Chotaliya
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Bookrajensen00
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSsupratikrath
 
Hotel avasa, hyderabad
Hotel avasa, hyderabadHotel avasa, hyderabad
Hotel avasa, hyderabadNamratha Bs
 
HOTEL Design - Case Study
HOTEL Design - Case StudyHOTEL Design - Case Study
HOTEL Design - Case StudyMansi Pushpakar
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...UdayGotetiStudios
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structuresAnupama Krishnan
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention centerKiruthika Selvi K J
 

Was ist angesagt? (20)

Case study on Resort
Case study on ResortCase study on Resort
Case study on Resort
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Banquet Standards
Banquet StandardsBanquet Standards
Banquet Standards
 
Windflower Hill Spa resort, Kerala
Windflower Hill Spa resort, KeralaWindflower Hill Spa resort, Kerala
Windflower Hill Spa resort, Kerala
 
Architectural Design Thesis
Architectural Design Thesis Architectural Design Thesis
Architectural Design Thesis
 
Open air theater
Open air theaterOpen air theater
Open air theater
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Club House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTSClub House Designs by IDEA CENTRE ARCHITECTS
Club House Designs by IDEA CENTRE ARCHITECTS
 
Resort design
Resort designResort design
Resort design
 
Hotel avasa, hyderabad
Hotel avasa, hyderabadHotel avasa, hyderabad
Hotel avasa, hyderabad
 
HOTEL Design - Case Study
HOTEL Design - Case StudyHOTEL Design - Case Study
HOTEL Design - Case Study
 
Resort case study
Resort case studyResort case study
Resort case study
 
Amphitheatre.pptx
 Amphitheatre.pptx Amphitheatre.pptx
Amphitheatre.pptx
 
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...School Of Architecture And Planning vijayawada ,  Case study sheets and Liter...
School Of Architecture And Planning vijayawada , Case study sheets and Liter...
 
Indian examples of long span structures
Indian examples of long span structuresIndian examples of long span structures
Indian examples of long span structures
 
Resort design pdf
Resort design pdfResort design pdf
Resort design pdf
 
resort complex casestudy
resort complex casestudyresort complex casestudy
resort complex casestudy
 
Parking final
Parking finalParking final
Parking final
 
Presentation case study convention center
Presentation case study convention centerPresentation case study convention center
Presentation case study convention center
 
Shopping mall.
Shopping mall.Shopping mall.
Shopping mall.
 

Ähnlich wie Data collaction of resort

Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railingZulaiha Amaria
 
Residential Design Presentation By Neha chapparwal, M.Sc. interior Design
 Residential Design Presentation By Neha chapparwal, M.Sc. interior Design  Residential Design Presentation By Neha chapparwal, M.Sc. interior Design
Residential Design Presentation By Neha chapparwal, M.Sc. interior Design dezyneecole
 
Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairsZulaiha Amaria
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditoriumNilanjana Pal
 
Deck structural design
Deck structural designDeck structural design
Deck structural designZulaiha Amaria
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvUAEhighstreet.com
 
2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by BulletDave Arbogast RV
 
retreat house detail study
retreat house detail studyretreat house detail study
retreat house detail studyRahul Verma
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working DrawingGeeva Chandana
 
LITERATURE_STUDY.pptx
LITERATURE_STUDY.pptxLITERATURE_STUDY.pptx
LITERATURE_STUDY.pptxamansudi2
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PMerrileeDelvalle969
 

Ähnlich wie Data collaction of resort (20)

HOSTEL%20LIBRARY%20STUDY.pptx
HOSTEL%20LIBRARY%20STUDY.pptxHOSTEL%20LIBRARY%20STUDY.pptx
HOSTEL%20LIBRARY%20STUDY.pptx
 
Installing the deck railing
Installing the deck railingInstalling the deck railing
Installing the deck railing
 
Residential Design Presentation By Neha chapparwal, M.Sc. interior Design
 Residential Design Presentation By Neha chapparwal, M.Sc. interior Design  Residential Design Presentation By Neha chapparwal, M.Sc. interior Design
Residential Design Presentation By Neha chapparwal, M.Sc. interior Design
 
Sports complex
Sports complexSports complex
Sports complex
 
Installing deck stairs
Installing deck stairsInstalling deck stairs
Installing deck stairs
 
Facility design 2
Facility design   2Facility design   2
Facility design 2
 
Case study about auditorium
Case study about auditoriumCase study about auditorium
Case study about auditorium
 
