ECBC Training Workshop
MODULE 6:
Lighting
This presentation was prepared by International Resources Group (IRG) for the Energy Conservation
and Commercialization Project (ECO-III), and was made possible by the support of the American
People through the United States Agency for International Development (USAID). The contents of
this presentation are the sole responsibility of IRG and do not necessarily reflect the views of USAID
or the United States Government. The ECO-III Project would like to acknowledge Ministry of Power
and the Bureau of Energy Efficiency of Government of India for their support.
ACKNOWLEDGEMENT
All images, photographs, text and all viewable and non-viewable material, except that which has
been sourced from the references cited, is the property of USAID ECO-III Project and Bureau of
Energy Efficiency, Ministry of Power, Government of India. Reproduction of any part of this material
must acknowledge the creative owners. Reproduction of information, images, graphs, text and data
sourced from the references cited may have additional copyright protection.
Source format:
USAID ECO-III Project and Bureau of Energy Efficiency (2010): ECBC Professional Training Material,
New Delhi, India
COPYRIGHT
Lighting: Outline
» Introduction
» Whole Building Design Approach
» ECBC Requirements
• Mandatory
• Prescriptive
» ECBC Compliance Forms
9/22/2010 4ECBC Training Workshop: Lighting
Introduction
» Lighting is a major energy consumer in commercial buildings
» Lighting accounts for 15% of total energy consumption in India
• Commercial Buildings 20-40%
» In most commercial buildings, lighting is one of the largest sources of internal heat
gain
• Heat generated from electric lighting contributes significantly to the energy needed for cooling
of buildings
• Each kilowatt-hour (kWh) reduction in lighting energy approximately saves 0.4 kWh in cooling
energy
» Lighting is one of the fastest developing energy-efficient technologies
9/22/2010 5ECBC Training Workshop: Lighting
Whole Building Design Approach
1. Improve the space (color of room surfaces and furnishings)
2. Optimize light quality
• Reduction of Glare and veiling reflections
• Proper Luminance Ratios
• Mix of direct and indirect sources
• Appropriate color temperature
• Appropriate color rendering
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 6ECBC Training Workshop: Lighting
Whole Building Design Approach
3. Capture Daylight
• Daylighting Design Approaches
– Building form – U-shaped, stepped-back
– Skylights, atria
– Elements – light shelves, reflectors, louvers, blinds
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 7ECBC Training Workshop: Lighting
Simple daylighting techniques
This schematic shows a mix of top-lighting and side-lighting, light shelves, high reflectance
ceilings, and wall diffusion to provide fairly uniform deep-plan daylighting without the glare of
direct sunlight.
Whole Building Design Approach
3. Capture Daylight
• Energy savings and demand reduction
– Reducing need for electrical Lighting
– Reducing cooling load (daylight contributes less heat to a space per given amount of
light – efficacy of daylight is significantly higher than most forms of electrical lighting)
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 8ECBC Training Workshop: Lighting
Building heat gain from different light sources
With proper glazing selection in a building, daylight will contribute far less
heat per unit of light delivered to the interior than electric lights do.
Whole Building Design Approach
3. Capture Daylight
• Glazing selection
– Tinted
– Reflective
– Low-e
– Spectrally selective
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 9ECBC Training Workshop: Lighting
Total solar and visible light transmissions for selected glazing units
Glazing units with high visible light transmission and low solar heat gain coefficients (SHGC, the fraction of the incident solar energy transmitted through a window) are best for
daylighting in buildings dominated by cooling loads.
Whole Building Design Approach
3. Capture Daylight
• Redirecting daylight (and light transport systems)
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 10ECBC Training Workshop: Lighting
How light-bending panels can improve daylighting
Using refractive and reflective optics allows direct daylight to be distributed deeper
into a building’s core.
The Sun Pipe light pipe
This simple daylighting product resembles a skylight in function, but it is easier to
install and avoids direct glare.
Whole Building Design Approach
3. Capture Daylight
• Controls for daylight dimming
4. Consider lighting quantity (‘less
light properly delivered’ Vs ‘more
light poorly delivered’)
• Separate task and ambient lighting
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 11ECBC Training Workshop: Lighting
Light levels with and without dimming
These are typical light levels on a horizontal surface. In this example, electric lights supply
600 lux at night. Thus when the lights are turned on or off during the day, 600 lux is added
or subtracted from the natural light. At midday, even with no lights, the illumination levels
are greater than at nighttime levels.
Whole Building Design Approach
5. Energy-efficient electric lighting based on
• Task
• Level of quality desired
• Amount of light required
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 12ECBC Training Workshop: Lighting
A brief history of lighting
The compact fluorescent lamp has improved the product efficacy and lifetime 50-fold as compared with the
tungsten-filament lamp and by half a million compared with the candle.
Lamp efficacy of major light sources
LED operation
Whole Building Design Approach
6. Use of lighting controls
• On-off controls
– Manual switches
– Elapsed-time switches
– Clock switches
– EMS (Energy Management Systems) controls
– Photocell controls
– Occupancy controls
– Swtiched power strips
• Dimming controls
– Power reducers
– Stepped-dimming controls
– Continuous-dimming controls
SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005)
9/22/2010 13ECBC Training Workshop: Lighting
Representative sensor coverage diagram
Ultrasonic sensors can detect motion at any point within the contour lines shown in the
graph. Infrared sensors “see” only in the wedge-shaped zones and they generally don’t see
as far as ultrasonic units. Some sensors are further straight ahead than to the side. The
