International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
INTERNATIONAL JOURNAL OF ELECTRICAL ENGINEERING
 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME
                            & TECHNOLOGY (IJEET)

ISSN 0976 – 6545(Print)
ISSN 0976 – 6553(Online)
Volume 4, Issue 2, March – April (2013), pp. 93-104
                                                                              IJEET
© IAEME: www.iaeme.com/ijeet.asp
Journal Impact Factor (2013): 5.5028 (Calculated by GISI)                 ©IAEME
www.jifactor.com




            UNDER FREQUENCY LOAD SHEDDING FOR ENERGY
               MANAGEMENT USING ANFIS/CASE STUDY

                               M.S.Sujatha1, Dr M. Vijay Kumar2
                          1
                         Professor, SVEC, Tirupati-517102, AP, India
                      2
                       Professor, JNTUCEA, Anantapur-515002, AP, India


    ABSTRACT

           Energy management is the major concern for both developing and developed
    countries. Energy sources are scarce and expensive to develop and exploit, hence we
    should confer a procedure to accumulate it by the use of load shedding. If the disturbance
    is large, like large load variations, outage of components (transmission lines, transformers,
    generators, etc.) causes power system blackouts. The conventional method is to solve an
    optimal power flow problem to find out the rescheduling for overload alleviation. But this
    will not give the desired speed of solution. Speed and accuracy of under frequency load
    shedding (UFLS) has a vital role in its effectiveness for preserving system stability and
    reducing energy loss. Initial rate of change of frequency is a fast and potentially useful
    signal to detect the overload when a disturbance accurse. This paper presents a new
    method for solving UFLS problem by using adaptive neuro-fuzzy controller for
    determining the amount of load shed to avoid a cascading outage. The development of new
    and accurate techniques for vulnerability control of power systems can provide tools for
    improving the reliability, continuity of power supply and reducing the energy loss. The
    applicability of ANFIS is tested on a case study at Renigunta 220/132/33 KV sub- station.

    Keywords: Under Frequency Load shedding, Rate of frequency decline, Adaptive Neuro-
    Fuzzy, blackouts.

    1. INTRODUCTION

           When power system is in stable operation at normal frequency, the total mechanical
    power input from the prime movers to the generators is equal to the sum of all running
    loads, plus all real power losses in the system. The frequency conditions of the overall

                                                 93
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

system will directly depend on the amount of active power that the generator prime movers
could deliver to the system. With a small disturbance, the frequency decay rate will be
low and the turbine governor will quickly raise the steam or water to the turbine to
restore the frequency, provided the system has sufficient spinning reserve. However, if the
disturbance is large, like large load variations, outage of components (transmission lines,
transformers, generators, etc.) causes power system blackouts [5]. Recently there was a
major disturbance in Northern Region at 02.33hrs on 30-07-2012. Subsequently, there was
another disturbance at 13.00hrs on 31-07-2012 resulting in collapse of Northern, Eastern and
North-Eastern regional grids [15]. Due to this the frequency may fall to a dangerous value
before the turbine Governor fully operated. The decrease in system frequency, which occurs
very rapidly and will lead to system collapse. The important protection strategy used for
this purpose is a class of protection schemes known as system protection schemes (SPS).
One of the most commonly used type of system protection scheme, generally accepted
after the northeastern blackout of 1965, is Under Frequency Load Shedding (UFLS)
scheme.
        Conventional UFLS system is designed to recover the balance of generation and
consumption following a generator outage or sudden load increase. The loads to be shed
by this system are constant load feeders and are not selected adaptively. In other words,
always the same loads are dropped from the system, regardless of the location of
disturbance. In this method loads are classified in three groups of non-vital, semi vital and
vital loads [11]. However, in recent years, centralized load shedding algorithms to enhance
adaptability of the schemes has been proposed in [4]. Adaptive under-frequency load
shedding based on the magnitude of the disturbance estimation is considered in [9]. S. J.
Huang and C. C. Huang presented Adaptive under-frequency load shedding based on the
time based for remote and isolated power system networks [16].Other adaptive load
shedding methods based on df/dt are presented in [1], [6]-[8]. The work introduces the new
intelligent UFLS using adaptive neuro-fuzzy controller to decide the amount of load to be
shed.

2. CONVENTIONAL LOAD SHEDDING APPROACH

     This section is a review of load shedding techniques that have been devised over a
number of years each having its own set of applications and drawbacks.

2.1 Breaker Interlock Load Shedding

       This is the simplest method of carrying out load shedding. For this scheme, the
circuit breaker interdependencies are arranged to operate based on hardwired trip signals
from an intertie circuit breaker or a generator trip. This method is often used when the
speed of the load shedding is critical. Even though, the execution of this scheme is fast,
breaker interlock load shedding possesses a number of inherent drawbacks.

        •   Load shedding based on worst-case scenario
        •   Only one stage of load shedding
        •   More loads are shed than required
        •   Modifications to the system is costly



                                             94
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

2.2. Under-Frequency Relay Load Shedding

        Guidelines for setting up a frequency load shedding are common to both large and
small systems [12]. The design methodology considers fixed load reduction at fixed system
frequency levels. Upon reaching the frequency set point and expiration of pre-specified
time delay, the frequency relay trips one or more load breakers. This cycle is repeated
until the system frequency is recovered. Drawbacks of this scheme are

            Slow response time.
            Incorrect / Excessive load shedding
            Analysis knowledge is always lost


2.3. Programmable Logic Controller-Based Load Shedding

        A PLC-based load shedding scheme offers many advantages such as the use of an
existing distributed network via the power management system, as well as an automated
means of load relief. However, in such applications monitoring the power system is limited
to a portion of the network with the acquisition of scattered data. This drawback is further
compounded by the implementation of pre-defined load priority tables at the PLC level that
are executed sequentially to curtail blocks of load regardless of the dynamic changes in the
system loading, generation, or operating configuration. The system-wide operating condition
is often missing from the decision-making process resulting in insufficient or excessive load
shedding. In addition, response time (time between the detection of the need for load
shedding and action by the circuit breakers) during transient disturbances is often too long
requiring even more load to be dropped

3. MATHEMATICAL ANALYSIS OF LOAD SHEDDING:

3.1 Active Power and Frequency

       During normal operation of power system, the total mechanical power input to the
system generators is equal to the sum of the connected loads and all real power losses. If, for
any reason, the balance of generation and loads is disrupted, operating frequency of the
system would change according to equation (1).

     df
2H      = Pm − Pe                                                                         (1)
     dt

Where H is the inertia constant, f is the generator frequency in pu, Pm is the generator
mechanical power in pu and Pe is the generator electrical power in pu.
       In general, power system loads are dependent on both voltage and frequency. To
compute exact amount of system load, this dependence should be considered. Power system
voltage is a local parameter and its value is not usually known precisely for each remote
system bus. As such, the effect of voltage in load modeling has been ignored in several
researches. Despite of voltage, system frequency is a general parameter and is almost same
at all points of a power system. The frequency dependent characteristic of composite load is

                                              95
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

expressed in equation (2).