Deck structural design
Deck structural designDeck structural design
Deck structural design
 
Coffee table @1
Coffee table @1Coffee table @1
Coffee table @1
 
Deck structural design
Deck structural designDeck structural design
Deck structural design
 
Diseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesvDiseño de tanques circulares para cultivo de pecesv
Diseño de tanques circulares para cultivo de pecesv
 
Woven Wire Partitions
Woven Wire PartitionsWoven Wire Partitions
Woven Wire Partitions
 
Drilling_Basics.ppt
Drilling_Basics.pptDrilling_Basics.ppt
Drilling_Basics.ppt
 
Wenger Theatre Equipment
Wenger Theatre EquipmentWenger Theatre Equipment
Wenger Theatre Equipment
 
2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet2013 Keystone Premier Travel Trailer by Bullet
2013 Keystone Premier Travel Trailer by Bullet
 
retreat house detail study
retreat house detail studyretreat house detail study
retreat house detail study
 
Kitchen Working Drawing
Kitchen Working DrawingKitchen Working Drawing
Kitchen Working Drawing
 
LITERATURE_STUDY.pptx
LITERATURE_STUDY.pptxLITERATURE_STUDY.pptx
LITERATURE_STUDY.pptx
 
Kitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space PKitchens, Baths and Universal DesignAn introduction to Space P
Kitchens, Baths and Universal DesignAn introduction to Space P
 
kitchen-200908101834.pdf
kitchen-200908101834.pdfkitchen-200908101834.pdf
kitchen-200908101834.pdf
 

Mehr von Ar. Sahid Akhtar

Mehr von Ar. Sahid Akhtar (20)

Siri fort sport complex
Siri fort sport complexSiri fort sport complex
Siri fort sport complex
 
Dubai sport city uae
Dubai sport city  uaeDubai sport city  uae
Dubai sport city uae
 
Jawahar lal nehru, stadium, new delhi
Jawahar lal nehru, stadium, new delhiJawahar lal nehru, stadium, new delhi
Jawahar lal nehru, stadium, new delhi
 
Thesis Book (Vertical architecture collage)
Thesis Book (Vertical architecture collage) Thesis Book (Vertical architecture collage)
Thesis Book (Vertical architecture collage)
 
Toilet Details For Your Rest Room
Toilet Details For Your Rest RoomToilet Details For Your Rest Room
Toilet Details For Your Rest Room
 
The hong kong community college 02
The hong kong community college 02The hong kong community college 02
The hong kong community college 02
 
The hong kong community college 01
The hong kong community college 01The hong kong community college 01
The hong kong community college 01
 
Cept ahmadabad 02
Cept ahmadabad 02Cept ahmadabad 02
Cept ahmadabad 02
 
Cept ahmadabad 01
Cept ahmadabad 01Cept ahmadabad 01
Cept ahmadabad 01
 
Spa dlehi 01
Spa dlehi  01Spa dlehi  01
Spa dlehi 01
 
Spa delhi 02
Spa delhi 02Spa delhi 02
Spa delhi 02
 
Thesis synopsis
Thesis synopsisThesis synopsis
Thesis synopsis
 
Concept framing
Concept framingConcept framing
Concept framing
 
Vertical neighborhood synopsis
Vertical neighborhood synopsisVertical neighborhood synopsis
Vertical neighborhood synopsis
 
Vertical architecture campus synopsis
Vertical architecture campus synopsisVertical architecture campus synopsis
Vertical architecture campus synopsis
 
Islamic retreat center
Islamic retreat centerIslamic retreat center
Islamic retreat center
 
Hotel planning
Hotel planningHotel planning
Hotel planning
 
Market fruit & veg
Market fruit & vegMarket fruit & veg
Market fruit & veg
 
Introduction of shoping mall 03
Introduction of shoping mall 03Introduction of shoping mall 03
Introduction of shoping mall 03
 
Introduction of shoping mall (2)
Introduction of shoping mall (2)Introduction of shoping mall (2)
Introduction of shoping mall (2)
 

Kürzlich hochgeladen

Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...limedy534
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectBoston Institute of Analytics
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改yuu sss
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Jack DiGiovanna
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfgstagge
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort servicejennyeacort
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptSonatrach
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一F sss
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样vhwb25kk
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPTBoston Institute of Analytics
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryJeremy Anderson
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...Boston Institute of Analytics
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfBoston Institute of Analytics
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhijennyeacort
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝soniya singh
 

Kürzlich hochgeladen (20)

Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
Effects of Smartphone Addiction on the Academic Performances of Grades 9 to 1...
 
