2011 04-26 powell-street_urban_design_plan
1. POWELL STREET URBAN DESIGN PLAN
F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
2.
3. 3P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Acknowledgements
City of Emeryville
1333 Park Avenue
Emeryville, CA 94608-3517
Ofļ¬ce of the City Manager/Emeryville Redevelopment Agency
Patrick D. OāKeeffe, City Manager/Agency Executive Director
Planning and Building Department
Charles S. Bryant (AICP), Director
Public Works Department
Maurice Kaufman, Public Works Director
Department of Economic Development and Housing
Helen Bean, Director
Michelle De Guzman, Community Economic Development Coordinator
Wallace Roberts & Todd, LLC ā San Francisco
James K. Stickley, ASLA, Principal
John R. Gibbs, ASLA, Project Manager / Landscape Architect
Julie Peng, Landscape Architect
Dan Affleck, Landscape Designer
Adopted April 5th, 2011, by vote of the Emeryville City Council
4. 4P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Table of Contents
Project Approach.........................................................................................................5
Existing Conditions.....................................................................................................6
Site Photos.........................................................................................................6
Aerial Photo and Survey...................................................................................8
ProjectOverview..........................................................................................................7
Phase 1: Multi-Modal Improvements.......................................................................12
Phase 2: Civic Identity................................................................................................16
Phase3: TransitIdentity...............................................................................................23
Supplemental Information........................................................................................26
StreetSections.................................................................................................26
Project Concept Precedents...........................................................................28
Art Elements...................................................................................................29
Bicycle and Pedestrian Safety.........................................................................30
Gateway Parcel Massing Study......................................................................31
AC Transit Route Map....................................................................................32
Transit Network Summary..............................................................................33
General Plan Diagrams...................................................................................34 Powell Street as it currently exists- a vast auto-oriented corridor leading into the city.
5. 5P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Market Place
Expansion
Transit
Center
BRE
Development Area
South Bayfront
Site B
Market Place
Expansion
Powell Street Urban
Design Project Study Area
Shellmound Design
Guidelines Study
Powell Street Urban
Design Project Study Area BAY TRAIL
BAYTRAIL
East Shore State Park
PROJECT APPROACH
Conceptual Design Narrative
Project Guiding Principles
The General Plan offers street designations and level of service criteria thatā¢
balance -if not favor- pedestrian, bicycle, and transit mobility. The Plan further
articulates a vision for connectivity, revitalization, and sustainability.
The corridor has been extensively studied. Project designers should incorporateā¢
the recommendations of previous authors including the UC Berkeley Traffic
Safety Study. The design should embody the objectives of a ācomplete street.ā
The corridor serves as a significant point of welcome to the City for residents,ā¢
freeway passerbyes, and regional shoppers. As a gateway, it should effectively
announce and characterize Emeryvilleās quality of life.
In order to provide optimal pedestrian/bicycle/transit circulation and civicā¢
beautification without reducing vehicle travel lanes, the corridor can be
widened into the adjacent parcels when redesign of those uses is appropriate.
The number of travel lanes on Powell will not change.
Regional and City residents should gain improved pedestrian and bicycle accessā¢
to waterfront open space resources via the Bay Trail and other conenctions.
The project should promote the revitalization of private properties and stimulateā¢
reinvestment/redevelopment.
The Powell / Shellmound District is an emerging, mixed-use urbanā¢
neighborhood. A finer grain mix of green space, neighborhood serving retail,
and pedestrian access is increasingly appropriate.
Overall Design Objectives
Identify clear project phases that address near term multi-modal improvements (0-5 years) and a long term vision (8-ā¢
15 years). Each phase should maximize improvement to pedestrian, bicycle, and transit functions.
Create a distinctive sense of place that makes legible the design principles and builds a positive civic gateway.ā¢
Connect the Cityās inland neighborhoods to the Bay and extensive waterfront open space via substantial sidewalk/ā¢
multi-use path connectors.
