Project Management:




                            Style Guide
                             Corporate
  A How-To Guide

       presented by:




                                 EM Collateral
     Jennifer L. Pricci
Behind the Curtain




                                                                    About EM
A successful Project Manager must simultaneously manage the
four basic elements of a project: resources, time, money, and
most importantly, scope. All these elements are interrelated.




                                                                  Management
Each must be managed effectively. All must be managed




                                                                    Project
together if the project, and the project manager, is to be a
success.
 Resources
People, equipment, material




                                                                    Style Guide
                                                                     Corporate
  Time
Task durations, dependencies, critical path
 Money
Costs, contingencies, profit




                                                                         EM Collateral
  Scope
Project size, goals, requirements
Most literature on project management speaks of the need to
manage and balance three elements: people, time, and money.
However, the fourth element is the most important and it is the
first and last task for a successful project manager.
Managing Scope




                                                                     About EM
The project scope is the definition of what the project is
supposed to accomplish and the budget (of time and money)
that has been created to achieve these objectives.




                                                                   Management
                                                                     Project
It is absolutely imperative that any change to the scope of the
project have a matching change in budget, either time or
resources. If the budget is not adjusted, the smart project
manager will avoid the change in scope.




                                                                     Style Guide
Usually, scope changes occur in the form of "scope creep".




                                                                      Corporate
Scope creep is the piling up of small changes that by themselves
are manageable, but in aggregate are significant. Make sure
any requested change, no matter how small, is accompanied by
approval for a change in budget or schedule or both.
You can not effectively manage the resources, time and money




                                                                          EM Collateral
in a project unless you actively manage the project scope.
When you have the project scope clearly identified and
associated to the timeline and budget, you can begin to manage
the project resources. These include the people, equipment, and
material needed to complete the project.
Managing Resources




                                                                 About EM
Managing project resources frequently involves more than
people management. The project manager must also manage
the equipment used for the project and the material needed




                                                               Management
by the people and equipment assigned to the project.




                                                                 Project
  People
Project employees, vendor staff, subcontract labor
  Equipment




                                                                 Style Guide
From heavy equipment or development, test, and staging




                                                                  Corporate
servers, CD burners or recording studio, tape decks, mixers,
microphones and speakers
 Material
CD blanks, computers, jewel cases, instruction manuals




                                                                      EM Collateral
Managing Resources: People




                                                                     About EM
Managing the people resources means having the right
people, with the right skills and the proper tools, in the right
quantity at the right time. It also means ensuring that they




                                                                   Management
know what needs to be done, when, and how. And it means




                                                                     Project
motivating them to take ownership in the project too.
Managing direct employees normally means managing the
senior person in each group of employees assigned to your
project. Remember that these employees also have a line




                                                                     Style Guide
                                                                      Corporate
manager to whom they report and from whom the usually take
technical direction. In a matrix management situation, like a
project team, your job is to provide project direction to them.
Managing labor subcontracts usually means managing the
team lead for the subcontracted workers, who in turn manages
the workers.




                                                                          EM Collateral
Managing Resources: Equipment




                                                                       About EM
The equipment you have to manage as part of your project
depends on the nature of the project. For a project to release a
new version of a computer game, the equipment would include




                                                                     Management
computers, test equipment, and duplication and packaging




                                                                       Project
machinery.
The project management key for equipment is much like for
people resources. You have to make sure you have the right
equipment in the right place at the right time and that it has the




                                                                       Style Guide
                                                                        Corporate
supplies it needs to operate properly.




                                                                            EM Collateral
Managing Resources: Material




                                                                      About EM
Most projects involve the purchase of material. For a project to
release a music CD by a hot new artist, it would include the CD
blanks, artwork for the jewel case, and press releases to be sent




                                                                    Management
to deejays. The project management issue with supplies is to




                                                                      Project
make sure the right supplies arrive at the right time (we'll talk
about the right price later).
All your skill in managing resources won't help, however, unless
you can stick to the project schedule. Time management is




                                                                      Style Guide
                                                                       Corporate
critical in successful project management.




                                                                           EM Collateral
Managing Time




                                                                   About EM
Time management is a critically important skill for any
successful project manager.
Project Managers who succeed in meeting their project schedule




                                                                 Management
                                                                   Project
have a good chance of staying within their project budget. The
most common cause of blown project budgets is lack of
schedule management.
 Tasks




                                                                   Style Guide
Duration, resources, dependencies




                                                                    Corporate
  Schedule
Tasks, predecessors, successors
 Critical Path
Changeable, often multiple, float




                                                                        EM Collateral
Managing Time: Tasks




                                                                    About EM
Any project can be broken down into a number of tasks that
have to be performed. To prepare the project schedule, the
project manager has to figure out what the tasks are, how long




                                                                  Management
they will take, what resources they require, and in what order




                                                                    Project
they should be done.
Each of these elements has a direct bearing on the schedule.
If you omit a task, the project won't be completed. If you
underestimate the length of time or the amount of resources




                                                                    Style Guide
                                                                     Corporate
required for the task, you may miss your schedule. The schedule
can also be blown if you make a mistake in the sequencing of
the tasks.




                                                                         EM Collateral
Managing Time: Schedule




                                                                        About EM
Build the project schedule by listing, in order, all the tasks that
need to be completed. Assign a duration to each task.
Allocate the required resources. Determine predecessors




                                                                      Management
(what tasks must be completed before) and successors (tasks




                                                                        Project
that can't start until after) each task.
It's pretty simple and straightforward. For instance, think of a
project called "Getting Dressed In The Morning". The task "put on
shirt" may have a longer duration if it is a buttoned dress shirt




                                                                        Style Guide
                                                                         Corporate
than if it's a pullover. It doesn't matter which order you complete
the tasks "put on right shoe" and "put on left shoe", but it is
important to complete the "put on pants" task before starting the
"put on shoes" task.
The difficulty in managing a project schedule is that there are




                                                                             EM Collateral
seldom enough resources and enough time to complete the
tasks sequentially. Therefore, tasks have to be overlapped so
several happen at the same time. Project management software
greatly simplifies the task of creating and managing the project
schedule by handling the iterations in the schedule logic for you.
Managing Time: Path




                                                                        About EM
When all tasks have been listed, resourced, and sequenced,
you will see that some tasks have a little flexibility in their
required start and finish date. This is called float. Other tasks




                                                                      Management
have no flexibility, zero float. A line through all the tasks with




                                                                        Project
zero float is called the critical path. All tasks on this path, and
there can be multiple, parallel paths, must be completed on time
if the project is to be completed on time. The Project Manager's
key time management task is to manage the critical path.