Pe = PL + d ∆f                                                                            (2)
 Where, d is load reduction factor and PL is the load power in Pu.

3.2 Final Frequency

       According to equations (1) and (2) if, a power system encounters with an overload
case, and then frequency of the system begins to decline. At the same time, system load
which is dependent on frequency by factor d is reduced as well. If no other action is
performed, eventually system settles at a final frequency at which the amount of
generation reduction would be equal to reduction of system loads. The final frequency is
given by the equation (3).

                        
                                l0       
                                          
            f ∞ = f 0 − 1 −              
                            (1 + l 0 ) d                                                (3)
                                         
Where, f0 is the initial normal frequency, f∞ is the final frequency and l0 is the amount of
overload in pu.

3.3 Minimum Allowable Frequency

All of the power system apparatus are made and designed for nominal frequency. Power
plant auxiliary services are more demanding in terms of minimum allowable frequency.
Steam turbine is the most sensitive equipment against frequency drops. Continuous
operation of steam turbines should be restricted to frequency above 47.5Hz. Frequency falls
below 47 Hz must be avoided. In fact, every commercial turbine can sustain up to 10
contingencies at 47 Hz just for one second without being jeopardize [13].

 3.4. Conventional under frequency load shedding scheme

       For a system overload, the amount of load which must be shed is determined based
 on the minimum allowable frequency and the amount of overload. The minimum
 allowable frequency could be considered as 47 Hz instead of 47.5Hz in load shedding
 schemes design, if the system dispatch center can increase the generation by governors
 quickly. Total amount of the load which must be shed to cover the maximum anticipated
 overload, is obtained from equation (4) is employed in [10].

      L            f 
          − d 1 − 
LD =
     1+ L      50                                                                        (4)
                 f 
      1 − d 1 − 
             50 
   Where, LD is the total load which must be shed, L is the rate of overload per unit
produced in the system, f is permissible settling frequency and the d coefficient is the load
reduction coefficient which is related to the type of disturbance.


                                              96
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

4. PROPOSED SYSTEM
       Proposed system discusses the neural network, fuzzy logic and adaptive neuro fuzzy
methods of load shedding.

4.1. Neural network
         Fast and optimal adaptive load shedding method for power system is using, Artificial Neural
Networks [2], [14]. The first step in the design of a NN is to determine an architecture that will yield
good results. The idea is to use the simplest architecture while maximizing performance. Usually,
NN architecture is determined based on subjective assessment on the part of the engineer. In
order to achieve appropriate neural network training lots of neural networks have been trained
and concluded that the architecture of 2 hidden layers, the first with 14 nodes and the second with
10 nodes, was best suited for this application.
         Levenberg Marquardt Back Propagation technique [3] is used to train the NN. This consists
of the same routine as typical back propagation with the exception that instead of one learning rate
for all the NN nodes, a learning rate was assigned to each of the nodes in order to speed up
convergence. The activation function used within this work is a hyperbolic tangent function and the
inputs were normalized to have a mean of zero and a variance of one.

4.2 Fuzzy Logic
        The generation and load data are given as inputs to the simulation system shown in Figure 1,
it calculates the rate of change of frequency at that moment and sends that data to the fuzzy
controller. The fuzzy controller decides the amount of load shed required to maintain the system to
operate in stable manner as shown in Table.3 [17].

4.3. Neuro-Fuzzy
        Neuro-fuzzy system is a combination of neural network and fuzzy logic in which it
combines the learning and adapting abilities of neural networks with the fuzzy interpretation of fuzzy
logic system.
        A typical ANFIS structure with five layers and two inputs, each with two membership
functions and Rule viewer in ANFIS approach is shown in Figures 2 and 3 respectively. The ANFIS
has the constraint that it only supports the Sugeno-type systems of 1st or 0th order. The system can
only be designed as a single output system and the system must be of unity weights for each rule.




                      Fig.1: Simulation diagram of Fuzzy Controlled Load Shedding


                                                   97
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME




         Fig.2: ANFIS Structure with 1input 1 Output, and 1 Membership Function for each
                                              input

         Fuzzy logic system needs rules to be defined first, but one may have no knowledge
about a power system for the formation of rules. Therefore, automated parameters tuned by
a neural network embedded inside a fuzzy system can replace the need for prior knowledge
about a power system. To implement the proposed load shedding scheme for vulnerability
control of power systems, firstly, base case simulation is carried out on a power system so as
to analyze the system behavior at the base case condition. The next step is to analyze the
system behavior when subjected to credible system contingencies such as line outage (LO),
generator outage (GO), load increase (LI) and disconnection of loads (DL). The selection of
inputs to the controller is an important design consideration and therefore for power system
vulnerability control, the rate of change of frequency is selected as input variable for the
load shedding controller. The overall output of the ANFIS is the estimated amount of load
shed. Here the training data is given which was collected from the Electricity Board and
error is observed.




                           Fig.3: Rule viewer in ANFIS Approach

5. SIMULATION RESULTS

        Figure 4 shows the training error of neuro fuzzy controller. Figures 5a, 5b and 5c
show the variation of frequency during normal condition, load is greater than generation and
after restoration using proposed technique respectively.. Table 1 shows the inputs of the
fuzzy controller (Generation and Load) by that it calculates the rate of change of frequency

                                              98
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

(df/dt) and the output obtained is the amount of load shed required to maintain the system to
operate in a stable manner. Table 2 shows comparison of actual load shed using conventional
approach with fuzzy and neuro-fuzzy.




                        Fig.4: Training Error of Neuro-fuzzy controller




                           Fig.5: Variation of frequency under different
                                   operating conditions

   Table 2: Comparison of load shed values of AP grid with neural, Fuzzy and Neuro fuzzy
                                         systems

                                                                             Neuro
                       Actual value       Neural shed        Fuzzy
             df/dt                                                         fuzzy shed
                      shed by AP grid       value          shed value
                                                                              value
              -.3           120                123             119             119
              -.9           360                357             344             358
             -1.4           560                554             536             557
             -1.8           720                717             695             717
             -2.6          1040               1042            1000            1039




                                              99
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

6. CASE STUDY

       In the case study 220/132/33KV substation, Renigunta, AP is considered. It
consists of 13 numbers of 132 KV, 6     numbers of 20KV and 7 numbers of 3KV
feeders.

        Table 3 & Table 4 shows the import and export details of Renigunta 220/132/33
KV substation respectively. By observing here, it is clear that the generation is lower
than load, so load shedding must require to protect the grid from collapse and reduce
the drastically decrease in frequency. By using these Import and Export details, neural
network is trained and the amount of load shed required for maintaining the grid in stable
was observed. In this work the generation and load data are given as inputs to the
simulation system, it calculates the rate of change of frequency at that moment and sends
that data to the fuzzy controller. The fuzzy controller decides the amount of load shed
required to maintain the system to operate in stable manner. Table 5 shows that, the
amount of load to be shed by fuzzy and neuro – fuzzy using rate of change of frequency
as the input to the controller.

       From the Table 6, it is observed that the required amount of load to be shed is less
than the existing method of load shedding value. The amount of load shed by neural,
fuzzy and neuro – fuzzy approach is very low when compared to existing method of load
shed value. By this it is clear that, using proposed method energy is saved, frequency is
restored and power can be supplied for more number of consumers.