Heart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis ProjectHeart Disease Classification Report: A Data Analysis Project
Heart Disease Classification Report: A Data Analysis Project
 
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
专业一比一美国俄亥俄大学毕业证成绩单pdf电子版制作修改
 
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制南十字星大学毕业证(SCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
Building on a FAIRly Strong Foundation to Connect Academic Research to Transl...
 
RadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdfRadioAdProWritingCinderellabyButleri.pdf
RadioAdProWritingCinderellabyButleri.pdf
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
9711147426✨Call In girls Gurgaon Sector 31. SCO 25 escort service
 
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.pptdokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
dokumen.tips_chapter-4-transient-heat-conduction-mehmet-kanoglu.ppt
 
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
办理学位证中佛罗里达大学毕业证,UCF成绩单原版一比一
 
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
1:1定制(UQ毕业证)昆士兰大学毕业证成绩单修改留信学历认证原版一模一样
 
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default  Presentation : Data Analysis Project PPTPredictive Analysis for Loan Default  Presentation : Data Analysis Project PPT
Predictive Analysis for Loan Default Presentation : Data Analysis Project PPT
 
Defining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data StoryDefining Constituents, Data Vizzes and Telling a Data Story
Defining Constituents, Data Vizzes and Telling a Data Story
 
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
NLP Data Science Project Presentation:Predicting Heart Disease with NLP Data ...
 
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdfPredicting Salary Using Data Science: A Comprehensive Analysis.pdf
Predicting Salary Using Data Science: A Comprehensive Analysis.pdf
 
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝DelhiRS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
RS 9000 Call In girls Dwarka Mor (DELHI)⇛9711147426🔝Delhi
 
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
Deep Generative Learning for All - The Gen AI Hype (Spring 2024)
 
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Defence Colony Delhi 💯Call Us 🔝8264348440🔝
 

