SlideShare ist ein Scribd-Unternehmen logo
1 von 36
Downloaden Sie, um offline zu lesen
Third quarter results 2008



5th November 2008
Disclaimer
•Forward-Looking Statements
           This document may contain forward-looking information and statements about
ArcelorMittal and its subsidiaries. These statements include financial projections and estimates
and their underlying assumptions, statements regarding plans, objectives and expectations with
respect to future operations, products and services, and statements regarding future performance.
Forward-looking statements may be identified by the words “believe,” “expect,” “anticipate,”
“target” or similar expressions. Although ArcelorMittal’s management believes that the
expectations reflected in such forward-looking statements are reasonable, investors and holders
                                 forward looking
of ArcelorMittal’s securities are cautioned that forward-looking information and statements are
subject to numerous risks and uncertainties, many of which are difficult to predict and generally
beyond the control of ArcelorMittal, that could cause actual results and developments to differ
materially and adversely from those expressed in, or implied or projected by, the forward-looking
information and statements. These risks and uncertainties include those discussed or identified in
                   statements
the filings with the Luxembourg Stock Market Authority for the Financial Markets (Commission de
Surveillance du Secteur Financier) and the United States Securities and Exchange Commission
(the “SEC”) made or to be made by ArcelorMittal, including ArcelorMittal’s Annual Report on Form
20-F for the year ended December 31, 2007 filed with the SEC. ArcelorMittal undertakes no
              y
obligation to publicly update its forward-looking statements, whether as a result of new
information, future events, or otherwise.




                                                                                                 1
Agenda



•   Introduction and overview
•   Health and safety
•   Environment and steel market
•   Industrial plan
•   Q3 results and financial plan
•   Divisional highlights
•   Guidance




                                    2
Introduction and overview




                            3
Introduction and overview


   •     Health & Safety
         –     Frequency rate* down to 2.1
   •     Strong third quarter earnings supported by unique 3-dimensional strategy
         –     EBITDA increased 6.6% to USD 8.6bn in Q3 2008 as compared to Q2 2008
   •     Solid financial structure
         –     Net Debt** of USD 32.5bn resulting in a Net Debt/EBITDA ratio of 1.2x ***
         –     Liquidity of USD 12bn
   •     Response to current economic environment
         –     Adaptation of existing growth plan to reflect market conditions
         –     Increasing management gains t
               I      i            t i target from USD 4bn to USD 5bn through additional SG&A savings
                                             tf        4b t       5b th     h dditi    l         i
         –     Increasing voluntary production cuts to accelerate inventory reduction
         –     Targeting USD 10bn Net Debt reduction by end of 2009 to increase financial flexibility
   •     Guidance EBITDA in Q4 08 reflecting increased voluntary production cuts
         –     EBITDA is expected to be in the range of USD 2 5bn – USD 3bn
                                                            2.5bn
   •     Base dividend maintained in 2009
         –     Base dividend maintained at 1.50 USD/share




* Lost time injuries per 1,000,000 worked hours
** Net Debt is equal to long-term debt, net of current portion plus our payable to banks and current portion of long-term debt, less cash and cash equivalents, restricted cash
                                                                                                                                                                                  4
    and short-term investments
*** Based on last twelve months EBITDA
Health and Safety




                    5
Health and Safety

      Steel frequency rate*


            4.1
                           3.9           3.8
                                                        3.7
                                                                     3.5
                                                                                     3.2
                                                                             3.0

                                                                                            2.7
                                                                                                    2.4
                                                                                                                  2.1
                                                                                                           2.3




           Q1 06         Q2 06          Q3 06         Q4 06         Q1 07   Q2 07   Q3 07   Q4 07   Q108   Q208   Q308




                                      Heath and safety performance progressively improving

IISI-standard: Fr = Lost Time Injuries per 1.000.000 worked hours
                                                                                                                         6
Environment and steel market




                               7
Historic production cuts in China as
  industry faces heavy losses

  Crude steel production in China (y/y change %)*           Chinese and Asian spot price for HRC**
  35
                                                            1150
  30
  25                                                         950
  20
                                                             750
  15
  10                                                         550
   5
                                                             350
   0
                                                             150
   -5




                                                                                                            07



                                                                                                                      08
                                                              02



                                                                     03



                                                                              04



                                                                                        05



                                                                                                  06
 -10




                                                                                                           n



                                                                                                                     n
                                                              n



                                                                     n



                                                                             n



                                                                                       n



                                                                                                 n


                                                                                                         Ja



                                                                                                                   Ja
                                                            Ja



                                                                   Ja



                                                                           Ja



                                                                                     Ja



                                                                                               Ja
 -15
                                                                     HRC / China domestic FOB Shanghai (incl. 17% vat) $/t
   02



               03



                       04



                               05



                                       06



                                               07



                                                       08




                                                                     HRC / East Asia import CFR $/t
J-



            J-



                    J-



                            J-



                                    J-



                                            J-



                                                    J-




                 Strong destocking to prompt price improvement before end of 2008
* Source: IISI
                                                                                                                         8
** Source: SBB
Rapid inventory reduction following
  production cuts in the US