Prescribe a street geometry where curbs, gutters, and crosswalks each contribute to a clear and regularizedā¢
aesthetic. Compress vehicle-oriented layout such as curb radii, lane width, and speed to acceptable minimums to
maintain function while improving pedestrian safety and access.
Add crosswalks and configure with center median pedestrian refuges.ā¢
Treat stormwater runoff to remove pollutants before discharge to Bay.ā¢
Configure new building edges and massing to best address issues of height, transparency, street animation, andā¢
entry.
Promote safe sidewalk conditions through the use of paving and signage which clearly delineates access zones forā¢
cyclist and pedestrians.
Provide a connection point from Powell Street to East Shore State Park.ā¢
Project area and nearby development projects
6. 6P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS PHOTOS
Sequential walk on the SOUTH side of Powell St, from Frontage Rd. walking east towards Shellmound St.
Sequential walk on the NORTH side of Powell Street, from Frontage Rd. walking east towards Christie Ave.
1.
6.
2.
7.
3.
8.
4.
9.
5.
10.
1.
6.
2.
7.
3.
8.
4.
9.
5.
10.
7. 7P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS PHOTOS
View of Powell St. and Christie Ave. looking west
View of historic map describing irregular and unique pattern of the city grid
that formed over time.
Ground level view of Powell St. Emeryville Crescent at Powell St. and Frontage Rd.
8. 8P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
EXISTING CONDITIONS AERIAL AND SURVEY 0 40ā 80ā 160ā
9. 9P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PROJECT OVERVIEW
Phase 1:
Multi-Modal Improvements
Reconfigure south side Powell Bay Trail/sidewalk and landscape toā¢
improve pedestrian/bicycle access from Shellmound to Frontage
Road. Greenway is public in character and beautifies the private retail
frontage.
Provide new Transbay bus stops for San Francisco/Emeryvilleā¢
communting, also available for use by Emery-Go-Round.
Provide various pedestrian and bicycle improvements including thoseā¢
identified by UC Berkeley Traffic Safety Study.
Phase 2:
Civic Identity
Create an enhanced pedestrian and bicycle path and landscape cor-ā¢
ridor on the north side of Powell connecting Christie to the Frontage
Road.
Provide a center median of a sufficient size to include large trees,ā¢
mounded soil above the water table, and other design features that
create a positive civic gateway feature.
Provide new crosswalk at Powell and Christie intersection.ā¢
Create overlook to Emeryville Crescent and gateway to Eastshoreā¢
State Park.
Phase 3:
Transit Vision
Provide dedicated transit access from the freeway off ramp throughā¢
the Powell Christie intersection (remove stops at ramp locations).
Provide new crosswalk at Powell and freeway ramp intersection.ā¢
Configure Powell Frontage intersection to allow bus only left turnā¢
access to bridge. Prevent illegal vehicle access through use of hydraulic
bollard, signage, and raised, mountable curb.
Create an enhanced pedestrian and bicycle path and landscapeā¢
corridor on the south side of Powell to mirror the north side.
10. 10P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
LANE ADDED
BRIDGE WIDENED
BAY TRAIL
EXISTING CONDITIONS
PHASE 1
BAY TRAIL BAY TRAIL
BAY TRAIL
DENNYāS
POWELL ST. PLAZA
HOTEL
I-80 OVERPASS
GAS
STATION
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
DENNYāS
POWELL ST. PLAZA
HOTEL
I-80 OVERPASS
GAS
STATION
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
New
Pedestrian
Signal
EXISTING AND PHASE 1 DIAGRAM
I-80 OVERPASS
New Crosswalk
Tighten RadiusArt Opportunity Zone
Art Opportunity Zone
New Bus Sop Extend Median into Crosswalk to
Provide Pedestrian Refuge
Straighten Crosswalk
Straighten SidewalkNew Bus Stop
11. 11P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1 SUMMARY OF CHANGES
Phase 1: Multi-Modal Improvements
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Straighten Class I path on south sideā¢
at Powell Plaza and I-80 underpass
from Frontage Rd. to Shellmound
Ave.
Improve visibility of Bay Trail on southā¢
side as important connection to the
waterfront.
