Outline
Lawrence D.Miles 
1904 - 1985 
History 
• Shortage of materials during world war II 
• General Electric company found that many of the substitutes 
have better or equal performance at less cost. 
• Lawrence De Miles Launched an effort to make the concept 
systematic 
• Establishment of Society of American Value Engineers “SAVE” 
in 1959
What is Value? 
• Value is the lowest price you must pay to provide a reliable 
function or service (L. D. Miles) 
• “The ratio of Function to Cost” 
Value = 
Worth 
Cost 
= 
Function(Utility) 
Cost
Waste Cost 
Why do Projects have “Unnecessary” Costs? 
1. Low Time for Designing 
2. Lack of information 
3. Lack of Ideas 
4. Negative Prejudice 
5. Lack Of Experience 
6. Weaknesses in human relations 
7. Multi Concept 
…
What is Value Engineering?
What is Value Engineering? 
• Value Engineering (VE, or Value Analysis) is a management 
technique that seeks the best functional balance between cost , 
reliability and performance of a product, project, process or 
service.
Implementation 
• How is a Value Engineering Study Conducted?
The Job Plan 
Value engineering is often done by systematically following 
a multi-stage job plan. Larry Miles' original system was a 
six-step procedure which he called the "value analysis job 
plan."
The Job Plan 
The modern version has the following eight steps: 
1. Orientation 
2. Information 
3. Functional 
4. Creative 
5. Evaluation 
6. Development 
7. Presentation 
8. Implementation and Follow-up
The Job Plan 
1. Orientation Phase 
 Identify issues 
 Prioritize Issues 
 Drafts scopes and objective 
 Establish evaluation factors 
 Determine Study Team 
 Collect Data 
 Prepare for value study 
 ...
The Job Plan 
2. Information Phase 
 Further familiarization of the project by the team; all team 
members participate in determine the true needs of the project. 
 Areas of high cost or low worth are identified.
The Job Plan 
3. Functional Phase 
 Functional analysis outlines the basic function of a product 
using a verb and a noun such as ‘boil water’ as in the case of 
our kettle. 
What is the Function? 
“ Boil Water ” 
Verb Noun
The Job Plan 
4. Creative Phase 
 This step requires a certain amount of creative thinking by the 
team. A technique that is useful for this type of analysis is 
brainstorming. This stage is concerned with developing 
alternative.
The Job Plan 
5. Evaluation Phase 
 In this phase of the workshop, the VA team 
judges the ideas developed during the creative 
phase. 
 The VA team ranks the ideas. 
 Ideas found to be irrelevant or not worthy of 
additional study are disregarded. 
 Those ideas that represent the greatest potential 
for cost savings and improvements are selected 
for development.
The Job Plan 
6. Development Phase 
 The team develops the selected ideas into 
alternatives (or proposals) with a sufficient 
level of documentation to allow decision 
makers to determine if the alternative should 
be implemented.
The Job Plan 
7. Presentation Phase 
1. The presentation phase is actually 
presenting the best alternative (or 
alternatives) to those who have the 
authority to implement the proposed 
solutions that are acceptable.
The Job Plan 
8. Implementation And Follow Up 
1. Develop an implementation plan 
2. Execute the plan 
3. Monitor the plan to completion 
Objective: During the implementation and follow-up phase, 
management must assure that approved recommendations are 
converted into actions.
Purpose 
1. Determine the best design alternatives 
2. Reduce cost 
3. Improve quality 
4. Increase reliability and availability 
5. Enhance customer satisfaction 
6. Improve organizational performance 
7. Identify problems 
8. Develop recommended solutions
Potential Saving From VE 
Early changes are naturally less expensive than later ones, 
as shown in the diagram below.
Principles 
Value Engineering principles: 
Systematic method for evaluating product performance 
and value 
The use of multi-functional teams 
Focus on a simplified product 
1 
2 
3
Case Study 
Focus Adjustment Knob for Slit Lamp
Case Study 
Introduce the Product 
• In this presentation we have considered a medical instrument 
manufacturing company, Aadarsh Instruments, located in Ambala. 
• This firm is producing different types of microscopes which they 
export to various countries around the globe. 
• One of their model SL250 have a component named Focus 
Adjustment Knob for Slit Lamp in microscope. This microscope has 
found application in the field of eye inspection.
Case Study 
The steps used for this purpose are as follows: 
1. Product selection plan 
2. Gather information of product 
3. Functional analysis 
4. Creativity Worksheet 
5. Evaluation sheet 
6. Cost analysis 
7. Result
Case Study 
1. Plan For Product Selection 
• This Product is used to adjust the focus of lens for magnification 
purpose. 
• The present specifications of this part and its material used are 
costlier than the average industry cost. 
• Value of this product can be increased by maintaining its functions 
and reducing its cost or keeping the cost constant and increasing 
the functionality of the product.
2. Obtain Product Information 
i. Material – Aluminum Bronze Alloy 
ii. Diameter of base plate –30 mm 
iii. Thickness of plate--3 mm 
iv. Cost of the scrap is – 293 rupee/Kg 
v. Pieces Produced annually – 8000 
vi. Process used – C.N.C. indexing milling 
vii. Cycle time—2.5 min 
viii. Anodizing—2/min 
ix. Material cost—65 gm 
x. Total Present cost – 29.99 rupee /piece 
*{1$=56 rupee}* 
Case Study
Case Study 
3. Functional Analysis of Present Functions
Case Study 
4. Develop Alternate Design Or Methods 
During brainstorming these ideas were listed: 
i. Change design 
ii. Change material 
iii. Use plastic 
iv. Make it lighter 
v. Change the production process 
vi. Use nylon indexing unit
Case Study 
5. Evaluation Phase 
For judging the ideas, the following designs were considered: 
A. Function 
B. Cost 
C. Maintainability 
D. Quality 
E. Space 
each of the above criteria was compared with others , and depending on 
their relative importance, three categories were formed, major, medium, 
and minor.
Case Study 
Comparing this criteria according 
to relative importance :
Case Study 
 From the paired comparison we get the following result: 
 The above ideas were discussed and the best feasible ideas 
were separated which were: 
a) Change the material to steel 
b) Use Nylon unit 
c) Use existing material
Case Study 
6. Cost Analysis
7. Result 
The total savings after the implementation of value engineering 
are given below: 
• Cost before analysis – 29.99 rupee 
• Total Cost of nylon knob – 18.40 rupee 
• Saving per product – 11.59 rupee 
• Percentage saving per product – 38.64 % 
• Annual Demand of the product – 8000 
• Total Annual Saving – 92,720 rupee 
• Value Improvement - 62.98 % 
Case Study
Conclusion 
Three goals that we're looking at value engineering: 
1. Identify additional functions that aren’t 
attractive to customers. 
2. Add attractive functions for customers. 
3. Saving because of the elimination of 
redundant functions.
Elemental LED
Value Engineering