ranges shown here are representative; some sensors may be more or less sensitive.
ECBC Requirements: Overview
ECBC Lighting Requirements apply to
» Interior spaces of buildings
» Exterior building features, including façades, illuminated roofs, architectural
features, entrances, exits, loading docks, and illuminated canopies
» Exterior building grounds lighting that is provided through the building’s electrical
service
» The mandatory requirements for lighting mostly relate to interior and exterior
lighting controls.
» The prescriptive requirements limit the installed electric wattage for interior
building lighting.
• Demonstrated through the Building Area Method or the Space Function Method
9/22/2010 14ECBC Training Workshop: Lighting
ECBC Requirements: Mandatory
Automatic Lighting Control
» Interior lighting systems in buildings larger than 500 m2 (5,000 ft²) shall be
equipped with an automatic control device.
• All office areas less than 30 m2 (300 ft2) shall be equipped with occupancy sensors.
• For other spaces, this automatic control device shall function on either:
– (a) A scheduled basis at specific programmed times. An independent program schedule
shall be provided for areas of no more than 2,500 m2 (25,000 ft²) and not more than one
floor;
OR
– (b) Occupancy sensors that shall turn the lighting off within 30 minutes of an occupant
leaving the space. Light fixtures controlled by occupancy sensors shall have a wall-mounted,
manual switch capable of turning off lights when the space is occupied.
9/22/2010 15ECBC Training Workshop: Lighting
ECBC Requirements: Mandatory
Space Control
» Each space shall have at least one control device to independently control the
general lighting
» Each control device shall be activated either manually by an occupant or
automatically by sensing an occupant.
» Each control device shall:
• Control a maximum of 250 m2 for a space less than or equal to 1,000 m2, and a maximum of
1,000 m2 for a space greater than 1,000 m2
• Be capable of overriding the shutoff control required in Automatic Lighting Shutoff for no more
than 2 hours
• Be readily accessible and located so the occupant can see the control
9/22/2010 16ECBC Training Workshop: Lighting
ECBC Requirements: Mandatory
Daylighting Control
If Daylighting strategy is used in the design, ECBC requires controls that can reduce the
light output of luminaires in the daylit space.
» Luminaire in daylighted areas greater than 25 m2 shall be equipped with either a
manual or automatic control device that:
• Is capable of reducing the light output of the luminaires in the daylighted areas by at least 50%
• Controls only the luminaires located entirely within the daylighted area
There are also control requirements for exterior lighting (with photosensor or time
switches) and specialty lighting applications (i.e. displays, hotel rooms, task lighting).
9/22/2010 17ECBC Training Workshop: Lighting
ECBC Requirements: Mandatory
Exit Signs
» Internally-illuminated exit signs shall
not exceed 5W per face.
Exterior Building Grounds Lighting
» Lighting for exterior building grounds
luminaires which operate at greater
than 100W shall contain lamps
having a minimum efficacy of 60
lm/W unless the luminaire is
controlled by a motion sensor.
NOTE: Luminaires meeting these requirements include
fluorescent, mercury vapor and high pressure sodium
SOURCE: (Image) Adapted from ASHRAE/IESNA Standard 90.1-1999
9/22/2010 18ECBC Training Workshop: Lighting
Exterior Grounds Lighting and specific Technologies
ECBC Requirements: Prescriptive
Interior Lighting Power
» Prescriptive lighting requirements limit the installed electric wattage for interior
building lighting
» Trade-offs of interior lighting power allowance among portions of the building for
which a different method of calculation has been used are NOT permitted
» Installed lighting power is calculated and compared using the maximum
permissible interior lighting power densities
• Specified for various building types (Building Area Method)
OR
• Building space functions (Space Function Method)
9/22/2010 19ECBC Training Workshop: Lighting
ECBC Requirements: Prescriptive
Building Area Method
1. Determine the allowed lighting power density (LPD) from Table 7.1 of ECBC for each appropriate
building area type
2. Calculate the gross lighted floor area type
3. Multiply the allowed watts/sq.mt. Listed for each selected building type by the corresponding
lighted floor areas to determine the allowed LPD
4. The sum of all the interior lighting power for various areas of the building cannot exceed the total
watts to be in compliance
9/22/2010 20ECBC Training Workshop: Lighting
ECBC Requirements: Prescriptive
Space Function Method
1. Determine the appropriate building type and their allowed lighting power densities, which varies
according to the function of the space
2. For each space enclosed by partitions 80% or greater than ceiling height, determine the gross
interior floor area.
3. The lighting power allowance for a space is the product of the gross lighted floor area of the space
times the allowed lighting power density for that space.
4. The interior lighting power allowance for the building is the sum of the lighting power allowances
for all spaces.
9/22/2010 21ECBC Training Workshop: Lighting
ECBC Requirements: Prescriptive
Exterior Lighting Power
» The connected exterior lighting power must not exceed the allowed limits by ECBC.
» Trade-offs between applications are not permitted.
9/22/2010 22ECBC Training Workshop: Lighting
ECBC Compliance Forms
9/22/2010 23ECBC Training Workshop: Lighting
End of MODULE
» Introduction
» Whole Building Design Approach
» ECBC Requirements
• Mandatory
• Prescriptive
» ECBC Compliance Forms
9/22/2010 24ECBC Training Workshop: Lighting
Content Development Team
USAID ECO-III Project
Dr. Satish Kumar
Sanyogita Manu
Aalok Deshmukh
Ravi Kapoor
Project Sub-consultants
Vasudha Lathey
Shruti Narayan
Anurag Bajpai
Contact Information
USAID ECO-III Project
AADI Building, Lower Ground Floor
2 Balbir Saxena Marg, Hauz Khas
New Delhi 110016
T: +91-11-2685-3110
F: +91-11-2685-3114
Email: eco3@irgssa.com
Website: www.eco3.org
Bureau of Energy Efficiency
Government of India, Ministry of Power
4th Floor, SEWA Bhawan, R. K. Puram
New Delhi 110066
T: +91-11-2617-9699
F: +91-11-2617-8352
Email: webmanager-bee@nic.in
Website: www.bee-india.nic.in