Data collaction of resort

  • 1.
  • 2.
  • 3.
  • 4. HIGHEST NO. OF RESORTS s w
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. FURNITURE CLEARANCES: •To assure adequate space for convenient use of furniture in the bedroom, not less than the following clearances should be observed. •42 in at one side or foot of bed for dressing. •6 in between side of bed and side of dresseror chest. •36 in in front of dresser, closet, and chest ofdrawers. •24 in for major circulation path (door to closet,etc .) •22 in on one side of bed for circulation. •12 in on least used side of double bed . The least-used side of a single or twin bed can be placed against the wall except in bedrooms for the elderly. PRIMARY BED ROOM. PRIMARY BED ROOM. PRIMARY BED ROOM WITHOUT CRIB. SINGLE OCCUPANCY BED ROOM FOR ELDERLY. BED ROOM:
  • 15.
  • 22.
  • 23. RECREATIONAL ACTIVITIES: Indoor recreational activities invariably require definite spaces for equipment and clearances for using it . Not all games occupy floor areas indicated as necessary for those diagramed on this page . But if interiors are planned to accommodate large units of equipment such as that required for table tennis, and provide necessary playing clearances, spaces will be adequate for many other uses as well . Dimensions of game equipment and floor areas required for its use are both subject to variation. Sizes noted here are comfortable averages, not absolute minima . POOL AND BILLIARDS POOL AND BILLIARD TABLE SIZES
  • 24. CARROM AND CARDS PLAYING AREA PLAY ROOM GYMNASSIUM
  • 26. BACK BOARDS OF BASKET BALL COURT:
  • 29. Badminton is a racquet SPORT played by either two opposing players (singles) or two opposing pairs (doubles), who take positions on opposite halves of a rectangular court that is divided by a net. Players score points by striking a shuttlecock with their racquet so that it passes over the net and lands in their opponents' half of the court. A rally ends once the shuttlecock has struck the ground, and each side may only strike the shuttlecock once before it passes over the net. CARROM: The game is played on a board of lacquered plywood, normally with a 29 inch (74 cm) square playing surface. The edges of the playing surface are bounded by bumpers of wood, and the bottom of the board is covered by a net with a 10 cm2 or larger capacity. BILLIARDS OR SNOOKER
  • 30. LIGHTING: The lights over a pool, snooker or billiard table must be at least 520 lux and the minimum height of the fixture is no lower than 1.016m above the bed of the table. The lights must be placed around the table so that any lighting is not directed at the players. SNOOKER: Snooker is played on an english billiards table using 15 red, 6 coloured and on e white cue ball. Points are scored by pocketing balls and forcing an opponent to give away points thro ugh ‘snookers’. It may be played by two persons, pairs or a team. THE TABLE: The playing area of a snooker table is 3.57m x 1.778m. Height of the table from the floor to top of the cushion is 88.1cm to 87.6cm. There is a tolerance of +/-13mm for both dimensions. There are six pockets, the same as a pool table. Equipment Cue must be at least 91.4cm in length. POOL : pool is played on a pocket billiard table with one white cue ball and 15 numbered object balls. It can be played by two individuals, pairs or teams. Points are scored for pocketing designated balls in designated pockets. The first player or side to reach an agreed number of points wins the game. SPACE ABOUT TABLE: Recommended minimum space about the table is 2.5m (absolute minimum is 1.6m) BILLIARD TABLE
  • 31. TABLE: A ‘9 foot’ pool table has a playing surface of 2.54m long and 1.27m wide and an ‘8 foot’ pool table is 2.34m long and 1.17m wide. The length of a pool table is always twice the width. Billiard, snooker and pool tables are covered in a fabric with a minimum of 85 per cent combined worsted wool and no more than 15 per cent nylon. Yellow-green, blue-green and electric blue are acceptable for competition. There are six pockets in snooker and pool tables — two at the top end called the ‘top’ pockets, one each at the middle of the longer sides called ‘centre’ pockets and two at the bottom end called ‘bottom’ pockets. EQUIPMENT: Cue sticks used at competitions must be a minimum length of 1.016m and a maximum weight of 708.75g. The tip must be no wider than 14mm. BALLS: A set of pool balls consists of one white cue ball and 15 colour-coded numbered balls. The balls numbered 1 through 8 have solid colours and the balls numbered 9 thorough 15 are white with a centre band of colour. The balls are 52.5mm in diameter and are coloured and numbered as follows • Yellow - 1 And 9 Orange – 5 and 13  Blue - 2 And 10 Green – 6 and 14  Red - 3 And 11 Maroon – 7 and 15  Purple - 4 And 12 Black - 8  Orange - 5 And 13  Green - 6 And 14