                                                            HRC – N th America domestic FOB US Midwest mill
                                                                   North A id       ti         Mid   t ill
  Crude t l
  C d steel production in the US (y/y change %)*
               d ti    i th      (/ h
                                                            $/short ton**
   30
                                                            1200
   25
                                                            1100
   20
                                                            1000
                                                             000
   15
                                                             900
   10
                                                             800
    5
                                                             700
    0
                                                             600
   -5
    5                                                        500
  -10                                                        400
  -15                                                        300
  -20                                                        200
    02



               03



                       04



                               05



                                       06



                                               07



                                                       08




                                                               02



                                                                      03



                                                                             04



                                                                                    05



                                                                                           06



                                                                                                  07



                                                                                                         08
 J-



            J-



                    J-



                            J-



                                    J-



                                            J-



                                                    J-




                                                             J-



                                                                    J-



                                                                           J-



                                                                                  J-



                                                                                         J-



                                                                                                J-



                                                                                                       J-
  Destocking phase expected to be completed and prices to stabilise by end of 2008
* Source: IISI                                                                                            9
** Source: SBB
Market expected to progressively
stabilise in Europe

   Crude steel production in EU 27 (y/y change %)
                             EU-27             %)*             HRC –South Europe domestic Ex-Works Euro/t**
                                                                    S th E       d    ti E W k E       /t**
   20                                                          800

   15
                                                               700

   10
                                                               600
     5
                                                               500
     0

                                                               400
    -5

                                                               300
   -10

   -15                                                         200
     02



                03



                          04



                                  05



                                          06



                                                  07



                                                          08




                                                                 02




                                                                                             06
                                                                        03



                                                                               04



                                                                                      05




                                                                                                    07



                                                                                                           08
  J-



             J-



                       J-



                               J-



                                       J-



                                               J-



                                                       J-




                                                               J-



                                                                      J-



                                                                             J-



                                                                                    J-



                                                                                           J-



                                                                                                  J-



                                                                                                         J-
                     Production cuts and destocking expected to continue into 2009
* Source: IISI
                                                                                                         10
** Source: SBB
Stainless steel market deterioration to
       continue

       CR304 – European base price and alloy surcharge*                            CR304 – Asian and European total price*

                                                                                   7,000
                                                                                   7 000
       6,900

                                                                                   6,000
       5,900

                                                                                   5,000
       4,900

       3,900                                                                       4,000

       2,900                                                     Alloy surcharge   3,000

       1,900                                                                       2,000

         900                                                                       1,000
          02



                  03



                            04



                                      05



                                                 06



                                                           07



                                                                     08




                                                                                     04




                                                                                                 05




                                                                                                                06




                                                                                                                              07




                                                                                                                                             08
         n



                  n



                           n



                                     n



                                               n



                                                          n



                                                                    n
       Ja



                Ja



                         Ja



                                   Ja



                                             Ja



                                                        Ja



                                                                  Ja




                                                                                     n




                                                                                                n




                                                                                                               n




                                                                                                                             n




                                                                                                                                            n
                                                                                   Ja




                                                                                              Ja




                                                                                                             Ja




                                                                                                                           Ja




                                                                                                                                          Ja
                CR 304 - North Europe domestic base price delivered (USD/t)
                                                                                           CR 304 - East Asia import CFR (USD/t)
                CR 304 - North Europe domestic total price delivered (USD/t)
                                                                                           CR 304 - North Europe domestic total price delivered (USD/t)




                                       No market improvement expected before 2009
                                                                                                                                             11
* Source: SBB
Industrial plan




                  12
Increasing production cuts to accelerate
inventory reduction
AM Planned production cuts in Q4 2008       AM Quarterly crude steel production (million tonnes)

                                            32
                                 >35%
 Flat Carbon America
                                            30

    Long Carbon
                                 >30%
 Flat Carbon Europe                         28


                                            26
    Flat Carbon Europe
                                                                                                               -9mt
                                 ~30%
  Long Carbon
                                            24
                                                                                                                est.
                                            22
                                 >35%
   Asia, Africa & CIS
  Asia, Africa, CIS
                                            20



                                 ~30%       18
    Stainless steel
   Stainless steel                                1Q 2Q     3Q 4Q     1Q 2Q     3Q 4Q     1Q 2Q     3Q 4Q
                                                 2006 2006 2006 2006 2007 2007 2007 2007 2008 2008 2008 2008




          ArcelorMittal capacity utilisation to be voluntarily reduced below 65%

                                                                                                       13
Accelerating and increasing
management gains
  Management gains breakdown (USD billion)
  6.0
  60



  5.0

                                                                                                     1.0

  4.0
                                                                            0.5
                                                                            05


  3.0                                                        1.2
                                                                                                                    5.0

                                                                                       4.0
  2.0                                      0.9
                                                                            3.5

