Production System Effiency STANDARDIZED WORK  TRAINING
Definition – Standardized Work  ,[object Object],[object Object],[object Object],[object Object],[object Object]
Objective ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Key Factors ,[object Object],[object Object],[object Object],[object Object],[object Object]
Cycle   Time and Takt Time Takt time is a rate that represents, in seconds, the number of parts the customer expect us to deliver Cycle time is a rate, in seconds, at which the product must be produced in order to offset “waste” in the system and achieve the Takt Time needed to satisfy the customer
Work Content Sum of the basic tasks carried out at each workstation to obtain a complete and good product (amount of work for a part) It is measured by timing the cycle of each operator using a cycle time measurement form.  The measurement must be based on 20 consecutive cycle times (everything included).  Time necessary for self-inspection has to be included. For each operator, we will show the minimum time,  wait time excluded ,  as well as the maximun and mean time.
FORMS ,[object Object],[object Object],[object Object],[object Object]
Standardized Work Chart ,[object Object],[object Object],[object Object]
Standardized Work Chart
Work Combination  Chart ,[object Object],[object Object],[object Object]
Work Combination  Chart
Standard Operation Sheet ,[object Object],[object Object]
Standard Operation Sheet
Standard Operation Sheet

Weitere ähnliche Inhalte

Was ist angesagt?

Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleFrank-G. Adler
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessW3 Group Canada Inc.
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniquesKobi Vider
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenChetanMehta39
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 

Was ist angesagt? (20)

Introduction to Standardized Work
Introduction to Standardized WorkIntroduction to Standardized Work
Introduction to Standardized Work
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Standard Work
Standard WorkStandard Work
Standard Work
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
Standard work
Standard workStandard work
Standard work
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
Visual management controls systems techniques
Visual management controls systems techniquesVisual management controls systems techniques
Visual management controls systems techniques
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
OEE
OEEOEE
OEE
 
SMED-Observation Training
SMED-Observation TrainingSMED-Observation Training
SMED-Observation Training
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Spaghetti Chart
Spaghetti ChartSpaghetti Chart
Spaghetti Chart
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Visual Controls - Mieruka
Visual Controls - MierukaVisual Controls - Mieruka
Visual Controls - Mieruka
 
13 smed methodology_v2
13 smed methodology_v213 smed methodology_v2
13 smed methodology_v2
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 

Ähnlich wie Standardized Work

IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET Journal
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and managementbahir dar university
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxssusera85eeb1
 
Automation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfAutomation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfSanjayK560966
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWIAEME Publication
 
SMV VS CYCLE TIME
SMV VS CYCLE TIME SMV VS CYCLE TIME
SMV VS CYCLE TIME Liton Ahmed
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryInfoStream Solutions
 
Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringlovely467637
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...IRJET Journal
 

Ähnlich wie Standardized Work (20)

IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
IRJET- Standard Work Documents (SWD) Development and Implementation of New Pr...
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
 
Industrial Machines Maintenance
Industrial Machines MaintenanceIndustrial Machines Maintenance
Industrial Machines Maintenance
 
SAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account AssignmentSAP PM: Inspection Rounds & Operation Account Assignment
SAP PM: Inspection Rounds & Operation Account Assignment
 
B. Manufacturing Engineering.docx
B. Manufacturing Engineering.docxB. Manufacturing Engineering.docx
B. Manufacturing Engineering.docx
 
Automation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdfAutomation in Manufacturing (1).pdf
Automation in Manufacturing (1).pdf
 
A line in apparel
A line in apparelA line in apparel
A line in apparel
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
 
SMV VS CYCLE TIME
SMV VS CYCLE TIME SMV VS CYCLE TIME
SMV VS CYCLE TIME
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing IndustryOverall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
Overall Equipment Efficiency - A Next-Gen KPI for the Manufacturing Industry
 
Proteus mmx overview
Proteus mmx overviewProteus mmx overview
Proteus mmx overview
 
Chapter4EN.PDF.pdf
Chapter4EN.PDF.pdfChapter4EN.PDF.pdf
Chapter4EN.PDF.pdf
 
Automobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineeringAutomobile parts design diploma mechanical engineering
Automobile parts design diploma mechanical engineering
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
 

Mehr von exerciselean

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011exerciselean
 
F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009exerciselean
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015exerciselean
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010exerciselean
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)exerciselean
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEANexerciselean
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshopexerciselean
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009exerciselean
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]exerciselean
 

Mehr von exerciselean (10)

Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011Exercise Lean LLC_revised Brochure July 11 2011
Exercise Lean LLC_revised Brochure July 11 2011
 
F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009F119 Team_Report_out_Sept 10, 2009
F119 Team_Report_out_Sept 10, 2009
 
System Kaizen Approach May 2015
System Kaizen Approach May 2015System Kaizen Approach May 2015
System Kaizen Approach May 2015
 
Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010Rapid Site Assessment June 27 2010
Rapid Site Assessment June 27 2010
 
Tpm Presentation
Tpm PresentationTpm Presentation
Tpm Presentation
 
Kaizen System Diagnosis(1)
Kaizen  System Diagnosis(1)Kaizen  System Diagnosis(1)
Kaizen System Diagnosis(1)
 
8 Wastes - getting LEAN
8 Wastes - getting LEAN8 Wastes - getting LEAN
8 Wastes - getting LEAN
 
Setup Reduction Workshop
Setup Reduction WorkshopSetup Reduction Workshop
Setup Reduction Workshop
 
A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009A3 Report Out Kitting Project June 1, 2009
A3 Report Out Kitting Project June 1, 2009
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
 

Kürzlich hochgeladen

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Kürzlich hochgeladen (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Standardized Work

  • 1. Production System Effiency STANDARDIZED WORK TRAINING
  • 2.
  • 3.
  • 4.
  • 5. Cycle Time and Takt Time Takt time is a rate that represents, in seconds, the number of parts the customer expect us to deliver Cycle time is a rate, in seconds, at which the product must be produced in order to offset “waste” in the system and achieve the Takt Time needed to satisfy the customer
  • 6. Work Content Sum of the basic tasks carried out at each workstation to obtain a complete and good product (amount of work for a part) It is measured by timing the cycle of each operator using a cycle time measurement form. The measurement must be based on 20 consecutive cycle times (everything included). Time necessary for self-inspection has to be included. For each operator, we will show the minimum time, wait time excluded , as well as the maximun and mean time.
  • 7.
  • 8.
  • 10.
  • 12.