PRESENTATION ON
IN-PLANT TRAINING
       DURATION:06-06-2011 to 02-07-2011

                 AT
  Kanti bijlee utpadan nigam ltd.
       (a jv of ntpc & bseb) By- Hari ohm Singh
            Kanti, Muzaffarpur, Bihar      Reg no:- 09bee020
History Of Development of Plant

            • Vaishali power generating company ltd.(VPGCL)
Formerly •Owned by “Bihar State Electricity Board”


            • Kanti Bijlee Utpadan Nigam Ltd.
Currently   • A joint venture of NTPC(51-74%) and BSEB(49-26%)


            • It is totally coal fired thermal power station.
Features


            • There are two units each of 110MW installed capacity.
Capacity    • Installed capacity= 2*110 MW
Step-1
       coal to steam


           Step-2
  steam to mechanical power

           Step-3
power generation , transmission &
distribution
•working fluid is pumped from low to high pressure.
Process
  1-2
          • high pressure liquid enters a boiler where it is
            heated at constant pressure by an external heat
Process
  2-3       source to become a dry saturated vapor.

          • The dry saturated vapor expands through
Process     a turbine, generating power.
  3-4


          • The wet vapor then enters a condenser where it is
Process     condensed at a constant temperature to become
  4-1       a saturated liquid.

          • After the vapor has passed through H.P. it is
            reheated before passing through I.P. turbine.
Process   • this prevents the vapor from condensing during its
  3-3’      expansion which can seriously damage the turbine
            blades, and improves the efficiency of the cycle
The coal is unloaded either manually or with the help of
wagon tippler into the hopper to the conveyer belt.
Coal is passed through metal detectors in order to remove
metals present in coal.
Stones from coal is removed manually in its journey through
conveyer belt.
Then the coal is passed through vibrating screen where coal
of 5mm is separated from large coals.
Then coal is crushed in crusher and passed through metal
detectors to remove iron particles.
Coal is then supplied from coal bunker to pulverizing mill.
Coal dust comes out of this mill.(KBUNL have ball mills)
At KBUNL water tube boiler is employed for steam
generation.

Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and
secondary air is provided by F.D fan for pulverized coal combustion in
the furnace.

Water from boiler is passed through the down comers to the bottom
ring header. From bottom ring header water goes to water walls for
heat absorption and conversion in to steam.

Bottom of furnace is open to allow ash/clinkers to fall freely in to the
bottom ash hopper. And flue gas is used in economiser and reheaters.
Then it is discharged with the help of I.D fan in to atmosphere.
High pressure
turbine                  Intermediate
•It is of single flow    pressure turbine           Low pressure turbine
 design with eight       •Double flow design        •It is also of double
 stages of blading.       with seven stages of       flow design with 6
•Each stage has           blading on either side.    stages in front and
 moving and              •Each stage has             rear flow paths.
 stationary blades.       moving and stationary     •Each stage has
•Superheated              blades.                    moving and
 steam(at 1100⁰c) from   •Reheated steam(at          stationary blades.
 boiler drum enters in    535⁰ c) from H.P          •Stem out of I.P.
 to it.                   turbine outlet enters      turbine directly
•Speed-3000rpm            in to it.                  enters in to it.
                         •Speed-3000rpm             •Speed-3000rpm
Rating                   Continuous


Active Output            110 MW


Rated Voltage            11000+/-5%V


Rated Current            7220 A


Power Factor             0.8 lagging


Frequency                50 Hz


Excitation System        Static type


Field current at rated 1335 A
output

Type of cooling system   Hydrogen Cooled


Hydrogen Pressure        2 Ata


No. Of      H₂   cooled 06
elements

Cooling medium for H₂    Soft water
Mechanical power produced at the shaft of the turbine is
used to rotate rotor.
Rotating Magnetic flux produced by rotor cuts stator
conductor and from electromagnetic induction, electricity is
produced .
rotor runs at 3000 rpm, produces 3-phase voltage at 11kv ,
and of 50 HZ frequency.

Oil shielded hydrogen is used for the cooling purpose of
generator.
In case of any fault if production of plants stops then bearing motor
rotates rotor shaft of turbine continuously at 65 rpm. This is because if
shaft doesn’t rotate then due to load it may bend.
KBUNL has a capacity to generate 220 MW of electricity
but only one unit is working and another is under R&M
process. 90 MW is generated out of 110 MW.

The transmission is done through 3-phase , double circuit system.


