SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Anti Termite  Measures AR . MANISH JAIN  www.frontdesk.co.in
Necessity of Anti-termite measures ,[object Object],[object Object],AR . MANISH JAIN  www.frontdesk.co.in
Classification  ,[object Object],[object Object],According to their habits, termites can be divided into two well defined groups: A:  Subterranean   or ground nesting  termites  which build nests in the soil and live in them B:  Non-subterranean   or wood nesting  termites  which live in wood with no contact with soil. AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-1 Earth free from roots, dead leaves, or other organic matter shall be placed and  compacted in successive horizontal layers of loose material not more than 200 mm thick. Dry brick shall be inserted at least 50 mm in brick masonry for providing apron floor alround the periphery  AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-2 Brick on edge masonry in cement mortar shall be laid on the plinth wall. Dry brick shall be placed on the inner side of plinth wall for getting anticipated offset space for coarse sand and on the other side for installing anti-termite masonry groove. In the case of intermediate walls, dry bricks are placed on either side of the brick on edge masonry for getting offset space for coarse sand layer AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-3 The dry brick for the anti-termite groove shall be taken out and  dense cement concrete 1 : 3 : 6 ( 1 cement : 3 sand : 6 coarse aggregate, by volume ) sub-floor carpet shall be laid casting the anti-termite groove in position. In case of internal partition walls, the cement concrete subfloor shall be laid on either side over the dry bricks to sufficient extent for  getting staggered vertical joints over the joint of plinth wall and earth filling AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-4 Superstructure masonry shall be raised over the dense cement concrete sub-floor carpet and over-head jobs completed  AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-5 The dry brick for coarse sand layer shall be removed and graded sand ( of size 3 to 5 mm ) layer at least 100 mm thick shall be compacted over the earth filling and underneath the partially laid dense cement concrete sub-floor carpet  AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-6 Dense cement concrete ( 1 : 3 76 mix ) sub-floor at least 75 mm  thick shall be laid over the sand filling. Necessary finish may be provided  to the cement concrete sub-floor carpet  AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-7 Dry brick provided for apron floor ( see 4.1.1) shall be taken out and 600 mm wide formation of earth in 1 : 30 slope shall be made. Over the formation, 75 mm thick lime concrete 1 : 3 : 6 ( 1 lime: 3 sand : G-coarse aggregate, by volume ) shall be laid AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-8 Over the 75 mm thick lime concrete bed at least 25 mm thick cement concrete topping 1 : 2 : 4 ( 1 cement : 2 sand : 4 fine aggregate, by volume ) shall be laid and 12 mm thick cement plaster shall be applied on foundation and plinth AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stage-9 The final recommendations incorporating the constructional details  given in all pervious slides is shown in AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Anti Termite Construction Stone Wall The final recommendations incorporating the all the anti termite constructional details  given in stone wall superstructure AR . MANISH JAIN  www.frontdesk.co.in
INSTALLATION OF TERMITE SHIELDS Termite shields may be installed round the periphery of a building where infestation of termite is high. Provision of metal shields takes care of external protection only. For the metal shield to function effectively, it is essential that it is installed correctly and the shape of the shield shall be maintained properly which requires periodical inspection after installation. At least 50 mm width of termite shield shall be properly embedded in the cement concrete sub-floor with 50 mm horizontal  projection  on the external side of the wall and further projection of 50  mm  bent downwards at an angle of 45”. The 50 mm embedment of  termite  shield in concrete sub-floor facilitates its easy replacement whenever required  AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