                                                                        Style Guide
                                                                         Corporate
Be aware, that items can be added to or removed from the
critical path as circumstances change during the execution of
the project. Installation of security cameras may not be on the
critical path, but if the shipment is delayed, it may become part
of the critical path. Conversely, pouring the concrete foundation
may be on the critical path, but if the project manager obtains an




                                                                             EM Collateral
addition crew and the pour is completed early it could come off
the critical path (or reduce the length of the critical path).
Regardless of how well you manage the schedule and the
resources, there is one more critical element - managing the
budget.
Managing Budget




                                                                       About EM
If you have effectively managed the project resources and
project schedule, managing budget should not be a problem.
It is, however, a task that requires the project manager's careful




                                                                     Management
attention. You can only manage effectively a limited number of




                                                                       Project
cost items, so focus on the critical ones.
  Costs
Estimated, actual, variability




                                                                       Style Guide
 Contingencies




                                                                        Corporate
Weather, suppliers, design allowance
 Profit
Cost, contingencies, remainder




                                                                            EM Collateral
Managing Budget: Costs




                                                                          About EM
Each project task will have a cost. Whether it is the cost of the
labor hours of a computer programmer or the purchase price of
a cubic yard of concrete. In preparing the project budget, each of




                                                                        Management
these costs is estimated and then totaled.




                                                                          Project
Some of these estimates will be more accurate than others. A
company knows what it will charge each of its projects for
different classifications of labor. Commodities are priced in a
very competitive market so prices are fairly predictable. Other




                                                                          Style Guide
                                                                           Corporate
estimates are less accurate, such as items or services where
higher performance is required. For an expensive item,
therefore, the percent increase could be a significant amount.
When the estimated cost of an item is uncertain, the project
budget often includes a design allowance. This is money that is




                                                                               EM Collateral
set aside in the budget "just in case" the actual cost of the item is
wildly different than the estimate.
Managing Budget: Contingencies




                                                                 About EM
Unusual problems with suppliers are always a possibility on
large projects. Companies usually include a contingency
amount in the project budget to cover these kinds of things.




                                                               Management
                                                                 Project
                                                                 Style Guide
                                                                  Corporate
                                                                      EM Collateral
Managing Budget: Profit




                                                                     About EM
So a project budget is composed of the estimated cost, plus the
contingency and design allowance, plus any profit. The project
manager's job is to keep the actual cost at or below the




                                                                   Management
estimated cost, to use as little of the design allowance and




                                                                     Project
contingency as possible, and to maximize the profit the
company earns on the project.
To maximize your chances of meeting your project budget, meet
your project schedule. The most common cause of blown




                                                                     Style Guide
                                                                      Corporate
budgets is blown schedules. Meeting the project schedule won't
guarantee you will meet the project budget, but it significantly
increases your chances. And above all, manage the project
scope. Don't allow the project scope to "creep" upward without
getting budget and/or schedule adjustments to match.




                                                                          EM Collateral
Successful project management is an art and a science that
takes practice. The ideas presented above can give you a basic
understanding of project management, but consider it only a
beginning.
The 80/20 Rule




                                                                       About EM
In 1906, Italian economist Vilfredo Pareto created a
mathematical formula to describe the unequal distribution of
wealth in his country, observing that twenty percent of the




                                                                     Management
people owned eighty percent of the wealth. In the late 1940s, Dr.




                                                                       Project
Joseph M. Juran inaccurately attributed the 80/20 Rule to Pareto,
calling it Pareto's Principle. While it may be misnamed, Pareto's
Principle or Pareto's Law as it is sometimes called, can be a very
effective tool to help you manage effectively.




                                                                       Style Guide
                                                                        Corporate
The 80/20 Rule means that in anything a few (20 percent) are
vital and many (80 percent) are trivial. In Pareto's case it meant
20 percent of the people owned 80 percent of the wealth. In
Juran's initial work he identified 20 percent of the defects
causing 80 percent of the problems. Project Managers know
that 20 percent of the work (the first 10 percent and the last 10




                                                                            EM Collateral
percent) consume 80 percent of your time and resources. You
can apply the 80/20 Rule to almost anything.
Applying the 80/20 Rule




                                                                         About EM
The value of the Pareto Principle for a manager is that it
reminds you to focus on the 20 percent that matters. Of the
things you do during your day, only 20 percent really matter.




                                                                       Management
Those 20 percent produce 80 percent of your results. Identify




                                                                         Project
and focus on those things. When the fire drills of the day begin to
sap your time, remind yourself of the 20 percent you need to
focus on. If something in the schedule has to slip, if something
isn't going to get done, make sure it's not part of that 20 percent.




                                                                         Style Guide
                                                                          Corporate
Pareto's Principle, the 80/20 Rule, should serve as a daily
reminder to focus 80 percent of your time and energy on the 20
percent of you work that is really important. Don't just "work
smart", work smart on the right things.




                                                                              EM Collateral
Steps to Managing A Project




                                                                         About EM
1   Define the Scope
    The first, and most important, step in any project is defining
    the scope of the project. What is it you are supposed to




                                                                       Management
    accomplish by managing this project? What is the project




                                                                         Project
    objective? Equally important is defining what is not included
    in the scope of your project. If you don't get enough definition
    from your boss, clarify the scope yourself and send it back
    upstairs for confirmation.




