FORMWORK
What is Formwork
Formwork is a die or a mould including all supporting structures, used to shape and support the
concrete until it attains sufficient strength to carry its own weight. It should be capable of carrying
all imposed dead and live loads apart from its own weight.
INTRODUCTION TO FORMWORK
• Formwork has been in use since the beginning of concrete construction.
• New materials such as steel, plastics and fiberglass are used in formwork.
• greater attention is being given to the design, fabrication, erection and
dismantling of formwork
DEFENITION:
• As a structure,
• Temporary which is designed to contain fresh fluid concrete.
• Form it into the required shape and dimensions.
• Support it until it cures sufficiently to become self supporting.
The term ‘formwork’ includes the actual material contact with the concrete, known asform
face, and all the necessary associated supporting structure.
REQUIREMENTS OF A GOOD FORMWORK SYSTEM
 How formwork can be erected and de-shuttered fast.
 How good concrete quality and surface finish can be achieved.
 What is the optimum stock of formwork required for the size of work force, the specified time
schedule and flow of materials.
 What is the overall cost savings that can be achieved using the right type of formwork.
 How SAFETY can be improved for the site personnel.
In order to successfully carry out its function, formwork must achieve a balance of following
requirements:
• Containment
• Strength
• Resistance To Leakage
• Accuracy
• Ease Of Handling
• Finish And Reuse Potential
• Access For Concerted
• Economy
Containment: formwork must be capable of shaping and supporting the fluid concrete until it
cures.
Strength: formwork must be capable of safely withstanding without distortion or danger the dead
weight of the fluid concrete is placed on it, labour weight, equipment weight and any
environmental loadings.
Resistance to leakage: all joints in form work must be either close fitting of covered with form tape
to make them grout tight. If grout leakage occurs the concrete Will leak at that point. Leakages
cause honeycombing of the surface.
Accuracy: formwork must be accurately set out so that the resulting concrete product is in a right
place and is of correct shape and dimensions.
Ease of handling: form panels and units should be designed so that their maximum size does not
exceed that which can be easily handled by hand or mechanical means. In addition all formwork
must also be designed and constructed to include facilities for adjustments, leveling, easing and
striking without damage to the form work or concrete.
Finish and reuse potential: the form face material must be selected to be capable of consistently
imparting the desired concrete finish (smooth, textured, featured or exposed aggregate etc.) At
the same time it should also achieve the required number of reuse.
Access for concrete: any formwork arrangement must be provide access for placing ofthe
concrete. The extent of this provision will be dependent on the ease of carrying outthe
concrete operations.
Economy: all the formwork is very expensive. On average about 35% of the total cost of any
finished concrete unit or element can be attributed to its formwork; of this just over 40% can be
taken for material for formwork and 60% for labour. The formwork designer must therefore not
only consider the maximum number of times that any form can be reused, but also produce a
design that will minimize the time taken for erection and striking.
FORMWORK BASED ON MATERIALS
MATERIALS FOR FORMWORK
Formwork can be made out of a large variety of materials.
• The material most commonly being used to date is timber. However, due to the
depleting forest reserves and increasing cost of timber the use of alternate materials such as
plywood and steel has become prominent.
• More recently, materials such as plastics and fiberglass are also being used for
pre-fabricating formwork.
• The type of material to be used depends on the nature of construction as well
as availability and cost of material.
• The constraints on the project such as overall cost, time of completion also play
a major role in the use of a particular material for formwork.
TIMBER FORMS
Timber is required for practically all jobs of formwork. The timber bring used for formwork must
satisfy the following requirements:
I. It should be durable and treatable
II. It should have sufficient strength characteristics
III. It should be light weight and well seasoned without warping,
IV. It should hold nails well.
Advantages of using timber forms:
I. It is economical for small construction jobs
II. It is design flexible and easy to erect
III. It has good thermal insulation which makes it useful to be used in colder
Regions
Iv. It can easily be made into any shape or size
Plywood forms (in combination with timber)
• Concrete shuttering plywood is bwp grade plywood, preservative treated and specially
suited for use in concrete shuttering and formwork.
• The plywood is built up of odd number of layers with grain of adjacent layers
perpendicular to each other.
• Plywood is used extensively for formwork for concrete, especially for sheathing, decking
and form linings.
• There are two types of plywood - internal and exterior.
• The interior type is bonded with water resistant glue and exterior type is bonded with
water proof glue.
Hardboard forms
• Hardboard is a board material manufactured of wood fiber, which is then refined
or partly refined to form a panel having a density range of approximately 50 to 80 pounds per
cubic foot.
• Hardboards are standard / non-tempered or tempered.
• The tempered one being used for formwork. Tempered hardboard is solid or
perforated hardboard panels impregnated with resin under high pressure to make them stronger
and more resistant to moisture and abrasion.
• The boards available in large sheets have a hard, smooth surface that produces
a concrete whose surface is relatively free of blemishes and joint marks.
• The thin sheets can be bent to small radii, which is an advantage when casting
concrete members with curved surfaces.
ALUMINIUM FORMS
• Forms made from aluminum are in many respects similar to those made of steel.
• However, because of their lower density, aluminum forms are lighter than steel
forms, and this is their primary advantage when compared to steel.
• As the strength of aluminum in handling, tension and compression is less than
the strength of steel, it is necessary to use large sections.
• The formwork turns out to be economical if large numbers of reuses are made in
construction.
• The major disadvantage of aluminum forms is that no changes can be made
once the formwork is fabricated.
PLASTICS
These forms have become increasingly popular for casting unique shapes and patterns being
designed in concrete because of the excellent finish obtained requiring minimum or no surface
treatment and repairs.
Different types of plastic forms are available like glass reinforced plastic, fiber reinforced
plastic and thermoplastics etc.
Fiberglass-reinforced plastic is the most common and has several advantages such as
I. The material allows greater freedom of design
II. Unusual textures and designs can be molded into the form
III. It allows the contractor to pour structural and finished concrete
Simultaneously
IV. Because sections can be joined on the job site in such a way so as to eliminate
joints, there is no size limitation
If carefully handled, a number of reuses are possible making it highly
Economical
Vi. It is lightweight and easily stripped
The disadvantage of using plastic forms is that it does not lend itself to field fabrication
Hence, the design and planning of this form must be carefully carried out.Also care must take not
to damage the plastic by the heat applied for accelerated curing of the concrete. Trough and
waffle units in fiberglass are used in construction of large floor areas and multistoried office
buildings.
STEEL FORMWORK:
Mostly used in large construction projects or in situations where large number of re-uses
of the same shuttering is possible. Suitable for circular or curved shaped structures such as
tanks, columns, chimneys. Etc. & for structures like sewer tunnel and retaining wall.
Advantages of steel formwork over timber form:
I. strong, durable & have longer life
II. Reuses can be assumed to vary from 100 to 120 wares timber varies
from 10 to 12.
III. Steel can be installed & dismantled with greater ease & speed resulting in
saving in labour cost.
IV. Excellent quality of exposed concrete surface obtained. Thus saving in
the cost of finishing the conc. surface.
V. no danger of formwork absorbing water from the conc. & hence
minimizing honeycombing
CONSTRUCTION OF FORMWORK:
• propping and centering
• shuttering
• provision of camber
• cleaning & surface treatment
Propping and centering:
The props used for centering may be of steel, timber post or ballies.pillars made
up of brick masonry in mud mortar are also sometimes used as props.
Shuttering:
can be made up of timber planks or it may be in the form of panel unit made either
by fixing ply wood to timber frames or by welding steel plates to angle framing.
Provision of camber
Certain amount of deflection in structure is unavoidable. It is therefore desirable to
give an upward camber in the horizontal member of conc. Structure to counteract the effect of
deflection.
Surface treatment
• Before laying conc. The formwork should be cleaned of all rubbish particularly
the sawdust savings & chippings etc.
• Before laying conc. the face of formwork in contact with conc. shall be cleaned &
treated with release agent like raw linseed oil or soft soap solution as to prevent the conc. getting
struck to the formwork.
Order and method of removing formwork:
• Shuttering forming vertical faces of walls, beams & column sides should be
removed first. Shuttering forming sofit to slab should be removed next.
• Shuttering forming soffit to beams, girders or other heavily loaded member
should be removed in the end.
DURATION TAKEN FOR REMOVAL OF FORMWORK
1 WALLS COLUMNS & VERTICAL SIDES
OF BEAMS 1-2 DAY
2 SLABS 3 DAYS
3 BEAM SOFFIT 7 DAYS
4 REMOVAL OF PROPS TO SLABS
A) SLAB SPANNINIG UPTO 4.5M 7 DAYS
B) SLAB SPANNINIG OVER 4.5M 14 DAYS
5 REMOVAL OF PROPS TO BEAMS
AND ARCHES
A) SPANNING UPTO 6 MTS 14 DAYS
B) SPANNING OVER 6 MTS 21 DAYS
TYPES OF FORMWORK
There are different types of formwork available for different purposes. Generally,
the formworks for vertical concreting are called wall forms and those for horizontal concreting are
called slab or floor forms. The various types of formwork available today in the market are
discussed in detail.
TRADITIONAL FORMWORK
• This usually consists of standard framed panels tied together over their backs
with horizontal members called waling.
• The waling is provided with the basic function of resisting the horizontal force of
wet concrete.
• One side of the wall formwork is first assembled ensuring that it is correctly
aligned, plumbed and strutted.
• The steel reinforcement cage is then placed and positioned before the other side
of the formwork is erected and fixed.
• Plywood sheet in combination with timber is the most common material used for
wall formwork.
• The usual method is to make up wall forms as framed panels with the plywood
facing sheet screwed on to studs on a timber frame. This allows for the plywood to be easily
removed and reversed and used on both sides so as to increase the number of reuses.
• The wall forms are susceptible to edge and corner damage and must be
carefully handled.
• Special attention must be given to comers and attached piers since the
increased pressures applied by wet concrete could cause the abutments to open up, giving rise to
unacceptable grout escape and a poor finish to the cast wall.
CLIMBING FORMWORK
• Method of casting walls consists of a climbing formwork, the climbing of which
may be manual or crane assisted.
• It employs a common set of forms used in a repetitive manner for casting walls
in set vertical lifts.
• After each casting the forms are removed and raised to form the next lift until the
required height has been reached.
• These forms are widely used in the construction of industrial chimneys, silos,
high rise towers & building cores, bridge piers & pylons, airport control towers,
telecommunication, towers etc.
The climbing form has many advantages such as the following
• Staged construction process allows balance of site resources.
• Anchor accessories can be reused after each pour, reducing material costs on
current and future construction programs.
• In case of trolley mounted formwork, the panel retracts from the face, providing
space for cleaning and fixing of concrete.
• Formwork & access platforms lifted as one, minimizing crane support, reducing
labour and material costs.