Improve visibility and crossing safetyā¢
at ramp crossings on south side (I-80
eastbound and westbound).
Improve safety at I-80 on ramp nearā¢
Dennyās by tightening radius and
planting the area.
Improve pedestrian crossing ofā¢
Frontage Rd. on north side by
installing pedestrian signal phase on
right turn lanes.
Improve Bay Trail connection toā¢
Shellmound Ave. at Hotel parking lot.
Extend median into crosswalk toā¢
provide pedestrian refuge.
Provide striping, special paving andā¢
signage to clearly seperate bike and
pedestrian traļ¬c appropriate to path
width.
Provide interim stops for AC Transitā¢
Transbay busses. Inbound bus stop is
at oļ¬ ramp location. Bus would pull
out of traļ¬c per Caltrans. Outbound
is oļ¬ Frontage Rd.
Highlight shelters withā¢
contemporary design, lighting, and
proximity to sidewalk connection.
Consider sponsorship of interimā¢
shelters by businesses and arts
groups.
Powell St.-Frontage Rd:
Add new approach (one-wayā¢
northbound, left and thru) for
traļ¬c from eastbound I-80 oļ¬
ramp left-turns.
Add new phase to signal timingā¢
at intersection.
Powell-I-80 oļ¬ ramps:
Signal operation/phasing toā¢
remain the same, but adjust
timings parameters.
Powell-Christie:
Change existing westboundā¢
bridge approach by adding left-
turn lane.
Modify eastbound bridge toā¢
accommodate Bay Street garage
entry.
Adjust timings parameters ofā¢
signal operation/phasing.
Create new landscape treatmentā¢
for south side Powell St. that
compliments both civic and retail
improvement goals.
Provide lighting and/or artā¢
features to convey Bay Trail
connection from Christie Ave. to
Frontage Rd. on south side.
Indicates Project Recommended by UC Berkeley Pedestrian and Bicycle Safety Evalua-
tion for the the City of Emeryville at Four Intersections. These Projects are the Current
Subject of The Bike and Pedestrian Safety Improvement Project by the City of Emeryville
Department of Public Works.
12. 12P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
Southeast corner of Powell St. and Christie Ave. existing condition Southeast corner of Powell St. and Christie Ave. Phase 1 condition
View of lighted path under Interstate 80
13. 13P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
14. 14P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
View of proposed bus stop at corner of Powell St. and I-80 off ramp
15. 15P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 1: MULTI-MODAL IMPROVEMENTS
DENNYāS
I-80
OVERPASS
POWELL ST.
PLAZA
POWELL ST.
GAS
STATION
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD
16. 16P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
NEW RAMP CONNECTOR
NEW CENTRAL BUS SHELTER
BUS ONLY LEFT TURN
PHASE 2
PHASE 3
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
POWELL ST. PLAZA
HOTELI-80 OVERPASS
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
HOTEL
I-80 OVERPASS
LA-Z- BOY
POWELL ST.
CHRISTIEAVE.
FRONTAGERD.
PHASE 2 AND 3 DIAGRAM
Straighten North Sidewalk
Straighten South Sidewalk
Add Crosswalk
Add Crosswalk
Re-align Crosswalk
I-80 OVERPASS
I-80 OVERPASS
Art Opportunity Zone
17. 17P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Create new multi-use path andā¢
Class I bicycle facility on north
side of Powell St.
Create new center median withā¢
pedestrian refuge to improve
crossing of Powell St. at Christie
Ave.
Add new crosswalk on Powellā¢
St. at I-80 oļ¬ ramps.
Modify curb and radius onā¢
northeast corner to provide
new crosswalk at Powell St/
Christie Ave. intersection.
Provide striping, special pavingā¢
and signage to clearly seperate
bicycle and pedestrian traļ¬c
appropriate to path width.
Provide on-going improvementā¢
to existing operations.
Improve eastbound I-80ā¢
oļ¬ ramp and Powell St.
intersection. Redirect left
turn traļ¬c away under
overpass and to Powell St.-
Frontage Rd.intersection.
