March 2012
Stewarts Care
Palmerstown Campus, Dublin 20
15-Year Energy Services
Contract with Dalkia Limited
Armagh & Down District Council
27-Mar-12
March 2012
Contents
1. Project Partners
2. Project Summary
3. The Commercial Approach
4. The Solution
5. Benefits for Stewarts
6. Phase 2
March 2012
1
Project Partners
March 2012 4
Who are Stewarts
Charitable Foundation
140 year tradition in the provision of care for people with
intellectual disability
They work in the community and on their own sites
Services provided regardless of age, religion, socio-economic
background and encompassing every degree of intellectual
disability
They have facilities such as equestrian centres, leisure centres,
educational centres and medical centres for use by our clients
March 2012 5
Who are Dalkia
Dalkia’s Business: Producing energy efficiency
53,457 employees in 42 countries, 71% outside of France
Revenue: €8.6 billion
119,600 energy facilities managed
114.7 TWh energy managed capacity
Reduction of 7.1 million metric tones of CO2 in 2010
March 2012 6
Dalkia and Stewarts
A small Stewarts site based in Ireland, in Kilcloon was an
existing client of Dalkia
Kilcloon facility
• Situated between Maynooth and Dunboyne
• Spread over 13 acres
• Activities Include
Horticulture, creative activities
State-of–the- art Equestrian Centre
Dalkia Services since Q1 2008
• Facilities management
• 24/7 Helpdesk
• Mechanical maintenance (HVAC)
• Electrical maintenance
• Handyman services
March 2012
2
Project Summary
March 2012 8
The site of the new contract
As a result of the good service provided at Kilcloon,
Stewarts asked Dalkia to look at the main campus in
Palmerstown, near Dublin, in Feb 2009
Facilities contain:
• medical care units,
• administration buildings,
• educational buildings,
• residential units and
• a leisure centre
The site is approx 1km2 with 30+ buildings of varying use
Prior to Dalkia, the site had very old boilers and high
energy costs.
March 2012 9
Palmerstown
campus
Leisure Centre
Day Activity
Center (DAC)
Laundry
Main Building
Carraig Care Building
March 2012
3
The Commercial Approach
March 2012 11
Initial context
Inefficient energy plant
High energy costs
High dependency on oil
High maintenance costs
March 2012 12
Project Development
Agreement (PDA)
Stewarts signed a PDA with Dalkia in February 2009
The objective of the project as defined in the PDA was to
• work with the customer over coming months to propose solution that
would deliver
energy performance benefits to customer
minimal impact on the site’s customers
delivering financial benefits
Through the PDA have to be defined
• Customer’s needs & required benefits
• Scope for energy efficient projects
• ESCO modelling / contract offering
Under the PDA, Dalkia Ireland conducted a 3 month feasibility study
March 2012 13
Timeline
PDA (3 Months) Feb to Apr 2009
Heads of Terms (3 Months) Jul to Sep 2009
• Detail design and preparing contract, co-work with client
Energy Services Contract Signed 09 October 2009
Interim Phase (6 Months) Oct 09 to Mar 10
• Construction project implementation
• Upgrade works
• Energy efficient projects implementation
New Service Commencement 01-Apr-2010
• Operational phase
(all projects finalised and plant commissioned)
Contract Duration 15 Years
Ongoing facilities and energy management
• additional energy projects being identified
March 2012 14
Stewarts Energy Costs
Apr-08 to Mar-09
€949k
Heating Oil
€489,152
52%
Electricity
€346,150
36%
Natural Gas
€113,799
12%
Stewarts Energy Consumption
Apr-08 to Mar-09
Natural Gas
2,504,710
22%
Electricity
2,096,523
18%
Heating Oil
6,850,691
60%
Original Situation
Energy consumption & cost
analysis
Prior to Stewarts engaging with
Dalkia
• €950k annual energy costs
(April 2008 to March 2009)
• Energy consumption per type of
energy :
Heating Oil: 6,851 MWh
Electricity: 2,097 MWh
Natural Gas: 2,504MWh
March 2012 15
Procurement Analysis
Dalkia Prepared Tender Package
9 Electricity Accounts
30 Gas Accounts
Palmerstown Campus + other Stewarts community sites
Potential savings
• 30% Cost Saving vs. Public Electricity Supplier (PES) i.e. ESB
• Achieved one-off savings of €25k by changing gas supplier
• Achieved one-off savings of €120k by changing electricity supplier
March 2012 16
Stewarts Energy Costs
Base Year: Oct-08 to Sep-09
€825k
Natural Gas
€79,129
10%
Electricity
€298,927
36%
Heating Oil
€446,779
54%
Stewarts Energy Consumption
Base Year: Oct-08 to Sep-09
Heating Oil
7,434,365
66%
Electricity
2,057,592
18%
Natural Gas
1,744,241
16%
Base Line Situation
Energy consumption & cost
analysis following Procurement
Exercise
Prior to Stewarts signing Energy
Contract with Dalkia
• €825K annual energy costs
(Oct 2008 to Sep 2009)
• “Base Line” Energy consumption per
type of energy:
Heating Oil: 7,434 MWh
Electricity: 2,058 MWh
Natural Gas: 1,744 MWh
March 2012
4
The Solution
March 2012 18
Energy Management
Demonstrate an approach to energy management from
all perspectives:
• demand and supply side