• fine adjustments of the form face can be made during construction, providing
accurate alignment of the form face vertically & laterally.
SLIDING FORMWORK OR SLIPFORMING
• slip form means a continuously moving form, moving with such a speed that
concrete when exposed has already achieved enough strength to support the vertical pressure
from concrete still in the form as well as to withstand lateral pressure caused by wind etc.
• Thus, the slip form concreting technique is a rapid and economical construction
method that can be applied with great advantage to many types of construction projects such as
chimneys, silos, water towers, bridge-columns, lift shaft cores and shaft lining etc.
• The technique is based on movable forms which are gradually lifted by hydraulic
jacks.
• It is a continuous process where wet concrete is added to wet concrete.
Reinforcing steel and/or post tensioned cables are continuously fixed as the normal slipping
speed is 3 to 6 meters per 24 hours. The slip form construction is designed for each project
depending on the structure of the project. The advantages of slip forming are
• Minimum consumption of timber and steel plates.
• Total elimination of traditional scaffolding
• Minimum requirements of carpenters for assembling.
• It gives a monolithic structure.
• The concrete surfaces can be treated and finished while concrete is green,
• Depending on the weather conditions, it is possible to achieve a vertical rise to
the tune of 4 to 5 m in summer and 2 to 3 m in winter.
• The procedure of continuous slipping is applied to making both inner and outer
walls as well as columns of a building.
• Form climbs.
PERMANENT FORMWORK
• Permanent form or stay-in-place formwork is one in which the form is left as an
integral part of the structure.
• Permanent formwork can also be utilized as the facing materials of in situ
reinforced concrete. They can be of two types—participating and non-participating.
• The material used for these forms must be durable and of sufficient strength.
Commonly used materials include polyvinyl chloride (pvc), galvanized coiled sheet steel,
fabricated steel, carbon/epoxy thin shell.
• The high initial cost of design and installation, lack of familiarity for installation
and maintenance and more specified form design are some of the barriers to the use of this form.
• However, there are various advantages like low cost of transportation and
installation, precise form design, maximum flexibility, greater durability with reduced long term
maintenance and versatility.
SPECIAL FORMS
These are those forms that are specially designed and manufactured for a particular kind
of construction. The need for a special formwork may arise due to several factors such as
• when the contract demands the highest class of dimensional tolerance to be followed
• Where the form work shape required becomes uneconomical or impracticable for site fabrication
• Where the formwork is required to be self-contained i.e. self propelled,
• Where rate of concreting, admixtures or types of concrete are such that concrete pressure
developed within forms and stresses in the forms demand special attention where a substantial
number of re-uses is envisaged
TABLE FORM
• This is a special formwork designed for use in casting large repetitive
floor slabs in medium to high-rise structures.
• The main objective of reducing the time required re-erecting, striking and re-
erecting slab formwork.
• A system which can be put as an entire unit, removed, hoisted and repositioned
without any dismantling.
GANGED PANEL FORM
• The increasing pace in the construction of multi-storey and massive concrete
structures, and the parallel progress in development of cranes and other mechanical methods of
transporting forms have made the use of ganged prefabricated forms for the concreting of large
sections of high walls very common.
• Ranging up to 30x50 ft, their size is limited only by the mechanics of handling.
Large panels can be assembled flat on the ground where it is easier to work. Delay and lost
motion are avoided in stripping because the gang forms are stripped as a unit.
TUNNEL FORM
The tunnel formwork is a room sized structural steel fabricated form which is used to cast
the rcc walls and floor slabs of a building as a monolithic structure in a continuous pour. The
forms are then heated using hot air blowers for accelerated curing of the concrete. This system is
most economical when the structure consists of large number of identical units. There exist two
versions of this type of formwork. They are:
A. The half tunnel formwork used to cast only one wall and slab simultaneously
B. The full tunnel formwork used to cast two walls and a slab simultaneously
The sequence of construction involves placing of reinforcement, electrical and sanitary
conduits along with the tunnel forms. Concrete is then poured and the open side of the forms is
covered and hot air blowers placed inside. The forms are removed the next day and placed on
the next site using cranes. The optimum use of tunnel form is in multiunit shear wall structure with
identical floor layout at each level.
DOKA FormWork System.
I. Doka System Components
The various basic components that make up the various DOKA system are as follows:
1. Doka formwork beams
2. Doka formwork sheets
3. Dokadur panels
4. Doka floor props
5. Form ties and suspension cones
6. Multi-trip packaging
1. Doka formwork beams
The core of the system lies in the usage of an Engineered timber component, the H-
Beam.
The H-beams are manufactured in a modern automated plant at Pondicherry under strict quality
control the flanges are made of seasoned chemically treated timber. The web is made of boiling
water proof ply wood and joined with the flange by the unique finger jointing method. The H-
beams thus manufactured are light, dimensionally stable and retains its structural properties over
a period of time even after repeated usage. It is more predictable, easy to design and use, The
number of reuses of H-Beams is more than 100 times (8 times that of conventional timber) and it
consumes only 40% of timber volume required.
The H-beams are available in two size namely in H-16 - 16 cms depth & H-20 - 20 cms depth,
length varying between 1m to 6m.
Salient Feature
• Reduction in consumption of timber.
• Making work at site minimized.
• No. of reuses more than 8 times that of conventional timber.
• Dimensionally stable, uniform in size and consistent in strength.
• Cost ratio per use H-16 beam : conventional timber = 1:3.5
• Economical and long - lasting.
• Light weight ≅ 6kgs per RMT.
Doka beam H20
Innovative end reinforcement .
• For less damage to the ends of the beams
• For outstanding durability
Outstanding production level.
• Ensures uniformly high quality and load-bearing strength for safe and dependable usage
• Is the basis for the reliability of the Doka beam formwork and Dokaflex floor formwork
• From mechanical strenght grading
Practical marks for all standard lengths.
 As a grid for easy installation and checking of the Dokaflex 1-2-4 system
Doka beam H20 eco
Ends of beams bevelled for more strength but has no end reinforcement.
2. Doka formwork sheets
Doka has an extensive range of formwork sheets for the most varied areas of application. All
sheets are made of glue-bonded layered wood and are extremely strong and dimensionally
stable.
Max. Shear Force Max. Bending
Moment
EI
11 KN 4 KN/M 170 x 106 KG.CM2
Formwork sheet 3-S Plus
Three-ply concrete-formwork sheet, made of European spruce (picea abies), designed specially
for building. Produces a uniform concrete surface.
Surface: Synthetic melamine resin glue with PU sealant and light corundum sanding on one
side•
Bonding: Boilproof and weatherproof•
Edges: Impregnating emulsion,•
Doka yellow
Thicknesses: 21 and 27 mm•
Formwork sheet 3-SO
Three-ply concrete-formwork sheet, made of European spruce. Produces a uniform concrete
surface.
 Surface: Synthetic melamine resin glue
 Bonding: Boilproof and weatherproof
 Edges: Impregnating emulsion,
 Doka yellow
 Thicknesses: 21 and 27 mm
Dokaplex Multi-ply sheets
High-grade multi-ply sheet made of Finnish birch hardwood for use again and again. Produces a
high-quality, smooth concrete surface.
• Surface: Phenol-resin coating, 120 g/m²
• Bonding: Boilproof and weatherproof phenol-resin glue (BFU 100) to DIN 68705-T3
• Edges: Dispersion
• Thickness: 21 mm
3. Dokadur panels
Dokadur panels are the state of the art for floor-slab panels. All-round edge and surface sealing
dependably protects the panel against the wear and tear of everyday construction work.
Maximised number of reuses and best-quality concrete surfaces.
• From special surface sealing by means of PUR varnish and melamine resin coating with
precision-metered corundum sanding
• For improved safety at work, because risk of slipping is reduced
• From significantly reduced moisture absorption for much-reduced discolouration,
structuring and cracking
Big savings on costs
• From easy cleaning of the surfaces, ready for the next use
• From all-round edge protection made of high-grade PU
• For exact edges with minimal cleaning
• For low costs on account of easy and fast reconditioning of the edge
4. Doka Floor Props.
Doka floor props are the right choice for every application. High load-bearing strength plus many
practical details that help to make handling easier.
• The props are available in various sizes viz. CT-250,CT-300,CT-340 & CT-410. The
number indicates the extended length of props in cms.
• Carrying capacity is rated from 20 kN to 30 kN.
• The tripods make the props self standing for easier and faster erection of the shuttering
system. The adjustments in height are obtained by operating the prop nut. The required
dimension in plan is obtained by side-lapping of the H-Beams in the primary or secondary layer.
• A very accurate and convenient shutter is ready for tying of reinforcement and concreting.
• The system also facilitates re-propping. By adopting the method of repropping it is
possible to reduce the total quantity of formwork materials significantly. The system is very well
adapted for use alongwith the L&T-Doka Beam Forming Supporting system.
5. Form ties and suspension cones
Doka has a complete range of tried-and-tested formtie solutions and dependable suspension
points for wall formwork, single-sided formwork and climbing formwork in uncompromising quality
for maximum safety.
Doka tie rods and anchor accessories
 Provide safety through superb manufacturing quality
 Reduce labour costs for installing ties, because a hammer is all that is needed for easy installation
 Are durable, robust and unaffected by dirt
Robustly dimensioned universal climbing cones
 ensure firm connections between structure and formwork
 for safety on high structures
 for all kinds of climbing formwork
Safe suspension solutions for working and protection platforms
 With different attachments to suit the application
 Ideally matched to the carrying capacity of Doka working and protection platforms
 Easy to install and reusable.
6. Multi-trip packaging
Multi-trip packaging such as containers, stacking pallets and skeleton transport boxes keep
everything in place on the site, minimise time wasted searching for parts, and streamline the
storage and transport of system components, small items and accessories.
Savings on material overheads and labour costs.
• Through faster loading and unloading of system components, small items and
accessories
• Through easy relocation to the next point where the parts are needed
• Through safe storage in stacks, particularly when space is at a premium
Stacking pallets 150 and 120 simplify the storage and transport of floor props, removable folding
tripods, formwork beams and Dokadur panels. The clamp-on wheels make the stacking pallets
mobile, so they can easily be steered through standard door-size openings in residential
accommodation projects.
II. DOKA Floor System
No matter what the room height, the shape of the layout or the slab thickness, with Doka you
always have exactly co-ordinated formwork in one single consistent system, comprising a
conveniently small number of easy to manage system components.
Dokaflex 1-2-4
Dokaflex 1-2-4 is the fast, versatile floor formwork for floorplans of any shape, for beams,
slab overhangs and semifinished floor elements – and the ready reckoner is ideal for calculating
the quantities of materials, so there's no need for formwork planning. The free choice of formwork
sheets leaves nothing to be desired when it comes to the finished structure of the fair-face
concrete.
• The L&T-Doka Fex system is suitable for RC-floors upto 4.40 m high.
• The plywood sheathing is supported by a layer of secondary H-Beams at the designed
spacing. The primary layer of H-Beams are supported with necessary accessories over the
collapsible telescopic props fitted with tripods to ensure lateral stability.