Restripe westbound lanes onā¢
Powell St. from Christie Ave.
to Frontage Rd.
Create major new civicā¢
identity from landscape
treatments on north side
and center median.
Add new decorative lightā¢
ļ¬xtures to north and south
side of Powell St.
Create opportunities forā¢
more public art on new
paths to celebrate and
interpret the unique culture
of Emeryville.
Create overlook atā¢
Emeryville Crescent to
reconnect city to Bay
and serve as gateway to
Eastshore Park.
Pedestrian and Bicycle Transit Vehicle Image and Atmosphere
Create new Bay Trail/multi-ā¢
use path on newly-landscaped
south side of Powell connecting
Shellmound St. to Bay.
Create new center median withā¢
pedestrian refuge to improve
crossing of Powell St. at Christie
Ave.
Provide striping, special pavingā¢
and signage to clearly seperate
bicycle and pedestrian traļ¬c
appropriate to path width.
Provide dedicated transitā¢
only lanes and center median
station as civic marker and
signature gateway feature.
Modify signal timing atā¢
Powell St. and Christie Ave. to
prioritize bus movements over
private vehicles.
Provide bus only lane forā¢
westbound I-80 on ramp from
Powell St.
Restripe eastbound lanes onā¢
Powell from Frontage Road
to Christie Ave.
Prevent illegal westboundā¢
I-80 onramp access with
ļ¬exible posts and a hydraulic
bollard.
Integrate public art intoā¢
new transit shelter design
through dynamic graphic
media, lighting, color, and or
form.
Complete civic identityā¢
through landscape
treatments on south side
to match north. Reinstall
decorative lights from
Phase 2.
PHASE 2 AND 3 SUMMARY OF CHANGES
Phase 2: Civic Identity
Phase 3: Transit Vision
18. 18P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
Existing condition
Southeast corner of Powell St. and Christie Ave. Phase 2 condition
View illustrating the landforms proposed for the Phase 2 median
Southeast corner of Powell St. and Christie Ave. Phase 1 condition
19. 19P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
20. 20P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
View of proposed Bay Trail Overlook At Emeryville Crescent (Powell St. and Frontage Rd.)
View of existing location
21. 21P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 2: CIVIC IDENTITY
I-80
OVERPASS
POWELL ST.
PLAZA
NEW
DEVELOPMENT
PARCEL
POWELL ST.
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD
22. 22P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Existing condition
Southeast corner of Powell St. and Christie Ave. Phase 2 condition Southeast corner of Powell St. and Christie Ave. Phase 3 condition
Northeast corner of Powell St. and Christie Ave. Phase 3 condition
PHASE 2: CIVIC IDENTITY
23. 23P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
24. 24P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
View of reconfigured Bay Trail connection to crescent overlook and special bus only ramp access
25. 25P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
PHASE 3: TRANSIT IDENTITY
I-80
OVERPASS
NEW
DEVELOPMENT
PARCEL
NEW
DEVELOPMENT
PARCEL
POWELL ST.
LA-Z-
BOY
CHRISTIEAVE.
FRONTAGERD.
26. 26P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Median SidewalkSidewalk
10.5ā 10ā10.5ā 10ā 10ā 12ā 6ā10ā10.5ā10.5ā10ā.510ā7ā 13ā
Existing Condition Powell St. Section
Phase 1 Powell St. Section
Median SidewalkSidewalk
10ā 10ā10ā 10ā 10ā 12ā 6ā10ā10ā10ā10ā10ā7ā 13ā
POWELL STREET CROSS SECTIONS
LOOKING WEST TOWARDS FREEWAY
27. 27P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
POWELL STREET CROSS SECTIONS
P H A S E 2 P O W E L L S T S E C T I O N
Phase 3 Powell St. Section
Phase 2 Powell St. Section
Bus Shelter SidewalkSidewalk
11ā56ā 11ā 11ā 11ā 8ā11ā11ā 11ā 11ā 11ā8ā 15ā15ā 20ā20ā
P H A S E 2 P O W E LLL LLLLLLL S T S ES C T I O N
30ā
Median SidewalkSidewalk
11ā10.5ā10ā.510.5ā10.5ā10.5ā10ā7ā 13ā 11ā 11ā 11ā 8ā 15ā 20ā
LOOKING WEST TOWARDS FREEWAY
28. 28P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
PROJECT CONCEPT PRECEDENTS
Station canopy- Lyon, France Transit boulevard- San Francisco, CA
BRT station- Eugene, OregonGrand civic boulevard, Champs Elysees- Paris, France Civic station design- Liege, Belgium
29. 29P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
ART ELEMENTS
The Powell Street corridor provides opportunities for art installations and lighting elements
that can function as a gateway to the city and an expression of the unique character of
Emeryville. This page shows interesting examples from other cities.