With the help of station transformer 11kv is step up to 220 kv and
fed to substation.
It is the brain of any substation. All necessary steps about Transmission
, protection, Charging e.t.c are carried out in the control room.
 Measuring instruments of the control room:-

                 Relay circuit
                 •A protective device that operate during faulty condition and gives command to
                  circuit breaker to trip. Mainly the electromagnetic induction relays are used.




                 Fault locator
                 By comparing voltage and current the relay measures the line
                 impedance up to the point of fault and locate the position of
                 fault from the previous knowledge of line impedance.

                 Switch gear
                 • Switches used in substation for making or breaking the
                   electrical contacts in convenient way. There are two
                   type of switches air switch and oil switch.
Voltmeter and ammeter
•As the names imply they are used for measuring voltage and
 current respectively.

Power meter
•Used to measure the power in standard unit of MW or KW.



Crt screen
•A computer arrangement in which current information about
 transmission line is seen.


Battery room
Consists of several batteries and chargers for emergency
purpose.
It consists of following equipments :-
   transformer
   •The autotransformer used in power station. It has three windings
    primary, secondary and tertiary. The 220kv voltage is fed as input to primary by
    step down 132kv fed to KBUNL as input.


   circuit breaker(sf6 at KBUNL)
   •Used for closing or opening an electrical circuit under normal or abnormal
    conditions. These circuit breakers are equipped with trip coil connected to
    relay, design to open breaker automatically


   tower
   •We have suspension type tower called as ‘A’ type tower. The peak point angle is
    0⁰ to 2⁰. In this type conductor is suspended with an insulator.
   •Guard ring Is used to balance the capacitive current in transmission lines.
Current transformer
•Used to reduce the current level such that it can be measured easily.



Bus isolators
•Used to isolate bus bars.



Lightning arrestor
•Used to protect the transmission line and connected equipment during
 lightening .


Wave trap
wave trap which changes the frequency 50Hz to 500Hz can be
used for communicate between power plants.
• A controlled quantity of crushed coal is fed to each bowl mill (pulveriser) by its
           respective feeders and primary air is supplied from the primary air fans which drives
           the coal as it is being pulverized and transports the pulverized coal through the coal
Step-1     piping system to the coal burner.



         •The pulverized coal and air discharge from the coal burners is directed
          towards the centre of furnace to form fire ball.
Step-2

         •The secondary air heating system supplies secondary air for combustion
          in the furnace around the pulverized coal burners and through auxiliary
Step-3    air compartments ,directly adjacent to the coal burner compartments.


         •Above a predictable minimum loading condition, the ignition becomes
          self-sustaining. Combustion is completed as the gases spiral up in the
Step-4    furnace.
•The terminal voltage of alternator must be equal to the bus-bar voltage.
Step-1

         •The running speed frequency must be equal to the bus-bar frequency.
         •( Ns=120f/P ) => ( f=PN/120 )
Step-2   •Where, f= frequency,P= no. Of poles ,N= speed of alternator



         •The phase sequence of the incoming unit must be same as that of the
          existing bus bar to which the generator is to be synchronized.
Step-3
NTPC,muzaffarpur

More Related Content

What's hot

Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt nilesh choubey
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)Rajan Kumar Choudhary
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpurShrey Dhasmana
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
NTPC FARIDABAD TRAINING REPORT
NTPC FARIDABAD TRAINING REPORTNTPC FARIDABAD TRAINING REPORT
NTPC FARIDABAD TRAINING REPORTAnil Jadon
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportIshan Khandelwal
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILERanjan kumar
 

What's hot (20)

Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt Summer training at NTPC Badarpur ppt
Summer training at NTPC Badarpur ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Ntpc Report
Ntpc ReportNtpc Report
Ntpc Report
 
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)NTPC Project KORBA(SUPER THEMAL POWER PLANT)
NTPC Project KORBA(SUPER THEMAL POWER PLANT)
 
NTPC faridabad nd badarpur
NTPC faridabad nd badarpurNTPC faridabad nd badarpur
NTPC faridabad nd badarpur
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
NTPC FARIDABAD TRAINING REPORT
NTPC FARIDABAD TRAINING REPORTNTPC FARIDABAD TRAINING REPORT
NTPC FARIDABAD TRAINING REPORT
 
NTPC Farakka
NTPC FarakkaNTPC Farakka
NTPC Farakka
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
ntpc unchahar
ntpc unchaharntpc unchahar
ntpc unchahar
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning ReportRamgarh Gas Thermal Power Plant (RGTPP) Traning Report
Ramgarh Gas Thermal Power Plant (RGTPP) Traning Report
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 