Weitere ähnliche Inhalte

Was ist angesagt?

Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and AnalysisChaitanya Chenna
 
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYVALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYSJMIT,now NMAMIT NITTE
 
Value engineering case study ppt
Value engineering case study pptValue engineering case study ppt
Value engineering case study pptAnuragTewari2
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1Pankaj Nalwa
 
VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTAbhay Sharma
 
Value Engineering Introduction - K K B
Value Engineering Introduction - K K BValue Engineering Introduction - K K B
Value Engineering Introduction - K K BKumar Bhatt
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value EngineeringTushar Lohani
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GMohan Kumar G
 
Value Analysis and Value Engineering -Function & Evaluation of Function
Value Analysis and Value Engineering -Function & Evaluation of FunctionValue Analysis and Value Engineering -Function & Evaluation of Function
Value Analysis and Value Engineering -Function & Evaluation of FunctionJayaprakash Manickaraj
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentationjonschofield
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)Avijeet Suryavanshi
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process ReengineeringT HARI KUMAR
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysisPrathamesh Kadam
 
Product Design & Development - 1
Product Design & Development - 1Product Design & Development - 1
Product Design & Development - 1QRCE
 

Was ist angesagt? (20)

Value engineering
Value engineeringValue engineering
Value engineering
 
Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and Analysis
 
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRYVALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
VALUE ENGINEERING CONCEPT-A BRIEF IN CONSTRUCTION INDUSTRY
 