30. 30P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.SUPPLEMENTAL INFORMATION
BICYCLE AND PEDESTRIAN SAFETY
Signage and striping can clearly direct the flow of traffic and prevent conflict between
cylists and pedestrians, as seen in these examples.
31. 31P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
Massing and Form Description
Building Form/Edges: Flexible frontage massing with potentialā¢
entries and varying degrees of transparency. (i.e. de Young
Museum)
FAR shown above 3.5 - 5.0ā¢
Massing and Form Description
Building Form/Edges: Consistent frontage massing andā¢
architecture with entry positioned at corner and Christie. Towers
are symmetrical to the North and South of Powell St.
FAR shown above 3.5-5.0ā¢
Massing and Form Description
Building Form/Edges: Two separate masses are appropriate onā¢
Powell, shown as a tower and 5-story building, with a plaza
between and accessed from Powell Street and the site interior.
Each building should engage the street with high transparency.
Event venue type uses would contribute to the theme of
commerce.
Scheme shows a second tower to test mass and FARā¢
FAR shown above 4.5-6.0ā¢
SUPPLEMENTAL INFORMATION
GATEWAY PARCEL MASSING STUDY
ChristieAve
Powell St
Powell St Powell St
ChristieAve
ChristieAve
Potential Programming
Mixed-use with residential, office/commercial, cultural venueā¢
Ground floor retail facing Christie Ave.ā¢
Assumes realigned Christie Wayā¢
Potential Programming
Mixed-use with residential, office/commercialā¢
Ground floor retail facing Christie Aveā¢
Assumes realigned Christie Wayā¢ Potential Programming
Mixed-use with residential, office/commercial, cultural/event venueā¢
Exhibition space, conference center may be appropriateā¢
Ground floor retail facing Christie Aveā¢
Assumes realigned Christie Wayā¢
32. 32P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
SUPPLEMENTAL INFORMATION
AC TRANSIT ROUTE MAP SOURCE: www.actransit.org
33. 33P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
C
J
Z
F
57
EM
J
C
Z
F
57
EM Emery-Go-Round
(local service)
Bus Line Designations
Transbay Service
Late Night
(last trip midnight)
Commute Hour Service
(no midday or night service)
Commute Hour Service
(no midday or night service)
Transbay Service
SUPPLEMENTAL INFORMATION
TRANSIT NETWORK SUMMARY
34. 34P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
High Density Residential
Medium-High Density Residential
Medium Density Residential
Mixed Use with Residential
Mixed Use with Non-Residential
Office/Technology
Industrial
Public
Marina
Park/Open Space
Other Park Opportunity
Regional Retail Overlay
Neighborhood Retail Overlay
Neighborhood Center
Major Hub
Transit Center
TransitCent
er
1/4
M
ile
1/4
Mile
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
FIGURE 2-2
Land Use Diagram
2-11
S a n F r a n c i s c o B a y
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
MAXIMUM FLOOR AREA RATIOS
EMERYVILLE GENERAL PLAN
Notes: Maximum FAR may not be attainable
on all sites given development standards
in the Zoning Ordinance.
Bonus FAR is discretionary and will be
awarded only after developers
demonstrate that projects meet
community goals.
* FARs are established by Planned Unit
Developments (PUDs) and do not
include parking in the calculations.
