Location : Hadala, Rajkot, Gujarat
Location : Hadala, Rajkot, Gujarat
ABOUT THE SUBSTATION
 The substation at Hadala (Rajkot), Gujarat is a 400 kV distribution substation.
 It receives power at 400 kV from Adani Thermal power plant via Varsana, from Mundra
TPP via Chorania (Limbdi) and via Jetpur and from Varsana SS.
 It sends power at two voltage levels – 220 kV and 132 kV to Morbi, Nyara (Rajkot),
Tappar, Gondal etc.
 The substation is connected as a ring system as
Chorania
(Limbdi)
Amreli
Jetpur
Hadala
(Rajkot)
(Continue… )
(cont.)
 The substation is having two main bus and one transfer bus for both 400 kV side and
220 kV side.
 There are in total 6 lines of 400 kV level, 8+ lines of 220 kV and some lines of 132 kV
level.
 It’s a record that there has been no accidents in this substation since last 2000+ days.
Equipments in substation
 Lightening arresters
 Wave trap
 Current Transformer (C.T.)
 Potential Transformer (P.T.)
 Line isolator with Earthing switch
 SF6 Circuit breaker with starting
resistance
 Bus isolator
 3 phase reactor
(cont.)
Equipments in substation
 Power transformers
 Cables trench & tray
 Fire fighting facility
LIGHTENING ARRESTER
 The lightening arresters (L.A.) are used to ground
the high voltage impulse falling on line during
lightening.
 L.A. of all the lines connected to a bus are
connected in parallel in order to ensure the proper
grounding of surge as well as to increase its life.
 The L.A. core is made up of Zinc Oxide (ZnO2). It
acts as a non-linear resistance i.e. it offers a very
high resistance during normal conditions and offers
low resistance to the surge voltages.
 A ring type structure is attached to L.A. in order to
reduce the corona effect.
WAVE TRAP
 A wave trap is used on those transmission
lines which are equipped with PLCC (Power
Line Carrier Communication).
 As the communication signal frequency is
much different from line frequency and also
the voltage level is too low, it is quite
necessary to separate the power signal and
communication signal.
 This task is performed by a wave trap which
simply consists of L-C series and parallel
filters.
INSTRUMENT TRANFORMERS
 The instrument transformers are:
1. Current Transformers (C.T.) – Used to
measure phase current.
2. Potential Transformers (P.T.) – Used to
measure phase to neutral voltage.
 In this substation at some places CVT
(Capacitive Voltage Transformers) are
used which does function of PT as well as
assisting the Wave Trap.
C.T. P.T.
LINE/BUS ISOLATORS
Centre Break
Isolator
Double Break
Isolator
Pantograph type bus isolators
LINE/BUS ISOLATORS
 The line isolators are used to isolate the line (after the operation of opening C.B.)
under maintenance from the healthy system which otherwise may get resulted in L-
G fault.
 The bus isolators are used to isolate the bus under maintenance.
 In this substation normally line isolators were centre break type isolators while the
bus isolators were either double break type OR pantograph type isolators.
 The disc type structure at the tips of centre break type isolator is to reduce the
corona loss while they are open.
(cont.)
CIRCUIT BREAKERS
 In this substation almost all the circuit
breakers are SF6 type circuit breakers.
 There is a switchable series resistance along
with the C.B. as shown here. It is inserted
while closing the circuit breakers for a short
time.
 This resistor, hence, limits the charging
current of the line’s stray capacitance.
3 PHASE REACTOR
 The shunt reactors are used to absorb the excess of
reactive power in the transmission lines.
 In this substation as long transmission lines are
terminating in, their stray capacitance inject reactive
power to absorb which, the reactor is installed here.
 The installed reactor is capable to reduce the line
voltage by as much as 5 kV.
 In this substation, power lines coming from wind
power station is also terminating. Since, there are
large variations in the power production, their reactive
power demand is also varying. Hence the reactor here
is a switchable reactor.
POWER TRANSFORMER
 This substation has two type of power transformers:
1) 400 kV  220 kV and
2) 220 kV  132 kV
 The cooling system employed is forced air – forced oil.
 The cooling systems of transformers are automatically
controlled. Once the temperature reaches 70 C, the
cooling system starts and as temperature reaches 60  C,
the systems switches OFF.
 The supply to the cooling system is given from the
substation supply transformer.
400 kV transformer
220 kV to 132 kV transformer
CABLES TRENCH & TRAY
 The cables that collect the communication signals from
instrument transformers, circuit breakers, isolators,
wave traps etc. are made to run in cable trench
towards the control room.
 The place where all the cables are collected is called
cable tray.
FIRE FIGHTING FACILITY
 As oil is used as coolant and body insulator, there are possibilities of fire in case of
short circuits.
 Fire fighting facility available in two ways in this substation.
 One way is that at some particular distance gaseous fire extinguishing cylinders
are kept.
 Another is that a water pipe runs everywhere in substation. In case of fire, it
sprinkles the water in surrounding area in fine molecular form in order to stop
propagation of fire.
CONTROL ROOM & RELAY ROOM
• The control room has various control panels which shows the information like
incoming power, outgoing power, frequency, time common to all substations, status
of various lines (healthy, faulted, under outage or maintenance), status of various
protective instruments like isolators, circuit breakers; temperatures of various
instruments, working tap of transformers etc.
• The DAS (Data Acquisition System) is used to accumulate the data received from
various sources.
• The relay room is separate from the control room. All relays used here are numerical
and are either from Siemens OR ABB .
• The protection system is so fast that it can detect a fault within 30 ms and hence the
circuit breaker can be operated within as less as 80 ms.
• For 400 kV side C.B., one time auto reclosure is allowed in order to clear the
temporary faults automatically.
Control Room Relay Room
BATTERY ROOM
 The control panels and relays of the substation require DC supply of 220 V.
 This DC supply is made with the help of battery bank reserve normally kept in a
separate room called Battery room.
 The batteries used in this substation are Nickel-Cadmium (Ni-Cd) batteries. These
batteries are used due to their advantages like low maintenance, longer life (15-25
years) etc.
 Each cell is of 2 V and 6Ah capacity.
 The battery room and the battery chargers are shown in next slide.
BATTERY ROOM & ITS CHARGERS
Battery Room Battery Chargers
Visit to 400 kV substation, Hadala