              Table 3: Import details of Renigunta 220/132/33 KV sub-station

                              Feeder name          Input power


                              Manubolu-1             55MW


                              Manubolu-2             55MW

                                CK Palli             135MW

                                 Kodur               70MW


                                  Total
                                                     315MW




                                            100
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

             Table 4: Export details of Renigunta 220/132/33 KV sub-station

                      Feeder name                 Output value

                      M.Mngalam-1                   72 MW

                      M.Mngalam-2                   72 MW

                        Railway-1                       0 MW

                        Railway-1                       6 MW

                        Grindwel                    10 MW

                        Amaraja                      16MW

                        Puttur-1                     12MW

                        Puttur-2                     12MW

                        Tirupathi                    50MW

                       Chandragiri                   17MW

                            Lv-1                   17.6MW

                            Lv-2                   12.4MW

                                                    324MW
                            Total



            Table 5: Comparisons of Actual, Neural, Fuzzy, and Neuro –
                              Fuzzy output values

                    df/dt       Actual           Fuzzy            Neuro-
                              difference         output           fuzzy
                                                                 output
                    -0.2             8              7              7.8

                    -0.4            16             14             15.6

                    -0.5            20             17             19.5

                    -0.7            28             24             27.5




                                           101
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

                      Table 6: Comparing real time and project values

            Required            Actual         Neural      Fuzzy          Neuro-
         amount of Load         Load           output      output       fuzzy output
           shed(MW)              shed          (MW)        (MW)            (MW)
                               value(M
                12                w)
                                  28              12        10              11

                20                28              19        17              19

                27                36              26        23              26

                35                40              33        30              33



7. CONCLUSIONS

        Due to the shortage of electricity, load shedding is extremely common in
India. To overcome drastically decreasing frequency of the system, usually, load
shedding is performed. Automatic load shedding is required to anticipate and relieve the
overloaded equipment before there is loss of generation, line tripping, equipment damage, or
a chaotic random shutdown of the system.
        The present work deals with under frequency load shedding. It shows greater
importance in maintaining the frequency in a stable and constant manner. Stability is
mainly based on recovering, rate of change of frequency to normal value. To avoid this
drastically decrease of rate of change of frequency an ANFIS controller is designed to find
the amount of load to be shed at demand side in order to bring back the frequency to a
normal value .
        The existing methods such as Breaker inter locking system, Under Frequency Relay
Load Shedding, PLC based controllers are used for the load shedding. These methods are
time consuming and also shed excess amount of load. Compared to other under frequency
load shedding control methods, the ANFIS method/approach shows the advantages like
lower value of load shedding, shorter response of time, saving more amounts of energy
and benefiting more consumers. The applicability of ANFIS is tested on a case study at
Renigunta 220/132/33 KV sub- station.

REFERENCES

[1]   M. Moazzami and A. khodabakhshian, “A New Optimal Adaptive under Frequency
      Load Shedding Using Artificial Neural Networks,” Proceedings of ICEE 2010, May
      11-13.
[2]   Pukar Mahat, Zhe Chen and Birgitte Bak-Jensen, “Under frequency Load
      Shedding for an Islanded Distribution System with Distributed Generators,” IEEE
      transactions on power delivery, vol.25, no.2, April. 2010.



                                            102
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

[3]     C.-T. Hsu, M.-S. Kang and C.-S. Chen “Design of adaptive load shedding artificial
       neural networks “IEE Proc.-Gener. Transm. Distrib., Vol. 152, No. 3, May. 2005
[4]     M.Sanaye Pasand, H..Seyedi, “New Centralized Adaptive under Frequency Load
        Shedding Algorithms,” Large Power Engineering System conference, 10-12 Oct. 2007,
        pp. 44-48.
[5]     M. Sanaye Pasand, M. R. Dadashzadeh, “Iran national grid blackout, power system
        protection point of view,” Developments in Power System Protection, 8‘Th IEEE
        International Conf. Vol. 1, April.2004, pp 20-23.
[6]     P. M. Anderson and M..Mirheydar, “An adaptive method for setting under frequency
         load shedding relays,” IEEE Trans. Power Syst., vol.7, no. 2, May.1992, pp. 647–655.
[7]     S. J. Huang and C. C. Huang, “An adaptive load shedding method with time-based
        design for isolated power systems,” Int. J. Elect. Power Energy Syst., vol. 22, Jan. 2000,
        pp. 51–58.
[8]     D. Prasetijo, W. R. Lachs, and D. Sutanto, “A new load shedding scheme for limiting
         under frequency,” IEEE Trans. Power Syst., vol. 9, no. 3, Aug. 1994, pp. 1371–1378.
[9]     V. V. Terzija, “Adaptive under-frequency load shedding based on the magnitude
         of the disturbance estimation,” IEEE Trans. Power Syst., vol. 21, no. 3, Aug.2006, pp.
         1260–1266.
[10]    M. R. Dadashzadeh, M. Sanaye-Passand, “Simulation and Investigation of Load
         Shedding Algorithms for a Real Network Using Dynamic Modeling”, 39th International
         Universities Power Engineering conf. 2, Sept. 2004, pp. 1111-15.
[11]    Z. Ding, D. Cartes and S. Sirvastava, “New load shedding scheme for islanded
        power systems,” 2006 IEEE/SMC International Conference on System of Systems
        Engineering Los Angeles, CA, USA - April.2006.
[12]    J. R. Jones and W.D. Kirkland, "Computer algorithm for selection of frequency relays
         for load shedding," IEEE Computer Application in Power, Jan. 1988, pp. 21-25.
[13]    M. NagpaI, A. Moshref, Z. Shukn, .I. T. Vijayan, D. Chan and C. Henvile "Dynamic
         simulation optimize application of an under frequency load shedding scheme," Western
         Protective Relay Conference, Spokane, Washington, October 2 1-23, 1997.
[14]    N.ManojKumar, M.S.Sujatha, T.Devaraj, N.M.G.Kumar “Artificial neural network
         approach for under frequency load shedding “International journal of scientific and
         engineering research, vol 3, issue 7, July .2012.
[15]   “Report enquiry committee on grid Disturbance in Northern region on 30th July 2012
         and in and North-Eastern on 31th July 2012” http//www.powermin.nic.in, 16 August
         2012, Retrieved 28 August 2012
[16]   S. J. Huang and C. C. Huang, “An adaptive load shedding method with time-based
       design for isolated power systems,” Int. J. Elect. Power Energy Syst., vol. 22,
       pp. 51–58, Jan. 2000.
[17]   M.S.Sujatha, Manoj Kumar.N and Dr M. Vijay Kumar, “Under Frequency Load Shedding
       for Reduction of Energy Losses by Adaptive Neuro Fuzzy Technique”, International
       Journal of Computer Engineering and Technology, Volume 3, Issue 2, 2012, pp. 12 - 18,
       ISSN Print: 0976 – 6367, ISSN Online: 0976 – 6375.
[18]   Mukesh Kumar Kirar and Ganga Agnihotri, “Transient Stability Enhancement By Ann
        Based Adaptive Load Shedding” International Journal of Electrical Engineering &
        Technology (IJEET), Volume 3, Issue 3, 2012, pp. 200 - 210, ISSN Print : 0976-6545,
        ISSN Online: 0976-6553



                                               103
International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 –
6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME

AUTHORS BIBLIOGRAPHY

             M.S.Sujatha is currently pursuing her PhD degree in Electrical and
             Electronics Engineering department at university of JNTUCA, Anantapur,
             A.P, India. She received her B.E degree from Mysore University and
             M.Tech degree from JNTUCA, Anantapur. Her research interest includes
             wireless technologies for power system applications; protection, monitoring
             and control and reduction in Energy Losses.