                                                                         Style Guide
                                                                          Corporate
2 Determine Available Resources
  What people, equipment, and money will you have available
  to you to achieve the project objectives? As a project
  manager, you usually will not have direct control of these
  resources, but will have to manage them through matrix
  management. Find out how easy or difficult that will be to do.




                                                                              EM Collateral
3 Check the Timeline
  When does the project have to be completed? As you
  develop your project plan you may have some flexibility in
  how you use time during the project, but deadlines usually
  are fixed. If you decide to use overtime hours to meet the
  schedule, you must weigh that against the limitations
  of your budget.
Steps to Managing A Project




                                                                        About EM
4 Assemble Your Project Team
  Get the people on your team together and start a dialog.
  They are the technical experts. That's why their functional




                                                                      Management
  supervisor assigned them to the project. Your job is to




                                                                        Project
  manage the team.
5 List the Big Steps
  What are the major pieces of the project? If you don't know,
  start by asking your team. It is a good idea to list the steps in




                                                                        Style Guide
                                                                         Corporate
  chronological order but don't obsess about it; you can
  always change the order later.
6 List the Smaller Steps
  List the smaller steps in each of the larger steps. Again, it
  usually helps you remember all the steps if you list them in




                                                                             EM Collateral
  chronological order. How many levels deep you go of more
  and more detailed steps depends on the size and complexity
  of your project.
7 Develop a Preliminary Plan
  Assemble all your steps into a plan. What happens first?
  What is the next step? Which steps can go on at
  the same time with different resources? Who is
  going to do each step? How long will it take?
Steps to Managing A Project




                                                                        About EM
8 Create Your Baseline Plan
  Get feedback on your preliminary plan from your team and
  from any other stakeholders. Adjust your timelines and work




                                                                      Management
  schedules to fit the project into the available time. Make any




                                                                        Project
  necessary adjustments to the preliminary plan to produce a
  baseline plan.
9 Request Project Adjustments
  There is almost never enough time, money or talent assigned




                                                                        Style Guide
                                                                         Corporate
  to a project. Your job is to do more with the limited resources
  than people expect. However, there are often limits placed
  on a project that are simply unrealistic. You need to make
  your case and present it to your boss and request these
  unrealistic limits be changed. Ask for the changes at the
  beginning of the project. Don't wait until it's in trouble to ask




                                                                             EM Collateral
  for the changes you need.
10 Work Your Plan, But Don't Die For It
   Making the plan is important, but the plan can be changed.
   You have a plan for driving to work every morning. If one
   intersection is blocked by an accident, you change your plan
   and go a different way. Do the same with your
   project plans. Change them as needed, but always
   keep the scope and resources in mind.
Steps to Managing A Project




                                                                      About EM
11 Monitor Your Team's Progress
   You will make little progress at the beginning of the project,
   but start then to monitor what everyone is doing anyway.




                                                                    Management
   That will make it easier to catch issues before they become




                                                                      Project
   problems.
12 Document Everything
   Keep records. Every time you change from your baseline
   plan, write down what the change was and why it was




                                                                      Style Guide
                                                                       Corporate
   necessary. Every time a new requirement is added to the
   project write down where the requirement came from and
   how the timeline or budget was adjusted because of it. You
   can't remember everything, so write them down so you'll be
   able to look them up at the end-of-project review and learn
   from them.




                                                                           EM Collateral
13 Keep Everyone Informed
   Keep all the project stakeholders informed of progress all
   along. Let them know of your success as you complete each
   milestone, but also inform them of problems as soon as they
   come up. Also keep you team informed. If changes are being
   considered, tell the team about them as far ahead
   as you can. Make sure everyone on the team is
   aware of what everyone else is doing.
TO-DO List: Ranking




                                                                        About EM
Making a "things to do list" is not enough. You have to rank
them. You have to know which tasks are more important so you
can focus on them. Then you have to allocate resources to those




                                                                      Management
items, measure your progress, and reward yourself for your




                                                                        Project
successes.
Ranking
I list all my to do items in a spreadsheet, although you can do




                                                                        Style Guide
them on paper as I used to do. You also can put them in your




                                                                         Corporate
palmtop computer or PDA, write them on your calendar, or input
them to a time management software.
The first step is to list all you have to do.
Using the 80/20 Rule assign a rank to them so you can focus on




                                                                             EM Collateral
the important items. I use an A, B, C ranking. My A list are the
things I have to get done today, before I leave. My B list are
things I need to get done, but not necessarily today. My C list are
the things I need to find time to do soon.
TO-DO List: Time Management




                                                                     About EM
It wasn't enough to know what was important; what made the A
list. I also needed to know how long things would take and how
much time I had to devote to them. I added a column to my to




                                                                   Management
do list with the estimated time each task should take and an




                                                                     Project
adjacent column with the cumulative total.
Time Management
Start by surveying your own time. Take a week or so to sample




                                                                     Style Guide
each task on your to do list and assign the proper time values.




                                                                      Corporate
Much of your day may be taken up by interruptions - dealing
with events that happened, crises that came up, or problems
that had to be solved. On average these interruptions consume
four hours a day. Working a typical ten-hour day, means you
have six hours a day for the things on your to do list.




                                                                          EM Collateral
Each night, before you leave the office, update your to do list.
Delete the things completed, delegated, or downgraded, add
the new things that had come up, rearrange the priorities to get
the most important tasks on top, and assign estimated time to
each. Then go down the list to the six hour mark and draw a
line. That becomes your target for the next day.
TO-DO List: Reward Yourself




                                                                         About EM
Most often, your target line falls somewhere on your A list.
Seldom is it anywhere near the bottom. However, that is not your
goal.