• all energy streams (gas, oil, electricity, etc.)
• Uses a mix of energy projects and technologies to deliver
benefits to client
Dalkia proposition
1. Energy & Utilities Management
2. Optimized Energy Production
3. Demand Side Energy Management
March 2012 19
Stewart’s Palmerstown Campus
District Heating
LTHW from NEC
Leisure Centre
140 kWe CHP
Zone Heating Controls
55 no. Zones
New MDB & Generator
Site-Wide Projects
Energy Efficient Lighting
Boiler Optimisation
Controls
Monitoring & Targeting
System
New Energy Centre
140 kWe CHP
2 no. 960kg/h
Steam Boilers
700kW LTHW Boiler
March 2012 20
Detailed Dalkia solution
1- Enhanced Procurement
Dalkia manage all accounts and billing for electricity, gas and
heating oil
Visibility on costs & savings
Annual procurement service provided
March 2012 21
Detailed Dalkia solution
2- Optimized Supply
New Hospital/Laundry Energy Centre
•140 kWe Cogenco CHP
•Condensing LTHW Boiler
•Dedicated Steam Boilers
Small District Heating System to
Carraig Building
Leisure Centre Combined Heat &
Power Unit
New Energy Centre
DHS
Leisure Centre CHP
March 2012 22
New Hospital/Laundry Energy Centre
Combined Heat & Power Unit:
• 140 kWe Cogenco CHP
• Primary Source of Heating for Hospital
• Generating Electricity for Stewart’s Site
Low-Temperature Hot Water Boiler:
• 770 kW Condensing Boiler
• Providing support for CHP in Winter Months
• Back Up for CHP during Maintenance
Dedicated Steam Boiler Plant:
• 2 x 1Ton Steam boilers.
• Proving Steam for Laundry
New Hot Water Tank
Circulation Pumps
New Energy Centre
Before construction
Detailed Dalkia solution
2- Optimized Supply
March 2012 23
Detailed Dalkia solution
3- Demand-side Energy Management
Zone heating controls
• in priority care buildings
• 55 zones in Carraig Building
Site-wide Projects
• Energy-efficient lighting upgrades
• Boiler optimization controls
• Monitoring & Targeting System
Zone Heating Controls
March 2012 24
3- Demand-side Energy Management
Energy Efficient Lighting
Replacing lamps & fittings
Installing Occupancy Sensors
Installing Photocells
Payback on average between 2-5 years
March 2012 25
3- Demand-side Energy Management
Monitoring & Targeting System
“You can only manage what you measure!”
• Real-Time Energy Metering
• Electricity & Natural Gas
• Steam & Heat
• Wireless Installation
• Internet Access to Data
Benefits
• Avoids waiting on Energy Invoices
• Highlight Anomalies in Energy Trends
• Monitor impact of projects
March 2012 26
Energy Centre
March 2012 27
Leisure Centre CHP
March 2012 28
New Efficient Plant…
March 2012 29
3- Demand-side Energy Management
Dalkia Energy Bureau Service
On-going Energy Bureau Support
• Annual Procurement
• Monthly Site Visits
• Quarterly Meeting / Report
• Monitoring & Targeting Checks
• Bill Validation
Yrs 1 –2
• Identify Further Projects…(Phase 2)
Yrs 3 –15
• Scaled Back Approach as all major energy projects will be
identified and implemented
March 2012 30
Investments
Dalkia organised up-front investment
• SEAI (Sustainable Energy Authority of Ireland) Funding received for
projects reducing overall capital cost to Stewarts
• 15-Yr energy services contract in place
• Financing on repayment of project capex
• Client financing project through the energy cost savings achieved
each year
In figures: €1.5M investment
• €1.15M financed by Dalkia
• €350k by government funds
March 2012 31
The contract
15 Year Energy Services Agreement
Services
• Management of Energy Consumption & Costs on site (Energy)
• Operation & Maintenance (O&M)
• Replacement Guarantee Service on Major New Plant (RGS)
• On-going Energy Management / Advisory & Expertise Services
Shared Savings Agreement
• monthly & annual kWh savings targets on day & night grid electricity,
natural gas & heating oil
• Max. of 10% savings for Dalkia (performance based)
Workforce
• 1 Site Manager
• 1 Technician
• Mobile Support
• Specialist Sub-contracts
March 2012
5
Benefits for Stewarts
March 2012 33
Benefits for the customer
Year 1 – Energy Cost Savings
• Year 1 Site Energy Costs decreased from €950k to €824k to €650k
• €230k Energy Costs Savings (based on kWh Savings)
• Savings achieved at currently low energy prices…savings will increase as
energy rates increase)
• Forecasted Year 2 Energy Costs Savings €400k+
Year 1 - Energy Consumption Savings
• 51% reduction in imported grid electricity
• 40% reduction in heating oil consumed
• Significant increase in natural gas consumption…however a cheaper,
more-efficient and cleaner fuel heating gas oil
Year 1 - Carbon Savings
• Annual carbon emission savings of 1,250 Tons
• Equivalent to taking 315 cars off the road every year
March 2012 34
Year 1 Results
Year 1 Results of Stewarts &
Dalkia Energy Services
Agreement
• €650K annual energy costs
(Apr 2010 to Mar 2011)
• Energy consumption per type of
energy :
Heating Oil : 4,529 MWh
Electricity : 999 MWh
Natural gas : 6,300 MWh
Stewarts Energy Consumption
Year 1: Apr-10 to Mar-11
Natural Gas
6,300,504
54%
Electricity
998,942
8%
Heating Oil
4,529,249
38%