Weitere ähnliche Inhalte

Was ist angesagt?

Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawanpraveen rohilla
 
Passive design
Passive designPassive design
Passive designGrkemDiken
 
Parliament library, New Delhi.
Parliament library, New Delhi.Parliament library, New Delhi.
Parliament library, New Delhi.Mayur Waghulde
 
Infosys Hyderabad
Infosys HyderabadInfosys Hyderabad
Infosys HyderabadGRIHA India
 
SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE IshaRajpurohit
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Centerbaburajiv2007
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Vinay M
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGgatti Teja
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Drishty Ranjit
 
Green Buildings - innovative green technologies and case studies
Green Buildings - innovative green technologies and case studiesGreen Buildings - innovative green technologies and case studies
Green Buildings - innovative green technologies and case studiesctlachu
 
Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerationsmominzaki
 
CEPT University, Ahmedabad - Net Zero Energy Building
CEPT University, Ahmedabad - Net Zero Energy BuildingCEPT University, Ahmedabad - Net Zero Energy Building
CEPT University, Ahmedabad - Net Zero Energy BuildingDanfoss India
 
Building design in hot and dry climate
Building design in hot and dry climateBuilding design in hot and dry climate
Building design in hot and dry climateShivang Madaan
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.Janmejoy Gupta
 
Sohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreGaurav Jhunjhunwala
 

Was ist angesagt? (20)

Indira paryavaran bhawan
Indira paryavaran bhawanIndira paryavaran bhawan
Indira paryavaran bhawan
 
Passive design
Passive designPassive design
Passive design
 
Parliament library, New Delhi.
Parliament library, New Delhi.Parliament library, New Delhi.
Parliament library, New Delhi.
 
Infosys Hyderabad
Infosys HyderabadInfosys Hyderabad
Infosys Hyderabad
 
SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE SUSTAINABLE AND GREEN ARCHITECTURE
SUSTAINABLE AND GREEN ARCHITECTURE
 
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green CenterLEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
LEED India + Case Study : CII Sohrabji Godrej, ITC Green Center
 
Case study
Case studyCase study
Case study
 
Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.Green Building Case Study on TERI,bangalore.
Green Building Case Study on TERI,bangalore.
 