TERMITE SHIELDS at Entrance  At entrances and doorways, where installation of termite shield is not practicable anti-termite masonry groove is installed  Necessary construction arrangements shall be ‘made at the junction of  termite shield  and groove to ensure that entry of termite is prevented AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Installation of Termite Caps Termite caps shall be used in the case of basement with support where timber sections occur over them in the case of columns. The termite caps shall be kept at plinth level covering the whole of the section in the plinth below providing the necessary projection of 50 mm beyond the outer edge of the column on all sides and also the turnover of 50 mm width. In case of down-water pipes the termite cap shall be fitted on the pipe   in the form of a ring. The projection and turn-over shall be the same as specified for termite shields in general. The bottom portion of down-water-pipe should be at least 200 mm away from wall. AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Chemical Treatment of Soil Treating the soil beneath the building and around the foundations with a soil insecticide is a preventive measure. The purpose of the treatment is to create a chemical barrier between the ground from where termites come and woodwork or other cellulosic materials in the buildings. The following chemicals conforming to relevant Indian Standard in water emulsion are effective when applied uniformly over the area to be treated. Chemical  Relevant Indian  Concentration by    Standard   Weight, percent  (active  Ingredient) Chlorpyrifos 20 EC  IS 8944  1.0  Lindane   20 EC   IS 632  1.0 AR . MANISH JAIN  www.frontdesk.co.in
A: Treatment for Masonry Foundations The bottom surface and   the sides (up to a height of about 300 mm) of the excavation made from masonry foundations and basements shall be treated with the chemical at the rate of 5 lt/m2 surface are AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN  www.frontdesk.co.in
B:  Treatment for Masonry Foundations After the masonry foundations and the retaining wall of the basements come up, the backfill in immediate contact with the foundation structure shall be treated at the rate of 7.5 l/m2 of the vertical surface of the sub-structure for each side. If water is used for ramming the earth fill, the chemical treatment shall be carried out after the ramming operation is done by rodding the earth at 150 mm centres close to parallel to the wall surface and spraying the chemical emulsion at the above dosage.  AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN  www.frontdesk.co.in
C:  Treatment at Junction of the   Wall and the Floor Special  care shall be taken to establish continuity of the vertical chemical barrier on inner wall surface from ground level (where it had stopped with the treatment described in 7.2.2) up to the level of the filled earth surface. To achieve this, a small channel 30 mm x 30 mm shall be made at all the junctions of wall and columns with the floor (before laying the sub-grade) the rod holes made in the channel up to the ground level 150 mm apart and the iron rod moved backward and forward to break up the earth and chemical emulsion poured along the wall at the rate of 7.5 l/m2 of vertical wall or column surface so as to soak the soil right to the bottom. The soil should be tamped back into place after the operation. AS PER IS CODE 6313 (Part 2) :2001
D:  Treatment of Top Surface of Plinth Filling The top surface of the consolidated earth within plinth walls shall be treated with chemical emulsion at the rate of 5 l/m2 of the surface before the sand bed or sub-grade is laid. If the filled earth has been well rammed and the surface does not allow the emulsion to seep through, holes up to 50 to 75 mm deep at 150 mm centres both ways maybe made with 12 mm diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion. AS PER IS CODE 6313 (Part 2) :2001
E:  Treatment of Soil Along External    Perimeter of  Building After the building is complete, the earth along the external perimeter of the building should be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward parallel to the wall to break up the earth and chemical emulsion poured along the wall at the rate of 7.5 l/m2 of vertical surfaces. After the treatment, the earth should be tamped back into place. Should the earth outside the building be graded on completion of building, this treatment should be carried out on completion of such grading. AS PER IS CODE 6313 (Part 2) :2001
F:  Treatment of Soil Under Apron Along External Perimeter of Building Top surface of the consolidated earth over which the apron is to be laid shall be treated with chemical emulsion at the rate of 5 l/m2 of the surface before the  apron is laid. If consolidated earth does not allow emulsion to seep through, holes up to 50 to 75 mm  deep at 150 mm centres both ways may be made with 12 mm diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN  www.frontdesk.co.in
Treatment for RCC Foundations and Basement In the case of RCC foundations, the concrete is dense being a 1:2:4 (cement: fine aggregates: coarse aggregates, by volume) mix or richer, the termites are unable to penetrate it, it is therefore, unnecessary to start the treatment from the bottom of excavations. The treatment shall start at a depth of 500 mm below the ground level except when such ground level is raised or lowered by filling or cutting after the foundations have been cast. In such cases, the depth of 500 mm shall be determined from the new soil level resulting from the filling or cutting mentioned above, and soil in immediate contact with the vertical surfaces of RCC foundations shall be treated at the rate of 7.5 I/SQM The other details shall  be as laid down in AS PER IS CODE 6313 (Part 2) :2001