                                                                       Management
                                                                         Project
Reward Yourself
When I hit or passed the line, I went home feeling like it had
been a productive and successful day. Instead of beating myself
up over the things I hadn't been able to get to, I acknowledged




                                                                         Style Guide
my success at having met or beaten my goal. The next day, I




                                                                          Corporate
had to start all over again and reach for the new goal, but I did it
from the perspective of building on previous success rather than
from the frustration of constantly having more to do that I had
time to accomplish.
To be successful, you have to develop a system to manage your




                                                                              EM Collateral
time so you can get more done in the time you have. If your
target line on your to do list is always near the top, revise your
system so you can begin working a little farther down the list
every day. List the tasks you have to do. Prioritize those that are
important, not just urgent. Have a plan for what to accomplish
each day. Work toward that plan. Reward yourself when
you meet or beat your goal.
Your System




                                                                       About EM
To be successful, you have to develop a system to manage your
time so you can get more done in the time you have. If your
target line on your to do list is always near the top, revise your




                                                                     Management
system so you can begin working a little farther down the list




                                                                       Project
every day. Remember
 There are only 24 hours in a day
 Find out where you're wasting time.
 Create time management goals.




                                                                       Style Guide
                                                                        Corporate
 Implement a time management plan.
 Use time management tools.
 Prioritize ruthlessly.
 Learn to delegate and/or outsource.
 Establish routines and stick to them as much as possible.
 Get in the habit of setting time limits for tasks.




                                                                            EM Collateral
 Be sure your systems are organized.
 Don't waste time waiting.

Weitere ähnliche Inhalte

Was ist angesagt?

Project management roundtable summary final
Project management roundtable summary finalProject management roundtable summary final
Project management roundtable summary finalNASAPMC
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management DiplomaTheunis Venter
 
Understanding the risks in enterprise project management
Understanding the risks in enterprise project managementUnderstanding the risks in enterprise project management
Understanding the risks in enterprise project managementOrangescrum
 
Pinck.pascal
Pinck.pascalPinck.pascal
Pinck.pascalNASAPMC
 
Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Glen Alleman
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project managementPMlynda17
 
Project Management case analysis
Project Management case analysisProject Management case analysis
Project Management case analysisWakas Khalid
 
Success mgt client april 12 (2)
Success mgt client april 12 (2)Success mgt client april 12 (2)
Success mgt client april 12 (2)Roy Dunster
 
Flawless Project Execution The Road To Greatness For Professional Services Firms
Flawless Project Execution The Road To Greatness For Professional Services FirmsFlawless Project Execution The Road To Greatness For Professional Services Firms
Flawless Project Execution The Road To Greatness For Professional Services Firmsarjencornelisse
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jimNASAPMC
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeLong Thang Pham
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project managementREHMAT ULLAH
 
The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeWorkfront
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...Abdul Naqashbandi
 
Project Management
Project ManagementProject Management
Project ManagementRami Issa
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4sami325
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1Mohamed , PMP
 
Duncan.william
Duncan.williamDuncan.william
Duncan.williamNASAPMC
 

Was ist angesagt? (20)

Project management roundtable summary final
Project management roundtable summary finalProject management roundtable summary final
Project management roundtable summary final
 
Project Management Diploma
Project Management DiplomaProject Management Diploma
Project Management Diploma
 
Understanding the risks in enterprise project management
Understanding the risks in enterprise project managementUnderstanding the risks in enterprise project management
Understanding the risks in enterprise project management
 
Pinck.pascal
Pinck.pascalPinck.pascal
Pinck.pascal
 
Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)Immutable principles of project management (fw pmi)(v4)
Immutable principles of project management (fw pmi)(v4)
 
Answer sheet project management
Answer sheet project managementAnswer sheet project management
Answer sheet project management
 
Project Management case analysis
Project Management case analysisProject Management case analysis
Project Management case analysis
 
Success mgt client april 12 (2)
Success mgt client april 12 (2)Success mgt client april 12 (2)
Success mgt client april 12 (2)
 
Project management
Project managementProject management
Project management
 
Project Vital Signs
Project Vital SignsProject Vital Signs
Project Vital Signs
 
Flawless Project Execution The Road To Greatness For Professional Services Firms
Flawless Project Execution The Road To Greatness For Professional Services FirmsFlawless Project Execution The Road To Greatness For Professional Services Firms
Flawless Project Execution The Road To Greatness For Professional Services Firms
 
Cassidy.jim
Cassidy.jimCassidy.jim
Cassidy.jim
 
Effective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, ExtremeEffective project management: Traditional, Agile, Extreme
Effective project management: Traditional, Agile, Extreme
 
Introduction of software project management
Introduction of software project managementIntroduction of software project management
Introduction of software project management
 
The 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All TimeThe 8 Worst Managed Projects of All Time
The 8 Worst Managed Projects of All Time
 
importance of resources allocation in formal method of software engineering ...
 importance of resources allocation in formal method of software engineering ... importance of resources allocation in formal method of software engineering ...
importance of resources allocation in formal method of software engineering ...
 
Project Management
Project ManagementProject Management
Project Management
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1
 
Duncan.william
Duncan.williamDuncan.william
Duncan.william
 

Ähnlich wie Guide to project management by j pricci

Ähnlich wie Guide to project management by j pricci (20)

Guide to project management by j pricci
Guide to project management by j pricciGuide to project management by j pricci
Guide to project management by j pricci
 
Introduction to-project-management-dabc
Introduction to-project-management-dabcIntroduction to-project-management-dabc
Introduction to-project-management-dabc
 
Project management for engineers and architects
Project management for engineers and architectsProject management for engineers and architects
Project management for engineers and architects
 
Project mgmt
Project mgmtProject mgmt
Project mgmt
 
Project management assignment help
Project management assignment helpProject management assignment help
Project management assignment help
 
Project-Manager.ppt
Project-Manager.pptProject-Manager.ppt
Project-Manager.ppt
 
Software project management
Software project managementSoftware project management
Software project management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Essay on project management
Essay on project managementEssay on project management
Essay on project management
 
PMP PMI Preparation Project Management Course.
PMP PMI Preparation Project Management Course.PMP PMI Preparation Project Management Course.
PMP PMI Preparation Project Management Course.
 