Floor Area Ratio (FAR)
Base/with Bonus
3.0/
4.0
3.0/
4.0
4.0/
5.5
4.0/
5.5
1.5/
2.0
0.75/
1.25
0.75/
1.25
1.5/
2.0
5.5/
8.0
4.0/
5.5
5.5/
8.0
0.75/
1.25
3.0/
4.0
4.0/
5.5
2.3*
0.75/
1.25
1.0/
1.5
1.4*
0.75/
1.25
1.5/
2.0
3.0/
4.0
4.0/
5.54.0/
5.5
1.5/
2.0
1.5/
2.0 3.0/
4.0
0.75/
1.25
1.5/2.0
3.0/
4.0
1.5/
2.0
FIGURE 2-3
Maximum Floor Area Ratios
2-14
S a n F r a n c i s c o B a y
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
AREAS OF CHANGE AND STABILITY
EMERYVILLE GENERAL PLAN
Areas of Potential Change
Master Plan Areas
Areas of Stability
To Bay Bridge
2-5
FIGURE 2-1
Areas of Change and Stabilityā 2009
S a n F r a n c i s c o B a y
Transit Center
Transit Center
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
0 600 1200 2400300
FEET
Amtrak
Station
Emery
Secondary
School
Emeryville
Marketplace
Approved
Civic
Center
Anna Yates
Elementary
School
Center for
Community Life
(proposed)
TransitCen
ter
FRONTAGEROAD
EASTSHOREFREEWAY
SHELLMOUND
ST
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLIS
ST
HARUFF ST
OVERLANDAVE
54TH
ST
55TH ST
BEAUDRY
ST
DOYLE
ST
POWELL
ST
59TH ST
61ST
ST
62ND
ST
63RD
ST
HOLLIS
ST
DOYLE
ST
VALLEJO
ST
64TH
ST
VALLEJO
ST
OCEAN
AVE
65TH
ST
67TH
ST
66TH
ST
SHERWIN
ST
HALLECK
ST
HUBBARD
ST
ST
HOLDEN
EMERY
ST
WATTSST
HARLANST
HAVENST
ST
45TH
PARK AVE
43RD ST
45TH ST
47TH ST
SALEMST.
46TH ST.
45TH ST.
44TH ST.
43RD ST.
42ND
ST.
41ST
ST.
40TH ST.
YERBA BUENA AVE
39TH
ST.
38TH ST.
APGAR ST.
36TH
ST.
37TH ST.
PERALTA
ST.
MAGNOLIA
ST.
47TH
ST
48TH ST
ADELINE
ST
SANPABLO
AVE
HORTON
ST
POWELL ST
40TH
ST
YERBA BUENA AVE.
CHRISTIEA
VE
CHIRON
WAY
PEABODY RD
MANDELAPKW
Y
SHELLMOUNDST
SANPABLO
AVE
64TH
ST
INTERSTATE 80
ASH
BY
AVE
W.MACARTHUR BLVD
Neighborhood Center
Activity Nodes
Neighborhood Retail Overlay
Regional Retail
Residential
Mixed Use
Industrial
Major Street
Large Park
Greenway
Existing Bike/Ped. Crossing
Potential Bike/Ped. Crossing
Freeway
Gateway
Core
CITY STRUCTURE
EMERYVILLE GENERAL PLAN
FIGURE 5-1
City Structure
5-4
SUPPLEMENTAL INFORMATION
GENERAL PLAN DIAGRAMS
SOURCE: Emerville General Plan January 2009
35. 35P O W E L L S T R E E T U R B A N D E S I G N P L A N : F R O N TA G E R O A D T O C H R I S T I E AV E N U E
City of Emeryville
Wallace Roberts & Todd, LLC.