Value engineering case study ppt
Value engineering case study pptValue engineering case study ppt
Value engineering case study ppt
 
Value analysis
Value analysisValue analysis
Value analysis
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
 
VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPT
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Value Engineering Introduction - K K B
Value Engineering Introduction - K K BValue Engineering Introduction - K K B
Value Engineering Introduction - K K B
 
Value analysis and Value Engineering
Value analysis and Value EngineeringValue analysis and Value Engineering
Value analysis and Value Engineering
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Value Analysis and Value Engineering -Function & Evaluation of Function
Value Analysis and Value Engineering -Function & Evaluation of FunctionValue Analysis and Value Engineering -Function & Evaluation of Function
Value Analysis and Value Engineering -Function & Evaluation of Function
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentation
 
Value Engineering
Value   EngineeringValue   Engineering
Value Engineering
 
A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)A Study Report on Value Analysis and Value Engineering (VAVE)
A Study Report on Value Analysis and Value Engineering (VAVE)
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
 
crashing of project
crashing of project crashing of project
crashing of project
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysis
 
Product Design & Development - 1
Product Design & Development - 1Product Design & Development - 1
Product Design & Development - 1
 

Andere mochten auch

Cost management plan
Cost management planCost management plan
Cost management planJody R Flower
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementOleksandr Lutsaievskyi
 
Depreciation methods; straight line
Depreciation methods; straight lineDepreciation methods; straight line
Depreciation methods; straight lineGeoff Burton
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringQuEST Global
 
Cost Reduction: Inventively Reducing the Cost of the Bill of Materials
Cost Reduction: Inventively Reducing the Cost of the Bill of MaterialsCost Reduction: Inventively Reducing the Cost of the Bill of Materials
Cost Reduction: Inventively Reducing the Cost of the Bill of MaterialsRichard Platt
 
Sustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerSustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerMichael D'heur
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementYagnik Savaliya
 
Cost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and TechniquesCost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and TechniquesThomas Tanel
 
Depreciation methods
Depreciation methodsDepreciation methods
Depreciation methodsAWAN BROTHERS
 

Andere mochten auch (9)

Cost management plan
Cost management planCost management plan
Cost management plan
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost Management
 
Depreciation methods; straight line
Depreciation methods; straight lineDepreciation methods; straight line
Depreciation methods; straight line
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value Engineering
 
Cost Reduction: Inventively Reducing the Cost of the Bill of Materials
Cost Reduction: Inventively Reducing the Cost of the Bill of MaterialsCost Reduction: Inventively Reducing the Cost of the Bill of Materials
Cost Reduction: Inventively Reducing the Cost of the Bill of Materials
 
Sustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerSustainable Cost Reduction Primer
Sustainable Cost Reduction Primer
 
Fast diagram, Work Design and Measurement
Fast diagram, Work Design and MeasurementFast diagram, Work Design and Measurement
Fast diagram, Work Design and Measurement
 
Cost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and TechniquesCost Reduction Strategies:Focus and Techniques
Cost Reduction Strategies:Focus and Techniques
 
Depreciation methods
Depreciation methodsDepreciation methods
Depreciation methods
 

Ähnlich wie Value Engineering

value engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdfvalue engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdfAhmedMostafaNagi
 
Value Engineering
Value EngineeringValue Engineering
Value EngineeringEdwinJacob5
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET Journal
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptxDevenJally1
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
Design and Development of Hybrid Storage Shelf
Design and Development of Hybrid Storage ShelfDesign and Development of Hybrid Storage Shelf
Design and Development of Hybrid Storage ShelfIRJET Journal
 
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning Lab
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning LabIntroduction to Agile Dr Richard Guerrero_Wessex AHSN Learning Lab
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning LabHealth Innovation Wessex
 
IRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET Journal
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxPareshSwami2
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineeringAyush dixit
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyAditya Deshpande
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process PlanningPraveenManickam2
 
Products & processes
Products & processesProducts & processes
Products & processesEbtehalTamer1
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxDeeshaKhamar1
 
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...Letizia Jaccheri
 
IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET Journal
 

Ähnlich wie Value Engineering (20)