Epm 2010
Epm 2010Epm 2010
Epm 2010
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 
CCP_SEC5_ Project Management
CCP_SEC5_ Project ManagementCCP_SEC5_ Project Management
CCP_SEC5_ Project Management
 
Project management boot camp
Project management boot campProject management boot camp
Project management boot camp
 
Iss 01
Iss 01Iss 01
Iss 01
 
Project management chapter 1 notes
Project management chapter 1 notesProject management chapter 1 notes
Project management chapter 1 notes
 
Project Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptxProject Management online sample (1) (1).pptx
Project Management online sample (1) (1).pptx
 
Project management
Project management Project management
Project management
 
Project Intro
Project IntroProject Intro
Project Intro
 

Mehr von Jennifer Pricci

Icd target marketing_needs_analysis
Icd target marketing_needs_analysisIcd target marketing_needs_analysis
Icd target marketing_needs_analysisJennifer Pricci
 
Sample website el_provost_hilevnav
Sample website el_provost_hilevnavSample website el_provost_hilevnav
Sample website el_provost_hilevnavJennifer Pricci
 
Linda chorneyonlinepresskit
Linda chorneyonlinepresskitLinda chorneyonlinepresskit
Linda chorneyonlinepresskitJennifer Pricci
 
Horse racingjones socialmediamrktgreport
Horse racingjones socialmediamrktgreportHorse racingjones socialmediamrktgreport
Horse racingjones socialmediamrktgreportJennifer Pricci
 
Diane turtonrecruitingdripcampaignscript
Diane turtonrecruitingdripcampaignscriptDiane turtonrecruitingdripcampaignscript
Diane turtonrecruitingdripcampaignscriptJennifer Pricci
 
Constant contact university
Constant contact universityConstant contact university
Constant contact universityJennifer Pricci
 
Lisa bouchelle musician e newsletter
Lisa bouchelle musician e newsletterLisa bouchelle musician e newsletter
Lisa bouchelle musician e newsletterJennifer Pricci
 
Power pointanimationhighimpactpresentations
Power pointanimationhighimpactpresentationsPower pointanimationhighimpactpresentations
Power pointanimationhighimpactpresentationsJennifer Pricci
 
Custom schicklogo eventivesponsorshippitch
Custom schicklogo eventivesponsorshippitchCustom schicklogo eventivesponsorshippitch
Custom schicklogo eventivesponsorshippitchJennifer Pricci
 
Embracing the web a tutorial
Embracing the web   a tutorialEmbracing the web   a tutorial
Embracing the web a tutorialJennifer Pricci
 
Edison learning cms_manual
Edison learning cms_manualEdison learning cms_manual
Edison learning cms_manualJennifer Pricci
 
Turton sister site how to organize web content
Turton sister site how to organize web contentTurton sister site how to organize web content
Turton sister site how to organize web contentJennifer Pricci
 
Bob burgeronlinepresskit
Bob burgeronlinepresskitBob burgeronlinepresskit
Bob burgeronlinepresskitJennifer Pricci
 
Lfi patrickparker patrick-parker_listing_preso
Lfi patrickparker patrick-parker_listing_presoLfi patrickparker patrick-parker_listing_preso
Lfi patrickparker patrick-parker_listing_presoJennifer Pricci
 
Real estate-social-networking-blogging-web-tutorial.pdf
Real estate-social-networking-blogging-web-tutorial.pdfReal estate-social-networking-blogging-web-tutorial.pdf
Real estate-social-networking-blogging-web-tutorial.pdfJennifer Pricci
 
090712 education hotbuttonfocusgroupresults
090712 education hotbuttonfocusgroupresults090712 education hotbuttonfocusgroupresults
090712 education hotbuttonfocusgroupresultsJennifer Pricci
 
Sell your house-patrick_parker_realty
Sell your house-patrick_parker_realtySell your house-patrick_parker_realty
Sell your house-patrick_parker_realtyJennifer Pricci
 

Mehr von Jennifer Pricci (20)

Icd target marketing_needs_analysis
Icd target marketing_needs_analysisIcd target marketing_needs_analysis
Icd target marketing_needs_analysis
 
Sample website el_provost_hilevnav
Sample website el_provost_hilevnavSample website el_provost_hilevnav
Sample website el_provost_hilevnav
 
Linda chorneyonlinepresskit
Linda chorneyonlinepresskitLinda chorneyonlinepresskit
Linda chorneyonlinepresskit
 
Bob burger case_study
Bob burger case_studyBob burger case_study
Bob burger case_study
 
Horse racingjones socialmediamrktgreport
Horse racingjones socialmediamrktgreportHorse racingjones socialmediamrktgreport
Horse racingjones socialmediamrktgreport
 
Diane turtonrecruitingdripcampaignscript
Diane turtonrecruitingdripcampaignscriptDiane turtonrecruitingdripcampaignscript
Diane turtonrecruitingdripcampaignscript
 
Constant contact university
Constant contact universityConstant contact university
Constant contact university
 
Lisa bouchelle musician e newsletter
Lisa bouchelle musician e newsletterLisa bouchelle musician e newsletter
Lisa bouchelle musician e newsletter
 
Power pointanimationhighimpactpresentations
Power pointanimationhighimpactpresentationsPower pointanimationhighimpactpresentations
Power pointanimationhighimpactpresentations
 
Custom schicklogo eventivesponsorshippitch
Custom schicklogo eventivesponsorshippitchCustom schicklogo eventivesponsorshippitch
Custom schicklogo eventivesponsorshippitch
 