               Dr. M. Vijay Kumar Graduated from NBKR Institute of Science and
               Technology, Vidyanagar, A.P, India in 1988.He obtained M.Tech degree from
               Regional Engineering College, Warangal, India in 1990. He received
               Doctoral degree from JNT University, Hyderabad, India in 2000. He has
guided 15 PhD’s. Currently, he is Professor in Electrical and Electronics Engineering
Department at JNTUA, Anantapur A.P, India. His areas of research interest are power
system protection, monitoring, control, power electronic and drives and power quality
issues. He is the recipient of The Pandit Madan Mohan Malaviya Memorial Prize.




                                          104

Weitere ähnliche Inhalte

Was ist angesagt?

Ece4762011 lect22
Ece4762011 lect22Ece4762011 lect22
Ece4762011 lect22ajsatienza
 
Exp 8 (1)8. Load-frequency dynamics of single area power system
Exp 8 (1)8.	Load-frequency dynamics of single area power systemExp 8 (1)8.	Load-frequency dynamics of single area power system
Exp 8 (1)8. Load-frequency dynamics of single area power systemShweta Yadav
 
Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...eSAT Journals
 
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...IAEME Publication
 
Automatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAutomatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAlexander Decker
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontrollerRajVerma175
 
Power System Analysis Unit - V
Power System Analysis Unit - VPower System Analysis Unit - V
Power System Analysis Unit - Varunatshare
 
Automatic generation control of thermal generating unit by using conventional...
Automatic generation control of thermal generating unit by using conventional...Automatic generation control of thermal generating unit by using conventional...
Automatic generation control of thermal generating unit by using conventional...IAEME Publication
 
Iaetsd load frequency control for a distributed grid
Iaetsd load frequency control for a distributed gridIaetsd load frequency control for a distributed grid
Iaetsd load frequency control for a distributed gridIaetsd Iaetsd
 
Load Frequency Control of Two Area System
Load Frequency Control of Two Area SystemLoad Frequency Control of Two Area System
Load Frequency Control of Two Area SystemManash Deka
 
Load shedding and load scheduling (ppt)
Load shedding and load scheduling (ppt)Load shedding and load scheduling (ppt)
Load shedding and load scheduling (ppt)GehlotDarshan1
 
Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...eSAT Journals
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentationAneeque Qaiser
 

Was ist angesagt? (20)

Psoc
PsocPsoc
Psoc
 
Ece4762011 lect22
Ece4762011 lect22Ece4762011 lect22
Ece4762011 lect22
 
Exp 8 (1)8. Load-frequency dynamics of single area power system
Exp 8 (1)8.	Load-frequency dynamics of single area power systemExp 8 (1)8.	Load-frequency dynamics of single area power system
Exp 8 (1)8. Load-frequency dynamics of single area power system
 
Class 16 load shedding
Class 16 load sheddingClass 16 load shedding
Class 16 load shedding
 
Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...Steady state stability analysis and enhancement of three machine nine bus pow...
Steady state stability analysis and enhancement of three machine nine bus pow...
 
MajorProject2016
MajorProject2016MajorProject2016
MajorProject2016
 
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...
DESIGN OF CONTROL STRATEGIES FOR THE LOAD FREQUENCY CONTROL (LFC) IN MULTI AR...
 
Automatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systemsAutomatic generation control problem in interconnected power systems
Automatic generation control problem in interconnected power systems
 
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEMISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
ISLANDING DETECTION TECHNIQUE FOR DISTRIBUTED GENERATION SYSTEM
 
Automated load shedding using microcontroller
Automated load shedding using microcontrollerAutomated load shedding using microcontroller
Automated load shedding using microcontroller
 
Power System Analysis Unit - V
Power System Analysis Unit - VPower System Analysis Unit - V
Power System Analysis Unit - V
 
Automatic generation control of thermal generating unit by using conventional...
Automatic generation control of thermal generating unit by using conventional...Automatic generation control of thermal generating unit by using conventional...
Automatic generation control of thermal generating unit by using conventional...
 
Wide area monitoring, protection and control in future smart grid
Wide area monitoring, protection and control in future smart gridWide area monitoring, protection and control in future smart grid
Wide area monitoring, protection and control in future smart grid
 
Iaetsd load frequency control for a distributed grid
Iaetsd load frequency control for a distributed gridIaetsd load frequency control for a distributed grid
Iaetsd load frequency control for a distributed grid
 
Load Frequency Control of Two Area System
Load Frequency Control of Two Area SystemLoad Frequency Control of Two Area System
Load Frequency Control of Two Area System
 
Load shedding and load scheduling (ppt)
Load shedding and load scheduling (ppt)Load shedding and load scheduling (ppt)
Load shedding and load scheduling (ppt)
 
Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...Load frequency control in co ordination with frequency controllable hvdc link...
Load frequency control in co ordination with frequency controllable hvdc link...
 
Maximum power point tracking algorithms for wind energy systems
Maximum power point tracking algorithms for wind energy systemsMaximum power point tracking algorithms for wind energy systems
Maximum power point tracking algorithms for wind energy systems
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentation
 
Microgrid stability and control modes
Microgrid stability and control modes Microgrid stability and control modes
Microgrid stability and control modes
 

Andere mochten auch

Etap validation cases and comparison results
Etap validation cases and comparison resultsEtap validation cases and comparison results
Etap validation cases and comparison resultsOUSSAMA AATIQ
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Sheddingmichaeljmack
 
National Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft ReportNational Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft Reportnationalconsumersleague
 
Digital Environment Home Energy Management System
Digital Environment Home Energy Management SystemDigital Environment Home Energy Management System
Digital Environment Home Energy Management Systemmdda
 
Hardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemHardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemeSAT Journals
 
Energy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANEnergy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANZin Kyaw
 
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...ASHOKKUMAR RAMAR
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
full report original
full report originalfull report original
full report originalgokulnath R.S
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11shivram21957
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidIEEEP Karachi
 
Optimum energy management system
Optimum energy management systemOptimum energy management system
Optimum energy management systemMuhammad Zubair
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAhmed Aslam
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
PF correction using SEPIC
PF correction using SEPICPF correction using SEPIC
PF correction using SEPICSoumya Dash
 
PLC based load managment
PLC based load managmentPLC based load managment
PLC based load managmentmanishkumarm
 