Stewarts Energy Costs
Year 1: Apr-10 to Mar-11
€650k
Heating Oil
€315,244
49%
Electricity
€144,270
22%
Natural Gas
€189,810
29%
March 2012 35
Results: Energy Consumption
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
MWh
Apr08 to Mar09 Base Year Year 1
Stewarts Palmerstown Annual Energy Consumption
Grid Electricity Natural Gas Heating Oil
March 2012 36
Results: Energy Costs
€0
€50,000
€100,000
€150,000
€200,000
€250,000
€300,000
€350,000
€400,000
€450,000
€500,000
Apr08 to Mar09 Base Year Year 1
Stewarts Palmerstown Annual Energy Costs
Grid Electricity Natural Gas Heating Oil
€949k €824k €650k
TOTAL:
March 2012 37
Results: Carbon Emissions
-
500
1,000
1,500
2,000
2,500
3,000
Tons
Apr08 to Mar09 Base Year Year 1
Stewarts Palmerstown Annual Energy Carbon Emmissions
Grid Electricity Natural Gas Heating Oil
5,121 5,067 3,818
TOTAL:
March 2012 38
Benefits for the customer
Project Recognition
• Winner of the Biomnis Innovation Healthcare Award in May 2011
• Finalist at the Dalkia Victoires International Project Awards 2011
• Named Winner of the Best European Energy Service Project in the
Public Sector by the EESI in Brussels in Sep 2010
Benefits
• New, Modern and Energy Efficient Heating Plant, Controls,
Lighting
• Reduced Operational Costs
• Replacement Guarantee Service
• Savings covering the majority of service fees
• Security of supply
• Expert Energy partner
• Actions position Stewarts as responsible community member
March 2012 39
Client testimonial
“We have recently signed a 15 year energy performance contract with
Dalkia encompassing a significant investment by Dalkia in both demand side
and supply side energy projects and the ongoing operation and
maintenance of those energy assets.
Dalkia are currently involved in the implementation of those projects in
various locations around our campus and to date we have been impressed
with the care and attention paid to the welfare of our clients and staff.
Two examples in particular stand out, namely the construction of the New
Energy Centre and secondly the installation of the zoned heating control
systems in one our campus buildings. The former involves a significant
construction project externally in the campus ground. The construction
activities have at all times accommodated the movement and health and
safety of our clients and staff in the vicinity of the project. The latter being
mostly an internal project involving upgrading the heating systems in the
building which has not discommoded our clients or interrupted essential
services such as heat or power to any degree.”
Gerry Mullholland
Staffing Director
Stewarts
March 2012
6
Phase 2 - 2011/2012
March 2012 41
Phase 2: Timeline
Initial discussions held to identify site needs Jan 2011
Concept stage Feb – Mar 2011
• Budgetary costs and savings for six different concepts
were modelled
• Single concept chosen and brought into detailed
Design stage
Detailed Design Stage Apr – Jun 2011
• Detailed mechanical and electrical specifications created
• Specifications sent out for tender to three companies
• Installation costs, energy savings and CO2 savings
finalised
Final contract negotiations Jul – Sept 2011
Installation Phase (4 Months) Oct – Jan 2012
• Natural gas infrastructure installed
• All mechanical and electrical projects installed
New Service Commencement Feb 2012
• Operational phase and ongoing energy measurement
and verification
March 2012 42
Renewable Energy
Installation of 23 separate solar thermal systems for
domestic hot water (DHW) heating
Solar systems are Kingspan Thermomax HP200 evacuated
tube technology
Dual coil hot water cylinders installed to allow both solar
and new natural gas boilers provide required DHW
Solar systems to displace 31% of site’s fossil fuel
requirements
Total of 106m2 of solar panels installed
March 2012 43
Renewable Energy
March 2012 44
Energy Efficiency
Installation of zoned heating controls within 27 separate
buildings onsite
A total of 467 individually controlled heating zones have
been created, providing both added comfort to clients and
reduced energy demand for the site
Each zone has been scheduled for 7 day / 24 hour on/off
control and associated room temperature setpoints
Controls to reduce fossil fuel consumption by minimum of
11%
Bonded bead cavity wall insulation and fibre glass attic
insulation installed in 22 buildings
March 2012 45
Energy Efficiency
March 2012 46
GHG Savings
March 2012 47
Phase 2 Forecasted Results
Cost savings
• 72% reduction in fossil fuel energy costs
• €266k annual energy costs savings compared with baseline energy
demand and oil consumption
• Impact of future energy price fluctuations now dampened for Stewarts
Care
Energy savings
• 41% reduction in fossil fuel consumption
Carbon savings
• Annual emission savings of 649 tonnes of CO2 - equivalent to taking 163
cars off the road every year
• Removal of gas oil infrastructure from site
• 56% reduction in CO2 emissions for site
March 2012 48
www.dalkia.ie
www.stewartscare.ie
THANK YOU
Q&A