Weitere ähnliche Inhalte

Was ist angesagt?

Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionsandeepasandaruwan1
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated pptwasim shaikh
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in constructionUdisha15
 
What is wall? Different types of wall.
What is wall? Different types of wall.What is wall? Different types of wall.
What is wall? Different types of wall.Syed Raja
 
Water proofing methods
Water proofing methodsWater proofing methods
Water proofing methodsprasath k s
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonryKHUSHBU SHAH
 
Types of pitched roofs
Types of pitched roofsTypes of pitched roofs
Types of pitched roofsanandcivil103
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniquesSayali Darakh
 
DPC, Back Filling and Plinth Protection.pptx
DPC, Back Filling and Plinth Protection.pptxDPC, Back Filling and Plinth Protection.pptx
DPC, Back Filling and Plinth Protection.pptxSantoshreddy B
 
Difference between damp &water proofing
Difference between damp &water proofingDifference between damp &water proofing
Difference between damp &water proofingChandan kumar
 
What is building orientation.pptx
What is building orientation.pptxWhat is building orientation.pptx
What is building orientation.pptxAbeyBel
 

Was ist angesagt? (20)

Waterproofing methods & materials used in construction
Waterproofing methods & materials used in constructionWaterproofing methods & materials used in construction
Waterproofing methods & materials used in construction
 
7.roofs
7.roofs7.roofs
7.roofs
 
Refuse Chute
Refuse ChuteRefuse Chute
Refuse Chute
 
Damp Proof Course
Damp Proof Course Damp Proof Course
Damp Proof Course
 
Shoring
ShoringShoring
Shoring
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
What is wall? Different types of wall.
What is wall? Different types of wall.What is wall? Different types of wall.
What is wall? Different types of wall.
 
Water proofing methods
Water proofing methodsWater proofing methods
Water proofing methods
 
Chapter 4 (a) stone masonry
Chapter 4 (a) stone masonryChapter 4 (a) stone masonry
Chapter 4 (a) stone masonry
 
Types of pitched roofs
Types of pitched roofsTypes of pitched roofs
Types of pitched roofs
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 
DPC, Back Filling and Plinth Protection.pptx
DPC, Back Filling and Plinth Protection.pptxDPC, Back Filling and Plinth Protection.pptx
DPC, Back Filling and Plinth Protection.pptx
 
English garden
English gardenEnglish garden
English garden
 
Difference between damp &water proofing
Difference between damp &water proofingDifference between damp &water proofing
Difference between damp &water proofing
 
Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
 
What is building orientation.pptx
What is building orientation.pptxWhat is building orientation.pptx
What is building orientation.pptx
 
Foundation
FoundationFoundation
Foundation
 
MADRAS TERRACE ROOF.ppt
MADRAS TERRACE ROOF.pptMADRAS TERRACE ROOF.ppt
MADRAS TERRACE ROOF.ppt
 
Brick Masonry
Brick MasonryBrick Masonry
Brick Masonry
 

Ähnlich wie Termite Treatment

Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfpanchalt755
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationIshwar Chauhan
 
Pct assignment
Pct assignmentPct assignment
Pct assignmentDan Palmer
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptxPAVITRA GOYAL
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochurekristenjames
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptxPrituJadhav1
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation Prabhat chhirolya
 
Bmc flooring
Bmc flooring   Bmc flooring
Bmc flooring Cutegalrj
 
Finishing works Part 1.pptx
Finishing works Part 1.pptxFinishing works Part 1.pptx
Finishing works Part 1.pptxSandipPaul46
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quickkristenjames
 
Diaphragm walls construction_and_design
Diaphragm walls construction_and_designDiaphragm walls construction_and_design
Diaphragm walls construction_and_designMuhammad iqbal
 

Ähnlich wie Termite Treatment (20)

Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdf
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
Repair,Retrofitting and Rehabilitation
Repair,Retrofitting and RehabilitationRepair,Retrofitting and Rehabilitation
Repair,Retrofitting and Rehabilitation
 
Pct assignment
Pct assignmentPct assignment
Pct assignment
 
02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx02 FLOORING 08.06.2022.pptx
02 FLOORING 08.06.2022.pptx
 
Bolderstone brochure
Bolderstone brochureBolderstone brochure
Bolderstone brochure
 