Value Engineering
Value Engineering Value Engineering
Value Engineering
 
value engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdfvalue engineering--conversion- Copy.pdf
value engineering--conversion- Copy.pdf
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 
Value engineering
Value engineeringValue engineering
Value engineering
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
Design and Development of Hybrid Storage Shelf
Design and Development of Hybrid Storage ShelfDesign and Development of Hybrid Storage Shelf
Design and Development of Hybrid Storage Shelf
 
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning Lab
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning LabIntroduction to Agile Dr Richard Guerrero_Wessex AHSN Learning Lab
Introduction to Agile Dr Richard Guerrero_Wessex AHSN Learning Lab
 
IRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value AnalysisIRJET- Overview of Value Engineering and Value Analysis
IRJET- Overview of Value Engineering and Value Analysis
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptx
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
ID, UP, & RUP.pptx
ID, UP, & RUP.pptxID, UP, & RUP.pptx
ID, UP, & RUP.pptx
 
Products & processes
Products & processesProducts & processes
Products & processes
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptx
 
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...Operationalization of Lean thinking through Value Stream Mapping with Simulat...
Operationalization of Lean thinking through Value Stream Mapping with Simulat...
 
IRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value EngineeringIRJET- A Case Study Analysis through the Implementation of Value Engineering
IRJET- A Case Study Analysis through the Implementation of Value Engineering
 

Kürzlich hochgeladen

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming languageSmritiSharma901052
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 

Kürzlich hochgeladen (20)

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
OOP concepts -in-Python programming language
OOP concepts -in-Python programming languageOOP concepts -in-Python programming language
OOP concepts -in-Python programming language
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 