Weitere ähnliche Inhalte

Was ist angesagt?

Palestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyPalestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyLogan Energy Ltd
 
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-cs
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-csWww.nrdc.org international india_files_energy-retrofit-godrej-bhavan-cs
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-csWorld Office Forum
 
Pulse Energy Webinar - Strategies for Reducing Energy Use on Campus
Pulse Energy Webinar - Strategies for Reducing Energy Use on CampusPulse Energy Webinar - Strategies for Reducing Energy Use on Campus
Pulse Energy Webinar - Strategies for Reducing Energy Use on CampusPulse Energy
 
Measuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayMeasuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayIEA DSM Implementing Agreement (IA)
 
Carnegie BPObjective-Energy
Carnegie BPObjective-EnergyCarnegie BPObjective-Energy
Carnegie BPObjective-EnergyNick Sloan
 
Spotlight On LED Retrofit
Spotlight On LED RetrofitSpotlight On LED Retrofit
Spotlight On LED RetrofitIjaz Rauf
 
Energy for Housing - Andy Frew, NI Housing Executive
Energy for Housing - Andy Frew, NI Housing ExecutiveEnergy for Housing - Andy Frew, NI Housing Executive
Energy for Housing - Andy Frew, NI Housing ExecutiveInvest Northern Ireland
 
BEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyBEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyMathangi Ramakrishnan
 
EESAP4 Bontemps, Stephanie
EESAP4 Bontemps, StephanieEESAP4 Bontemps, Stephanie
EESAP4 Bontemps, Stephanieeesap
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017GWT
 
Passive House: A Primer on High Performance Buildings
Passive House: A Primer on High Performance BuildingsPassive House: A Primer on High Performance Buildings
Passive House: A Primer on High Performance BuildingsMichael Nemeth
 
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...IEA DSM Implementing Agreement (IA)
 
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015Green Parking Council
 
Reduce Building Energy Use Through Occupant Engagement
Reduce Building Energy Use Through Occupant EngagementReduce Building Energy Use Through Occupant Engagement
Reduce Building Energy Use Through Occupant EngagementPulse Energy
 
Sw creative financing 2 25
Sw creative financing 2 25Sw creative financing 2 25
Sw creative financing 2 25Shelterwood LLC
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programsTNenergy
 

Was ist angesagt? (20)

Palestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case StudyPalestra Fuel Cell and Trigeneration Case Study
Palestra Fuel Cell and Trigeneration Case Study
 
Proposal snowflake ski basin case
Proposal snowflake ski basin caseProposal snowflake ski basin case
Proposal snowflake ski basin case
 
White Certificates in Australia
White Certificates in Australia White Certificates in Australia
White Certificates in Australia
 
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-cs
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-csWww.nrdc.org international india_files_energy-retrofit-godrej-bhavan-cs
Www.nrdc.org international india_files_energy-retrofit-godrej-bhavan-cs
 
Pulse Energy Webinar - Strategies for Reducing Energy Use on Campus
Pulse Energy Webinar - Strategies for Reducing Energy Use on CampusPulse Energy Webinar - Strategies for Reducing Energy Use on Campus
Pulse Energy Webinar - Strategies for Reducing Energy Use on Campus
 
Measuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in NorwayMeasuring and verifying energy savings within the Energy Fund Model in Norway
Measuring and verifying energy savings within the Energy Fund Model in Norway
 
Carnegie BPObjective-Energy
Carnegie BPObjective-EnergyCarnegie BPObjective-Energy
Carnegie BPObjective-Energy
 
Spotlight On LED Retrofit
Spotlight On LED RetrofitSpotlight On LED Retrofit
Spotlight On LED Retrofit
 
Energy for Housing - Andy Frew, NI Housing Executive
Energy for Housing - Andy Frew, NI Housing ExecutiveEnergy for Housing - Andy Frew, NI Housing Executive
Energy for Housing - Andy Frew, NI Housing Executive
 
Aci home-mpg-sam nutter-csg
Aci home-mpg-sam nutter-csgAci home-mpg-sam nutter-csg
Aci home-mpg-sam nutter-csg
 
BEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency PolicyBEE_India’s Energy Efficiency Policy
BEE_India’s Energy Efficiency Policy
 
Korea's Energy Standards & Labeling
Korea's Energy Standards & Labeling Korea's Energy Standards & Labeling
Korea's Energy Standards & Labeling
 
EESAP4 Bontemps, Stephanie
EESAP4 Bontemps, StephanieEESAP4 Bontemps, Stephanie
EESAP4 Bontemps, Stephanie
 
Mark Sandeen MAS 2017
Mark Sandeen MAS 2017Mark Sandeen MAS 2017
Mark Sandeen MAS 2017
 
Passive House: A Primer on High Performance Buildings
Passive House: A Primer on High Performance BuildingsPassive House: A Primer on High Performance Buildings
Passive House: A Primer on High Performance Buildings
 
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
Energy Efficiency Obligations - the UK Practical Experience on Validating & E...
 
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
Lighting Energy Efficiency in Parking (LEEP) Campaign Awards 2015
 
Reduce Building Energy Use Through Occupant Engagement
Reduce Building Energy Use Through Occupant EngagementReduce Building Energy Use Through Occupant Engagement
Reduce Building Energy Use Through Occupant Engagement
 
Sw creative financing 2 25
Sw creative financing 2 25Sw creative financing 2 25
Sw creative financing 2 25
 
National grid's energy efficiency programs
National grid's energy efficiency programsNational grid's energy efficiency programs
National grid's energy efficiency programs
 

Andere mochten auch

Dms5015 sub topic_1.4_notes (1)
Dms5015 sub topic_1.4_notes (1)Dms5015 sub topic_1.4_notes (1)
Dms5015 sub topic_1.4_notes (1)shahban
 
Digital authoring
Digital authoringDigital authoring
Digital authoringariellehg
 
ROC 1e jaars ppt 02/11/2010
ROC 1e jaars ppt 02/11/2010ROC 1e jaars ppt 02/11/2010
ROC 1e jaars ppt 02/11/2010Marilou Morales
 

Andere mochten auch (7)