Andere mochten auch (19)

load shedding
load sheddingload shedding
load shedding
 
Etap validation cases and comparison results
Etap validation cases and comparison resultsEtap validation cases and comparison results
Etap validation cases and comparison results
 
Blackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load SheddingBlackout Avoidance & Undervoltage Load Shedding
Blackout Avoidance & Undervoltage Load Shedding
 
National Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft ReportNational Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft Report
 
Digital Environment Home Energy Management System
Digital Environment Home Energy Management SystemDigital Environment Home Energy Management System
Digital Environment Home Energy Management System
 
Hardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemHardware prototype of smart home energy management system
Hardware prototype of smart home energy management system
 
Energy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANEnergy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HAN
 
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
full report original
full report originalfull report original
full report original
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11
 
report
reportreport
report
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By Wajid
 
Optimum energy management system
Optimum energy management systemOptimum energy management system
Optimum energy management system
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR Requirement
 
Power Management in BMS
Power Management in BMSPower Management in BMS
Power Management in BMS
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
PF correction using SEPIC
PF correction using SEPICPF correction using SEPIC
PF correction using SEPIC
 
PLC based load managment
PLC based load managmentPLC based load managment
PLC based load managment
 

Ähnlich wie Under frequency load shedding for energy management using anfis case study

Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...idescitation
 
An approach for a multi-stage under-frequency based load shedding scheme for...
An approach for a multi-stage under-frequency based  load shedding scheme for...An approach for a multi-stage under-frequency based  load shedding scheme for...
An approach for a multi-stage under-frequency based load shedding scheme for...IJECEIAES
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...IRJET Journal
 
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...IJAEMSJORNAL
 
Seminar on load scheduling and load shedding
Seminar on load scheduling and load sheddingSeminar on load scheduling and load shedding
Seminar on load scheduling and load sheddingBIJAY NAYAK
 
Frequency Response Assessment: Parameter Identification of Simplified Governo...
Frequency Response Assessment: Parameter Identification of Simplified Governo...Frequency Response Assessment: Parameter Identification of Simplified Governo...
Frequency Response Assessment: Parameter Identification of Simplified Governo...Power System Operation
 
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...IJAPEJOURNAL
 
Rap india working draft 1 1
Rap india   working draft 1 1Rap india   working draft 1 1
Rap india working draft 1 1Kabeed Mansur
 
Combinational load shedding using load frequency control and voltage stabili...
Combinational load shedding using load frequency control and  voltage stabili...Combinational load shedding using load frequency control and  voltage stabili...
Combinational load shedding using load frequency control and voltage stabili...IJECEIAES
 
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...bhimsen987
 
System operation and control Power system restoration – World practices & fut...
System operation and control Power system restoration – World practices & fut...System operation and control Power system restoration – World practices & fut...
System operation and control Power system restoration – World practices & fut...Power System Operation
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentIJERD Editor
 
The Enhanced Performance SVC for Transient Instability Oscillation Damping
The Enhanced Performance SVC for Transient Instability Oscillation DampingThe Enhanced Performance SVC for Transient Instability Oscillation Damping
The Enhanced Performance SVC for Transient Instability Oscillation DampingPower System Operation
 
An Automatic Load Controller for Domestic Applications
An Automatic Load Controller for Domestic ApplicationsAn Automatic Load Controller for Domestic Applications
An Automatic Load Controller for Domestic Applicationsijtsrd
 
Adaptive type 2 fuzzy controller for
Adaptive type 2 fuzzy controller forAdaptive type 2 fuzzy controller for
Adaptive type 2 fuzzy controller forijfls
 
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsPredicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsDr. Amarjeet Singh
 
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...IJERA Editor
 
Distributed Generation Allocation to Improve Steady State Voltage Stability o...
Distributed Generation Allocation to Improve Steady State Voltage Stability o...Distributed Generation Allocation to Improve Steady State Voltage Stability o...
Distributed Generation Allocation to Improve Steady State Voltage Stability o...IJAPEJOURNAL
 
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...ijtsrd
 

Ähnlich wie Under frequency load shedding for energy management using anfis case study (20)

Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
Energy Management by Adaptive Neuro-Fuzzy For Under Frequency Load Shedding/C...
 
An approach for a multi-stage under-frequency based load shedding scheme for...
An approach for a multi-stage under-frequency based  load shedding scheme for...An approach for a multi-stage under-frequency based  load shedding scheme for...
An approach for a multi-stage under-frequency based load shedding scheme for...
 
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
A Load Shedding Scheme Based On Frequency Response Model With Fast Voltage St...
 
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...
A New Under-Frequency Load Shedding Method Using the Voltage Electrical Dista...
 
Seminar on load scheduling and load shedding
Seminar on load scheduling and load sheddingSeminar on load scheduling and load shedding
Seminar on load scheduling and load shedding
 
Frequency Response Assessment: Parameter Identification of Simplified Governo...
Frequency Response Assessment: Parameter Identification of Simplified Governo...Frequency Response Assessment: Parameter Identification of Simplified Governo...
Frequency Response Assessment: Parameter Identification of Simplified Governo...
 
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
Effects of the Droop Speed Governor and Automatic Generation Control AGC on G...
 
Rap india working draft 1 1
Rap india   working draft 1 1Rap india   working draft 1 1
Rap india working draft 1 1
 
Combinational load shedding using load frequency control and voltage stabili...
Combinational load shedding using load frequency control and  voltage stabili...Combinational load shedding using load frequency control and  voltage stabili...
Combinational load shedding using load frequency control and voltage stabili...
 
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...
Grid_Inertia_and_Frequency_Control_in_Power_Systems_with_High_Penetration_of_...
 
40220140505009
4022014050500940220140505009
40220140505009
 
System operation and control Power system restoration – World practices & fut...
System operation and control Power system restoration – World practices & fut...System operation and control Power system restoration – World practices & fut...
System operation and control Power system restoration – World practices & fut...
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
The Enhanced Performance SVC for Transient Instability Oscillation Damping
The Enhanced Performance SVC for Transient Instability Oscillation DampingThe Enhanced Performance SVC for Transient Instability Oscillation Damping
The Enhanced Performance SVC for Transient Instability Oscillation Damping
 
An Automatic Load Controller for Domestic Applications
An Automatic Load Controller for Domestic ApplicationsAn Automatic Load Controller for Domestic Applications
An Automatic Load Controller for Domestic Applications
 
Adaptive type 2 fuzzy controller for
Adaptive type 2 fuzzy controller forAdaptive type 2 fuzzy controller for
Adaptive type 2 fuzzy controller for
 
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution FactorsPredicting Post Outage Transmission Line Flows using Linear Distribution Factors
Predicting Post Outage Transmission Line Flows using Linear Distribution Factors
 
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...
Active Anti-Islanding Protection For Grid Connected Solar Photovoltaic Power ...
 
Distributed Generation Allocation to Improve Steady State Voltage Stability o...
Distributed Generation Allocation to Improve Steady State Voltage Stability o...Distributed Generation Allocation to Improve Steady State Voltage Stability o...
Distributed Generation Allocation to Improve Steady State Voltage Stability o...
 
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...
Design Fuzzy-PI Based Controller for Load Frequency Control of Thermal - Ther...
 