Defined positioning grid with full flexibility in floorplan geometry
• For quick erection of the formwork, because the positioning points are clear
• Enables rapid adaptation to walls and columns by simply telescoping the transverse and
longitudinal beams
Speedy progress and simple logistics
• Because there is only a small number of matched individual components
• With high-grade Eurex floor props with consecutively numbered pegging holes and low
release forces
• With high-grade Eurex floor props with consecutively numbered pegging holes and low
release forces
• Because the ready reckoner makes it easy to calculate the quantities needed
• Because dispensing with planning and preparatory operations cuts costs by a significant
margin
• Because the maximum pitches for longitudinal and transverse beams and props are
marked on the beams - for floor-slab thicknesses up to 30 cm
Safety and economy
• From durable and robust individual components
• Because the panels can be rented
• With high-grade polyurethane surround for first-class concrete surfaces and reduced
investment costs
• With non-slip surfaces for significantly enhanced safety at work
• With high-grade Eurex floor props with consecutively numbered pegging holes and low
release forces
• With the new, much-improved longitudinal and transverse beams for significantly reduced
post-use costs
Every requirement for fair-faced concrete fulfilled
• By free choice of formwork sheets
• By the sealed surface of the rentable panels
Dokamatic table
The innovative design of the Dokamatic table makes for even faster formwork handling whenever
large floor slabs have to be cast. Standard functional components can be installed for
straightforward, speedy adaptation to changing requirements on the construction site.
Fast repositioning reduces labour costs
• Because fully assembled units are manoeuvred quickly into place - no laborious carrying
of individual components from one location to the next
• Because practical shifting devices makes for virtually fatigue-free operations
• Because easier to handle and safer than hand-operated formwork, particularly as room
heights increase
The Dokamatic table helps save on labour and on crane time: One man using the shifting trolley
with attachable drive unit can move the tables to the next casting location on the same level. The
system is optimised for minimal forming times on large-area projects and deals easily with varying
requirements in terms of statics and geometry.
Dokamatic table sizes
• Comes in 4 rentable standard sizes with grid logic: 4.0 x 2.0 m, 4.0 x 2.5 m, 5.0 x 2.0 m
and 5.0 x 2.5 m
• Special sizes for special applications can be supplied at any time
• Made up of high-grade system components such as the sturdy Dokamatic table waling 12
and Doka beams H20 top for outstanding durability and minimum post-use costs
• Fully assembled Dokamatic tables delivered to your site right on time
Load-bearing tower Staxo
Staxo is a high-strength load-bearing tower made of robust steel frames for high shoring and
heavy loads. Integrated connectors for rapid assembly. This modern load-bearing tower system
comprises only a few individual parts and is extremely versatile. A comprehensive range of safety
accessories completes the system.
Highly stable and highly versatile
 With 1.52 m wide frame with non-buckling vertical sections
 With 50 cm grid for setting the frame spacing
 With the tower unit's large footprint
 Because horizontal loads are safely dissipated
 Load-bearing capacity up to 70 kN/leg
Speedy assembly, even when the towers are high
 Because there are only a few individual parts, they are light and easy to handle
 Because the vertical adapters for the next lift are integrated, without loose parts or add-ons
 With drop-in assembly battens and integrated climbing rungs
Less crane time needed
 Because the towers can be pre-assembled on the flat, then hoisted into position
 With shifting carriages for horizontal repositioning
Staxo frame
• Extremely strong, galvanised steel frame for straightforward height adjustment in a 30 cm
grid; choice of three heights 0.90, 1.20 and 1.80 m
• Frame spacing with diagonal crosses from 1.00 to 2.50 m adjustable in 50 cm grid
• Reliably withstands horizontal forces such as wind loads
• Integrated next-lift frame adapters for ergonomic handling even high above the ground -
no tools required
• Integrated climbing rungs and drop-in assembly battens support safe assembly and
disassembly
Diagonal cross
• Timesaving integration of horizontal and diagonal braces in a single component
• Different lengths for variable frame spacing
• Colour clips and stamping for clear marking of the lengths
• Safe assembly with captive gravity catches
Setting the next lift is always quick and safe: no time is lost looking for parts, because the locking
springs (1),
(3) and connecting sleeves (2) are captive, integrated into the frames.
No additional parts or loose parts, so even high above the ground handling is still straightforward.
Height adjustment
Height adjustment accurate to the millimetre, even under load. By means of screw-jack U-spindle
at the top, screw-jack foot or heavy-duty screw jack at the bottom. The heavy-duty screw jack 130
has an extension height of 130 cm and is available for jobs requiring maximum versatility.
Beam forming support system
The L&T-Doka Beam Forming Support system is suitable for RC-Beams of depth between 30 cm
to 120 cm.
Beam bottom
The plywood sheathing is supported by a layer of secondary H-20 Beams at the designed
spacing to form the beam bottom. The primary H-Beams in turn support the secondary layer.
Beam sides
The plywood sheathing is supported by H-Beams at the designed spacing running along the
length of the RC-beam to form the beam sides. The H-beams are supported by the beam
forming support which are clamped onto the H-20 beams provided for the Beam bottom. The
beam forming support ensures the right angle between the beam bottom and sides. The BFS
extn. provides the necessary adjustment in depth.
The beam forming support with extension are available in three sizes viz.BFS with extn.600mm
long, 900mm long & 1200mm long.
III. Wall Formwork System
The L&T-Doka Wall formwork system is suitable for casting of RC-Walls including water tight
structures.
The plywood sheathing is supported by H-Beams which are in turn supported by the steel walers.
The wall formwork facilitates fixing of working platforms for access, checking of reinforcement,
concreting etc., the panels also have provision for fixing for alignment system which ensure
verticality. The pressure due to concrete are sustained by High strength tie system.
The walers are available in sizes of 0.8m, 1.2m, 1.6m, 1.8m, 2m & 2.4m the inside corners are
formed by “universal inside corner” and the outside by universal outside fixing or angle plates.
The high strength tie system can be through tie system or lost anchor system depending on the
structure. The H-Beams can be butt jointed to form larger size of panels.
The formwork panel along with the working platform and alignment systems can be lifted as a
single unit using a crane thus the labour involved in each operation of erection and deshuttering
is reduced to a minimum. The panels are formed in the carpentry workshop at site and the
number of operations/assembly of components at each location is minimal and hence accuracy is
maintained. Since large panels are handled as a single unit, the damage/loss of small
components is eliminated contributing to very high material productivity. In the absence of a
crane the panels can be dismantled and handled separately. The wall formwork system can
handle very large pressures generated due to pumping of concrete.
The planners place the Doka formwork beams H 20 (1) and the bracing, which consists of steel
waling (2) to suit the anticipated load. The sheeting (3) is freely selectable – your choice of
smooth fair-faced concrete, wood-textured surface, and so on.
Doka framed formwork Frameco
The Frameco formwork system
• Forms wall heights up to 3.00 m without stacking
• Has sturdy, galvanised steel frames to produce smooth concrete surfaces
• Permissible fresh-concrete pressure 70 kN/m²
Only 2 anchors up to a height of 3.00 m
• Means fewer anchors have to be set, so forming work is faster
• Reduces labour costs for post-casting work on the anchorage holes
End-to-end 15 cm grid with only 5 panel widths
• Simplifies planning, forming and logistics on the construction site
• Reduces the number of cost-intensive closures
• Means matching panel formats for best possible utilisation of formwork
• Reduces quantities in stock and costs for rental, because of effortless adaptation to any
floor plan
 Makes for compact lifting units for fast positioning and short crane times
IV. Column Formwork System
The L&T-Doka Column formwork system is suitable for casting of columns of minimum 15cm *
15cm .
In the Column formwork system the H-Beams along with steel walers and accessories makeup
the assembly. The Column formwork facilitates fixing of working platforms for access, checking of
reinforcement, concreting etc., The formwork panel along with the working platform and alignment
systems can be lifted as a single unit using a crane thus the labour involved in each operation of
erection and deshuttering is reduced to a minimum. The panels are formed in the carpentry
workshop at site and the number of operations/assembly of components at each location is
minimal and hence accuracy is maintained. Since large panels are handled as a single unit, the
damage/loss of small components is eliminated contributing to very high material productivity. In
the absence of a crane the panels can be dismantled and handled separately. The column
formwork system can handle very large pressures generated due to pumping of concrete.
Any column size, straight from the modular system ...
• For speedy forming of any column cross-section with standard parts
• For optimum adaptation to any special geometry up to 5 m in diameter
• For column cross-sections up to 120 x 120 cm with only one splice plate
• For first-class concrete surfaces with any sheeting
• Permissible fresh-concrete pressure 90 kN/m²
Some of the possible cross-sections of column
V. Climbing Formwork System
The L&T-Doka Climbing System are used for tall structures like cooling towers, etc where it is
very uneconomical to provide staging or scaffolding for supporting the external or internal wall
formwork.
In this system a bracket is hooked on to anchors called lost anchors provided in the already cast
wall and supports/alignments are taken from these brackets. The brackets are suitably braced to
prevent any sway and are provided with walkways/working platforms / handrails etc for safety and
ease of working.
Varying degrees of sophistication are available in the
Climbing formwork systems, a few of which are as listed.
CB - 150 A - Simple Climbing, Crane handled - platform width 1.50 m. The brackets & wall
formwork are to be handled separately.
CB - 150 F- Traveling Climbing, Crane handled - platform width 1.50 m. roll back arrangement
for deshuttering & cleaning of shutters. The wall formwork and climbing bracket are lifted as one
unit.
Automatic climbing formwork, the wall formwork along with the climbing brackets slide along the
wall using motors, thus eliminating the need for crane. This system is very often used for natural
draught cooling towers.
MF - 240 - Simple Climbing, Crane handled - platform width 2.40 m. these brackets can also be
fitted with automatic climbers SKE-50 which is a hydraulic system with 5T carrying capacity or
SKE-100 with 10T carrying capacity.
The MF 240 system
* Travelling unit MF (1):
Platform is 2.40 m wide for safe and convenient manipulation of the formwork. 75 cm
retraction for easy cleaning of the formwork and for working on the reinforcement.
* Climbing bracket MF (2):
Combines with beam and frame formwork, high load-bearing capacity (50 kN per climbing
bracket), angle of inclination ± 15° from vertical.
* Working brackets (2):
Modular principle for versatility: these brackets can be used as pouring, intermediate and
suspension brackets.
The SKE system
The modular system for automatic climbing
* Free positioning of brackets and automatic climbers as single-section climbing scaffold
* Lift heights up to 5.50 m
* Formwork systems:
• wall formwork FF 20 and large-area formwork Top 50
• framed formwork Framax and Alu-Framax
* Climbing speed 5 min/m
SKE 50
* Load-carrying capacity 5 metric tons per bracket
* Ideal solution for a huge number of climbing tasks
* Up to 40 automatic climbers per hydraulic unit
SKE 100
* Load-carrying capacity 10 metric tons per bracket
* Platform system for simultaneous work at different levels
* Extremely strong brackets permit wide, variable spacing