Dms5015 sub topic_1.4_notes (1)
Dms5015 sub topic_1.4_notes (1)Dms5015 sub topic_1.4_notes (1)
Dms5015 sub topic_1.4_notes (1)
 
Sim paud
Sim paudSim paud
Sim paud
 
Power point
Power pointPower point
Power point
 
Digital authoring
Digital authoringDigital authoring
Digital authoring
 
ROC 1e jaars ppt 02/11/2010
ROC 1e jaars ppt 02/11/2010ROC 1e jaars ppt 02/11/2010
ROC 1e jaars ppt 02/11/2010
 
Zeus i els seus mites
Zeus i els seus mitesZeus i els seus mites
Zeus i els seus mites
 
Stop motion
Stop motionStop motion
Stop motion
 

Ähnlich wie Stewarts care dalkia armagh down district council presentaiton 27mar12

Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentationsCodema
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results PresentationITM Power
 
Energy Efficiency for Economic Growth
Energy Efficiency for Economic GrowthEnergy Efficiency for Economic Growth
Energy Efficiency for Economic Growthatlanticcouncil
 
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10th
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10thScottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10th
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10thEdinburgh Centre for Carbon Innovation
 
UK EE Financing Schemes: An Update
UK EE Financing Schemes: An UpdateUK EE Financing Schemes: An Update
UK EE Financing Schemes: An UpdateSteven Fawkes
 
Bornholm Model (District Heating) - Per Alex Sørensen
Bornholm Model (District Heating) - Per Alex SørensenBornholm Model (District Heating) - Per Alex Sørensen
Bornholm Model (District Heating) - Per Alex SørensenTipperary Energy Agency
 
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...The Future Economy Network
 
Fawkes steven conference may 2013
Fawkes steven conference may 2013Fawkes steven conference may 2013
Fawkes steven conference may 2013Steven Fawkes
 
Fawkes Steven ACEEE conference May 2013
Fawkes Steven ACEEE conference May 2013Fawkes Steven ACEEE conference May 2013
Fawkes Steven ACEEE conference May 2013Steven Fawkes
 
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkās
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkāsAustrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkās
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkāsEkonomikas ministrija/ Dzīvo siltāk
 
Irish public sector programme
Irish public sector programmeIrish public sector programme
Irish public sector programmeLeonardo ENERGY
 
Irish public sector programme
Irish public sector programmeIrish public sector programme
Irish public sector programmeLeonardo ENERGY
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...ARC research group
 
FMP Event - ESOS as a tool - Richard lloyd
FMP Event - ESOS as a tool - Richard lloydFMP Event - ESOS as a tool - Richard lloyd
FMP Event - ESOS as a tool - Richard lloydGlobal Business Intel
 
Darren Holman, Energy Services Product & Compliance Manager at Total
Darren Holman, Energy Services Product & Compliance Manager at TotalDarren Holman, Energy Services Product & Compliance Manager at Total
Darren Holman, Energy Services Product & Compliance Manager at TotalGlobal Business Events
 
Project Ireland 2040: Energy and Climate Change
Project Ireland 2040: Energy and Climate ChangeProject Ireland 2040: Energy and Climate Change
Project Ireland 2040: Energy and Climate ChangeSustainableEnergyAut
 
Future of Heat 2020 - The role of partnerships in decarbonisation
Future of  Heat 2020 - The role of partnerships in decarbonisationFuture of  Heat 2020 - The role of partnerships in decarbonisation
Future of Heat 2020 - The role of partnerships in decarbonisationJohnArmstrong144
 
Claire Geeson, energy legislation update
Claire Geeson, energy legislation updateClaire Geeson, energy legislation update
Claire Geeson, energy legislation updateSimon Owen
 

Ähnlich wie Stewarts care dalkia armagh down district council presentaiton 27mar12 (20)

Developing district heating in ireland presentations
Developing district heating in ireland presentationsDeveloping district heating in ireland presentations
Developing district heating in ireland presentations
 
ITM Power Results Presentation
ITM Power Results PresentationITM Power Results Presentation
ITM Power Results Presentation
 
Energy Efficiency for Economic Growth
Energy Efficiency for Economic GrowthEnergy Efficiency for Economic Growth
Energy Efficiency for Economic Growth
 
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10th
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10thScottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10th
Scottish Green Investment Portfolio, ECCI Carbon Chat Room event, Jun 10th
 
UK EE Financing Schemes: An Update
UK EE Financing Schemes: An UpdateUK EE Financing Schemes: An Update
UK EE Financing Schemes: An Update
 
Sgcp13mackenzie
Sgcp13mackenzieSgcp13mackenzie
Sgcp13mackenzie
 
Bornholm Model (District Heating) - Per Alex Sørensen
Bornholm Model (District Heating) - Per Alex SørensenBornholm Model (District Heating) - Per Alex Sørensen
Bornholm Model (District Heating) - Per Alex Sørensen
 
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...
Bath & North East Somerset Council, B&NES Schools Energy Efficiency , Energy ...
 
Fawkes steven conference may 2013
Fawkes steven conference may 2013Fawkes steven conference may 2013
Fawkes steven conference may 2013
 
Fawkes Steven ACEEE conference May 2013
Fawkes Steven ACEEE conference May 2013Fawkes Steven ACEEE conference May 2013
Fawkes Steven ACEEE conference May 2013
 
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
Radical Innovation in the Electricity Sector – Brian MOTHERWAY- IEA - June 20...
 