Value Engineering

  • 1. Value Engineering Created by: Farzad Vasheghani Farahani Fall 2014 / Amir Kabir University of Technology
  • 2.  History  Value Concept  What is Value Engineering?  Implementation of VE in our project  Principle and Purpose of VE  Case Study  Conclusion Outline
  • 3. Lawrence D.Miles 1904 - 1985 History • Shortage of materials during world war II • General Electric company found that many of the substitutes have better or equal performance at less cost. • Lawrence De Miles Launched an effort to make the concept systematic • Establishment of Society of American Value Engineers “SAVE” in 1959
  • 4. What is Value? • Value is the lowest price you must pay to provide a reliable function or service (L. D. Miles) • “The ratio of Function to Cost” Value = Worth Cost = Function(Utility) Cost
  • 5. Waste Cost Why do Projects have “Unnecessary” Costs? 1. Low Time for Designing 2. Lack of information 3. Lack of Ideas 4. Negative Prejudice 5. Lack Of Experience 6. Weaknesses in human relations 7. Multi Concept …
  • 6. What is Value Engineering?
  • 7. What is Value Engineering? • Value Engineering (VE, or Value Analysis) is a management technique that seeks the best functional balance between cost , reliability and performance of a product, project, process or service.
  • 8. Implementation • How is a Value Engineering Study Conducted?
  • 9. The Job Plan Value engineering is often done by systematically following a multi-stage job plan. Larry Miles' original system was a six-step procedure which he called the "value analysis job plan."
  • 10. The Job Plan The modern version has the following eight steps: 1. Orientation 2. Information 3. Functional 4. Creative 5. Evaluation 6. Development 7. Presentation 8. Implementation and Follow-up
  • 11. The Job Plan 1. Orientation Phase  Identify issues  Prioritize Issues  Drafts scopes and objective  Establish evaluation factors  Determine Study Team  Collect Data  Prepare for value study  ...
  • 12. The Job Plan 2. Information Phase  Further familiarization of the project by the team; all team members participate in determine the true needs of the project.  Areas of high cost or low worth are identified.
  • 13. The Job Plan 3. Functional Phase  Functional analysis outlines the basic function of a product using a verb and a noun such as ‘boil water’ as in the case of our kettle. What is the Function? “ Boil Water ” Verb Noun
  • 14. The Job Plan 4. Creative Phase  This step requires a certain amount of creative thinking by the team. A technique that is useful for this type of analysis is brainstorming. This stage is concerned with developing alternative.
  • 15. The Job Plan 5. Evaluation Phase  In this phase of the workshop, the VA team judges the ideas developed during the creative phase.  The VA team ranks the ideas.  Ideas found to be irrelevant or not worthy of additional study are disregarded.  Those ideas that represent the greatest potential for cost savings and improvements are selected for development.
  • 16. The Job Plan 6. Development Phase  The team develops the selected ideas into alternatives (or proposals) with a sufficient level of documentation to allow decision makers to determine if the alternative should be implemented.
  • 17. The Job Plan 7. Presentation Phase 1. The presentation phase is actually presenting the best alternative (or alternatives) to those who have the authority to implement the proposed solutions that are acceptable.
  • 18. The Job Plan 8. Implementation And Follow Up 1. Develop an implementation plan 2. Execute the plan 3. Monitor the plan to completion Objective: During the implementation and follow-up phase, management must assure that approved recommendations are converted into actions.
  • 19. Purpose 1. Determine the best design alternatives 2. Reduce cost 3. Improve quality 4. Increase reliability and availability 5. Enhance customer satisfaction 6. Improve organizational performance 7. Identify problems 8. Develop recommended solutions
  • 20. Potential Saving From VE Early changes are naturally less expensive than later ones, as shown in the diagram below.
  • 21. Principles Value Engineering principles: Systematic method for evaluating product performance and value The use of multi-functional teams Focus on a simplified product 1 2 3
  • 22. Case Study Focus Adjustment Knob for Slit Lamp
  • 23. Case Study Introduce the Product • In this presentation we have considered a medical instrument manufacturing company, Aadarsh Instruments, located in Ambala. • This firm is producing different types of microscopes which they export to various countries around the globe. • One of their model SL250 have a component named Focus Adjustment Knob for Slit Lamp in microscope. This microscope has found application in the field of eye inspection.
  • 24. Case Study The steps used for this purpose are as follows: 1. Product selection plan 2. Gather information of product 3. Functional analysis 4. Creativity Worksheet 5. Evaluation sheet 6. Cost analysis 7. Result
  • 25. Case Study 1. Plan For Product Selection • This Product is used to adjust the focus of lens for magnification purpose. • The present specifications of this part and its material used are costlier than the average industry cost. • Value of this product can be increased by maintaining its functions and reducing its cost or keeping the cost constant and increasing the functionality of the product.
  • 26. 2. Obtain Product Information i. Material – Aluminum Bronze Alloy ii. Diameter of base plate –30 mm iii. Thickness of plate--3 mm iv. Cost of the scrap is – 293 rupee/Kg v. Pieces Produced annually – 8000 vi. Process used – C.N.C. indexing milling vii. Cycle time—2.5 min viii. Anodizing—2/min ix. Material cost—65 gm x. Total Present cost – 29.99 rupee /piece *{1$=56 rupee}* Case Study
  • 27. Case Study 3. Functional Analysis of Present Functions
  • 28. Case Study 4. Develop Alternate Design Or Methods During brainstorming these ideas were listed: i. Change design ii. Change material iii. Use plastic iv. Make it lighter v. Change the production process vi. Use nylon indexing unit
  • 29. Case Study 5. Evaluation Phase For judging the ideas, the following designs were considered: A. Function B. Cost C. Maintainability D. Quality E. Space each of the above criteria was compared with others , and depending on their relative importance, three categories were formed, major, medium, and minor.
  • 30. Case Study Comparing this criteria according to relative importance :
  • 31. Case Study  From the paired comparison we get the following result:  The above ideas were discussed and the best feasible ideas were separated which were: a) Change the material to steel b) Use Nylon unit c) Use existing material
  • 32. Case Study 6. Cost Analysis
  • 33. 7. Result The total savings after the implementation of value engineering are given below: • Cost before analysis – 29.99 rupee • Total Cost of nylon knob – 18.40 rupee • Saving per product – 11.59 rupee • Percentage saving per product – 38.64 % • Annual Demand of the product – 8000 • Total Annual Saving – 92,720 rupee • Value Improvement - 62.98 % Case Study
  • 34. Conclusion Three goals that we're looking at value engineering: 1. Identify additional functions that aren’t attractive to customers. 2. Add attractive functions for customers. 3. Saving because of the elimination of redundant functions.