Weitere ähnliche Inhalte

Was ist angesagt?

Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measuressabnisajit
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on FormworkEsri India
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar rautSAGAR RAUT
 
Concrete framework
Concrete frameworkConcrete framework
Concrete frameworkJustin Myint
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shutteringhamidgujjar
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shutteringKishor Ade
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction FormworkAnkit Singhai
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffoldingHamdija Velagic
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2Gali Suresh
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineeringFazal-E- Jalal
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities Pradumn Suryakar
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - editmuhammadumairallahdi
 

Was ist angesagt? (20)

Formwork failures and remedial measures
Formwork failures and remedial measuresFormwork failures and remedial measures
Formwork failures and remedial measures
 
A presentation on Formwork
A presentation on FormworkA presentation on Formwork
A presentation on Formwork
 
Formwork, by prof. sagar raut
Formwork, by prof. sagar rautFormwork, by prof. sagar raut
Formwork, by prof. sagar raut
 
Concrete framework
Concrete frameworkConcrete framework
Concrete framework
 
Fromwork
FromworkFromwork
Fromwork
 
From work & shuttering
From work & shutteringFrom work & shuttering
From work & shuttering
 
Formwork
FormworkFormwork
Formwork
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Types of formwork
Types of formworkTypes of formwork
Types of formwork
 
Construction Masonry
Construction MasonryConstruction Masonry
Construction Masonry
 
All you need to know about Construction Formwork
All you need to know about Construction FormworkAll you need to know about Construction Formwork
All you need to know about Construction Formwork
 
8. formwork and scaffolding
8. formwork and scaffolding8. formwork and scaffolding
8. formwork and scaffolding
 
Formwork seminar 2
Formwork seminar 2Formwork seminar 2
Formwork seminar 2
 
Formwork
FormworkFormwork
Formwork
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Formwork in civil engineering
Formwork in civil engineeringFormwork in civil engineering
Formwork in civil engineering
 
Costruction ppt
Costruction pptCostruction ppt
Costruction ppt
 
form work - Building construction necessities
form work - Building construction necessities  form work - Building construction necessities
form work - Building construction necessities
 
7 building construction part 2 flooring,roofs,staircase and maintance - edit
7 building construction part 2   flooring,roofs,staircase and maintance - edit7 building construction part 2   flooring,roofs,staircase and maintance - edit
7 building construction part 2 flooring,roofs,staircase and maintance - edit
 

Andere mochten auch

VVS congres 2013: werken en studeren, hel of zegen?
VVS congres 2013: werken en studeren, hel of zegen?VVS congres 2013: werken en studeren, hel of zegen?
VVS congres 2013: werken en studeren, hel of zegen?Sander Van der Maelen
 
Iilumination by absar ahsan
Iilumination by absar ahsanIilumination by absar ahsan
Iilumination by absar ahsanAbsar Ahsan
 
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...Sander Van der Maelen
 
2. linnaean era
2. linnaean era2. linnaean era
2. linnaean erascardonar
 
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5Sander Van der Maelen
 
Spending time with kids
Spending time with kidsSpending time with kids
Spending time with kidsFredrick Hurt
 
A homeless college student overcame all odds
A homeless college student overcame all oddsA homeless college student overcame all odds
A homeless college student overcame all oddsFredrick Hurt
 
CMO Confidential™ Main Room Session at Mumbrella360 Conference
CMO Confidential™ Main Room Session at Mumbrella360 ConferenceCMO Confidential™ Main Room Session at Mumbrella360 Conference
CMO Confidential™ Main Room Session at Mumbrella360 ConferenceJulia Vargiu
 
Planeacion financiera
Planeacion financieraPlaneacion financiera
Planeacion financieraKarla RuGo
 
Language Learning Strategies
Language Learning StrategiesLanguage Learning Strategies
Language Learning StrategiesAhmed Hashim
 
3. post linnean
3. post linnean3. post linnean
3. post linneanscardonar
 
Sociale media voor natuur- en milieueducatie
Sociale media voor natuur- en milieueducatieSociale media voor natuur- en milieueducatie
Sociale media voor natuur- en milieueducatieSander Van der Maelen
 

Andere mochten auch (18)

RESUME
RESUMERESUME
RESUME
 
01397532
0139753201397532
01397532
 
VVS congres 2013: werken en studeren, hel of zegen?
VVS congres 2013: werken en studeren, hel of zegen?VVS congres 2013: werken en studeren, hel of zegen?
VVS congres 2013: werken en studeren, hel of zegen?
 