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkās
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkāsAustrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkās
Austrijas pieredze ESKO projektu īstenošanā valsts īpašumā esošās ēkās
 
Irish public sector programme
Irish public sector programmeIrish public sector programme
Irish public sector programme
 
Irish public sector programme
Irish public sector programmeIrish public sector programme
Irish public sector programme
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
 
FMP Event - ESOS as a tool - Richard lloyd
FMP Event - ESOS as a tool - Richard lloydFMP Event - ESOS as a tool - Richard lloyd
FMP Event - ESOS as a tool - Richard lloyd
 
Darren Holman, Energy Services Product & Compliance Manager at Total
Darren Holman, Energy Services Product & Compliance Manager at TotalDarren Holman, Energy Services Product & Compliance Manager at Total
Darren Holman, Energy Services Product & Compliance Manager at Total
 
Project Ireland 2040: Energy and Climate Change
Project Ireland 2040: Energy and Climate ChangeProject Ireland 2040: Energy and Climate Change
Project Ireland 2040: Energy and Climate Change
 
Future of Heat 2020 - The role of partnerships in decarbonisation
Future of  Heat 2020 - The role of partnerships in decarbonisationFuture of  Heat 2020 - The role of partnerships in decarbonisation
Future of Heat 2020 - The role of partnerships in decarbonisation
 
Claire Geeson, energy legislation update
Claire Geeson, energy legislation updateClaire Geeson, energy legislation update
Claire Geeson, energy legislation update
 

Kürzlich hochgeladen

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Kürzlich hochgeladen (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