INFOSYS GREEN BUILDING
INFOSYS GREEN BUILDINGINFOSYS GREEN BUILDING
INFOSYS GREEN BUILDING
 
Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)Courtyard Effect (passive cooling technique)
Courtyard Effect (passive cooling technique)
 
Amphitheatre.pptx
 Amphitheatre.pptx Amphitheatre.pptx
Amphitheatre.pptx
 
Green Buildings - innovative green technologies and case studies
Green Buildings - innovative green technologies and case studiesGreen Buildings - innovative green technologies and case studies
Green Buildings - innovative green technologies and case studies
 
Natural ventilation
Natural ventilationNatural ventilation
Natural ventilation
 
Green building delhi case study
Green building delhi case studyGreen building delhi case study
Green building delhi case study
 
Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerations
 
CEPT University, Ahmedabad - Net Zero Energy Building
CEPT University, Ahmedabad - Net Zero Energy BuildingCEPT University, Ahmedabad - Net Zero Energy Building
CEPT University, Ahmedabad - Net Zero Energy Building
 
Building design in hot and dry climate
Building design in hot and dry climateBuilding design in hot and dry climate
Building design in hot and dry climate
 
passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.passive design strategies in composite & warm-humid climates.
passive design strategies in composite & warm-humid climates.
 
Sohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business CentreSohrabji Godrej Green Business Centre
Sohrabji Godrej Green Business Centre
 
Passive architecture
Passive architecturePassive architecture
Passive architecture
 

Andere mochten auch

Advit Foundation_Phase Change Materials
Advit Foundation_Phase Change MaterialsAdvit Foundation_Phase Change Materials
Advit Foundation_Phase Change MaterialsMathangi Ramakrishnan
 
BEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyBEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyMathangi Ramakrishnan
 
ECBC Training_Energy Efficiency Initiatives in Commercial Buildings
ECBC Training_Energy Efficiency Initiatives in Commercial BuildingsECBC Training_Energy Efficiency Initiatives in Commercial Buildings
ECBC Training_Energy Efficiency Initiatives in Commercial BuildingsMathangi Ramakrishnan
 
Concept of Green Roof
Concept of Green RoofConcept of Green Roof
Concept of Green Roofchris_louis
 
Roof top gardening
Roof top gardeningRoof top gardening
Roof top gardeningxunaed
 

Andere mochten auch (20)

ECBC Training_02-Scope Admin
ECBC Training_02-Scope AdminECBC Training_02-Scope Admin
ECBC Training_02-Scope Admin
 
ECBC Training_07-Electrical Power
ECBC Training_07-Electrical PowerECBC Training_07-Electrical Power
ECBC Training_07-Electrical Power
 
ECBC Training_08-Compliance
ECBC Training_08-ComplianceECBC Training_08-Compliance
ECBC Training_08-Compliance
 
ECBC_01-Introduction
ECBC_01-IntroductionECBC_01-Introduction
ECBC_01-Introduction
 
ECBC Training_04-HVAC
ECBC Training_04-HVACECBC Training_04-HVAC
ECBC Training_04-HVAC
 
ECBC Training_03-Envelope
ECBC Training_03-EnvelopeECBC Training_03-Envelope
ECBC Training_03-Envelope
 
ECBC Training_05-SHWP
ECBC Training_05-SHWPECBC Training_05-SHWP
ECBC Training_05-SHWP
 
Case Study_Omax Autos
Case Study_Omax AutosCase Study_Omax Autos
Case Study_Omax Autos
 
Case Study_Radnik Exports
Case Study_Radnik ExportsCase Study_Radnik Exports
Case Study_Radnik Exports
 
Case Study_Trident Group
Case Study_Trident GroupCase Study_Trident Group
Case Study_Trident Group
 
Advit Foundation_EMS and ISO 50001
Advit Foundation_EMS  and ISO 50001Advit Foundation_EMS  and ISO 50001
Advit Foundation_EMS and ISO 50001
 
Case Study_Welspun India
Case Study_Welspun IndiaCase Study_Welspun India
Case Study_Welspun India
 
Case Study_Ramesh Flowers
Case Study_Ramesh FlowersCase Study_Ramesh Flowers
Case Study_Ramesh Flowers
 
Advit Foundation_Phase Change Materials
Advit Foundation_Phase Change MaterialsAdvit Foundation_Phase Change Materials
Advit Foundation_Phase Change Materials
 
BEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyBEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency Policy
 
ECBC Training_Energy Efficiency Initiatives in Commercial Buildings
ECBC Training_Energy Efficiency Initiatives in Commercial BuildingsECBC Training_Energy Efficiency Initiatives in Commercial Buildings
ECBC Training_Energy Efficiency Initiatives in Commercial Buildings
 
Concept of Green Roof
Concept of Green RoofConcept of Green Roof
Concept of Green Roof
 
ECBC User Guide
ECBC User GuideECBC User Guide
ECBC User Guide
 
Green roofs
Green roofsGreen roofs
Green roofs
 
Roof top gardening
Roof top gardeningRoof top gardening
Roof top gardening
 

Ähnlich wie ECBC Training_06-Lighting

Green Studio Handbook - Part 3
Green Studio Handbook - Part 3Green Studio Handbook - Part 3
Green Studio Handbook - Part 3Galala University
 
BS 2 Electrical installatition 5
BS 2 Electrical installatition 5BS 2 Electrical installatition 5
BS 2 Electrical installatition 5Est
 
Lighting simulation i
Lighting simulation iLighting simulation i
Lighting simulation iNguyen Khuong
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatitionEst
 
The Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of ThingsThe Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of ThingsSUDHAKARA RAO PARVATANENI
 
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...Lighting and energy efficiency; KAED Gallery of International Islamic Univers...
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...Muhsin Otuyo
 
Energy Efficient Lighting Scheme OfBuildings Using Computer Tools
Energy Efficient Lighting Scheme OfBuildings Using Computer ToolsEnergy Efficient Lighting Scheme OfBuildings Using Computer Tools
Energy Efficient Lighting Scheme OfBuildings Using Computer Toolsijiert bestjournal
 
103344283 final-year-project2012-ee
103344283 final-year-project2012-ee103344283 final-year-project2012-ee
103344283 final-year-project2012-eehomeworkping7
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design StrategiesASHRAE Region VI
 
Building Science II: Lighting Report
Building Science II: Lighting ReportBuilding Science II: Lighting Report
Building Science II: Lighting ReportEe Dong Chen
 
SESEC Training Module 6: Lighting
SESEC Training Module 6: LightingSESEC Training Module 6: Lighting
SESEC Training Module 6: LightingDITF Denkendorf
 
Energy and environment engineering ppt
Energy and environment engineering pptEnergy and environment engineering ppt
Energy and environment engineering pptVishalRameshDhanure
 
Intelligent household led lighting system considering energy efficiency and u...
Intelligent household led lighting system considering energy efficiency and u...Intelligent household led lighting system considering energy efficiency and u...
Intelligent household led lighting system considering energy efficiency and u...Ecway Technologies
 
Brochure_SolarShading_screen_LR
Brochure_SolarShading_screen_LRBrochure_SolarShading_screen_LR
Brochure_SolarShading_screen_LRaajo
 
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, Spain
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, SpainJordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, Spain
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, SpainARC research group
 
SOLATUBE Cairo scp May 17th 2016 v3.1
SOLATUBE Cairo scp May 17th 2016 v3.1SOLATUBE Cairo scp May 17th 2016 v3.1
SOLATUBE Cairo scp May 17th 2016 v3.1TAQAMISR
 

Ähnlich wie ECBC Training_06-Lighting (20)

Green Studio Handbook - Part 3
Green Studio Handbook - Part 3Green Studio Handbook - Part 3
Green Studio Handbook - Part 3
 
BS 2 Electrical installatition 5
BS 2 Electrical installatition 5BS 2 Electrical installatition 5
BS 2 Electrical installatition 5
 
Lighting simulation i
Lighting simulation iLighting simulation i
Lighting simulation i
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 
The Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of ThingsThe Next Network: Lighting, Controls, and the Internet of Things
The Next Network: Lighting, Controls, and the Internet of Things
 
Publicacion osb 2010
Publicacion osb 2010Publicacion osb 2010
Publicacion osb 2010
 
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...Lighting and energy efficiency; KAED Gallery of International Islamic Univers...
Lighting and energy efficiency; KAED Gallery of International Islamic Univers...
 