Waterproffing.pptx
Waterproffing.pptxWaterproffing.pptx
Waterproffing.pptx
 
DPC treatment
DPC treatmentDPC treatment
DPC treatment
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation
 
construction study project sjce ctm
construction study project sjce ctmconstruction study project sjce ctm
construction study project sjce ctm
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
Bmc flooring
Bmc flooring   Bmc flooring
Bmc flooring
 
Finishing works Part 1.pptx
Finishing works Part 1.pptxFinishing works Part 1.pptx
Finishing works Part 1.pptx
 
BT & M Unit3.2.pptx.pptx
BT & M Unit3.2.pptx.pptxBT & M Unit3.2.pptx.pptx
BT & M Unit3.2.pptx.pptx
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 
Versaloc
VersalocVersaloc
Versaloc
 
Versaloc - very easy, very quick
Versaloc - very easy, very quickVersaloc - very easy, very quick
Versaloc - very easy, very quick
 
Unit 5 bmc
Unit 5 bmcUnit 5 bmc
Unit 5 bmc
 
Diaphragm walls construction_and_design
Diaphragm walls construction_and_designDiaphragm walls construction_and_design
Diaphragm walls construction_and_design
 
Versaloc (1)
Versaloc (1)Versaloc (1)
Versaloc (1)
 

Mehr von Manish Jain Luhadia (20)

Socio economic base for planning
Socio economic base for planning Socio economic base for planning
Socio economic base for planning
 
Planning techniques geo informatics
Planning techniques  geo informaticsPlanning techniques  geo informatics
Planning techniques geo informatics
 
Planning techniques
Planning techniquesPlanning techniques
Planning techniques
 
Environmental planning
Environmental planningEnvironmental planning
Environmental planning
 
Housing and environmental planning
Housing and environmental planningHousing and environmental planning
Housing and environmental planning
 
Mere yugal nayan
Mere yugal nayanMere yugal nayan
Mere yugal nayan
 
Construction material cement
Construction material cementConstruction material cement
Construction material cement
 
Non ferrous metal
Non ferrous metalNon ferrous metal
Non ferrous metal
 
Construction material lime
Construction material limeConstruction material lime
Construction material lime
 
Philosophies of mies vander rohe
Philosophies of mies vander rohePhilosophies of mies vander rohe
Philosophies of mies vander rohe
 
Deconstructivism
DeconstructivismDeconstructivism
Deconstructivism
 
Expressionism
ExpressionismExpressionism
Expressionism
 
Purism
PurismPurism
Purism
 
Brutalism
BrutalismBrutalism
Brutalism
 
Philosophies of le corbusier
Philosophies of  le corbusierPhilosophies of  le corbusier
Philosophies of le corbusier
 
Philosophies of f l wright
Philosophies of f l wright Philosophies of f l wright
Philosophies of f l wright
 
Philosophies of L SULLIVAN
Philosophies of L SULLIVANPhilosophies of L SULLIVAN
Philosophies of L SULLIVAN
 
Interdependence in architecture
Interdependence in architectureInterdependence in architecture
Interdependence in architecture
 
Wood panelling & staircase
Wood panelling & staircaseWood panelling & staircase
Wood panelling & staircase
 
Tod principle of architecture
Tod principle of architectureTod principle of architecture
Tod principle of architecture
 

Kürzlich hochgeladen

ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxkarenfajardo43
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17Celine George
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 

Kürzlich hochgeladen (20)

ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptxGrade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17How to Fix XML SyntaxError in Odoo the 17
How to Fix XML SyntaxError in Odoo the 17
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 