Stewarts care dalkia armagh down district council presentaiton 27mar12

  • 1. March 2012 Stewarts Care Palmerstown Campus, Dublin 20 15-Year Energy Services Contract with Dalkia Limited Armagh & Down District Council 27-Mar-12
  • 2. March 2012 Contents 1. Project Partners 2. Project Summary 3. The Commercial Approach 4. The Solution 5. Benefits for Stewarts 6. Phase 2
  • 4. March 2012 4 Who are Stewarts Charitable Foundation 140 year tradition in the provision of care for people with intellectual disability They work in the community and on their own sites Services provided regardless of age, religion, socio-economic background and encompassing every degree of intellectual disability They have facilities such as equestrian centres, leisure centres, educational centres and medical centres for use by our clients
  • 5. March 2012 5 Who are Dalkia Dalkia’s Business: Producing energy efficiency 53,457 employees in 42 countries, 71% outside of France Revenue: €8.6 billion 119,600 energy facilities managed 114.7 TWh energy managed capacity Reduction of 7.1 million metric tones of CO2 in 2010
  • 6. March 2012 6 Dalkia and Stewarts A small Stewarts site based in Ireland, in Kilcloon was an existing client of Dalkia Kilcloon facility • Situated between Maynooth and Dunboyne • Spread over 13 acres • Activities Include Horticulture, creative activities State-of–the- art Equestrian Centre Dalkia Services since Q1 2008 • Facilities management • 24/7 Helpdesk • Mechanical maintenance (HVAC) • Electrical maintenance • Handyman services
  • 8. March 2012 8 The site of the new contract As a result of the good service provided at Kilcloon, Stewarts asked Dalkia to look at the main campus in Palmerstown, near Dublin, in Feb 2009 Facilities contain: • medical care units, • administration buildings, • educational buildings, • residential units and • a leisure centre The site is approx 1km2 with 30+ buildings of varying use Prior to Dalkia, the site had very old boilers and high energy costs.
  • 9. March 2012 9 Palmerstown campus Leisure Centre Day Activity Center (DAC) Laundry Main Building Carraig Care Building
  • 11. March 2012 11 Initial context Inefficient energy plant High energy costs High dependency on oil High maintenance costs
  • 12. March 2012 12 Project Development Agreement (PDA) Stewarts signed a PDA with Dalkia in February 2009 The objective of the project as defined in the PDA was to • work with the customer over coming months to propose solution that would deliver energy performance benefits to customer minimal impact on the site’s customers delivering financial benefits Through the PDA have to be defined • Customer’s needs & required benefits • Scope for energy efficient projects • ESCO modelling / contract offering Under the PDA, Dalkia Ireland conducted a 3 month feasibility study
  • 13. March 2012 13 Timeline PDA (3 Months) Feb to Apr 2009 Heads of Terms (3 Months) Jul to Sep 2009 • Detail design and preparing contract, co-work with client Energy Services Contract Signed 09 October 2009 Interim Phase (6 Months) Oct 09 to Mar 10 • Construction project implementation • Upgrade works • Energy efficient projects implementation New Service Commencement 01-Apr-2010 • Operational phase (all projects finalised and plant commissioned) Contract Duration 15 Years Ongoing facilities and energy management • additional energy projects being identified
  • 14. March 2012 14 Stewarts Energy Costs Apr-08 to Mar-09 €949k Heating Oil €489,152 52% Electricity €346,150 36% Natural Gas €113,799 12% Stewarts Energy Consumption Apr-08 to Mar-09 Natural Gas 2,504,710 22% Electricity 2,096,523 18% Heating Oil 6,850,691 60% Original Situation Energy consumption & cost analysis Prior to Stewarts engaging with Dalkia • €950k annual energy costs (April 2008 to March 2009) • Energy consumption per type of energy : Heating Oil: 6,851 MWh Electricity: 2,097 MWh Natural Gas: 2,504MWh
  • 15. March 2012 15 Procurement Analysis Dalkia Prepared Tender Package 9 Electricity Accounts 30 Gas Accounts Palmerstown Campus + other Stewarts community sites Potential savings • 30% Cost Saving vs. Public Electricity Supplier (PES) i.e. ESB • Achieved one-off savings of €25k by changing gas supplier • Achieved one-off savings of €120k by changing electricity supplier
  • 16. March 2012 16 Stewarts Energy Costs Base Year: Oct-08 to Sep-09 €825k Natural Gas €79,129 10% Electricity €298,927 36% Heating Oil €446,779 54% Stewarts Energy Consumption Base Year: Oct-08 to Sep-09 Heating Oil 7,434,365 66% Electricity 2,057,592 18% Natural Gas 1,744,241 16% Base Line Situation Energy consumption & cost analysis following Procurement Exercise Prior to Stewarts signing Energy Contract with Dalkia • €825K annual energy costs (Oct 2008 to Sep 2009) • “Base Line” Energy consumption per type of energy: Heating Oil: 7,434 MWh Electricity: 2,058 MWh Natural Gas: 1,744 MWh
  • 18. March 2012 18 Energy Management Demonstrate an approach to energy management from all perspectives: • demand and supply side • all energy streams (gas, oil, electricity, etc.) • Uses a mix of energy projects and technologies to deliver benefits to client Dalkia proposition 1. Energy & Utilities Management 2. Optimized Energy Production 3. Demand Side Energy Management
  • 19. March 2012 19 Stewart’s Palmerstown Campus District Heating LTHW from NEC Leisure Centre 140 kWe CHP Zone Heating Controls 55 no. Zones New MDB & Generator Site-Wide Projects Energy Efficient Lighting Boiler Optimisation Controls Monitoring & Targeting System New Energy Centre 140 kWe CHP 2 no. 960kg/h Steam Boilers 700kW LTHW Boiler
  • 20. March 2012 20 Detailed Dalkia solution 1- Enhanced Procurement Dalkia manage all accounts and billing for electricity, gas and heating oil Visibility on costs & savings Annual procurement service provided
  • 21. March 2012 21 Detailed Dalkia solution 2- Optimized Supply New Hospital/Laundry Energy Centre •140 kWe Cogenco CHP •Condensing LTHW Boiler •Dedicated Steam Boilers Small District Heating System to Carraig Building Leisure Centre Combined Heat & Power Unit New Energy Centre DHS Leisure Centre CHP
  • 22. March 2012 22 New Hospital/Laundry Energy Centre Combined Heat & Power Unit: • 140 kWe Cogenco CHP • Primary Source of Heating for Hospital • Generating Electricity for Stewart’s Site Low-Temperature Hot Water Boiler: • 770 kW Condensing Boiler • Providing support for CHP in Winter Months • Back Up for CHP during Maintenance Dedicated Steam Boiler Plant: • 2 x 1Ton Steam boilers. • Proving Steam for Laundry New Hot Water Tank Circulation Pumps New Energy Centre Before construction Detailed Dalkia solution 2- Optimized Supply
  • 23. March 2012 23 Detailed Dalkia solution 3- Demand-side Energy Management Zone heating controls • in priority care buildings • 55 zones in Carraig Building Site-wide Projects • Energy-efficient lighting upgrades • Boiler optimization controls • Monitoring & Targeting System Zone Heating Controls
  • 24. March 2012 24 3- Demand-side Energy Management Energy Efficient Lighting Replacing lamps & fittings Installing Occupancy Sensors Installing Photocells Payback on average between 2-5 years
  • 25. March 2012 25 3- Demand-side Energy Management Monitoring & Targeting System “You can only manage what you measure!” • Real-Time Energy Metering • Electricity & Natural Gas • Steam & Heat • Wireless Installation • Internet Access to Data Benefits • Avoids waiting on Energy Invoices • Highlight Anomalies in Energy Trends • Monitor impact of projects