Weitere ähnliche Inhalte

Was ist angesagt?

PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurdilkhush009
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminarShrikant Bhansali
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 
132kv Substation
132kv Substation132kv Substation
132kv Substationguestecdd58
 
132 kv substation
132 kv substation132 kv substation
132 kv substationWipro
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54Subhash Mahla
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingAkriti Gupta
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 

Was ist angesagt? (20)

PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
 
132kv G.S.S. Jalore
132kv G.S.S. Jalore132kv G.S.S. Jalore
132kv G.S.S. Jalore
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
33kv substation
33kv substation33kv substation
33kv substation
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 
Introduction
IntroductionIntroduction
Introduction
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
132 kv substation
132 kv substation132 kv substation
132 kv substation
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
Electric substation
Electric substation Electric substation
Electric substation
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
220 kv gss dausa
220 kv gss dausa220 kv gss dausa
220 kv gss dausa
 

Ähnlich wie Visit to 400 kV substation, Hadala

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportArijit Basu
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limitedVSRAGHU
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf Ishan Khandelwal
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at JassureShuvam Pathania
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONRavi Phadtare
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfHariomgupta90
 
Indian grid system
Indian grid systemIndian grid system
Indian grid systemPRANAY GUPTA
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxfallinhay
 

Ähnlich wie Visit to 400 kV substation, Hadala (20)

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
Uttar pradesh power corporation limited
Uttar pradesh power corporation limitedUttar pradesh power corporation limited
Uttar pradesh power corporation limited
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf 400 kv Heerapura gss ppt by ishan pdf
400 kv Heerapura gss ppt by ishan pdf
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Report on 220kv substation at Jassure
Report on 220kv substation at JassureReport on 220kv substation at Jassure
Report on 220kv substation at Jassure
 
PPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATIONPPT ON 33/11KV SUBSTATION
PPT ON 33/11KV SUBSTATION
 
rough.pptx
rough.pptxrough.pptx
rough.pptx
 
pptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdfpptravi-191011011024 (1).pdf
pptravi-191011011024 (1).pdf
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 

Kürzlich hochgeladen

Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 

Kürzlich hochgeladen (20)

Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 

Visit to 400 kV substation, Hadala

  • 1. Visit to 400 kV substation Created by - NANDAN DESAI
  • 2. Location : Hadala, Rajkot, Gujarat
  • 3. Location : Hadala, Rajkot, Gujarat
  • 4. ABOUT THE SUBSTATION  The substation at Hadala (Rajkot), Gujarat is a 400 kV distribution substation.  It receives power at 400 kV from Adani Thermal power plant via Varsana, from Mundra TPP via Chorania (Limbdi) and via Jetpur and from Varsana SS.  It sends power at two voltage levels – 220 kV and 132 kV to Morbi, Nyara (Rajkot), Tappar, Gondal etc.  The substation is connected as a ring system as Chorania (Limbdi) Amreli Jetpur Hadala (Rajkot) (Continue… )
  • 5. (cont.)  The substation is having two main bus and one transfer bus for both 400 kV side and 220 kV side.  There are in total 6 lines of 400 kV level, 8+ lines of 220 kV and some lines of 132 kV level.  It’s a record that there has been no accidents in this substation since last 2000+ days.
  • 6. Equipments in substation  Lightening arresters  Wave trap  Current Transformer (C.T.)  Potential Transformer (P.T.)  Line isolator with Earthing switch  SF6 Circuit breaker with starting resistance  Bus isolator  3 phase reactor (cont.)
  • 7. Equipments in substation  Power transformers  Cables trench & tray  Fire fighting facility
  • 8. LIGHTENING ARRESTER  The lightening arresters (L.A.) are used to ground the high voltage impulse falling on line during lightening.  L.A. of all the lines connected to a bus are connected in parallel in order to ensure the proper grounding of surge as well as to increase its life.  The L.A. core is made up of Zinc Oxide (ZnO2). It acts as a non-linear resistance i.e. it offers a very high resistance during normal conditions and offers low resistance to the surge voltages.  A ring type structure is attached to L.A. in order to reduce the corona effect.
  • 9. WAVE TRAP  A wave trap is used on those transmission lines which are equipped with PLCC (Power Line Carrier Communication).  As the communication signal frequency is much different from line frequency and also the voltage level is too low, it is quite necessary to separate the power signal and communication signal.  This task is performed by a wave trap which simply consists of L-C series and parallel filters.
  • 10. INSTRUMENT TRANFORMERS  The instrument transformers are: 1. Current Transformers (C.T.) – Used to measure phase current. 2. Potential Transformers (P.T.) – Used to measure phase to neutral voltage.  In this substation at some places CVT (Capacitive Voltage Transformers) are used which does function of PT as well as assisting the Wave Trap. C.T. P.T.
  • 11. LINE/BUS ISOLATORS Centre Break Isolator Double Break Isolator Pantograph type bus isolators
  • 12. LINE/BUS ISOLATORS  The line isolators are used to isolate the line (after the operation of opening C.B.) under maintenance from the healthy system which otherwise may get resulted in L- G fault.  The bus isolators are used to isolate the bus under maintenance.  In this substation normally line isolators were centre break type isolators while the bus isolators were either double break type OR pantograph type isolators.  The disc type structure at the tips of centre break type isolator is to reduce the corona loss while they are open. (cont.)
  • 13. CIRCUIT BREAKERS  In this substation almost all the circuit breakers are SF6 type circuit breakers.  There is a switchable series resistance along with the C.B. as shown here. It is inserted while closing the circuit breakers for a short time.  This resistor, hence, limits the charging current of the line’s stray capacitance.
  • 14. 3 PHASE REACTOR  The shunt reactors are used to absorb the excess of reactive power in the transmission lines.  In this substation as long transmission lines are terminating in, their stray capacitance inject reactive power to absorb which, the reactor is installed here.  The installed reactor is capable to reduce the line voltage by as much as 5 kV.  In this substation, power lines coming from wind power station is also terminating. Since, there are large variations in the power production, their reactive power demand is also varying. Hence the reactor here is a switchable reactor.
  • 15. POWER TRANSFORMER  This substation has two type of power transformers: 1) 400 kV  220 kV and 2) 220 kV  132 kV  The cooling system employed is forced air – forced oil.  The cooling systems of transformers are automatically controlled. Once the temperature reaches 70 C, the cooling system starts and as temperature reaches 60  C, the systems switches OFF.  The supply to the cooling system is given from the substation supply transformer. 400 kV transformer 220 kV to 132 kV transformer
  • 16. CABLES TRENCH & TRAY  The cables that collect the communication signals from instrument transformers, circuit breakers, isolators, wave traps etc. are made to run in cable trench towards the control room.  The place where all the cables are collected is called cable tray.
  • 17. FIRE FIGHTING FACILITY  As oil is used as coolant and body insulator, there are possibilities of fire in case of short circuits.  Fire fighting facility available in two ways in this substation.  One way is that at some particular distance gaseous fire extinguishing cylinders are kept.  Another is that a water pipe runs everywhere in substation. In case of fire, it sprinkles the water in surrounding area in fine molecular form in order to stop propagation of fire.
  • 18. CONTROL ROOM & RELAY ROOM • The control room has various control panels which shows the information like incoming power, outgoing power, frequency, time common to all substations, status of various lines (healthy, faulted, under outage or maintenance), status of various protective instruments like isolators, circuit breakers; temperatures of various instruments, working tap of transformers etc. • The DAS (Data Acquisition System) is used to accumulate the data received from various sources. • The relay room is separate from the control room. All relays used here are numerical and are either from Siemens OR ABB . • The protection system is so fast that it can detect a fault within 30 ms and hence the circuit breaker can be operated within as less as 80 ms. • For 400 kV side C.B., one time auto reclosure is allowed in order to clear the temporary faults automatically.
  • 20. BATTERY ROOM  The control panels and relays of the substation require DC supply of 220 V.  This DC supply is made with the help of battery bank reserve normally kept in a separate room called Battery room.  The batteries used in this substation are Nickel-Cadmium (Ni-Cd) batteries. These batteries are used due to their advantages like low maintenance, longer life (15-25 years) etc.  Each cell is of 2 V and 6Ah capacity.  The battery room and the battery chargers are shown in next slide.