Termite Treatment

  • 1. Anti Termite Measures AR . MANISH JAIN www.frontdesk.co.in
  • 2.
  • 3.
  • 4. Anti Termite Construction Stage-1 Earth free from roots, dead leaves, or other organic matter shall be placed and compacted in successive horizontal layers of loose material not more than 200 mm thick. Dry brick shall be inserted at least 50 mm in brick masonry for providing apron floor alround the periphery AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 5. Anti Termite Construction Stage-2 Brick on edge masonry in cement mortar shall be laid on the plinth wall. Dry brick shall be placed on the inner side of plinth wall for getting anticipated offset space for coarse sand and on the other side for installing anti-termite masonry groove. In the case of intermediate walls, dry bricks are placed on either side of the brick on edge masonry for getting offset space for coarse sand layer AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 6. Anti Termite Construction Stage-3 The dry brick for the anti-termite groove shall be taken out and dense cement concrete 1 : 3 : 6 ( 1 cement : 3 sand : 6 coarse aggregate, by volume ) sub-floor carpet shall be laid casting the anti-termite groove in position. In case of internal partition walls, the cement concrete subfloor shall be laid on either side over the dry bricks to sufficient extent for getting staggered vertical joints over the joint of plinth wall and earth filling AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 7. Anti Termite Construction Stage-4 Superstructure masonry shall be raised over the dense cement concrete sub-floor carpet and over-head jobs completed AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 8. Anti Termite Construction Stage-5 The dry brick for coarse sand layer shall be removed and graded sand ( of size 3 to 5 mm ) layer at least 100 mm thick shall be compacted over the earth filling and underneath the partially laid dense cement concrete sub-floor carpet AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 9. Anti Termite Construction Stage-6 Dense cement concrete ( 1 : 3 76 mix ) sub-floor at least 75 mm thick shall be laid over the sand filling. Necessary finish may be provided to the cement concrete sub-floor carpet AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 10. Anti Termite Construction Stage-7 Dry brick provided for apron floor ( see 4.1.1) shall be taken out and 600 mm wide formation of earth in 1 : 30 slope shall be made. Over the formation, 75 mm thick lime concrete 1 : 3 : 6 ( 1 lime: 3 sand : G-coarse aggregate, by volume ) shall be laid AR . MANISH JAIN www.frontdesk.co.in
  • 11. Anti Termite Construction Stage-8 Over the 75 mm thick lime concrete bed at least 25 mm thick cement concrete topping 1 : 2 : 4 ( 1 cement : 2 sand : 4 fine aggregate, by volume ) shall be laid and 12 mm thick cement plaster shall be applied on foundation and plinth AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 12. Anti Termite Construction Stage-9 The final recommendations incorporating the constructional details given in all pervious slides is shown in AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 13. Anti Termite Construction Stone Wall The final recommendations incorporating the all the anti termite constructional details given in stone wall superstructure AR . MANISH JAIN www.frontdesk.co.in
  • 14. INSTALLATION OF TERMITE SHIELDS Termite shields may be installed round the periphery of a building where infestation of termite is high. Provision of metal shields takes care of external protection only. For the metal shield to function effectively, it is essential that it is installed correctly and the shape of the shield shall be maintained properly which requires periodical inspection after installation. At least 50 mm width of termite shield shall be properly embedded in the cement concrete sub-floor with 50 mm horizontal projection on the external side of the wall and further projection of 50 mm bent downwards at an angle of 45”. The 50 mm embedment of termite shield in concrete sub-floor facilitates its easy replacement whenever required AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 15. TERMITE SHIELDS at Entrance At entrances and doorways, where installation of termite shield is not practicable anti-termite masonry groove is installed Necessary construction arrangements shall be ‘made at the junction of termite shield and groove to ensure that entry of termite is prevented AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 16. Installation of Termite Caps Termite caps shall be used in the case of basement with support where timber sections occur over them in the case of columns. The termite caps shall be kept at plinth level covering the whole of the section in the plinth below providing the necessary projection of 50 mm beyond the outer edge of the column on all sides and also the turnover of 50 mm width. In case of down-water pipes the termite cap shall be fitted on the pipe in the form of a ring. The projection and turn-over shall be the same as specified for termite shields in general. The bottom portion of down-water-pipe should be at least 200 mm away from wall. AS PER IS CODE 6313 (Part 1) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 17. Chemical Treatment of Soil Treating the soil beneath the building and around the foundations with a soil insecticide is a preventive measure. The purpose of the treatment is to create a chemical barrier between the ground from where termites come and woodwork or other cellulosic materials in the buildings. The following chemicals conforming to relevant Indian Standard in water emulsion are effective when applied uniformly over the area to be treated. Chemical Relevant Indian Concentration by Standard Weight, percent (active Ingredient) Chlorpyrifos 20 EC IS 8944 1.0 Lindane 20 EC IS 632 1.0 AR . MANISH JAIN www.frontdesk.co.in