  • 32. SWIMMING POOL: All artificially constructed swimming pools other than residential pools shall be deemed to be public swimming pools. This shall not be applicable to residential pools as defined or wading or spray pools, which shall be covered under separate sections. The technical data presented here gives basic requirement, for public and semipublic pool design, systems and equipment . It is intended by the NSPI to serve as recommended minimum standards, and not as a model code.
  • 33. STRUCTURAL FEATURES, MATERIALS, MARKINGS: Structural Stability: All public pools shall be constructed of an inert and enduring material, designed to withstand all anticipated loading for both pool empty and pool full conditions . Working stresses shall be based upon predetermined ultimate strengths of materials used, with a factor of safety of not less than 2 1/2 . DIVING POOL:
  • 34. Standard pool Water attractions Size Kidney to olympic Widely varied Depth 2.5 – 9 feet Zero depth to 5 ft Drain 12”x12”, 9”x9” Many larger than 18”x23” (unblockable) Drain sq ft 10+ square feet Up to 1000 square feet Uses Swimming & wading Sliding, playing, jumping, floating, wave riding The term "swimming pool" means any outdoor or indoor structure intended for swimming or recreational bathing, including in-ground and above-ground structures, and includes hot tubs, spas, portable spas, and non-portable wading pools." SWIMMING POOL: OLYMPIC SWIMMING POOL RESORT SWIMMING POOL OLYMPIC SWIMMING POOL (MIN SIZE IS 300 SQM)
  • 35.
  • 36. TYPES AND SIZES OF TABLE ARRANGEMENTS
  • 37. TYPES AND SIZES OF TABLE ARRANGEMENTS DESIGN CRITERIA AND SPACE REQUIREMENT
  • 38. SIX SEATER RECTANGLE DINING TABLE SIX SEATER CIRCULAR DINING TABLE Aisles serving accessible seating should provide a path atleast 3’0” numbers in parentheses dimensions in centimetres.
  • 41. COCK TAIL TABLES/SEATING FOR 2 CURVELINEAR BAR/25 SEATERS 500 SFT CURVELINEAR BAR/9 SEATERS 176 SFT
  • 42.
  • 43.
  • 44. KITCHEN PLATFORM MANAGEMENT: •U shape kitchen plat form. •L shape kitchen plat form. •Straight kitchen which are generally found common in small size flats. •Corridor management in kitchen.
  • 45.
  • 46.
  • 47. TYPICAL LAY OUTS OF KITCHEN
  • 48.
  • 49. PARKING: INTRODUCTION: There continues to be an increase in vehicle numbers, with a corresponding demand for facilities to serve the car and the owner: petrol garages, high-road service stations, car parks, car showrooms and repair garages. PARKING CONFIGURATION: •Dimensions of vehicle parking spaces in parking bays range from 1.80x4.60 m to 2.50x 6.00m.But slightly longer for longer parking. •While the 90 degrees parking is more economical in space requirements (20-22 sq. per car), 45 degrees parking (23-26 sq. m) can be more convenient. EXTERNAL WIDTH DIMENSION EXTERNAL LENGTH DIMENSIONEXTERNAL HEIGHT DIMENSION TURNING RADIUS FOR LARGE VEHICLE (BUS)
  • 50. • Parallel parking. • Parallel parking requires experience, confidence and patience. • Parking spaces (min);7.5 meters long and 2.75 meters wide. ANGLE 90 PARKING • Efficient in low turnover rate or long term parking areas, the perpendicular, or 90 degree parking configuration is the most vehicles per linear meter. Standard dimensions for this configuration are: • Parking space width 2.75 meters. • Parking space length 6 meters. • Driving aisle width (2-way)7 meters. • Two rows plus aisle width 19 meters. • Vehicles per 100 linear meter double row 82. ANGLE 60 DEGREE PARKING • It is ideal for a fast turn over rate for predominately. • short term use . • Often offset by difficulties of inefficient circulation. • patterns and one-way aisles. PARKING LAYOUT:
  • 51. ANGLE 45 DEGREE PARKING: • The 45 degree angled parking configuration displace similar benefits and limitations as the 60 degree. Standard dimensions for this configuration are: • Parking space width 2.75 meters. • Parking space length 6 meters. • Driving aisle width (1-way) 4.5 meters. • Two rows plus aisle width 14 meters. • Vehicles per 100 linear meter double row 52.5. ANGLE 30 DEGREE PARKING Standard dimension for this configuration are: • Parking space width 2.75 meters. • Parking space length 6 meters. • Driving aisle width (1-way) 7 meters. • Two rows plus aisle width 19 meters. • Vehicle per 100 linear meter double row 39.4. Standard dimensions for this configuration are: •Parking space width 2.75 meters. •Parking space length 6 meters. •Driving aisles width (1-way)5.5 meters. •Two rows plus width 16.5 meters. •Vehicles per 100 linear meter double row 65.6.