Linda chorneyonesheet
Linda chorneyonesheetLinda chorneyonesheet
Linda chorneyonesheet
 
Embracing the web a tutorial
Embracing the web   a tutorialEmbracing the web   a tutorial
Embracing the web a tutorial
 
Edison learning cms_manual
Edison learning cms_manualEdison learning cms_manual
Edison learning cms_manual
 
Turton sister site how to organize web content
Turton sister site how to organize web contentTurton sister site how to organize web content
Turton sister site how to organize web content
 
Eventive marketing
Eventive marketingEventive marketing
Eventive marketing
 
Bob burgeronlinepresskit
Bob burgeronlinepresskitBob burgeronlinepresskit
Bob burgeronlinepresskit
 
Lfi patrickparker patrick-parker_listing_preso
Lfi patrickparker patrick-parker_listing_presoLfi patrickparker patrick-parker_listing_preso
Lfi patrickparker patrick-parker_listing_preso
 
Real estate-social-networking-blogging-web-tutorial.pdf
Real estate-social-networking-blogging-web-tutorial.pdfReal estate-social-networking-blogging-web-tutorial.pdf
Real estate-social-networking-blogging-web-tutorial.pdf
 
090712 education hotbuttonfocusgroupresults
090712 education hotbuttonfocusgroupresults090712 education hotbuttonfocusgroupresults
090712 education hotbuttonfocusgroupresults
 
Sell your house-patrick_parker_realty
Sell your house-patrick_parker_realtySell your house-patrick_parker_realty
Sell your house-patrick_parker_realty
 