Viewers also liked

ASMUBE Publicidade BrandingIdentidade visual & branding
ASMUBE Publicidade BrandingIdentidade visual  & branding   ASMUBE Publicidade BrandingIdentidade visual  & branding
ASMUBE Publicidade BrandingIdentidade visual & branding BLOG COMUNICAÇÃO
 
Uso do dicionário
Uso do dicionárioUso do dicionário
Uso do dicionárioVitor Abreu
 
Proposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceProposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceGuo ke
 
12600KVA Metal Silicon Furnace Technical Proposal
12600KVA Metal Silicon Furnace Technical Proposal12600KVA Metal Silicon Furnace Technical Proposal
12600KVA Metal Silicon Furnace Technical ProposalGuo ke
 
Power plant list
Power plant listPower plant list
Power plant listKanda Velan
 
Formulas excel
Formulas excelFormulas excel
Formulas excelcon_seguir
 
Induction Melting Equipment - Electroheat Induction
Induction Melting Equipment  - Electroheat InductionInduction Melting Equipment  - Electroheat Induction
Induction Melting Equipment - Electroheat InductionElectroHeat Induction
 
Manual química biológica espetacular
Manual química biológica espetacularManual química biológica espetacular
Manual química biológica espetacularSónia Rocha
 
Scrap Preheating for Steel Melting Induction Furnaces
Scrap Preheating for Steel Melting Induction FurnacesScrap Preheating for Steel Melting Induction Furnaces
Scrap Preheating for Steel Melting Induction FurnacesRADE INITIATIVE
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGuo ke
 
www.aulasdefisicaapoio.com - Física – Exercícios Resolvidos de Gravitação Un...
www.aulasdefisicaapoio.com -  Física – Exercícios Resolvidos de Gravitação Un...www.aulasdefisicaapoio.com -  Física – Exercícios Resolvidos de Gravitação Un...
www.aulasdefisicaapoio.com - Física – Exercícios Resolvidos de Gravitação Un...Videoaulas De Física Apoio
 
Blacksmithy shop
Blacksmithy shopBlacksmithy shop
Blacksmithy shopManoj Yadav
 

Viewers also liked (20)

ASMUBE Publicidade BrandingIdentidade visual & branding
ASMUBE Publicidade BrandingIdentidade visual  & branding   ASMUBE Publicidade BrandingIdentidade visual  & branding
ASMUBE Publicidade BrandingIdentidade visual & branding
 
Uso do dicionário
Uso do dicionárioUso do dicionário
Uso do dicionário
 
Chos 2015 alunos
Chos 2015 alunosChos 2015 alunos
Chos 2015 alunos
 
Excel formulas
Excel formulasExcel formulas
Excel formulas
 
Proposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction FurnaceProposal of GW-12T Intermediate Induction Furnace
Proposal of GW-12T Intermediate Induction Furnace
 
12600KVA Metal Silicon Furnace Technical Proposal
12600KVA Metal Silicon Furnace Technical Proposal12600KVA Metal Silicon Furnace Technical Proposal
12600KVA Metal Silicon Furnace Technical Proposal
 
Power plant list
Power plant listPower plant list
Power plant list
 
Aula de fórmulas excel
Aula de fórmulas excelAula de fórmulas excel
Aula de fórmulas excel
 
Formulas_Excel
Formulas_ExcelFormulas_Excel
Formulas_Excel
 
Formulas excel
Formulas excelFormulas excel
Formulas excel
 
Induction Furnace
Induction FurnaceInduction Furnace
Induction Furnace
 
Induction Melting Equipment - Electroheat Induction
Induction Melting Equipment  - Electroheat InductionInduction Melting Equipment  - Electroheat Induction
Induction Melting Equipment - Electroheat Induction
 
Manual química biológica espetacular
Manual química biológica espetacularManual química biológica espetacular
Manual química biológica espetacular
 
Scrap Preheating for Steel Melting Induction Furnaces
Scrap Preheating for Steel Melting Induction FurnacesScrap Preheating for Steel Melting Induction Furnaces
Scrap Preheating for Steel Melting Induction Furnaces
 
GW-1-750IF Induction Furnace
GW-1-750IF Induction FurnaceGW-1-750IF Induction Furnace
GW-1-750IF Induction Furnace
 
Bioquímica ilustrada peter n. campbell
Bioquímica ilustrada   peter n. campbellBioquímica ilustrada   peter n. campbell
Bioquímica ilustrada peter n. campbell
 
www.aulasdefisicaapoio.com - Física – Exercícios Resolvidos de Gravitação Un...
www.aulasdefisicaapoio.com -  Física – Exercícios Resolvidos de Gravitação Un...www.aulasdefisicaapoio.com -  Física – Exercícios Resolvidos de Gravitação Un...
www.aulasdefisicaapoio.com - Física – Exercícios Resolvidos de Gravitação Un...
 