Sustainable Design of a Commercial Building
Sustainable Design of a Commercial BuildingSustainable Design of a Commercial Building
Sustainable Design of a Commercial Building
 
Energy Efficient Lighting Scheme OfBuildings Using Computer Tools
Energy Efficient Lighting Scheme OfBuildings Using Computer ToolsEnergy Efficient Lighting Scheme OfBuildings Using Computer Tools
Energy Efficient Lighting Scheme OfBuildings Using Computer Tools
 
103344283 final-year-project2012-ee
103344283 final-year-project2012-ee103344283 final-year-project2012-ee
103344283 final-year-project2012-ee
 
High Performance Building Design Strategies
High Performance Building Design StrategiesHigh Performance Building Design Strategies
High Performance Building Design Strategies
 
Final l
Final lFinal l
Final l
 
Building Science II: Lighting Report
Building Science II: Lighting ReportBuilding Science II: Lighting Report
Building Science II: Lighting Report
 
icsp_tech_2pager
icsp_tech_2pagericsp_tech_2pager
icsp_tech_2pager
 
SESEC Training Module 6: Lighting
SESEC Training Module 6: LightingSESEC Training Module 6: Lighting
SESEC Training Module 6: Lighting
 
Energy and environment engineering ppt
Energy and environment engineering pptEnergy and environment engineering ppt
Energy and environment engineering ppt
 
Intelligent household led lighting system considering energy efficiency and u...
Intelligent household led lighting system considering energy efficiency and u...Intelligent household led lighting system considering energy efficiency and u...
Intelligent household led lighting system considering energy efficiency and u...
 
Brochure_SolarShading_screen_LR
Brochure_SolarShading_screen_LRBrochure_SolarShading_screen_LR
Brochure_SolarShading_screen_LR
 
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, Spain
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, SpainJordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, Spain
Jordi Macià, EURECAT Technology Centre of Catalonia, Barcelona, Spain
 
SOLATUBE Cairo scp May 17th 2016 v3.1
SOLATUBE Cairo scp May 17th 2016 v3.1SOLATUBE Cairo scp May 17th 2016 v3.1
SOLATUBE Cairo scp May 17th 2016 v3.1
 

Kürzlich hochgeladen

Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxEdgar Hertwich
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Anamikakaur10
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...SUHANI PANDEY
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionRocioDanicaCondorGol1
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...SUHANI PANDEY
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995garthraymundo123
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...SUHANI PANDEY
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...tanu pandey
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
 

Kürzlich hochgeladen (20)

Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995RA 7942:vThe Philippine Mining Act of 1995
RA 7942:vThe Philippine Mining Act of 1995
 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 