Iilumination by absar ahsan
Iilumination by absar ahsanIilumination by absar ahsan
Iilumination by absar ahsan
 
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...
Gevonden worden met uw zaak online (ook via Google) dankzij sociale media - W...
 
2. linnaean era
2. linnaean era2. linnaean era
2. linnaean era
 
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5
Vrijwilligers engageren met nieuwe media - Workshop Apestaartjaren 5
 
Spending time with kids
Spending time with kidsSpending time with kids
Spending time with kids
 
competenciaticycurriculo
competenciaticycurriculo competenciaticycurriculo
competenciaticycurriculo
 
A homeless college student overcame all odds
A homeless college student overcame all oddsA homeless college student overcame all odds
A homeless college student overcame all odds
 
Thong tin
Thong tinThong tin
Thong tin
 
CMO Confidential™ Main Room Session at Mumbrella360 Conference
CMO Confidential™ Main Room Session at Mumbrella360 ConferenceCMO Confidential™ Main Room Session at Mumbrella360 Conference
CMO Confidential™ Main Room Session at Mumbrella360 Conference
 
Uu 29 2004
Uu 29 2004Uu 29 2004
Uu 29 2004
 
Planeacion financiera
Planeacion financieraPlaneacion financiera
Planeacion financiera
 
Ipv6
Ipv6Ipv6
Ipv6
 
Language Learning Strategies
Language Learning StrategiesLanguage Learning Strategies
Language Learning Strategies
 
3. post linnean
3. post linnean3. post linnean
3. post linnean
 
Sociale media voor natuur- en milieueducatie
Sociale media voor natuur- en milieueducatieSociale media voor natuur- en milieueducatie
Sociale media voor natuur- en milieueducatie
 

Ähnlich wie Gurme santoshkumar

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyI'mMiss Lily
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdfReigerRoyal
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptxMr Amol Ghogare
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSjagrutib22
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structuresRithika Ravishankar
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdfFaizanSolanki
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork adarshkaushik6
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction purvi golecha
 
composite materials -properties and uses
composite materials -properties and usescomposite materials -properties and uses
composite materials -properties and usesSusmitaMulayPatil
 
concrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsconcrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsPanshulJamwal
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation EmHetchMaidabino
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptxMr Amol Ghogare
 
Forms and materials for speedy construction
Forms and materials for speedy constructionForms and materials for speedy construction
Forms and materials for speedy constructionMudassir khan
 

Ähnlich wie Gurme santoshkumar (20)

Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
types of formwork.pdf
types of formwork.pdftypes of formwork.pdf
types of formwork.pdf
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Types of modern construction formwork
Types of modern construction formwork Types of modern construction formwork
Types of modern construction formwork
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
composite materials -properties and uses
composite materials -properties and usescomposite materials -properties and uses
composite materials -properties and uses
 
concrete technology lecture notes for BTech students
concrete technology lecture notes for BTech studentsconcrete technology lecture notes for BTech students
concrete technology lecture notes for BTech students
 
Formwork
FormworkFormwork
Formwork
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Concrete structure presentation
Concrete structure presentation Concrete structure presentation
Concrete structure presentation
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
Formwork For Structural Member.pptx
Formwork For Structural Member.pptxFormwork For Structural Member.pptx
Formwork For Structural Member.pptx
 
Formwork
FormworkFormwork
Formwork
 
Forms and materials for speedy construction
Forms and materials for speedy constructionForms and materials for speedy construction
Forms and materials for speedy construction
 
Formwork
FormworkFormwork
Formwork
 

Kürzlich hochgeladen

FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 

Kürzlich hochgeladen (20)

FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 

Gurme santoshkumar

  • 1. FORMWORK What is Formwork Formwork is a die or a mould including all supporting structures, used to shape and support the concrete until it attains sufficient strength to carry its own weight. It should be capable of carrying all imposed dead and live loads apart from its own weight. INTRODUCTION TO FORMWORK • Formwork has been in use since the beginning of concrete construction. • New materials such as steel, plastics and fiberglass are used in formwork. • greater attention is being given to the design, fabrication, erection and dismantling of formwork DEFENITION: • As a structure, • Temporary which is designed to contain fresh fluid concrete. • Form it into the required shape and dimensions. • Support it until it cures sufficiently to become self supporting. The term ‘formwork’ includes the actual material contact with the concrete, known asform face, and all the necessary associated supporting structure. REQUIREMENTS OF A GOOD FORMWORK SYSTEM  How formwork can be erected and de-shuttered fast.  How good concrete quality and surface finish can be achieved.  What is the optimum stock of formwork required for the size of work force, the specified time schedule and flow of materials.  What is the overall cost savings that can be achieved using the right type of formwork.  How SAFETY can be improved for the site personnel. In order to successfully carry out its function, formwork must achieve a balance of following requirements: • Containment • Strength • Resistance To Leakage • Accuracy • Ease Of Handling • Finish And Reuse Potential • Access For Concerted
  • 2. • Economy Containment: formwork must be capable of shaping and supporting the fluid concrete until it cures. Strength: formwork must be capable of safely withstanding without distortion or danger the dead weight of the fluid concrete is placed on it, labour weight, equipment weight and any environmental loadings. Resistance to leakage: all joints in form work must be either close fitting of covered with form tape to make them grout tight. If grout leakage occurs the concrete Will leak at that point. Leakages cause honeycombing of the surface. Accuracy: formwork must be accurately set out so that the resulting concrete product is in a right place and is of correct shape and dimensions. Ease of handling: form panels and units should be designed so that their maximum size does not exceed that which can be easily handled by hand or mechanical means. In addition all formwork must also be designed and constructed to include facilities for adjustments, leveling, easing and striking without damage to the form work or concrete. Finish and reuse potential: the form face material must be selected to be capable of consistently imparting the desired concrete finish (smooth, textured, featured or exposed aggregate etc.) At the same time it should also achieve the required number of reuse. Access for concrete: any formwork arrangement must be provide access for placing ofthe concrete. The extent of this provision will be dependent on the ease of carrying outthe concrete operations. Economy: all the formwork is very expensive. On average about 35% of the total cost of any finished concrete unit or element can be attributed to its formwork; of this just over 40% can be taken for material for formwork and 60% for labour. The formwork designer must therefore not only consider the maximum number of times that any form can be reused, but also produce a design that will minimize the time taken for erection and striking. FORMWORK BASED ON MATERIALS MATERIALS FOR FORMWORK Formwork can be made out of a large variety of materials. • The material most commonly being used to date is timber. However, due to the depleting forest reserves and increasing cost of timber the use of alternate materials such as plywood and steel has become prominent. • More recently, materials such as plastics and fiberglass are also being used for pre-fabricating formwork. • The type of material to be used depends on the nature of construction as well as availability and cost of material. • The constraints on the project such as overall cost, time of completion also play a major role in the use of a particular material for formwork. TIMBER FORMS
  • 3. Timber is required for practically all jobs of formwork. The timber bring used for formwork must satisfy the following requirements: I. It should be durable and treatable II. It should have sufficient strength characteristics III. It should be light weight and well seasoned without warping, IV. It should hold nails well. Advantages of using timber forms: I. It is economical for small construction jobs II. It is design flexible and easy to erect III. It has good thermal insulation which makes it useful to be used in colder Regions Iv. It can easily be made into any shape or size Plywood forms (in combination with timber) • Concrete shuttering plywood is bwp grade plywood, preservative treated and specially suited for use in concrete shuttering and formwork. • The plywood is built up of odd number of layers with grain of adjacent layers perpendicular to each other. • Plywood is used extensively for formwork for concrete, especially for sheathing, decking and form linings. • There are two types of plywood - internal and exterior. • The interior type is bonded with water resistant glue and exterior type is bonded with water proof glue. Hardboard forms • Hardboard is a board material manufactured of wood fiber, which is then refined or partly refined to form a panel having a density range of approximately 50 to 80 pounds per cubic foot. • Hardboards are standard / non-tempered or tempered. • The tempered one being used for formwork. Tempered hardboard is solid or perforated hardboard panels impregnated with resin under high pressure to make them stronger and more resistant to moisture and abrasion. • The boards available in large sheets have a hard, smooth surface that produces a concrete whose surface is relatively free of blemishes and joint marks. • The thin sheets can be bent to small radii, which is an advantage when casting concrete members with curved surfaces. ALUMINIUM FORMS • Forms made from aluminum are in many respects similar to those made of steel. • However, because of their lower density, aluminum forms are lighter than steel forms, and this is their primary advantage when compared to steel.
  • 4. • As the strength of aluminum in handling, tension and compression is less than the strength of steel, it is necessary to use large sections. • The formwork turns out to be economical if large numbers of reuses are made in construction. • The major disadvantage of aluminum forms is that no changes can be made once the formwork is fabricated. PLASTICS These forms have become increasingly popular for casting unique shapes and patterns being designed in concrete because of the excellent finish obtained requiring minimum or no surface treatment and repairs. Different types of plastic forms are available like glass reinforced plastic, fiber reinforced plastic and thermoplastics etc. Fiberglass-reinforced plastic is the most common and has several advantages such as I. The material allows greater freedom of design II. Unusual textures and designs can be molded into the form III. It allows the contractor to pour structural and finished concrete Simultaneously IV. Because sections can be joined on the job site in such a way so as to eliminate joints, there is no size limitation If carefully handled, a number of reuses are possible making it highly Economical Vi. It is lightweight and easily stripped The disadvantage of using plastic forms is that it does not lend itself to field fabrication Hence, the design and planning of this form must be carefully carried out.Also care must take not to damage the plastic by the heat applied for accelerated curing of the concrete. Trough and waffle units in fiberglass are used in construction of large floor areas and multistoried office buildings. STEEL FORMWORK: Mostly used in large construction projects or in situations where large number of re-uses of the same shuttering is possible. Suitable for circular or curved shaped structures such as tanks, columns, chimneys. Etc. & for structures like sewer tunnel and retaining wall. Advantages of steel formwork over timber form: I. strong, durable & have longer life II. Reuses can be assumed to vary from 100 to 120 wares timber varies from 10 to 12. III. Steel can be installed & dismantled with greater ease & speed resulting in saving in labour cost. IV. Excellent quality of exposed concrete surface obtained. Thus saving in the cost of finishing the conc. surface.
  • 5. V. no danger of formwork absorbing water from the conc. & hence minimizing honeycombing CONSTRUCTION OF FORMWORK: • propping and centering • shuttering • provision of camber • cleaning & surface treatment Propping and centering: The props used for centering may be of steel, timber post or ballies.pillars made up of brick masonry in mud mortar are also sometimes used as props. Shuttering: can be made up of timber planks or it may be in the form of panel unit made either by fixing ply wood to timber frames or by welding steel plates to angle framing. Provision of camber Certain amount of deflection in structure is unavoidable. It is therefore desirable to give an upward camber in the horizontal member of conc. Structure to counteract the effect of deflection. Surface treatment • Before laying conc. The formwork should be cleaned of all rubbish particularly the sawdust savings & chippings etc. • Before laying conc. the face of formwork in contact with conc. shall be cleaned & treated with release agent like raw linseed oil or soft soap solution as to prevent the conc. getting struck to the formwork. Order and method of removing formwork: • Shuttering forming vertical faces of walls, beams & column sides should be removed first. Shuttering forming sofit to slab should be removed next. • Shuttering forming soffit to beams, girders or other heavily loaded member should be removed in the end. DURATION TAKEN FOR REMOVAL OF FORMWORK 1 WALLS COLUMNS & VERTICAL SIDES OF BEAMS 1-2 DAY 2 SLABS 3 DAYS 3 BEAM SOFFIT 7 DAYS 4 REMOVAL OF PROPS TO SLABS A) SLAB SPANNINIG UPTO 4.5M 7 DAYS B) SLAB SPANNINIG OVER 4.5M 14 DAYS 5 REMOVAL OF PROPS TO BEAMS AND ARCHES A) SPANNING UPTO 6 MTS 14 DAYS B) SPANNING OVER 6 MTS 21 DAYS
  • 6. TYPES OF FORMWORK There are different types of formwork available for different purposes. Generally, the formworks for vertical concreting are called wall forms and those for horizontal concreting are called slab or floor forms. The various types of formwork available today in the market are discussed in detail. TRADITIONAL FORMWORK • This usually consists of standard framed panels tied together over their backs with horizontal members called waling. • The waling is provided with the basic function of resisting the horizontal force of wet concrete. • One side of the wall formwork is first assembled ensuring that it is correctly aligned, plumbed and strutted. • The steel reinforcement cage is then placed and positioned before the other side of the formwork is erected and fixed. • Plywood sheet in combination with timber is the most common material used for wall formwork. • The usual method is to make up wall forms as framed panels with the plywood facing sheet screwed on to studs on a timber frame. This allows for the plywood to be easily removed and reversed and used on both sides so as to increase the number of reuses. • The wall forms are susceptible to edge and corner damage and must be carefully handled. • Special attention must be given to comers and attached piers since the increased pressures applied by wet concrete could cause the abutments to open up, giving rise to unacceptable grout escape and a poor finish to the cast wall. CLIMBING FORMWORK • Method of casting walls consists of a climbing formwork, the climbing of which may be manual or crane assisted. • It employs a common set of forms used in a repetitive manner for casting walls in set vertical lifts. • After each casting the forms are removed and raised to form the next lift until the required height has been reached.