  • 18. A: Treatment for Masonry Foundations The bottom surface and the sides (up to a height of about 300 mm) of the excavation made from masonry foundations and basements shall be treated with the chemical at the rate of 5 lt/m2 surface are AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 19. B: Treatment for Masonry Foundations After the masonry foundations and the retaining wall of the basements come up, the backfill in immediate contact with the foundation structure shall be treated at the rate of 7.5 l/m2 of the vertical surface of the sub-structure for each side. If water is used for ramming the earth fill, the chemical treatment shall be carried out after the ramming operation is done by rodding the earth at 150 mm centres close to parallel to the wall surface and spraying the chemical emulsion at the above dosage. AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 20. C: Treatment at Junction of the Wall and the Floor Special care shall be taken to establish continuity of the vertical chemical barrier on inner wall surface from ground level (where it had stopped with the treatment described in 7.2.2) up to the level of the filled earth surface. To achieve this, a small channel 30 mm x 30 mm shall be made at all the junctions of wall and columns with the floor (before laying the sub-grade) the rod holes made in the channel up to the ground level 150 mm apart and the iron rod moved backward and forward to break up the earth and chemical emulsion poured along the wall at the rate of 7.5 l/m2 of vertical wall or column surface so as to soak the soil right to the bottom. The soil should be tamped back into place after the operation. AS PER IS CODE 6313 (Part 2) :2001
  • 21. D: Treatment of Top Surface of Plinth Filling The top surface of the consolidated earth within plinth walls shall be treated with chemical emulsion at the rate of 5 l/m2 of the surface before the sand bed or sub-grade is laid. If the filled earth has been well rammed and the surface does not allow the emulsion to seep through, holes up to 50 to 75 mm deep at 150 mm centres both ways maybe made with 12 mm diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion. AS PER IS CODE 6313 (Part 2) :2001
  • 22. E: Treatment of Soil Along External Perimeter of Building After the building is complete, the earth along the external perimeter of the building should be rodded at intervals of 150 mm and to a depth of 300 mm. The rods should be moved backward and forward parallel to the wall to break up the earth and chemical emulsion poured along the wall at the rate of 7.5 l/m2 of vertical surfaces. After the treatment, the earth should be tamped back into place. Should the earth outside the building be graded on completion of building, this treatment should be carried out on completion of such grading. AS PER IS CODE 6313 (Part 2) :2001
  • 23. F: Treatment of Soil Under Apron Along External Perimeter of Building Top surface of the consolidated earth over which the apron is to be laid shall be treated with chemical emulsion at the rate of 5 l/m2 of the surface before the apron is laid. If consolidated earth does not allow emulsion to seep through, holes up to 50 to 75 mm deep at 150 mm centres both ways may be made with 12 mm diameter mild steel rod on the surface to facilitate saturation of the soil with the chemical emulsion AS PER IS CODE 6313 (Part 2) :2001 AR . MANISH JAIN www.frontdesk.co.in
  • 24. Treatment for RCC Foundations and Basement In the case of RCC foundations, the concrete is dense being a 1:2:4 (cement: fine aggregates: coarse aggregates, by volume) mix or richer, the termites are unable to penetrate it, it is therefore, unnecessary to start the treatment from the bottom of excavations. The treatment shall start at a depth of 500 mm below the ground level except when such ground level is raised or lowered by filling or cutting after the foundations have been cast. In such cases, the depth of 500 mm shall be determined from the new soil level resulting from the filling or cutting mentioned above, and soil in immediate contact with the vertical surfaces of RCC foundations shall be treated at the rate of 7.5 I/SQM The other details shall be as laid down in AS PER IS CODE 6313 (Part 2) :2001

Hinweis der Redaktion

  1. 12/18/09
  2. 12/18/09
  3. 12/18/09
  4. 12/18/09
  5. 12/18/09
  6. 12/18/09
  7. 12/18/09
  8. 12/18/09
  9. 12/18/09
  10. 12/18/09
  11. 12/18/09
  12. 12/18/09
  13. 12/18/09
  14. 12/18/09
  15. 12/18/09
  16. 12/18/09
  17. 12/18/09
  18. 12/18/09
  19. 12/18/09
  20. 12/18/09
  21. 12/18/09
  22. 12/18/09