Guide to project management by j pricci

  • 1. About EM Management Project Project Management: Style Guide Corporate A How-To Guide presented by: EM Collateral Jennifer L. Pricci
  • 2. Behind the Curtain About EM A successful Project Manager must simultaneously manage the four basic elements of a project: resources, time, money, and most importantly, scope. All these elements are interrelated. Management Each must be managed effectively. All must be managed Project together if the project, and the project manager, is to be a success. Resources People, equipment, material Style Guide Corporate Time Task durations, dependencies, critical path Money Costs, contingencies, profit EM Collateral Scope Project size, goals, requirements Most literature on project management speaks of the need to manage and balance three elements: people, time, and money. However, the fourth element is the most important and it is the first and last task for a successful project manager.
  • 3. Managing Scope About EM The project scope is the definition of what the project is supposed to accomplish and the budget (of time and money) that has been created to achieve these objectives. Management Project It is absolutely imperative that any change to the scope of the project have a matching change in budget, either time or resources. If the budget is not adjusted, the smart project manager will avoid the change in scope. Style Guide Usually, scope changes occur in the form of "scope creep". Corporate Scope creep is the piling up of small changes that by themselves are manageable, but in aggregate are significant. Make sure any requested change, no matter how small, is accompanied by approval for a change in budget or schedule or both. You can not effectively manage the resources, time and money EM Collateral in a project unless you actively manage the project scope. When you have the project scope clearly identified and associated to the timeline and budget, you can begin to manage the project resources. These include the people, equipment, and material needed to complete the project.
  • 4. Managing Resources About EM Managing project resources frequently involves more than people management. The project manager must also manage the equipment used for the project and the material needed Management by the people and equipment assigned to the project. Project People Project employees, vendor staff, subcontract labor Equipment Style Guide From heavy equipment or development, test, and staging Corporate servers, CD burners or recording studio, tape decks, mixers, microphones and speakers Material CD blanks, computers, jewel cases, instruction manuals EM Collateral
  • 5. Managing Resources: People About EM Managing the people resources means having the right people, with the right skills and the proper tools, in the right quantity at the right time. It also means ensuring that they Management know what needs to be done, when, and how. And it means Project motivating them to take ownership in the project too. Managing direct employees normally means managing the senior person in each group of employees assigned to your project. Remember that these employees also have a line Style Guide Corporate manager to whom they report and from whom the usually take technical direction. In a matrix management situation, like a project team, your job is to provide project direction to them. Managing labor subcontracts usually means managing the team lead for the subcontracted workers, who in turn manages the workers. EM Collateral
  • 6. Managing Resources: Equipment About EM The equipment you have to manage as part of your project depends on the nature of the project. For a project to release a new version of a computer game, the equipment would include Management computers, test equipment, and duplication and packaging Project machinery. The project management key for equipment is much like for people resources. You have to make sure you have the right equipment in the right place at the right time and that it has the Style Guide Corporate supplies it needs to operate properly. EM Collateral
  • 7. Managing Resources: Material About EM Most projects involve the purchase of material. For a project to release a music CD by a hot new artist, it would include the CD blanks, artwork for the jewel case, and press releases to be sent Management to deejays. The project management issue with supplies is to Project make sure the right supplies arrive at the right time (we'll talk about the right price later). All your skill in managing resources won't help, however, unless you can stick to the project schedule. Time management is Style Guide Corporate critical in successful project management. EM Collateral
  • 8. Managing Time About EM Time management is a critically important skill for any successful project manager. Project Managers who succeed in meeting their project schedule Management Project have a good chance of staying within their project budget. The most common cause of blown project budgets is lack of schedule management. Tasks Style Guide Duration, resources, dependencies Corporate Schedule Tasks, predecessors, successors Critical Path Changeable, often multiple, float EM Collateral
  • 9. Managing Time: Tasks About EM Any project can be broken down into a number of tasks that have to be performed. To prepare the project schedule, the project manager has to figure out what the tasks are, how long Management they will take, what resources they require, and in what order Project they should be done. Each of these elements has a direct bearing on the schedule. If you omit a task, the project won't be completed. If you underestimate the length of time or the amount of resources Style Guide Corporate required for the task, you may miss your schedule. The schedule can also be blown if you make a mistake in the sequencing of the tasks. EM Collateral
  • 10. Managing Time: Schedule About EM Build the project schedule by listing, in order, all the tasks that need to be completed. Assign a duration to each task. Allocate the required resources. Determine predecessors Management (what tasks must be completed before) and successors (tasks Project that can't start until after) each task. It's pretty simple and straightforward. For instance, think of a project called "Getting Dressed In The Morning". The task "put on shirt" may have a longer duration if it is a buttoned dress shirt Style Guide Corporate than if it's a pullover. It doesn't matter which order you complete the tasks "put on right shoe" and "put on left shoe", but it is important to complete the "put on pants" task before starting the "put on shoes" task. The difficulty in managing a project schedule is that there are EM Collateral seldom enough resources and enough time to complete the tasks sequentially. Therefore, tasks have to be overlapped so several happen at the same time. Project management software greatly simplifies the task of creating and managing the project schedule by handling the iterations in the schedule logic for you.
  • 11. Managing Time: Path About EM When all tasks have been listed, resourced, and sequenced, you will see that some tasks have a little flexibility in their required start and finish date. This is called float. Other tasks Management have no flexibility, zero float. A line through all the tasks with Project zero float is called the critical path. All tasks on this path, and there can be multiple, parallel paths, must be completed on time if the project is to be completed on time. The Project Manager's key time management task is to manage the critical path. Style Guide Corporate Be aware, that items can be added to or removed from the critical path as circumstances change during the execution of the project. Installation of security cameras may not be on the critical path, but if the shipment is delayed, it may become part of the critical path. Conversely, pouring the concrete foundation may be on the critical path, but if the project manager obtains an EM Collateral addition crew and the pour is completed early it could come off the critical path (or reduce the length of the critical path). Regardless of how well you manage the schedule and the resources, there is one more critical element - managing the budget.
  • 12. Managing Budget About EM If you have effectively managed the project resources and project schedule, managing budget should not be a problem. It is, however, a task that requires the project manager's careful Management attention. You can only manage effectively a limited number of Project cost items, so focus on the critical ones. Costs Estimated, actual, variability Style Guide Contingencies Corporate Weather, suppliers, design allowance Profit Cost, contingencies, remainder EM Collateral
  • 13. Managing Budget: Costs About EM Each project task will have a cost. Whether it is the cost of the labor hours of a computer programmer or the purchase price of a cubic yard of concrete. In preparing the project budget, each of Management these costs is estimated and then totaled. Project Some of these estimates will be more accurate than others. A company knows what it will charge each of its projects for different classifications of labor. Commodities are priced in a very competitive market so prices are fairly predictable. Other Style Guide Corporate estimates are less accurate, such as items or services where higher performance is required. For an expensive item, therefore, the percent increase could be a significant amount. When the estimated cost of an item is uncertain, the project budget often includes a design allowance. This is money that is EM Collateral set aside in the budget "just in case" the actual cost of the item is wildly different than the estimate.
  • 14. Managing Budget: Contingencies About EM Unusual problems with suppliers are always a possibility on large projects. Companies usually include a contingency amount in the project budget to cover these kinds of things. Management Project Style Guide Corporate EM Collateral
  • 15. Managing Budget: Profit About EM So a project budget is composed of the estimated cost, plus the contingency and design allowance, plus any profit. The project manager's job is to keep the actual cost at or below the Management estimated cost, to use as little of the design allowance and Project contingency as possible, and to maximize the profit the company earns on the project. To maximize your chances of meeting your project budget, meet your project schedule. The most common cause of blown Style Guide Corporate budgets is blown schedules. Meeting the project schedule won't guarantee you will meet the project budget, but it significantly increases your chances. And above all, manage the project scope. Don't allow the project scope to "creep" upward without getting budget and/or schedule adjustments to match. EM Collateral Successful project management is an art and a science that takes practice. The ideas presented above can give you a basic understanding of project management, but consider it only a beginning.