Blacksmithy shop
Blacksmithy shopBlacksmithy shop
Blacksmithy shop
 
Curso
CursoCurso
Curso
 
Office 2013
Office 2013Office 2013
Office 2013
 

Similar to NTPC,muzaffarpur

Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxAnandNakum
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptaryan5808
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptxParulChandna6
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPCricha khatri
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.pptAbhishek Awasthi
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.Sai Kumar
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationLekhraJ Meena
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222Ankit Poonia
 

Similar to NTPC,muzaffarpur (20)

Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptx
 
Ntpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training pptNtpc unchahar summer or vocational training ppt
Ntpc unchahar summer or vocational training ppt
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
KSTPS presentation.pptx
KSTPS presentation.pptxKSTPS presentation.pptx
KSTPS presentation.pptx
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Richappt
RichapptRichappt
Richappt
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Boilers
BoilersBoilers
Boilers
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Presentation sai,varun.
Presentation sai,varun.Presentation sai,varun.
Presentation sai,varun.
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
A Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power StationA Presentation on Kota Super Thermal Power Station
A Presentation on Kota Super Thermal Power Station
 
kota super thermal poer plant
kota super thermal poer plantkota super thermal poer plant
kota super thermal poer plant
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
Thermal power plant2222222222222222
Thermal power plant2222222222222222Thermal power plant2222222222222222
Thermal power plant2222222222222222
 
adi ntpc.pptx
adi ntpc.pptxadi ntpc.pptx
adi ntpc.pptx
 
kstps training report
kstps training reportkstps training report
kstps training report
 

Recently uploaded

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research DiscourseAnita GoswamiGiri
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDhatriParmar
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 

Recently uploaded (20)

Scientific Writing :Research Discourse
Scientific  Writing :Research  DiscourseScientific  Writing :Research  Discourse
Scientific Writing :Research Discourse
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptxDecoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 