Mehr von IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

Mehr von IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Under frequency load shedding for energy management using anfis case study

  • 1. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – INTERNATIONAL JOURNAL OF ELECTRICAL ENGINEERING 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME & TECHNOLOGY (IJEET) ISSN 0976 – 6545(Print) ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), pp. 93-104 IJEET © IAEME: www.iaeme.com/ijeet.asp Journal Impact Factor (2013): 5.5028 (Calculated by GISI) ©IAEME www.jifactor.com UNDER FREQUENCY LOAD SHEDDING FOR ENERGY MANAGEMENT USING ANFIS/CASE STUDY M.S.Sujatha1, Dr M. Vijay Kumar2 1 Professor, SVEC, Tirupati-517102, AP, India 2 Professor, JNTUCEA, Anantapur-515002, AP, India ABSTRACT Energy management is the major concern for both developing and developed countries. Energy sources are scarce and expensive to develop and exploit, hence we should confer a procedure to accumulate it by the use of load shedding. If the disturbance is large, like large load variations, outage of components (transmission lines, transformers, generators, etc.) causes power system blackouts. The conventional method is to solve an optimal power flow problem to find out the rescheduling for overload alleviation. But this will not give the desired speed of solution. Speed and accuracy of under frequency load shedding (UFLS) has a vital role in its effectiveness for preserving system stability and reducing energy loss. Initial rate of change of frequency is a fast and potentially useful signal to detect the overload when a disturbance accurse. This paper presents a new method for solving UFLS problem by using adaptive neuro-fuzzy controller for determining the amount of load shed to avoid a cascading outage. The development of new and accurate techniques for vulnerability control of power systems can provide tools for improving the reliability, continuity of power supply and reducing the energy loss. The applicability of ANFIS is tested on a case study at Renigunta 220/132/33 KV sub- station. Keywords: Under Frequency Load shedding, Rate of frequency decline, Adaptive Neuro- Fuzzy, blackouts. 1. INTRODUCTION When power system is in stable operation at normal frequency, the total mechanical power input from the prime movers to the generators is equal to the sum of all running loads, plus all real power losses in the system. The frequency conditions of the overall 93
  • 2. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME system will directly depend on the amount of active power that the generator prime movers could deliver to the system. With a small disturbance, the frequency decay rate will be low and the turbine governor will quickly raise the steam or water to the turbine to restore the frequency, provided the system has sufficient spinning reserve. However, if the disturbance is large, like large load variations, outage of components (transmission lines, transformers, generators, etc.) causes power system blackouts [5]. Recently there was a major disturbance in Northern Region at 02.33hrs on 30-07-2012. Subsequently, there was another disturbance at 13.00hrs on 31-07-2012 resulting in collapse of Northern, Eastern and North-Eastern regional grids [15]. Due to this the frequency may fall to a dangerous value before the turbine Governor fully operated. The decrease in system frequency, which occurs very rapidly and will lead to system collapse. The important protection strategy used for this purpose is a class of protection schemes known as system protection schemes (SPS). One of the most commonly used type of system protection scheme, generally accepted after the northeastern blackout of 1965, is Under Frequency Load Shedding (UFLS) scheme. Conventional UFLS system is designed to recover the balance of generation and consumption following a generator outage or sudden load increase. The loads to be shed by this system are constant load feeders and are not selected adaptively. In other words, always the same loads are dropped from the system, regardless of the location of disturbance. In this method loads are classified in three groups of non-vital, semi vital and vital loads [11]. However, in recent years, centralized load shedding algorithms to enhance adaptability of the schemes has been proposed in [4]. Adaptive under-frequency load shedding based on the magnitude of the disturbance estimation is considered in [9]. S. J. Huang and C. C. Huang presented Adaptive under-frequency load shedding based on the time based for remote and isolated power system networks [16].Other adaptive load shedding methods based on df/dt are presented in [1], [6]-[8]. The work introduces the new intelligent UFLS using adaptive neuro-fuzzy controller to decide the amount of load to be shed. 2. CONVENTIONAL LOAD SHEDDING APPROACH This section is a review of load shedding techniques that have been devised over a number of years each having its own set of applications and drawbacks. 2.1 Breaker Interlock Load Shedding This is the simplest method of carrying out load shedding. For this scheme, the circuit breaker interdependencies are arranged to operate based on hardwired trip signals from an intertie circuit breaker or a generator trip. This method is often used when the speed of the load shedding is critical. Even though, the execution of this scheme is fast, breaker interlock load shedding possesses a number of inherent drawbacks. • Load shedding based on worst-case scenario • Only one stage of load shedding • More loads are shed than required • Modifications to the system is costly 94
  • 3. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME 2.2. Under-Frequency Relay Load Shedding Guidelines for setting up a frequency load shedding are common to both large and small systems [12]. The design methodology considers fixed load reduction at fixed system frequency levels. Upon reaching the frequency set point and expiration of pre-specified time delay, the frequency relay trips one or more load breakers. This cycle is repeated until the system frequency is recovered. Drawbacks of this scheme are Slow response time. Incorrect / Excessive load shedding Analysis knowledge is always lost 2.3. Programmable Logic Controller-Based Load Shedding A PLC-based load shedding scheme offers many advantages such as the use of an existing distributed network via the power management system, as well as an automated means of load relief. However, in such applications monitoring the power system is limited to a portion of the network with the acquisition of scattered data. This drawback is further compounded by the implementation of pre-defined load priority tables at the PLC level that are executed sequentially to curtail blocks of load regardless of the dynamic changes in the system loading, generation, or operating configuration. The system-wide operating condition is often missing from the decision-making process resulting in insufficient or excessive load shedding. In addition, response time (time between the detection of the need for load shedding and action by the circuit breakers) during transient disturbances is often too long requiring even more load to be dropped 3. MATHEMATICAL ANALYSIS OF LOAD SHEDDING: 3.1 Active Power and Frequency During normal operation of power system, the total mechanical power input to the system generators is equal to the sum of the connected loads and all real power losses. If, for any reason, the balance of generation and loads is disrupted, operating frequency of the system would change according to equation (1). df 2H = Pm − Pe (1) dt Where H is the inertia constant, f is the generator frequency in pu, Pm is the generator mechanical power in pu and Pe is the generator electrical power in pu. In general, power system loads are dependent on both voltage and frequency. To compute exact amount of system load, this dependence should be considered. Power system voltage is a local parameter and its value is not usually known precisely for each remote system bus. As such, the effect of voltage in load modeling has been ignored in several researches. Despite of voltage, system frequency is a general parameter and is almost same at all points of a power system. The frequency dependent characteristic of composite load is 95