  • 27. March 2012 27 Leisure Centre CHP
  • 28. March 2012 28 New Efficient Plant…
  • 29. March 2012 29 3- Demand-side Energy Management Dalkia Energy Bureau Service On-going Energy Bureau Support • Annual Procurement • Monthly Site Visits • Quarterly Meeting / Report • Monitoring & Targeting Checks • Bill Validation Yrs 1 –2 • Identify Further Projects…(Phase 2) Yrs 3 –15 • Scaled Back Approach as all major energy projects will be identified and implemented
  • 30. March 2012 30 Investments Dalkia organised up-front investment • SEAI (Sustainable Energy Authority of Ireland) Funding received for projects reducing overall capital cost to Stewarts • 15-Yr energy services contract in place • Financing on repayment of project capex • Client financing project through the energy cost savings achieved each year In figures: €1.5M investment • €1.15M financed by Dalkia • €350k by government funds
  • 31. March 2012 31 The contract 15 Year Energy Services Agreement Services • Management of Energy Consumption & Costs on site (Energy) • Operation & Maintenance (O&M) • Replacement Guarantee Service on Major New Plant (RGS) • On-going Energy Management / Advisory & Expertise Services Shared Savings Agreement • monthly & annual kWh savings targets on day & night grid electricity, natural gas & heating oil • Max. of 10% savings for Dalkia (performance based) Workforce • 1 Site Manager • 1 Technician • Mobile Support • Specialist Sub-contracts
  • 33. March 2012 33 Benefits for the customer Year 1 – Energy Cost Savings • Year 1 Site Energy Costs decreased from €950k to €824k to €650k • €230k Energy Costs Savings (based on kWh Savings) • Savings achieved at currently low energy prices…savings will increase as energy rates increase) • Forecasted Year 2 Energy Costs Savings €400k+ Year 1 - Energy Consumption Savings • 51% reduction in imported grid electricity • 40% reduction in heating oil consumed • Significant increase in natural gas consumption…however a cheaper, more-efficient and cleaner fuel heating gas oil Year 1 - Carbon Savings • Annual carbon emission savings of 1,250 Tons • Equivalent to taking 315 cars off the road every year
  • 34. March 2012 34 Year 1 Results Year 1 Results of Stewarts & Dalkia Energy Services Agreement • €650K annual energy costs (Apr 2010 to Mar 2011) • Energy consumption per type of energy : Heating Oil : 4,529 MWh Electricity : 999 MWh Natural gas : 6,300 MWh Stewarts Energy Consumption Year 1: Apr-10 to Mar-11 Natural Gas 6,300,504 54% Electricity 998,942 8% Heating Oil 4,529,249 38% Stewarts Energy Costs Year 1: Apr-10 to Mar-11 €650k Heating Oil €315,244 49% Electricity €144,270 22% Natural Gas €189,810 29%
  • 35. March 2012 35 Results: Energy Consumption - 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 MWh Apr08 to Mar09 Base Year Year 1 Stewarts Palmerstown Annual Energy Consumption Grid Electricity Natural Gas Heating Oil
  • 36. March 2012 36 Results: Energy Costs €0 €50,000 €100,000 €150,000 €200,000 €250,000 €300,000 €350,000 €400,000 €450,000 €500,000 Apr08 to Mar09 Base Year Year 1 Stewarts Palmerstown Annual Energy Costs Grid Electricity Natural Gas Heating Oil €949k €824k €650k TOTAL:
  • 37. March 2012 37 Results: Carbon Emissions - 500 1,000 1,500 2,000 2,500 3,000 Tons Apr08 to Mar09 Base Year Year 1 Stewarts Palmerstown Annual Energy Carbon Emmissions Grid Electricity Natural Gas Heating Oil 5,121 5,067 3,818 TOTAL:
  • 38. March 2012 38 Benefits for the customer Project Recognition • Winner of the Biomnis Innovation Healthcare Award in May 2011 • Finalist at the Dalkia Victoires International Project Awards 2011 • Named Winner of the Best European Energy Service Project in the Public Sector by the EESI in Brussels in Sep 2010 Benefits • New, Modern and Energy Efficient Heating Plant, Controls, Lighting • Reduced Operational Costs • Replacement Guarantee Service • Savings covering the majority of service fees • Security of supply • Expert Energy partner • Actions position Stewarts as responsible community member
  • 39. March 2012 39 Client testimonial “We have recently signed a 15 year energy performance contract with Dalkia encompassing a significant investment by Dalkia in both demand side and supply side energy projects and the ongoing operation and maintenance of those energy assets. Dalkia are currently involved in the implementation of those projects in various locations around our campus and to date we have been impressed with the care and attention paid to the welfare of our clients and staff. Two examples in particular stand out, namely the construction of the New Energy Centre and secondly the installation of the zoned heating control systems in one our campus buildings. The former involves a significant construction project externally in the campus ground. The construction activities have at all times accommodated the movement and health and safety of our clients and staff in the vicinity of the project. The latter being mostly an internal project involving upgrading the heating systems in the building which has not discommoded our clients or interrupted essential services such as heat or power to any degree.” Gerry Mullholland Staffing Director Stewarts
  • 40. March 2012 6 Phase 2 - 2011/2012
  • 41. March 2012 41 Phase 2: Timeline Initial discussions held to identify site needs Jan 2011 Concept stage Feb – Mar 2011 • Budgetary costs and savings for six different concepts were modelled • Single concept chosen and brought into detailed Design stage Detailed Design Stage Apr – Jun 2011 • Detailed mechanical and electrical specifications created • Specifications sent out for tender to three companies • Installation costs, energy savings and CO2 savings finalised Final contract negotiations Jul – Sept 2011 Installation Phase (4 Months) Oct – Jan 2012 • Natural gas infrastructure installed • All mechanical and electrical projects installed New Service Commencement Feb 2012 • Operational phase and ongoing energy measurement and verification
  • 42. March 2012 42 Renewable Energy Installation of 23 separate solar thermal systems for domestic hot water (DHW) heating Solar systems are Kingspan Thermomax HP200 evacuated tube technology Dual coil hot water cylinders installed to allow both solar and new natural gas boilers provide required DHW Solar systems to displace 31% of site’s fossil fuel requirements Total of 106m2 of solar panels installed
  • 44. March 2012 44 Energy Efficiency Installation of zoned heating controls within 27 separate buildings onsite A total of 467 individually controlled heating zones have been created, providing both added comfort to clients and reduced energy demand for the site Each zone has been scheduled for 7 day / 24 hour on/off control and associated room temperature setpoints Controls to reduce fossil fuel consumption by minimum of 11% Bonded bead cavity wall insulation and fibre glass attic insulation installed in 22 buildings
  • 45. March 2012 45 Energy Efficiency
  • 46. March 2012 46 GHG Savings
  • 47. March 2012 47 Phase 2 Forecasted Results Cost savings • 72% reduction in fossil fuel energy costs • €266k annual energy costs savings compared with baseline energy demand and oil consumption • Impact of future energy price fluctuations now dampened for Stewarts Care Energy savings • 41% reduction in fossil fuel consumption Carbon savings • Annual emission savings of 649 tonnes of CO2 - equivalent to taking 163 cars off the road every year • Removal of gas oil infrastructure from site • 56% reduction in CO2 emissions for site