By Ahmed Fouad, PMP, PMI-SP
Head of Planning and Risk Management Coordinator
CCIC (Consolidated Contractors International
Company)
Contents
 Introduction and Bio
 Risk and Challenges Per Phase
 Engineering Works
 Procurement Works
 Construction Works
 Commissioning and Handing over
 Interface Works
 Resources , Cost & Contractual
 Summary
Introduction and Bio
 The Head of Planning and Risk Management Coordinator
at one of CCC’s Projects in Qatar. (MPAC Project)
 12 years of experience in the field of Project Management
for construction projects for Gas and LNG Plants, Oil and
gas pipelines, Infrastructure projects and Ports and
Buildings, the approximate construction value of these
projects is 4.5 Billion US Dollars.
 A certified PMP and PMI-SP and a volunteer for various
PMI activities .
 A part time Project Management and Personal
Development trainer.
Risk and Challenges Per Phase
Engineering Phase
 Engineering works work flow starts with Concept design then Schematic design then
Detailed design then IFC and AFC and Shop drawings.
 Due to the fast track nature of the world cup projects and the interface with other
infrastructure projects it is expected that these stages will overlap in a risky manner ,
i.e. Master plan finalization.
 Availability of well coordinate drawings IFC drawings between disciplines especially
(Arch/MEP).
 The Green buildings trend + New HVAC systems for the stadiums and the New
technology that will be implemented, will lead to new challenges and unusual
problems in the engineering and design phase and their interface with the other
disciplines, the lessons learned from each project must be communicated to the
ongoing and new project to avoid the pit falls.
 New and Specialized designer will be introduced and with the expected simultaneous
demand, delays and extra costs are expected.
Procurement Phase
 No tolerance regarding the PVL (Preferred Vendor Lists).
 New long lead items i.e. Score boards(9 month lead time), New technology HVAC equipments,
special lighting fixture, Custom made and special material.
 Final approval for regular long lead items S/G, MCC panels, etc., it is expected that the lead time
will increase by 20% due to the simulations demand by the various parallel ongoing major project.
 Mock- up approval & prototype approval by the client and end users.
 Challenges for new custom clearance regulations and changing of regulation.
 Expected Increase in all construction material costs and Increase in the delivery time.
 The suggested solution is to consolidate all forecasted project requirements schedules by a
governmental organization to secure the main construction material, i.e. Cement, reinforcement
steel, and for Contractors to order the material as early as possible and to plan for longer deliver
time, i.e. pipes, flooring, etc. but this must be support by flexibility and quick approval of design
and material approvals by Clients.
Construction Phase
 The Green buildings trend + New HVAC systems for the stadiums and the New
technology that will be implemented, will lead to engaging specialized S/C who are
new to the region, and with the new technology the experienced and highly skilled
manpower required to perform the tasks and meet the anticipated construction
boom will not be easily available.
 Consider precast option in design for all possible elements to reduce the work and
time on site.
 SKILLED Manpower availability.
 Managing S/C staff and team by main contractors team on behalf of S/C due to the
lack of qualified / sufficient team on board the S/C team and his failure to do it as
required which means more staff for main contractor leading to costs overrun.
Other Phases
Commissioning and Handing over:
 The Risk of End users having time and cost impacting comments at the handover
time.
 Expected challenges during commissioning of stadiums and the new technology
being used and its interface with other disciplines and systems.
Interface Works:
 Timely issuance of work permit (For excavation and for Construction).
 Civil Defense final approval at design stage and handover.
 Tie-in for power and utility supply.
 Changing the rules and regulations in Qatar (Civil Defense and Custom Clearance
Changes).
Other Phases
Resources, Cost & Contractual:
 No tolerance for any delay ( Fixed Completion Dates).
 Expected Claims especially for the expected acceleration costs to catch up with delays
due to the above risks.
 Inflation : Qatar has history of big Inflation Swings., during previous construction
boom (Asian Games), Inflation reached record 15.2 %, above high inflation rate is
partly due to very short construction duration.
 If new project awarding is delayed and construction for all major projects is in parallel,
the inflation will once again reach double digits due to highly compressed completion
period.
Summary
 Very High Risks in all project phases.
 Expected Increase in material the delivery time and costs.
 Shortage in Skilled Manpower.
 Since FIFA 2022 schedule is fixed, Projects must be completed on time.
 High inflation rate.
 However these challenges can only be successfully resolved, if all stake holders
involved work as “ one team with open mind ”.
Thank You

Weitere ähnliche Inhalte

Was ist angesagt?

Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedMichael Pink
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionJohn Khateeb
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsTwana Ahmad
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Shrikant Kate
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management A Makwana
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industryRubnawaz Bhatti
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsEssam Lotffy, PMP®, CCP®
 

Was ist angesagt? (20)

Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction Delay Analysis, Simplified
Construction Delay Analysis, SimplifiedConstruction Delay Analysis, Simplified
Construction Delay Analysis, Simplified
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & FactorsDELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors
 
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
Construction Scheduling, Work Study and Work Measurement _ Unit 2 _ Construct...
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
project management
project managementproject management
project management
 
Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management Project scheduling and resource levelling_Construction Management
Project scheduling and resource levelling_Construction Management
 
Different project management methodologies
Different project management methodologiesDifferent project management methodologies
Different project management methodologies
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Construction Management - New Trends
Construction Management - New TrendsConstruction Management - New Trends
Construction Management - New Trends
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
Introduction to cost management & control in construction projects
Introduction to cost management & control in construction projectsIntroduction to cost management & control in construction projects
Introduction to cost management & control in construction projects
 

Andere mochten auch

construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civilengsulaiman khan
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementAditi Shah
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13jpeabody
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in constructionKhaled Eid
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managamentitsvineeth209
 
Construction techniques of historical buildings
Construction techniques of historical buildingsConstruction techniques of historical buildings
Construction techniques of historical buildingsNiranjan Elavarasu
 
Starting a new construction company in Canada?
Starting a new construction company in Canada?Starting a new construction company in Canada?
Starting a new construction company in Canada?Ivette Chorro Fong
 
Greystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystoneConstruction
 
Construction project coordinator
Construction project coordinatorConstruction project coordinator
Construction project coordinatorprojectmanagement12
 

Andere mochten auch (20)

construction project managment_civileng
construction project managment_civilengconstruction project managment_civileng
construction project managment_civileng
 
Construction project manager
Construction project managerConstruction project manager
Construction project manager
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENTCONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
 
Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13Mn dot bidding and estimating 4 16-13
Mn dot bidding and estimating 4 16-13
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
Presentation1
Presentation1Presentation1
Presentation1
 
The Techniques Used In Project Managament
The Techniques Used In Project ManagamentThe Techniques Used In Project Managament
The Techniques Used In Project Managament
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
Construction techniques of historical buildings
Construction techniques of historical buildingsConstruction techniques of historical buildings
Construction techniques of historical buildings
 
Zeno brothers construction
Zeno brothers constructionZeno brothers construction
Zeno brothers construction
 
Starting a new construction company in Canada?
Starting a new construction company in Canada?Starting a new construction company in Canada?
Starting a new construction company in Canada?
 
Project supervisor
Project supervisorProject supervisor
Project supervisor
 
Senior project manager
Senior project managerSenior project manager
Senior project manager
 
Greystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General ContractorGreystone Construction | Company Brochure | MN & ND General Contractor
Greystone Construction | Company Brochure | MN & ND General Contractor
 
Project architect
Project architectProject architect
Project architect
 
Construction project coordinator
Construction project coordinatorConstruction project coordinator
Construction project coordinator
 
It project coordinator
It project coordinatorIt project coordinator
It project coordinator
 
Project planner
Project plannerProject planner
Project planner
 

Ähnlich wie Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project Managment in Construction 2022 by Ahmed Fouad CCC

Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projectsPALLA NARASIMHUDU
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projectsD.Pawan Kumar
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsRick Vogel
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET Journal
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTSHossamNegidaPMPRMPPS
 
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16Cong Danh Tran
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
I0313048051
I0313048051I0313048051
I0313048051theijes
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2Narayan Mane
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 

Ähnlich wie Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project Managment in Construction 2022 by Ahmed Fouad CCC (20)

D012522433
D012522433D012522433
D012522433
 
Tc iv submited paper risk analysis and managements large epc projects
Tc iv submited paper risk analysis and managements  large epc projectsTc iv submited paper risk analysis and managements  large epc projects
Tc iv submited paper risk analysis and managements large epc projects
 
Turnkey implementation of distribution projects
Turnkey implementation of distribution projectsTurnkey implementation of distribution projects
Turnkey implementation of distribution projects
 
Essentials of EOT Claims
Essentials of EOT ClaimsEssentials of EOT Claims
Essentials of EOT Claims
 
A Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction ProjectsA Critical Literature Review On Main Cause Of Delay In Construction Projects
A Critical Literature Review On Main Cause Of Delay In Construction Projects
 
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
IRJET-A Critical Literature Review on Main Cause of Delay in Construction Pro...
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
EXTENSION OF TIME CLAIMS IN OIL AND GAS CONSTRUCTION PROJECTS
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
CV _Eng_Tran Cong Danh_Project Engineer_15-Oct-16
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
I0313048051
I0313048051I0313048051
I0313048051
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Cv's Nitinai_Ratchawat
Cv's Nitinai_RatchawatCv's Nitinai_Ratchawat
Cv's Nitinai_Ratchawat
 
1.2 project management by bee 2
1.2 project management by bee 21.2 project management by bee 2
1.2 project management by bee 2
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 

Kürzlich hochgeladen

Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...IJAEMSJORNAL
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfShreyas Pandit
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectGayathriM270621
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfManish Kumar
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdfchess188chess188
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 

Kürzlich hochgeladen (20)

Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
Guardians of E-Commerce: Harnessing NLP and Machine Learning Approaches for A...
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
Theory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdfTheory of Machine Notes / Lecture Material .pdf
Theory of Machine Notes / Lecture Material .pdf
 
STATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subjectSTATE TRANSITION DIAGRAM in psoc subject
STATE TRANSITION DIAGRAM in psoc subject
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdfModule-1-(Building Acoustics) Noise Control (Unit-3). pdf
Module-1-(Building Acoustics) Noise Control (Unit-3). pdf
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdf
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 

Construction Risks for Qatar Stadiums for FIFA - Overviewing Cost & Project Managment in Construction 2022 by Ahmed Fouad CCC

  • 1. By Ahmed Fouad, PMP, PMI-SP Head of Planning and Risk Management Coordinator CCIC (Consolidated Contractors International Company)
  • 2. Contents  Introduction and Bio  Risk and Challenges Per Phase  Engineering Works  Procurement Works  Construction Works  Commissioning and Handing over  Interface Works  Resources , Cost & Contractual  Summary
  • 3. Introduction and Bio  The Head of Planning and Risk Management Coordinator at one of CCC’s Projects in Qatar. (MPAC Project)  12 years of experience in the field of Project Management for construction projects for Gas and LNG Plants, Oil and gas pipelines, Infrastructure projects and Ports and Buildings, the approximate construction value of these projects is 4.5 Billion US Dollars.  A certified PMP and PMI-SP and a volunteer for various PMI activities .  A part time Project Management and Personal Development trainer.
  • 5. Engineering Phase  Engineering works work flow starts with Concept design then Schematic design then Detailed design then IFC and AFC and Shop drawings.  Due to the fast track nature of the world cup projects and the interface with other infrastructure projects it is expected that these stages will overlap in a risky manner , i.e. Master plan finalization.  Availability of well coordinate drawings IFC drawings between disciplines especially (Arch/MEP).  The Green buildings trend + New HVAC systems for the stadiums and the New technology that will be implemented, will lead to new challenges and unusual problems in the engineering and design phase and their interface with the other disciplines, the lessons learned from each project must be communicated to the ongoing and new project to avoid the pit falls.  New and Specialized designer will be introduced and with the expected simultaneous demand, delays and extra costs are expected.
  • 6. Procurement Phase  No tolerance regarding the PVL (Preferred Vendor Lists).  New long lead items i.e. Score boards(9 month lead time), New technology HVAC equipments, special lighting fixture, Custom made and special material.  Final approval for regular long lead items S/G, MCC panels, etc., it is expected that the lead time will increase by 20% due to the simulations demand by the various parallel ongoing major project.  Mock- up approval & prototype approval by the client and end users.  Challenges for new custom clearance regulations and changing of regulation.  Expected Increase in all construction material costs and Increase in the delivery time.  The suggested solution is to consolidate all forecasted project requirements schedules by a governmental organization to secure the main construction material, i.e. Cement, reinforcement steel, and for Contractors to order the material as early as possible and to plan for longer deliver time, i.e. pipes, flooring, etc. but this must be support by flexibility and quick approval of design and material approvals by Clients.
  • 7. Construction Phase  The Green buildings trend + New HVAC systems for the stadiums and the New technology that will be implemented, will lead to engaging specialized S/C who are new to the region, and with the new technology the experienced and highly skilled manpower required to perform the tasks and meet the anticipated construction boom will not be easily available.  Consider precast option in design for all possible elements to reduce the work and time on site.  SKILLED Manpower availability.  Managing S/C staff and team by main contractors team on behalf of S/C due to the lack of qualified / sufficient team on board the S/C team and his failure to do it as required which means more staff for main contractor leading to costs overrun.
  • 8. Other Phases Commissioning and Handing over:  The Risk of End users having time and cost impacting comments at the handover time.  Expected challenges during commissioning of stadiums and the new technology being used and its interface with other disciplines and systems. Interface Works:  Timely issuance of work permit (For excavation and for Construction).  Civil Defense final approval at design stage and handover.  Tie-in for power and utility supply.  Changing the rules and regulations in Qatar (Civil Defense and Custom Clearance Changes).
  • 9. Other Phases Resources, Cost & Contractual:  No tolerance for any delay ( Fixed Completion Dates).  Expected Claims especially for the expected acceleration costs to catch up with delays due to the above risks.  Inflation : Qatar has history of big Inflation Swings., during previous construction boom (Asian Games), Inflation reached record 15.2 %, above high inflation rate is partly due to very short construction duration.  If new project awarding is delayed and construction for all major projects is in parallel, the inflation will once again reach double digits due to highly compressed completion period.
  • 10. Summary  Very High Risks in all project phases.  Expected Increase in material the delivery time and costs.  Shortage in Skilled Manpower.  Since FIFA 2022 schedule is fixed, Projects must be completed on time.  High inflation rate.  However these challenges can only be successfully resolved, if all stake holders involved work as “ one team with open mind ”.