  • 52. Proper design of the reception area is Critical in communicating an organization's Desired corporate image. Reception spaces Are both the first and last areas with which The visitor interacts and, accordingly, have Considerable visual impact in communicating That image . RECEPTION AREAS RECEPTIONIST WORK STATION/ COUNTER HEIGHT RECEPTIONIST WORK STATION/ DESK HEIGHT
  • 53. The seating arrangements illustrated here provide some typical conditions that the designer must address . individual seats are preferred over sofas .Corner seating arrangements must always consider leg clearance . circulation between low tables and the edges of chairs must be adequate to allow for the Legs of persons seated in the chairs . convenient locations for side tables, so that magazines, ashtrays, artwork, or portable lighting can be placed on them, Are important . SEATING ARRANGEMENTS IN RECEPTION AREAS.
  • 54. EXAMPLE OF AUDIO VISUAL ROOM
  • 55. CONFERENCE ROOM RECTANGULAR CONFERENCE TABLE CIRCULAR CONFERENCE TABLE
  • 56.
  • 57. REQUIREMENTS AND AREA REQUIRED: Public space and administration block : Entrance lobby 41 sq m Managers cabin 20 sq m Accounts and administration 10 sq m Record room 10 sq m Waiting cum lobby 56.5 sq m Reception 16 sq m Luggage room 11.6 sq m Conference room for 15 persons 38.5 sq m Pantry 11.6 sq m Directors cabin with toilet 18.6 sq m Audio visual room for 72 persons 103.2 sq m Dining space 208 sq m Serving area and pantry 26.5 sq m Common toilets Ladies and gents 27 sq m Dining spaces: Restaurant (veg dining) 151.36 sq m Restaurant (non-veg dining) 151.36 sq m Service area 15.21 sq m Pantries 31.98 sq m Cash counters 23.8 sq m Waiting and reception 21 sq m Bar section 302.72 sq m Washing area and toilets 25 sq m
  • 58. REQUIREMENTS AND AREA REQUIRED: Food service area: Kitchen (non veg food preparation area) 36.85 sq m Kitchen (veg food preparation area) 36.85 sq m Pantry 12.66 sq m Cold storage (veg) 6 sq m Cold storage (non-veg) 7.5 sq m Store with utensil store 29.25 sq m Utensil washing area 13.2 sq m Gas room 7.8 sq m Changing room for workers 6.6 sq m Office 13.2 sq m Staff dormitory (4 beds) 17.82 sq m Toilet 12.35 sq m ACCOMMODATIONS: Deluxe suits: Entrance verandah 3.5 sq m Lobby 5.5 sq m Living 22.8 sq m Pantry cum utility 11.88 sq m Master bed 20.68 sq m Toilet 17.2 sq m Deck 15.36 sq m Staircase 12.1 sq m
  • 59. REQUIREMENTS AND AREA REQUIRED: Family cottages: Entrance verandah 2.16 sq m Living 29.57 SQ M Pantry 3.78 sq m Master bed 18.47 sq m Toilet 11.4 sq m Stair case 12.1 sq m Single room lodging: Entrance lobby 5.88 sq m Room 23 sq m Toilet 4.2 sq m RECREATIONAL SPACES: Entrance verandah 3.72 sq m Entrance lobby with waiting 5.5 sq m Indoor games: 72 sq m Table tennis, billiards, card ,chess And carrom. Spa and health club: Massage room with shower and steam bath 2 60.46 sq m Spa room with dry court and shower bath 30.58 sq m Sauna room 5.9 sq m Common toilet(ladies) 3.9 sq m Common toilet(gents) 3.9 sq m Gymnasium 105 sq m Store 7.3 sq m
  • 60. REQUIREMENTS AND AREA REQUIRED: Swimming pool: Pool area 1600 sq m Changing rooms, showers, and toilets 45 sq m For gents Changing rooms, showers, and toilets 45 sq m For ladies Locker rooms 21.5 sq m Pump house 25 sq m Instructors room 25 sq m Life guards room 25 sq m Shopping arena: Laundry 24 sq m Beauty parlour 24 sq m Mens saloon 24 sq m Book stall 40 sq m Clinic 40 sq m Medical shop 24 sq m Flower shop 24 sq m Bakery and coffee shop 24 sq m Party hall with exhibition area: Entrance verandah 32 sq m Exhibition area with party hall 90 sq m Pantry 20.5 sq m Utility 4.75 sq m
  • 61. Store 4.5 sq m Toilet and washing area 25 sq m Staircase 12.1 sq m Exhibition arena 45 sq m Parking area: Four wheeler 1200 sq m Two wheeler 1000 sq m Mini bus 650 sq m Out door games: Badminton court 366.54 sq m Basket ball court 1367 sq m Servant quarters Generator room Electrical house Out door landscaped sitting Streets and service roads Water body Kiosks View towers Children's playing area Out door dining Security and ATM Ac plant
  • 62. AREA ANALYSIS: Total site area: 32 acre 1 acre = 40 gunta (4048.32 sq m) 32 acre = 129546.24 sq m Total ground coverage: 40% In that : building blocks : 28%(36272.88 sq m) ALL BUILDING BLOCKS ARE SHOWN IN PERCENTAGE WISE BELOW: Administration block:2% (2590.92 sq m) Single rooms area : 2% (2590.92 sq m) Deluxe suits : 8% (10363.68 sq m) Family cottages : 10% (12954.6 sq m) Dining and kitchen : 1% (1295.46 sq m) Party and exhibition hall : 0.5% (647.73 sq m) S P A and recreational : 2% (2590.92 sq m) Shopping arena and other : 1.5% (1943.19 sq m) Service core and servant quarters : 1% (1295.46 sq m) TOTAL : 28% (36272.88 sq m) Streets, parking and out door dining : 12% (15545.52 sq m) Service roads, children's playing area : 60% (77727.6 sq m) Out door landscaped sitting area, outdoor Games, water bodies, kiosks, and view towers etc. TOTAL : 100% (129546.24 sq m)