  • 4. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME expressed in equation (2). Pe = PL + d ∆f (2) Where, d is load reduction factor and PL is the load power in Pu. 3.2 Final Frequency According to equations (1) and (2) if, a power system encounters with an overload case, and then frequency of the system begins to decline. At the same time, system load which is dependent on frequency by factor d is reduced as well. If no other action is performed, eventually system settles at a final frequency at which the amount of generation reduction would be equal to reduction of system loads. The final frequency is given by the equation (3).   l0   f ∞ = f 0 − 1 −   (1 + l 0 ) d  (3)   Where, f0 is the initial normal frequency, f∞ is the final frequency and l0 is the amount of overload in pu. 3.3 Minimum Allowable Frequency All of the power system apparatus are made and designed for nominal frequency. Power plant auxiliary services are more demanding in terms of minimum allowable frequency. Steam turbine is the most sensitive equipment against frequency drops. Continuous operation of steam turbines should be restricted to frequency above 47.5Hz. Frequency falls below 47 Hz must be avoided. In fact, every commercial turbine can sustain up to 10 contingencies at 47 Hz just for one second without being jeopardize [13]. 3.4. Conventional under frequency load shedding scheme For a system overload, the amount of load which must be shed is determined based on the minimum allowable frequency and the amount of overload. The minimum allowable frequency could be considered as 47 Hz instead of 47.5Hz in load shedding schemes design, if the system dispatch center can increase the generation by governors quickly. Total amount of the load which must be shed to cover the maximum anticipated overload, is obtained from equation (4) is employed in [10]. L  f  − d 1 −  LD = 1+ L  50  (4)  f  1 − d 1 −   50  Where, LD is the total load which must be shed, L is the rate of overload per unit produced in the system, f is permissible settling frequency and the d coefficient is the load reduction coefficient which is related to the type of disturbance. 96
  • 5. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME 4. PROPOSED SYSTEM Proposed system discusses the neural network, fuzzy logic and adaptive neuro fuzzy methods of load shedding. 4.1. Neural network Fast and optimal adaptive load shedding method for power system is using, Artificial Neural Networks [2], [14]. The first step in the design of a NN is to determine an architecture that will yield good results. The idea is to use the simplest architecture while maximizing performance. Usually, NN architecture is determined based on subjective assessment on the part of the engineer. In order to achieve appropriate neural network training lots of neural networks have been trained and concluded that the architecture of 2 hidden layers, the first with 14 nodes and the second with 10 nodes, was best suited for this application. Levenberg Marquardt Back Propagation technique [3] is used to train the NN. This consists of the same routine as typical back propagation with the exception that instead of one learning rate for all the NN nodes, a learning rate was assigned to each of the nodes in order to speed up convergence. The activation function used within this work is a hyperbolic tangent function and the inputs were normalized to have a mean of zero and a variance of one. 4.2 Fuzzy Logic The generation and load data are given as inputs to the simulation system shown in Figure 1, it calculates the rate of change of frequency at that moment and sends that data to the fuzzy controller. The fuzzy controller decides the amount of load shed required to maintain the system to operate in stable manner as shown in Table.3 [17]. 4.3. Neuro-Fuzzy Neuro-fuzzy system is a combination of neural network and fuzzy logic in which it combines the learning and adapting abilities of neural networks with the fuzzy interpretation of fuzzy logic system. A typical ANFIS structure with five layers and two inputs, each with two membership functions and Rule viewer in ANFIS approach is shown in Figures 2 and 3 respectively. The ANFIS has the constraint that it only supports the Sugeno-type systems of 1st or 0th order. The system can only be designed as a single output system and the system must be of unity weights for each rule. Fig.1: Simulation diagram of Fuzzy Controlled Load Shedding 97
  • 6. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Fig.2: ANFIS Structure with 1input 1 Output, and 1 Membership Function for each input Fuzzy logic system needs rules to be defined first, but one may have no knowledge about a power system for the formation of rules. Therefore, automated parameters tuned by a neural network embedded inside a fuzzy system can replace the need for prior knowledge about a power system. To implement the proposed load shedding scheme for vulnerability control of power systems, firstly, base case simulation is carried out on a power system so as to analyze the system behavior at the base case condition. The next step is to analyze the system behavior when subjected to credible system contingencies such as line outage (LO), generator outage (GO), load increase (LI) and disconnection of loads (DL). The selection of inputs to the controller is an important design consideration and therefore for power system vulnerability control, the rate of change of frequency is selected as input variable for the load shedding controller. The overall output of the ANFIS is the estimated amount of load shed. Here the training data is given which was collected from the Electricity Board and error is observed. Fig.3: Rule viewer in ANFIS Approach 5. SIMULATION RESULTS Figure 4 shows the training error of neuro fuzzy controller. Figures 5a, 5b and 5c show the variation of frequency during normal condition, load is greater than generation and after restoration using proposed technique respectively.. Table 1 shows the inputs of the fuzzy controller (Generation and Load) by that it calculates the rate of change of frequency 98
  • 7. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME (df/dt) and the output obtained is the amount of load shed required to maintain the system to operate in a stable manner. Table 2 shows comparison of actual load shed using conventional approach with fuzzy and neuro-fuzzy. Fig.4: Training Error of Neuro-fuzzy controller Fig.5: Variation of frequency under different operating conditions Table 2: Comparison of load shed values of AP grid with neural, Fuzzy and Neuro fuzzy systems Neuro Actual value Neural shed Fuzzy df/dt fuzzy shed shed by AP grid value shed value value -.3 120 123 119 119 -.9 360 357 344 358 -1.4 560 554 536 557 -1.8 720 717 695 717 -2.6 1040 1042 1000 1039 99