NTPC,muzaffarpur

  • 1. PRESENTATION ON IN-PLANT TRAINING DURATION:06-06-2011 to 02-07-2011 AT Kanti bijlee utpadan nigam ltd. (a jv of ntpc & bseb) By- Hari ohm Singh Kanti, Muzaffarpur, Bihar Reg no:- 09bee020
  • 2. History Of Development of Plant • Vaishali power generating company ltd.(VPGCL) Formerly •Owned by “Bihar State Electricity Board” • Kanti Bijlee Utpadan Nigam Ltd. Currently • A joint venture of NTPC(51-74%) and BSEB(49-26%) • It is totally coal fired thermal power station. Features • There are two units each of 110MW installed capacity. Capacity • Installed capacity= 2*110 MW
  • 3. Step-1 coal to steam Step-2 steam to mechanical power Step-3 power generation , transmission & distribution
  • 4. •working fluid is pumped from low to high pressure. Process 1-2 • high pressure liquid enters a boiler where it is heated at constant pressure by an external heat Process 2-3 source to become a dry saturated vapor. • The dry saturated vapor expands through Process a turbine, generating power. 3-4 • The wet vapor then enters a condenser where it is Process condensed at a constant temperature to become 4-1 a saturated liquid. • After the vapor has passed through H.P. it is reheated before passing through I.P. turbine. Process • this prevents the vapor from condensing during its 3-3’ expansion which can seriously damage the turbine blades, and improves the efficiency of the cycle
  • 5. The coal is unloaded either manually or with the help of wagon tippler into the hopper to the conveyer belt. Coal is passed through metal detectors in order to remove metals present in coal. Stones from coal is removed manually in its journey through conveyer belt. Then the coal is passed through vibrating screen where coal of 5mm is separated from large coals. Then coal is crushed in crusher and passed through metal detectors to remove iron particles. Coal is then supplied from coal bunker to pulverizing mill. Coal dust comes out of this mill.(KBUNL have ball mills)
  • 6.
  • 7. At KBUNL water tube boiler is employed for steam generation. Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and secondary air is provided by F.D fan for pulverized coal combustion in the furnace. Water from boiler is passed through the down comers to the bottom ring header. From bottom ring header water goes to water walls for heat absorption and conversion in to steam. Bottom of furnace is open to allow ash/clinkers to fall freely in to the bottom ash hopper. And flue gas is used in economiser and reheaters. Then it is discharged with the help of I.D fan in to atmosphere.
  • 8.
  • 9.
  • 10. High pressure turbine Intermediate •It is of single flow pressure turbine Low pressure turbine design with eight •Double flow design •It is also of double stages of blading. with seven stages of flow design with 6 •Each stage has blading on either side. stages in front and moving and •Each stage has rear flow paths. stationary blades. moving and stationary •Each stage has •Superheated blades. moving and steam(at 1100⁰c) from •Reheated steam(at stationary blades. boiler drum enters in 535⁰ c) from H.P •Stem out of I.P. to it. turbine outlet enters turbine directly •Speed-3000rpm in to it. enters in to it. •Speed-3000rpm •Speed-3000rpm
  • 11. Rating Continuous Active Output 110 MW Rated Voltage 11000+/-5%V Rated Current 7220 A Power Factor 0.8 lagging Frequency 50 Hz Excitation System Static type Field current at rated 1335 A output Type of cooling system Hydrogen Cooled Hydrogen Pressure 2 Ata No. Of H₂ cooled 06 elements Cooling medium for H₂ Soft water
  • 12. Mechanical power produced at the shaft of the turbine is used to rotate rotor. Rotating Magnetic flux produced by rotor cuts stator conductor and from electromagnetic induction, electricity is produced . rotor runs at 3000 rpm, produces 3-phase voltage at 11kv , and of 50 HZ frequency. Oil shielded hydrogen is used for the cooling purpose of generator. In case of any fault if production of plants stops then bearing motor rotates rotor shaft of turbine continuously at 65 rpm. This is because if shaft doesn’t rotate then due to load it may bend.
  • 13. KBUNL has a capacity to generate 220 MW of electricity but only one unit is working and another is under R&M process. 90 MW is generated out of 110 MW. The transmission is done through 3-phase , double circuit system. With the help of station transformer 11kv is step up to 220 kv and fed to substation.
  • 14. It is the brain of any substation. All necessary steps about Transmission , protection, Charging e.t.c are carried out in the control room. Measuring instruments of the control room:- Relay circuit •A protective device that operate during faulty condition and gives command to circuit breaker to trip. Mainly the electromagnetic induction relays are used. Fault locator By comparing voltage and current the relay measures the line impedance up to the point of fault and locate the position of fault from the previous knowledge of line impedance. Switch gear • Switches used in substation for making or breaking the electrical contacts in convenient way. There are two type of switches air switch and oil switch.
  • 15. Voltmeter and ammeter •As the names imply they are used for measuring voltage and current respectively. Power meter •Used to measure the power in standard unit of MW or KW. Crt screen •A computer arrangement in which current information about transmission line is seen. Battery room Consists of several batteries and chargers for emergency purpose.
  • 16. It consists of following equipments :- transformer •The autotransformer used in power station. It has three windings primary, secondary and tertiary. The 220kv voltage is fed as input to primary by step down 132kv fed to KBUNL as input. circuit breaker(sf6 at KBUNL) •Used for closing or opening an electrical circuit under normal or abnormal conditions. These circuit breakers are equipped with trip coil connected to relay, design to open breaker automatically tower •We have suspension type tower called as ‘A’ type tower. The peak point angle is 0⁰ to 2⁰. In this type conductor is suspended with an insulator. •Guard ring Is used to balance the capacitive current in transmission lines.
  • 17. Current transformer •Used to reduce the current level such that it can be measured easily. Bus isolators •Used to isolate bus bars. Lightning arrestor •Used to protect the transmission line and connected equipment during lightening . Wave trap wave trap which changes the frequency 50Hz to 500Hz can be used for communicate between power plants.
  • 18. • A controlled quantity of crushed coal is fed to each bowl mill (pulveriser) by its respective feeders and primary air is supplied from the primary air fans which drives the coal as it is being pulverized and transports the pulverized coal through the coal Step-1 piping system to the coal burner. •The pulverized coal and air discharge from the coal burners is directed towards the centre of furnace to form fire ball. Step-2 •The secondary air heating system supplies secondary air for combustion in the furnace around the pulverized coal burners and through auxiliary Step-3 air compartments ,directly adjacent to the coal burner compartments. •Above a predictable minimum loading condition, the ignition becomes self-sustaining. Combustion is completed as the gases spiral up in the Step-4 furnace.
  • 19. •The terminal voltage of alternator must be equal to the bus-bar voltage. Step-1 •The running speed frequency must be equal to the bus-bar frequency. •( Ns=120f/P ) => ( f=PN/120 ) Step-2 •Where, f= frequency,P= no. Of poles ,N= speed of alternator •The phase sequence of the incoming unit must be same as that of the existing bus bar to which the generator is to be synchronized. Step-3