  • 16. The 80/20 Rule About EM In 1906, Italian economist Vilfredo Pareto created a mathematical formula to describe the unequal distribution of wealth in his country, observing that twenty percent of the Management people owned eighty percent of the wealth. In the late 1940s, Dr. Project Joseph M. Juran inaccurately attributed the 80/20 Rule to Pareto, calling it Pareto's Principle. While it may be misnamed, Pareto's Principle or Pareto's Law as it is sometimes called, can be a very effective tool to help you manage effectively. Style Guide Corporate The 80/20 Rule means that in anything a few (20 percent) are vital and many (80 percent) are trivial. In Pareto's case it meant 20 percent of the people owned 80 percent of the wealth. In Juran's initial work he identified 20 percent of the defects causing 80 percent of the problems. Project Managers know that 20 percent of the work (the first 10 percent and the last 10 EM Collateral percent) consume 80 percent of your time and resources. You can apply the 80/20 Rule to almost anything.
  • 17. Applying the 80/20 Rule About EM The value of the Pareto Principle for a manager is that it reminds you to focus on the 20 percent that matters. Of the things you do during your day, only 20 percent really matter. Management Those 20 percent produce 80 percent of your results. Identify Project and focus on those things. When the fire drills of the day begin to sap your time, remind yourself of the 20 percent you need to focus on. If something in the schedule has to slip, if something isn't going to get done, make sure it's not part of that 20 percent. Style Guide Corporate Pareto's Principle, the 80/20 Rule, should serve as a daily reminder to focus 80 percent of your time and energy on the 20 percent of you work that is really important. Don't just "work smart", work smart on the right things. EM Collateral
  • 18. Steps to Managing A Project About EM 1 Define the Scope The first, and most important, step in any project is defining the scope of the project. What is it you are supposed to Management accomplish by managing this project? What is the project Project objective? Equally important is defining what is not included in the scope of your project. If you don't get enough definition from your boss, clarify the scope yourself and send it back upstairs for confirmation. Style Guide Corporate 2 Determine Available Resources What people, equipment, and money will you have available to you to achieve the project objectives? As a project manager, you usually will not have direct control of these resources, but will have to manage them through matrix management. Find out how easy or difficult that will be to do. EM Collateral 3 Check the Timeline When does the project have to be completed? As you develop your project plan you may have some flexibility in how you use time during the project, but deadlines usually are fixed. If you decide to use overtime hours to meet the schedule, you must weigh that against the limitations of your budget.
  • 19. Steps to Managing A Project About EM 4 Assemble Your Project Team Get the people on your team together and start a dialog. They are the technical experts. That's why their functional Management supervisor assigned them to the project. Your job is to Project manage the team. 5 List the Big Steps What are the major pieces of the project? If you don't know, start by asking your team. It is a good idea to list the steps in Style Guide Corporate chronological order but don't obsess about it; you can always change the order later. 6 List the Smaller Steps List the smaller steps in each of the larger steps. Again, it usually helps you remember all the steps if you list them in EM Collateral chronological order. How many levels deep you go of more and more detailed steps depends on the size and complexity of your project. 7 Develop a Preliminary Plan Assemble all your steps into a plan. What happens first? What is the next step? Which steps can go on at the same time with different resources? Who is going to do each step? How long will it take?
  • 20. Steps to Managing A Project About EM 8 Create Your Baseline Plan Get feedback on your preliminary plan from your team and from any other stakeholders. Adjust your timelines and work Management schedules to fit the project into the available time. Make any Project necessary adjustments to the preliminary plan to produce a baseline plan. 9 Request Project Adjustments There is almost never enough time, money or talent assigned Style Guide Corporate to a project. Your job is to do more with the limited resources than people expect. However, there are often limits placed on a project that are simply unrealistic. You need to make your case and present it to your boss and request these unrealistic limits be changed. Ask for the changes at the beginning of the project. Don't wait until it's in trouble to ask EM Collateral for the changes you need. 10 Work Your Plan, But Don't Die For It Making the plan is important, but the plan can be changed. You have a plan for driving to work every morning. If one intersection is blocked by an accident, you change your plan and go a different way. Do the same with your project plans. Change them as needed, but always keep the scope and resources in mind.
  • 21. Steps to Managing A Project About EM 11 Monitor Your Team's Progress You will make little progress at the beginning of the project, but start then to monitor what everyone is doing anyway. Management That will make it easier to catch issues before they become Project problems. 12 Document Everything Keep records. Every time you change from your baseline plan, write down what the change was and why it was Style Guide Corporate necessary. Every time a new requirement is added to the project write down where the requirement came from and how the timeline or budget was adjusted because of it. You can't remember everything, so write them down so you'll be able to look them up at the end-of-project review and learn from them. EM Collateral 13 Keep Everyone Informed Keep all the project stakeholders informed of progress all along. Let them know of your success as you complete each milestone, but also inform them of problems as soon as they come up. Also keep you team informed. If changes are being considered, tell the team about them as far ahead as you can. Make sure everyone on the team is aware of what everyone else is doing.
  • 22. TO-DO List: Ranking About EM Making a "things to do list" is not enough. You have to rank them. You have to know which tasks are more important so you can focus on them. Then you have to allocate resources to those Management items, measure your progress, and reward yourself for your Project successes. Ranking I list all my to do items in a spreadsheet, although you can do Style Guide them on paper as I used to do. You also can put them in your Corporate palmtop computer or PDA, write them on your calendar, or input them to a time management software. The first step is to list all you have to do. Using the 80/20 Rule assign a rank to them so you can focus on EM Collateral the important items. I use an A, B, C ranking. My A list are the things I have to get done today, before I leave. My B list are things I need to get done, but not necessarily today. My C list are the things I need to find time to do soon.
  • 23. TO-DO List: Time Management About EM It wasn't enough to know what was important; what made the A list. I also needed to know how long things would take and how much time I had to devote to them. I added a column to my to Management do list with the estimated time each task should take and an Project adjacent column with the cumulative total. Time Management Start by surveying your own time. Take a week or so to sample Style Guide each task on your to do list and assign the proper time values. Corporate Much of your day may be taken up by interruptions - dealing with events that happened, crises that came up, or problems that had to be solved. On average these interruptions consume four hours a day. Working a typical ten-hour day, means you have six hours a day for the things on your to do list. EM Collateral Each night, before you leave the office, update your to do list. Delete the things completed, delegated, or downgraded, add the new things that had come up, rearrange the priorities to get the most important tasks on top, and assign estimated time to each. Then go down the list to the six hour mark and draw a line. That becomes your target for the next day.
  • 24. TO-DO List: Reward Yourself About EM Most often, your target line falls somewhere on your A list. Seldom is it anywhere near the bottom. However, that is not your goal. Management Project Reward Yourself When I hit or passed the line, I went home feeling like it had been a productive and successful day. Instead of beating myself up over the things I hadn't been able to get to, I acknowledged Style Guide my success at having met or beaten my goal. The next day, I Corporate had to start all over again and reach for the new goal, but I did it from the perspective of building on previous success rather than from the frustration of constantly having more to do that I had time to accomplish. To be successful, you have to develop a system to manage your EM Collateral time so you can get more done in the time you have. If your target line on your to do list is always near the top, revise your system so you can begin working a little farther down the list every day. List the tasks you have to do. Prioritize those that are important, not just urgent. Have a plan for what to accomplish each day. Work toward that plan. Reward yourself when you meet or beat your goal.
  • 25. Your System About EM To be successful, you have to develop a system to manage your time so you can get more done in the time you have. If your target line on your to do list is always near the top, revise your Management system so you can begin working a little farther down the list Project every day. Remember There are only 24 hours in a day Find out where you're wasting time. Create time management goals. Style Guide Corporate Implement a time management plan. Use time management tools. Prioritize ruthlessly. Learn to delegate and/or outsource. Establish routines and stick to them as much as possible. Get in the habit of setting time limits for tasks. EM Collateral Be sure your systems are organized. Don't waste time waiting.