ECBC Training_06-Lighting

  • 2. This presentation was prepared by International Resources Group (IRG) for the Energy Conservation and Commercialization Project (ECO-III), and was made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this presentation are the sole responsibility of IRG and do not necessarily reflect the views of USAID or the United States Government. The ECO-III Project would like to acknowledge Ministry of Power and the Bureau of Energy Efficiency of Government of India for their support. ACKNOWLEDGEMENT
  • 3. All images, photographs, text and all viewable and non-viewable material, except that which has been sourced from the references cited, is the property of USAID ECO-III Project and Bureau of Energy Efficiency, Ministry of Power, Government of India. Reproduction of any part of this material must acknowledge the creative owners. Reproduction of information, images, graphs, text and data sourced from the references cited may have additional copyright protection. Source format: USAID ECO-III Project and Bureau of Energy Efficiency (2010): ECBC Professional Training Material, New Delhi, India COPYRIGHT
  • 4. Lighting: Outline » Introduction » Whole Building Design Approach » ECBC Requirements • Mandatory • Prescriptive » ECBC Compliance Forms 9/22/2010 4ECBC Training Workshop: Lighting
  • 5. Introduction » Lighting is a major energy consumer in commercial buildings » Lighting accounts for 15% of total energy consumption in India • Commercial Buildings 20-40% » In most commercial buildings, lighting is one of the largest sources of internal heat gain • Heat generated from electric lighting contributes significantly to the energy needed for cooling of buildings • Each kilowatt-hour (kWh) reduction in lighting energy approximately saves 0.4 kWh in cooling energy » Lighting is one of the fastest developing energy-efficient technologies 9/22/2010 5ECBC Training Workshop: Lighting
  • 6. Whole Building Design Approach 1. Improve the space (color of room surfaces and furnishings) 2. Optimize light quality • Reduction of Glare and veiling reflections • Proper Luminance Ratios • Mix of direct and indirect sources • Appropriate color temperature • Appropriate color rendering SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 6ECBC Training Workshop: Lighting
  • 7. Whole Building Design Approach 3. Capture Daylight • Daylighting Design Approaches – Building form – U-shaped, stepped-back – Skylights, atria – Elements – light shelves, reflectors, louvers, blinds SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 7ECBC Training Workshop: Lighting Simple daylighting techniques This schematic shows a mix of top-lighting and side-lighting, light shelves, high reflectance ceilings, and wall diffusion to provide fairly uniform deep-plan daylighting without the glare of direct sunlight.
  • 8. Whole Building Design Approach 3. Capture Daylight • Energy savings and demand reduction – Reducing need for electrical Lighting – Reducing cooling load (daylight contributes less heat to a space per given amount of light – efficacy of daylight is significantly higher than most forms of electrical lighting) SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 8ECBC Training Workshop: Lighting Building heat gain from different light sources With proper glazing selection in a building, daylight will contribute far less heat per unit of light delivered to the interior than electric lights do.
  • 9. Whole Building Design Approach 3. Capture Daylight • Glazing selection – Tinted – Reflective – Low-e – Spectrally selective SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 9ECBC Training Workshop: Lighting Total solar and visible light transmissions for selected glazing units Glazing units with high visible light transmission and low solar heat gain coefficients (SHGC, the fraction of the incident solar energy transmitted through a window) are best for daylighting in buildings dominated by cooling loads.
  • 10. Whole Building Design Approach 3. Capture Daylight • Redirecting daylight (and light transport systems) SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 10ECBC Training Workshop: Lighting How light-bending panels can improve daylighting Using refractive and reflective optics allows direct daylight to be distributed deeper into a building’s core. The Sun Pipe light pipe This simple daylighting product resembles a skylight in function, but it is easier to install and avoids direct glare.
  • 11. Whole Building Design Approach 3. Capture Daylight • Controls for daylight dimming 4. Consider lighting quantity (‘less light properly delivered’ Vs ‘more light poorly delivered’) • Separate task and ambient lighting SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 11ECBC Training Workshop: Lighting Light levels with and without dimming These are typical light levels on a horizontal surface. In this example, electric lights supply 600 lux at night. Thus when the lights are turned on or off during the day, 600 lux is added or subtracted from the natural light. At midday, even with no lights, the illumination levels are greater than at nighttime levels.
  • 12. Whole Building Design Approach 5. Energy-efficient electric lighting based on • Task • Level of quality desired • Amount of light required SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 12ECBC Training Workshop: Lighting A brief history of lighting The compact fluorescent lamp has improved the product efficacy and lifetime 50-fold as compared with the tungsten-filament lamp and by half a million compared with the candle. Lamp efficacy of major light sources LED operation
  • 13. Whole Building Design Approach 6. Use of lighting controls • On-off controls – Manual switches – Elapsed-time switches – Clock switches – EMS (Energy Management Systems) controls – Photocell controls – Occupancy controls – Swtiched power strips • Dimming controls – Power reducers – Stepped-dimming controls – Continuous-dimming controls SOURCE: E Source Technology Atlas Series, Volume I Lighting (2005) 9/22/2010 13ECBC Training Workshop: Lighting Representative sensor coverage diagram Ultrasonic sensors can detect motion at any point within the contour lines shown in the graph. Infrared sensors “see” only in the wedge-shaped zones and they generally don’t see as far as ultrasonic units. Some sensors are further straight ahead than to the side. The ranges shown here are representative; some sensors may be more or less sensitive.