  • 8. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME 6. CASE STUDY In the case study 220/132/33KV substation, Renigunta, AP is considered. It consists of 13 numbers of 132 KV, 6 numbers of 20KV and 7 numbers of 3KV feeders. Table 3 & Table 4 shows the import and export details of Renigunta 220/132/33 KV substation respectively. By observing here, it is clear that the generation is lower than load, so load shedding must require to protect the grid from collapse and reduce the drastically decrease in frequency. By using these Import and Export details, neural network is trained and the amount of load shed required for maintaining the grid in stable was observed. In this work the generation and load data are given as inputs to the simulation system, it calculates the rate of change of frequency at that moment and sends that data to the fuzzy controller. The fuzzy controller decides the amount of load shed required to maintain the system to operate in stable manner. Table 5 shows that, the amount of load to be shed by fuzzy and neuro – fuzzy using rate of change of frequency as the input to the controller. From the Table 6, it is observed that the required amount of load to be shed is less than the existing method of load shedding value. The amount of load shed by neural, fuzzy and neuro – fuzzy approach is very low when compared to existing method of load shed value. By this it is clear that, using proposed method energy is saved, frequency is restored and power can be supplied for more number of consumers. Table 3: Import details of Renigunta 220/132/33 KV sub-station Feeder name Input power Manubolu-1 55MW Manubolu-2 55MW CK Palli 135MW Kodur 70MW Total 315MW 100
  • 9. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Table 4: Export details of Renigunta 220/132/33 KV sub-station Feeder name Output value M.Mngalam-1 72 MW M.Mngalam-2 72 MW Railway-1 0 MW Railway-1 6 MW Grindwel 10 MW Amaraja 16MW Puttur-1 12MW Puttur-2 12MW Tirupathi 50MW Chandragiri 17MW Lv-1 17.6MW Lv-2 12.4MW 324MW Total Table 5: Comparisons of Actual, Neural, Fuzzy, and Neuro – Fuzzy output values df/dt Actual Fuzzy Neuro- difference output fuzzy output -0.2 8 7 7.8 -0.4 16 14 15.6 -0.5 20 17 19.5 -0.7 28 24 27.5 101
  • 10. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME Table 6: Comparing real time and project values Required Actual Neural Fuzzy Neuro- amount of Load Load output output fuzzy output shed(MW) shed (MW) (MW) (MW) value(M 12 w) 28 12 10 11 20 28 19 17 19 27 36 26 23 26 35 40 33 30 33 7. CONCLUSIONS Due to the shortage of electricity, load shedding is extremely common in India. To overcome drastically decreasing frequency of the system, usually, load shedding is performed. Automatic load shedding is required to anticipate and relieve the overloaded equipment before there is loss of generation, line tripping, equipment damage, or a chaotic random shutdown of the system. The present work deals with under frequency load shedding. It shows greater importance in maintaining the frequency in a stable and constant manner. Stability is mainly based on recovering, rate of change of frequency to normal value. To avoid this drastically decrease of rate of change of frequency an ANFIS controller is designed to find the amount of load to be shed at demand side in order to bring back the frequency to a normal value . The existing methods such as Breaker inter locking system, Under Frequency Relay Load Shedding, PLC based controllers are used for the load shedding. These methods are time consuming and also shed excess amount of load. Compared to other under frequency load shedding control methods, the ANFIS method/approach shows the advantages like lower value of load shedding, shorter response of time, saving more amounts of energy and benefiting more consumers. The applicability of ANFIS is tested on a case study at Renigunta 220/132/33 KV sub- station. REFERENCES [1] M. Moazzami and A. khodabakhshian, “A New Optimal Adaptive under Frequency Load Shedding Using Artificial Neural Networks,” Proceedings of ICEE 2010, May 11-13. [2] Pukar Mahat, Zhe Chen and Birgitte Bak-Jensen, “Under frequency Load Shedding for an Islanded Distribution System with Distributed Generators,” IEEE transactions on power delivery, vol.25, no.2, April. 2010. 102
  • 11. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME [3] C.-T. Hsu, M.-S. Kang and C.-S. Chen “Design of adaptive load shedding artificial neural networks “IEE Proc.-Gener. Transm. Distrib., Vol. 152, No. 3, May. 2005 [4] M.Sanaye Pasand, H..Seyedi, “New Centralized Adaptive under Frequency Load Shedding Algorithms,” Large Power Engineering System conference, 10-12 Oct. 2007, pp. 44-48. [5] M. Sanaye Pasand, M. R. Dadashzadeh, “Iran national grid blackout, power system protection point of view,” Developments in Power System Protection, 8‘Th IEEE International Conf. Vol. 1, April.2004, pp 20-23. [6] P. M. Anderson and M..Mirheydar, “An adaptive method for setting under frequency load shedding relays,” IEEE Trans. Power Syst., vol.7, no. 2, May.1992, pp. 647–655. [7] S. J. Huang and C. C. Huang, “An adaptive load shedding method with time-based design for isolated power systems,” Int. J. Elect. Power Energy Syst., vol. 22, Jan. 2000, pp. 51–58. [8] D. Prasetijo, W. R. Lachs, and D. Sutanto, “A new load shedding scheme for limiting under frequency,” IEEE Trans. Power Syst., vol. 9, no. 3, Aug. 1994, pp. 1371–1378. [9] V. V. Terzija, “Adaptive under-frequency load shedding based on the magnitude of the disturbance estimation,” IEEE Trans. Power Syst., vol. 21, no. 3, Aug.2006, pp. 1260–1266. [10] M. R. Dadashzadeh, M. Sanaye-Passand, “Simulation and Investigation of Load Shedding Algorithms for a Real Network Using Dynamic Modeling”, 39th International Universities Power Engineering conf. 2, Sept. 2004, pp. 1111-15. [11] Z. Ding, D. Cartes and S. Sirvastava, “New load shedding scheme for islanded power systems,” 2006 IEEE/SMC International Conference on System of Systems Engineering Los Angeles, CA, USA - April.2006. [12] J. R. Jones and W.D. Kirkland, "Computer algorithm for selection of frequency relays for load shedding," IEEE Computer Application in Power, Jan. 1988, pp. 21-25. [13] M. NagpaI, A. Moshref, Z. Shukn, .I. T. Vijayan, D. Chan and C. Henvile "Dynamic simulation optimize application of an under frequency load shedding scheme," Western Protective Relay Conference, Spokane, Washington, October 2 1-23, 1997. [14] N.ManojKumar, M.S.Sujatha, T.Devaraj, N.M.G.Kumar “Artificial neural network approach for under frequency load shedding “International journal of scientific and engineering research, vol 3, issue 7, July .2012. [15] “Report enquiry committee on grid Disturbance in Northern region on 30th July 2012 and in and North-Eastern on 31th July 2012” http//www.powermin.nic.in, 16 August 2012, Retrieved 28 August 2012 [16] S. J. Huang and C. C. Huang, “An adaptive load shedding method with time-based design for isolated power systems,” Int. J. Elect. Power Energy Syst., vol. 22, pp. 51–58, Jan. 2000. [17] M.S.Sujatha, Manoj Kumar.N and Dr M. Vijay Kumar, “Under Frequency Load Shedding for Reduction of Energy Losses by Adaptive Neuro Fuzzy Technique”, International Journal of Computer Engineering and Technology, Volume 3, Issue 2, 2012, pp. 12 - 18, ISSN Print: 0976 – 6367, ISSN Online: 0976 – 6375. [18] Mukesh Kumar Kirar and Ganga Agnihotri, “Transient Stability Enhancement By Ann Based Adaptive Load Shedding” International Journal of Electrical Engineering & Technology (IJEET), Volume 3, Issue 3, 2012, pp. 200 - 210, ISSN Print : 0976-6545, ISSN Online: 0976-6553 103
  • 12. International Journal of Electrical Engineering and Technology (IJEET), ISSN 0976 – 6545(Print), ISSN 0976 – 6553(Online) Volume 4, Issue 2, March – April (2013), © IAEME AUTHORS BIBLIOGRAPHY M.S.Sujatha is currently pursuing her PhD degree in Electrical and Electronics Engineering department at university of JNTUCA, Anantapur, A.P, India. She received her B.E degree from Mysore University and M.Tech degree from JNTUCA, Anantapur. Her research interest includes wireless technologies for power system applications; protection, monitoring and control and reduction in Energy Losses. Dr. M. Vijay Kumar Graduated from NBKR Institute of Science and Technology, Vidyanagar, A.P, India in 1988.He obtained M.Tech degree from Regional Engineering College, Warangal, India in 1990. He received Doctoral degree from JNT University, Hyderabad, India in 2000. He has guided 15 PhD’s. Currently, he is Professor in Electrical and Electronics Engineering Department at JNTUA, Anantapur A.P, India. His areas of research interest are power system protection, monitoring, control, power electronic and drives and power quality issues. He is the recipient of The Pandit Madan Mohan Malaviya Memorial Prize. 104