S a n F r a n c i s c o B a y
Pedestrianonly
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYSTPOWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
BAY TRAIL
EMERYVILLE GENERAL PLAN
Bay Trail
Spur Trail
Spur Pedestrian Only Trail
Existing Overpass
Approved Overpass
To Bay Bridge To Mandela Parkway
via 32nd St
FIGURE 3-3
Bay Trail
3-10
S a n F r a n c i s c o B a y
Pedestrian and bike
access to Bay Bridge
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
BICYCLE SYSTEM
EMERYVILLE GENERAL PLAN FRAMEWORK
To MacArthur
BART
To West Oakland
BART
Existing or Proposed Class I
Existing or Proposed Class II & III
Bike Boulevard
Existing Overpass
Approved Overpass/Underpass
Proposed Overpass/Underpass
Existing Railroad Grade Crossing
Grade-separated crossings
across I-80 (for pedestrians
and bicycles) and the railroad
(for all travel modes) north
of Powell St
FIGURE 3-4
Bicycle System
3-12
S a n F r a n c i s c o B a y
To Bay Bridge
Transit Cent
er
Amtrak
Station
Transit Cent
er
Transit Cent
er
1/4
M
ile
1/4
Mile
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
Boat
Launching
Ramp
Fishing Pier
Windsurfing
Launch
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
CIRCULATION
EMERYVILLE GENERAL PLAN
To MacArthur
BART
To West Oakland
BART
Transit Street
Connector Street
Local Street
Auto Dominated Highway
Regional Rail
Bikeways
Existing or Proposed Class I
Existing or Proposed Class II & III
Bike Boulevard
Pedestrian-only Trail
Pedestrian Priority Zone
Existing Overpass
Approved Overpass/Underpass
(Pedestrian Only)
Proposed Overpass/Underpass
Existing Railroad Grade Crossing
Major Transit Hub
Grade-separated crossings
across I-80 (for pedestrians
and bicycles) and the railroad
(for all travel modes) north
of Powell St
FIGURE 3-1
Circulation
3-6
S a n F r a n c i s c o B a y
Transit Center
Amtrak
Station
Transit Cente
r
1/4
M
ile
1/4
Mile
BERKELEY
EMERYVILLE
OAKLAND
EMERYVILLE
OAKLAND
EMERYVILLE
FRONTAGEROAD
EASTSHOREFREEWAY
INTERSTATE80
LACOSTEST
65TH ST
CHRISTIEAVE
53RD
ST
HOLLISST
HARUFF ST
OVERLANDAVE
54TH ST
55TH ST
BEAUDRYST
POWELL ST
59TH ST
61ST ST
62ND ST
63RD ST
HOLLISST
DOYLE
ST
VALLEJOST
64TH
ST
VALLEJOST
OCEAN AVE
65TH ST
67TH ST
66TH ST
SHERWIN AVE
HALLECKST
HUBBARDST
HORTONST
HOLDENST
EMERY
ST
WATTSST
HARLANST
HAVENST
45TH ST
PARK AVE
43RD ST
41ST
ST
45TH ST
47TH ST
ESSEXST
SALEMST
SALEM
ST
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
40TH ST.
YERBA BUENA AVE
39TH ST.
38TH ST
APGAR ST
36TH ST
37TH ST
PERALTA
WATTS
47TH ST
48TH ST
ADELINEST
SANPABLOAVE
HORTONST
POWELL ST
40TH ST
YERBA BUENA AVE
SANPABLOAVE
CHRISTIE
AVE
BEACHST
PEABODY
LN
MANDELAPK
W
Y
SHELLMOUNDST
ASHBY
AVE
W. MACARTHUR BLVD
SHELLMOUNDST
BAYST
INTERSTATE 580
STAN
FO
RD
AVE
CHIRONWAY
WAY
SHELLMOUND
0 600 1200 2400300
FEET
TRANSIT SYSTEM
EMERYVILLE GENERAL PLAN
To MacArthur
BART
To West Oakland
BART
Transit Streets
Regional Rail
Existing Crossing (at grade)
Major Transit Hub
Future grade-separated
crossing of the railroad
between Powell St and
Ashby Ave at location
to be determined
FIGURE 3-5
Transit System
3-13
SUPPLEMENTAL INFORMATION
GENERAL PLAN DIAGRAMS
SOURCE: Emerville General Plan January 2009