  • 14. ECBC Requirements: Overview ECBC Lighting Requirements apply to » Interior spaces of buildings » Exterior building features, including façades, illuminated roofs, architectural features, entrances, exits, loading docks, and illuminated canopies » Exterior building grounds lighting that is provided through the building’s electrical service » The mandatory requirements for lighting mostly relate to interior and exterior lighting controls. » The prescriptive requirements limit the installed electric wattage for interior building lighting. • Demonstrated through the Building Area Method or the Space Function Method 9/22/2010 14ECBC Training Workshop: Lighting
  • 15. ECBC Requirements: Mandatory Automatic Lighting Control » Interior lighting systems in buildings larger than 500 m2 (5,000 ft²) shall be equipped with an automatic control device. • All office areas less than 30 m2 (300 ft2) shall be equipped with occupancy sensors. • For other spaces, this automatic control device shall function on either: – (a) A scheduled basis at specific programmed times. An independent program schedule shall be provided for areas of no more than 2,500 m2 (25,000 ft²) and not more than one floor; OR – (b) Occupancy sensors that shall turn the lighting off within 30 minutes of an occupant leaving the space. Light fixtures controlled by occupancy sensors shall have a wall-mounted, manual switch capable of turning off lights when the space is occupied. 9/22/2010 15ECBC Training Workshop: Lighting
  • 16. ECBC Requirements: Mandatory Space Control » Each space shall have at least one control device to independently control the general lighting » Each control device shall be activated either manually by an occupant or automatically by sensing an occupant. » Each control device shall: • Control a maximum of 250 m2 for a space less than or equal to 1,000 m2, and a maximum of 1,000 m2 for a space greater than 1,000 m2 • Be capable of overriding the shutoff control required in Automatic Lighting Shutoff for no more than 2 hours • Be readily accessible and located so the occupant can see the control 9/22/2010 16ECBC Training Workshop: Lighting
  • 17. ECBC Requirements: Mandatory Daylighting Control If Daylighting strategy is used in the design, ECBC requires controls that can reduce the light output of luminaires in the daylit space. » Luminaire in daylighted areas greater than 25 m2 shall be equipped with either a manual or automatic control device that: • Is capable of reducing the light output of the luminaires in the daylighted areas by at least 50% • Controls only the luminaires located entirely within the daylighted area There are also control requirements for exterior lighting (with photosensor or time switches) and specialty lighting applications (i.e. displays, hotel rooms, task lighting). 9/22/2010 17ECBC Training Workshop: Lighting
  • 18. ECBC Requirements: Mandatory Exit Signs » Internally-illuminated exit signs shall not exceed 5W per face. Exterior Building Grounds Lighting » Lighting for exterior building grounds luminaires which operate at greater than 100W shall contain lamps having a minimum efficacy of 60 lm/W unless the luminaire is controlled by a motion sensor. NOTE: Luminaires meeting these requirements include fluorescent, mercury vapor and high pressure sodium SOURCE: (Image) Adapted from ASHRAE/IESNA Standard 90.1-1999 9/22/2010 18ECBC Training Workshop: Lighting Exterior Grounds Lighting and specific Technologies
  • 19. ECBC Requirements: Prescriptive Interior Lighting Power » Prescriptive lighting requirements limit the installed electric wattage for interior building lighting » Trade-offs of interior lighting power allowance among portions of the building for which a different method of calculation has been used are NOT permitted » Installed lighting power is calculated and compared using the maximum permissible interior lighting power densities • Specified for various building types (Building Area Method) OR • Building space functions (Space Function Method) 9/22/2010 19ECBC Training Workshop: Lighting
  • 20. ECBC Requirements: Prescriptive Building Area Method 1. Determine the allowed lighting power density (LPD) from Table 7.1 of ECBC for each appropriate building area type 2. Calculate the gross lighted floor area type 3. Multiply the allowed watts/sq.mt. Listed for each selected building type by the corresponding lighted floor areas to determine the allowed LPD 4. The sum of all the interior lighting power for various areas of the building cannot exceed the total watts to be in compliance 9/22/2010 20ECBC Training Workshop: Lighting
  • 21. ECBC Requirements: Prescriptive Space Function Method 1. Determine the appropriate building type and their allowed lighting power densities, which varies according to the function of the space 2. For each space enclosed by partitions 80% or greater than ceiling height, determine the gross interior floor area. 3. The lighting power allowance for a space is the product of the gross lighted floor area of the space times the allowed lighting power density for that space. 4. The interior lighting power allowance for the building is the sum of the lighting power allowances for all spaces. 9/22/2010 21ECBC Training Workshop: Lighting
  • 22. ECBC Requirements: Prescriptive Exterior Lighting Power » The connected exterior lighting power must not exceed the allowed limits by ECBC. » Trade-offs between applications are not permitted. 9/22/2010 22ECBC Training Workshop: Lighting
  • 23. ECBC Compliance Forms 9/22/2010 23ECBC Training Workshop: Lighting
  • 24. End of MODULE » Introduction » Whole Building Design Approach » ECBC Requirements • Mandatory • Prescriptive » ECBC Compliance Forms 9/22/2010 24ECBC Training Workshop: Lighting
  • 25. Content Development Team USAID ECO-III Project Dr. Satish Kumar Sanyogita Manu Aalok Deshmukh Ravi Kapoor Project Sub-consultants Vasudha Lathey Shruti Narayan Anurag Bajpai
  • 26. Contact Information USAID ECO-III Project AADI Building, Lower Ground Floor 2 Balbir Saxena Marg, Hauz Khas New Delhi 110016 T: +91-11-2685-3110 F: +91-11-2685-3114 Email: eco3@irgssa.com Website: www.eco3.org Bureau of Energy Efficiency Government of India, Ministry of Power 4th Floor, SEWA Bhawan, R. K. Puram New Delhi 110066 T: +91-11-2617-9699 F: +91-11-2617-8352 Email: webmanager-bee@nic.in Website: www.bee-india.nic.in