  • 7. • These forms are widely used in the construction of industrial chimneys, silos, high rise towers & building cores, bridge piers & pylons, airport control towers, telecommunication, towers etc. The climbing form has many advantages such as the following • Staged construction process allows balance of site resources. • Anchor accessories can be reused after each pour, reducing material costs on current and future construction programs. • In case of trolley mounted formwork, the panel retracts from the face, providing space for cleaning and fixing of concrete. • Formwork & access platforms lifted as one, minimizing crane support, reducing labour and material costs. • fine adjustments of the form face can be made during construction, providing accurate alignment of the form face vertically & laterally. SLIDING FORMWORK OR SLIPFORMING • slip form means a continuously moving form, moving with such a speed that concrete when exposed has already achieved enough strength to support the vertical pressure from concrete still in the form as well as to withstand lateral pressure caused by wind etc. • Thus, the slip form concreting technique is a rapid and economical construction method that can be applied with great advantage to many types of construction projects such as chimneys, silos, water towers, bridge-columns, lift shaft cores and shaft lining etc. • The technique is based on movable forms which are gradually lifted by hydraulic jacks. • It is a continuous process where wet concrete is added to wet concrete. Reinforcing steel and/or post tensioned cables are continuously fixed as the normal slipping speed is 3 to 6 meters per 24 hours. The slip form construction is designed for each project depending on the structure of the project. The advantages of slip forming are • Minimum consumption of timber and steel plates. • Total elimination of traditional scaffolding • Minimum requirements of carpenters for assembling. • It gives a monolithic structure. • The concrete surfaces can be treated and finished while concrete is green, • Depending on the weather conditions, it is possible to achieve a vertical rise to the tune of 4 to 5 m in summer and 2 to 3 m in winter. • The procedure of continuous slipping is applied to making both inner and outer walls as well as columns of a building. • Form climbs. PERMANENT FORMWORK
  • 8. • Permanent form or stay-in-place formwork is one in which the form is left as an integral part of the structure. • Permanent formwork can also be utilized as the facing materials of in situ reinforced concrete. They can be of two types—participating and non-participating. • The material used for these forms must be durable and of sufficient strength. Commonly used materials include polyvinyl chloride (pvc), galvanized coiled sheet steel, fabricated steel, carbon/epoxy thin shell. • The high initial cost of design and installation, lack of familiarity for installation and maintenance and more specified form design are some of the barriers to the use of this form. • However, there are various advantages like low cost of transportation and installation, precise form design, maximum flexibility, greater durability with reduced long term maintenance and versatility. SPECIAL FORMS These are those forms that are specially designed and manufactured for a particular kind of construction. The need for a special formwork may arise due to several factors such as • when the contract demands the highest class of dimensional tolerance to be followed • Where the form work shape required becomes uneconomical or impracticable for site fabrication • Where the formwork is required to be self-contained i.e. self propelled, • Where rate of concreting, admixtures or types of concrete are such that concrete pressure developed within forms and stresses in the forms demand special attention where a substantial number of re-uses is envisaged TABLE FORM • This is a special formwork designed for use in casting large repetitive floor slabs in medium to high-rise structures. • The main objective of reducing the time required re-erecting, striking and re- erecting slab formwork. • A system which can be put as an entire unit, removed, hoisted and repositioned without any dismantling. GANGED PANEL FORM • The increasing pace in the construction of multi-storey and massive concrete structures, and the parallel progress in development of cranes and other mechanical methods of transporting forms have made the use of ganged prefabricated forms for the concreting of large sections of high walls very common. • Ranging up to 30x50 ft, their size is limited only by the mechanics of handling. Large panels can be assembled flat on the ground where it is easier to work. Delay and lost motion are avoided in stripping because the gang forms are stripped as a unit.
  • 9. TUNNEL FORM The tunnel formwork is a room sized structural steel fabricated form which is used to cast the rcc walls and floor slabs of a building as a monolithic structure in a continuous pour. The forms are then heated using hot air blowers for accelerated curing of the concrete. This system is most economical when the structure consists of large number of identical units. There exist two versions of this type of formwork. They are: A. The half tunnel formwork used to cast only one wall and slab simultaneously B. The full tunnel formwork used to cast two walls and a slab simultaneously The sequence of construction involves placing of reinforcement, electrical and sanitary conduits along with the tunnel forms. Concrete is then poured and the open side of the forms is covered and hot air blowers placed inside. The forms are removed the next day and placed on the next site using cranes. The optimum use of tunnel form is in multiunit shear wall structure with identical floor layout at each level. DOKA FormWork System. I. Doka System Components The various basic components that make up the various DOKA system are as follows: 1. Doka formwork beams 2. Doka formwork sheets 3. Dokadur panels 4. Doka floor props 5. Form ties and suspension cones 6. Multi-trip packaging 1. Doka formwork beams The core of the system lies in the usage of an Engineered timber component, the H- Beam. The H-beams are manufactured in a modern automated plant at Pondicherry under strict quality control the flanges are made of seasoned chemically treated timber. The web is made of boiling water proof ply wood and joined with the flange by the unique finger jointing method. The H- beams thus manufactured are light, dimensionally stable and retains its structural properties over a period of time even after repeated usage. It is more predictable, easy to design and use, The number of reuses of H-Beams is more than 100 times (8 times that of conventional timber) and it consumes only 40% of timber volume required. The H-beams are available in two size namely in H-16 - 16 cms depth & H-20 - 20 cms depth, length varying between 1m to 6m.
  • 10. Salient Feature • Reduction in consumption of timber. • Making work at site minimized. • No. of reuses more than 8 times that of conventional timber. • Dimensionally stable, uniform in size and consistent in strength. • Cost ratio per use H-16 beam : conventional timber = 1:3.5 • Economical and long - lasting. • Light weight ≅ 6kgs per RMT. Doka beam H20 Innovative end reinforcement . • For less damage to the ends of the beams • For outstanding durability Outstanding production level. • Ensures uniformly high quality and load-bearing strength for safe and dependable usage • Is the basis for the reliability of the Doka beam formwork and Dokaflex floor formwork • From mechanical strenght grading Practical marks for all standard lengths.  As a grid for easy installation and checking of the Dokaflex 1-2-4 system Doka beam H20 eco Ends of beams bevelled for more strength but has no end reinforcement. 2. Doka formwork sheets Doka has an extensive range of formwork sheets for the most varied areas of application. All sheets are made of glue-bonded layered wood and are extremely strong and dimensionally stable. Max. Shear Force Max. Bending Moment EI 11 KN 4 KN/M 170 x 106 KG.CM2
  • 11. Formwork sheet 3-S Plus Three-ply concrete-formwork sheet, made of European spruce (picea abies), designed specially for building. Produces a uniform concrete surface. Surface: Synthetic melamine resin glue with PU sealant and light corundum sanding on one side• Bonding: Boilproof and weatherproof• Edges: Impregnating emulsion,• Doka yellow Thicknesses: 21 and 27 mm• Formwork sheet 3-SO Three-ply concrete-formwork sheet, made of European spruce. Produces a uniform concrete surface.  Surface: Synthetic melamine resin glue  Bonding: Boilproof and weatherproof  Edges: Impregnating emulsion,  Doka yellow  Thicknesses: 21 and 27 mm Dokaplex Multi-ply sheets High-grade multi-ply sheet made of Finnish birch hardwood for use again and again. Produces a high-quality, smooth concrete surface. • Surface: Phenol-resin coating, 120 g/m² • Bonding: Boilproof and weatherproof phenol-resin glue (BFU 100) to DIN 68705-T3 • Edges: Dispersion • Thickness: 21 mm 3. Dokadur panels Dokadur panels are the state of the art for floor-slab panels. All-round edge and surface sealing dependably protects the panel against the wear and tear of everyday construction work. Maximised number of reuses and best-quality concrete surfaces. • From special surface sealing by means of PUR varnish and melamine resin coating with precision-metered corundum sanding • For improved safety at work, because risk of slipping is reduced • From significantly reduced moisture absorption for much-reduced discolouration, structuring and cracking Big savings on costs • From easy cleaning of the surfaces, ready for the next use
  • 12. • From all-round edge protection made of high-grade PU • For exact edges with minimal cleaning • For low costs on account of easy and fast reconditioning of the edge 4. Doka Floor Props. Doka floor props are the right choice for every application. High load-bearing strength plus many practical details that help to make handling easier. • The props are available in various sizes viz. CT-250,CT-300,CT-340 & CT-410. The number indicates the extended length of props in cms. • Carrying capacity is rated from 20 kN to 30 kN. • The tripods make the props self standing for easier and faster erection of the shuttering system. The adjustments in height are obtained by operating the prop nut. The required dimension in plan is obtained by side-lapping of the H-Beams in the primary or secondary layer. • A very accurate and convenient shutter is ready for tying of reinforcement and concreting. • The system also facilitates re-propping. By adopting the method of repropping it is possible to reduce the total quantity of formwork materials significantly. The system is very well adapted for use alongwith the L&T-Doka Beam Forming Supporting system. 5. Form ties and suspension cones Doka has a complete range of tried-and-tested formtie solutions and dependable suspension points for wall formwork, single-sided formwork and climbing formwork in uncompromising quality for maximum safety. Doka tie rods and anchor accessories  Provide safety through superb manufacturing quality  Reduce labour costs for installing ties, because a hammer is all that is needed for easy installation  Are durable, robust and unaffected by dirt Robustly dimensioned universal climbing cones  ensure firm connections between structure and formwork  for safety on high structures  for all kinds of climbing formwork Safe suspension solutions for working and protection platforms  With different attachments to suit the application
  • 13.  Ideally matched to the carrying capacity of Doka working and protection platforms  Easy to install and reusable. 6. Multi-trip packaging Multi-trip packaging such as containers, stacking pallets and skeleton transport boxes keep everything in place on the site, minimise time wasted searching for parts, and streamline the storage and transport of system components, small items and accessories. Savings on material overheads and labour costs. • Through faster loading and unloading of system components, small items and accessories • Through easy relocation to the next point where the parts are needed • Through safe storage in stacks, particularly when space is at a premium Stacking pallets 150 and 120 simplify the storage and transport of floor props, removable folding tripods, formwork beams and Dokadur panels. The clamp-on wheels make the stacking pallets mobile, so they can easily be steered through standard door-size openings in residential accommodation projects.
  • 14. II. DOKA Floor System No matter what the room height, the shape of the layout or the slab thickness, with Doka you always have exactly co-ordinated formwork in one single consistent system, comprising a conveniently small number of easy to manage system components. Dokaflex 1-2-4 Dokaflex 1-2-4 is the fast, versatile floor formwork for floorplans of any shape, for beams, slab overhangs and semifinished floor elements – and the ready reckoner is ideal for calculating the quantities of materials, so there's no need for formwork planning. The free choice of formwork sheets leaves nothing to be desired when it comes to the finished structure of the fair-face concrete. • The L&T-Doka Fex system is suitable for RC-floors upto 4.40 m high. • The plywood sheathing is supported by a layer of secondary H-Beams at the designed spacing. The primary layer of H-Beams are supported with necessary accessories over the collapsible telescopic props fitted with tripods to ensure lateral stability. Defined positioning grid with full flexibility in floorplan geometry • For quick erection of the formwork, because the positioning points are clear • Enables rapid adaptation to walls and columns by simply telescoping the transverse and longitudinal beams Speedy progress and simple logistics • Because there is only a small number of matched individual components • With high-grade Eurex floor props with consecutively numbered pegging holes and low release forces • With high-grade Eurex floor props with consecutively numbered pegging holes and low release forces • Because the ready reckoner makes it easy to calculate the quantities needed • Because dispensing with planning and preparatory operations cuts costs by a significant margin • Because the maximum pitches for longitudinal and transverse beams and props are marked on the beams - for floor-slab thicknesses up to 30 cm Safety and economy • From durable and robust individual components • Because the panels can be rented
  • 15. • With high-grade polyurethane surround for first-class concrete surfaces and reduced investment costs • With non-slip surfaces for significantly enhanced safety at work • With high-grade Eurex floor props with consecutively numbered pegging holes and low release forces • With the new, much-improved longitudinal and transverse beams for significantly reduced post-use costs Every requirement for fair-faced concrete fulfilled • By free choice of formwork sheets • By the sealed surface of the rentable panels Dokamatic table The innovative design of the Dokamatic table makes for even faster formwork handling whenever large floor slabs have to be cast. Standard functional components can be installed for straightforward, speedy adaptation to changing requirements on the construction site. Fast repositioning reduces labour costs • Because fully assembled units are manoeuvred quickly into place - no laborious carrying of individual components from one location to the next • Because practical shifting devices makes for virtually fatigue-free operations • Because easier to handle and safer than hand-operated formwork, particularly as room heights increase The Dokamatic table helps save on labour and on crane time: One man using the shifting trolley with attachable drive unit can move the tables to the next casting location on the same level. The system is optimised for minimal forming times on large-area projects and deals easily with varying requirements in terms of statics and geometry. Dokamatic table sizes • Comes in 4 rentable standard sizes with grid logic: 4.0 x 2.0 m, 4.0 x 2.5 m, 5.0 x 2.0 m and 5.0 x 2.5 m • Special sizes for special applications can be supplied at any time • Made up of high-grade system components such as the sturdy Dokamatic table waling 12 and Doka beams H20 top for outstanding durability and minimum post-use costs • Fully assembled Dokamatic tables delivered to your site right on time Load-bearing tower Staxo Staxo is a high-strength load-bearing tower made of robust steel frames for high shoring and heavy loads. Integrated connectors for rapid assembly. This modern load-bearing tower system comprises only a few individual parts and is extremely versatile. A comprehensive range of safety accessories completes the system.
  • 16. Highly stable and highly versatile  With 1.52 m wide frame with non-buckling vertical sections  With 50 cm grid for setting the frame spacing  With the tower unit's large footprint  Because horizontal loads are safely dissipated  Load-bearing capacity up to 70 kN/leg Speedy assembly, even when the towers are high  Because there are only a few individual parts, they are light and easy to handle  Because the vertical adapters for the next lift are integrated, without loose parts or add-ons  With drop-in assembly battens and integrated climbing rungs Less crane time needed  Because the towers can be pre-assembled on the flat, then hoisted into position  With shifting carriages for horizontal repositioning Staxo frame • Extremely strong, galvanised steel frame for straightforward height adjustment in a 30 cm grid; choice of three heights 0.90, 1.20 and 1.80 m • Frame spacing with diagonal crosses from 1.00 to 2.50 m adjustable in 50 cm grid • Reliably withstands horizontal forces such as wind loads • Integrated next-lift frame adapters for ergonomic handling even high above the ground - no tools required • Integrated climbing rungs and drop-in assembly battens support safe assembly and disassembly Diagonal cross • Timesaving integration of horizontal and diagonal braces in a single component • Different lengths for variable frame spacing • Colour clips and stamping for clear marking of the lengths • Safe assembly with captive gravity catches Setting the next lift is always quick and safe: no time is lost looking for parts, because the locking springs (1), (3) and connecting sleeves (2) are captive, integrated into the frames. No additional parts or loose parts, so even high above the ground handling is still straightforward. Height adjustment Height adjustment accurate to the millimetre, even under load. By means of screw-jack U-spindle at the top, screw-jack foot or heavy-duty screw jack at the bottom. The heavy-duty screw jack 130 has an extension height of 130 cm and is available for jobs requiring maximum versatility.
  • 17.
  • 18. Beam forming support system The L&T-Doka Beam Forming Support system is suitable for RC-Beams of depth between 30 cm to 120 cm. Beam bottom The plywood sheathing is supported by a layer of secondary H-20 Beams at the designed spacing to form the beam bottom. The primary H-Beams in turn support the secondary layer. Beam sides The plywood sheathing is supported by H-Beams at the designed spacing running along the length of the RC-beam to form the beam sides. The H-beams are supported by the beam forming support which are clamped onto the H-20 beams provided for the Beam bottom. The beam forming support ensures the right angle between the beam bottom and sides. The BFS extn. provides the necessary adjustment in depth. The beam forming support with extension are available in three sizes viz.BFS with extn.600mm long, 900mm long & 1200mm long. III. Wall Formwork System The L&T-Doka Wall formwork system is suitable for casting of RC-Walls including water tight structures. The plywood sheathing is supported by H-Beams which are in turn supported by the steel walers. The wall formwork facilitates fixing of working platforms for access, checking of reinforcement, concreting etc., the panels also have provision for fixing for alignment system which ensure verticality. The pressure due to concrete are sustained by High strength tie system. The walers are available in sizes of 0.8m, 1.2m, 1.6m, 1.8m, 2m & 2.4m the inside corners are formed by “universal inside corner” and the outside by universal outside fixing or angle plates. The high strength tie system can be through tie system or lost anchor system depending on the structure. The H-Beams can be butt jointed to form larger size of panels. The formwork panel along with the working platform and alignment systems can be lifted as a single unit using a crane thus the labour involved in each operation of erection and deshuttering is reduced to a minimum. The panels are formed in the carpentry workshop at site and the number of operations/assembly of components at each location is minimal and hence accuracy is maintained. Since large panels are handled as a single unit, the damage/loss of small components is eliminated contributing to very high material productivity. In the absence of a crane the panels can be dismantled and handled separately. The wall formwork system can handle very large pressures generated due to pumping of concrete. The planners place the Doka formwork beams H 20 (1) and the bracing, which consists of steel waling (2) to suit the anticipated load. The sheeting (3) is freely selectable – your choice of smooth fair-faced concrete, wood-textured surface, and so on.
  • 19. Doka framed formwork Frameco The Frameco formwork system • Forms wall heights up to 3.00 m without stacking • Has sturdy, galvanised steel frames to produce smooth concrete surfaces • Permissible fresh-concrete pressure 70 kN/m² Only 2 anchors up to a height of 3.00 m • Means fewer anchors have to be set, so forming work is faster • Reduces labour costs for post-casting work on the anchorage holes End-to-end 15 cm grid with only 5 panel widths • Simplifies planning, forming and logistics on the construction site • Reduces the number of cost-intensive closures • Means matching panel formats for best possible utilisation of formwork • Reduces quantities in stock and costs for rental, because of effortless adaptation to any floor plan  Makes for compact lifting units for fast positioning and short crane times
  • 20. IV. Column Formwork System The L&T-Doka Column formwork system is suitable for casting of columns of minimum 15cm * 15cm . In the Column formwork system the H-Beams along with steel walers and accessories makeup the assembly. The Column formwork facilitates fixing of working platforms for access, checking of reinforcement, concreting etc., The formwork panel along with the working platform and alignment systems can be lifted as a single unit using a crane thus the labour involved in each operation of erection and deshuttering is reduced to a minimum. The panels are formed in the carpentry workshop at site and the number of operations/assembly of components at each location is minimal and hence accuracy is maintained. Since large panels are handled as a single unit, the damage/loss of small components is eliminated contributing to very high material productivity. In the absence of a crane the panels can be dismantled and handled separately. The column formwork system can handle very large pressures generated due to pumping of concrete. Any column size, straight from the modular system ... • For speedy forming of any column cross-section with standard parts • For optimum adaptation to any special geometry up to 5 m in diameter • For column cross-sections up to 120 x 120 cm with only one splice plate • For first-class concrete surfaces with any sheeting • Permissible fresh-concrete pressure 90 kN/m² Some of the possible cross-sections of column V. Climbing Formwork System The L&T-Doka Climbing System are used for tall structures like cooling towers, etc where it is very uneconomical to provide staging or scaffolding for supporting the external or internal wall formwork. In this system a bracket is hooked on to anchors called lost anchors provided in the already cast wall and supports/alignments are taken from these brackets. The brackets are suitably braced to prevent any sway and are provided with walkways/working platforms / handrails etc for safety and ease of working. Varying degrees of sophistication are available in the Climbing formwork systems, a few of which are as listed.
  • 21. CB - 150 A - Simple Climbing, Crane handled - platform width 1.50 m. The brackets & wall formwork are to be handled separately. CB - 150 F- Traveling Climbing, Crane handled - platform width 1.50 m. roll back arrangement for deshuttering & cleaning of shutters. The wall formwork and climbing bracket are lifted as one unit. Automatic climbing formwork, the wall formwork along with the climbing brackets slide along the wall using motors, thus eliminating the need for crane. This system is very often used for natural draught cooling towers. MF - 240 - Simple Climbing, Crane handled - platform width 2.40 m. these brackets can also be fitted with automatic climbers SKE-50 which is a hydraulic system with 5T carrying capacity or SKE-100 with 10T carrying capacity. The MF 240 system * Travelling unit MF (1): Platform is 2.40 m wide for safe and convenient manipulation of the formwork. 75 cm retraction for easy cleaning of the formwork and for working on the reinforcement. * Climbing bracket MF (2): Combines with beam and frame formwork, high load-bearing capacity (50 kN per climbing bracket), angle of inclination ± 15° from vertical. * Working brackets (2): Modular principle for versatility: these brackets can be used as pouring, intermediate and suspension brackets. The SKE system The modular system for automatic climbing * Free positioning of brackets and automatic climbers as single-section climbing scaffold * Lift heights up to 5.50 m * Formwork systems: • wall formwork FF 20 and large-area formwork Top 50 • framed formwork Framax and Alu-Framax * Climbing speed 5 min/m SKE 50 * Load-carrying capacity 5 metric tons per bracket * Ideal solution for a huge number of climbing tasks * Up to 40 automatic climbers per hydraulic unit
  • 22. SKE 100 * Load-carrying capacity 10 metric tons per bracket * Platform system for simultaneous work at different levels * Extremely strong brackets permit wide, variable spacing