                                                             2.3
                           0.8
  1.0
                                           1.5
            0.6            0.6
  0.0
        Manpow er        Energy      Yield and quality Input cost effect   Other       Initial    Additionnal       New
        productivity
           d ii        consumption
                               i       improvement
                                       i                                           management    SG&A savings
                                                                                                           i    management
                                                                                    gains plan                   gains plan




Increasing management gains target from USD 4bn to USD 5bn through additional
         g     g      g        g                                g
                    SG&A savings over the next 5 years
                                                                                                                              14
Adjusting growth plan to market
conditions
 Products and value chain growth



                                                                        AM3S
                                                                         50%
                                                                    Growth plan
 Distribution           AM3S
                         39%
                                                                       2012*
                                            +3% per
   Steel          Value-added                                    Value-added
                                   57%       year in
                 and speciality                                 and speciality
 shipments
                   products                                       products
   110mt
                                            line with
                                             market
                      Iron ore
  Mining
                         46%                                           Iron ore
                                                                         65%
                       2007
                                             Growth
                                                           Medium/long term


                                         Growth plan adjusted

                                                                                  15
Investment completed in 2008
            Main projects to be completed in 2008                              Status
            -   Belgium-Liege (FCE): Restart of blast furnace no.6 of 1.2mt        Completed in Q1
                                                                               √
                leading to a 2.7mt capacity.
            -   Argentina-Acindar (LC): Steel capacity increase by 300,000t.   √   Completed in Q3
            -   Luxembourg-Rodange
                Luxembourg Rodange (LC): Revamping of mill adding              √   Completed in Q2
                                                                                   C   l t di
Growth          150,000t of sheet piles.
plan        -   Luxembourg-Differdange (LC): Revamping of electrical arc       √   Completed in Q3
                furnace adding 160,000t.
            -   Bosnia-Zenica (LC): Restart of 1mt integrated route.
                                                                               √   Completed in Q2
            -   South Africa Vanderbijlpark (AACIS): Two additional direct
                       Africa-Vanderbijlpark
                                                                                   Completion expected in Q4
                reduction kilns and de-bottlenecking adding 350,000t.

            -   Mexico-Mining: Iron ore project of 2mt                             Completion expected in Q4
Value
            -   Poland-Huta Warszawa (LC): New rolling mill of 650,000t        √   Completed in Q2
chain
            -   Italy-Piombino (FCE): New galvanising line of 310,000t
                    y          (    )      g          g          ,                 Completion expected in Q4
and
            -   Kazakhstan-Temirtau (AACIS): New bar mill of 400,000t          √   Completed in Q2
product
            -   Poland-Krakow(AM3S): New steel service centre of 450,000t      √   Completed in Q1
growth

                                                                               √
            -   France-Dunkerque (FCE): Continuous caster revamping.               Completed in Q1
MGT
                                                                               √
            -   France-Fos
                France Fos (FCE): Continuous caster revamping
                                                    revamping.                     Completed in Q1
gains and
  i     d
                                                                               √
            -   Poland-ZKZ (LC): New Coke battery of 734,000t.                     Completed in Q1
other
            -   Mexico-Lazaro (FCA): CO2 absorption system 2nd phase.              Completion delay to 2009




 USD 1.8bn of CAPEX realised in Q3 and USD 5.5bn of CAPEX expected for 2008
                                                                                                              16
Q3 results and financial plan




                                17
P&L highlights

     EBITDA to Net Income (USD million)                                                                EBITDA (USD billion)
                                                                                                                                                +7%***

                               Depreciation
                     1,414
                               & impairment
                                                                                                                                                  8.6
                                                                                                                                        8.0
                                                         FOREX &                                                              5.0
                                                                                                          4.9       4.8
                     1,699                                other**
                                                 386          394
                      Non                                                            Tax
                                                              529                                       3Q 2007   4Q 2007   1Q 2008   2Q 2008   3Q 2008
                                               Income
                   recurring
                                                                                     695
                                                 from    Net interest
                     item*
        8,580                                   equity                                                 Earnings per share (USD)
                                                                                     414



                                                                                  Minority
                                  5,467
                                                                                                                                                -
                                                                         4,930
                                                                                                                                                34%***
                                                                                              3,821
                                                                                                                                       4.20
                                                                                                                                                 2.79
                                                                                                         2.10      1.72      1.69


       EBITDA                   Operating                               Pre-tax                Net      3Q 2007   4Q 2007   1Q 2008   2Q 2008   3Q 2008
                                 incom e                                                     incom e




                                              EBITDA increased 7% in Q3 2008 versus Q2 2008

* USD 1,699m due to one-time impact of USA Labour agreement
                                                                                                                                                18
** Includes revaluation of derivative instruments
*** Compared to Q2 2008
Cash-flow highlights


    Free Cash-Flow (USD million)                                                                                 Return to shareholders (USD billion)

                                                                                                                            Buy-backs
                            631                                                                                             Dividends
                             Net                                                                                                                    2.1
                                                                                                                                                                         1.8
                         financials,
                                                                                                                                       1.3
                             tax
                                                                                                                          0.7                                   0.5
                         expenses
                                                                                                                                                    0.5         0.5      0.5
                                                                                                                          0.5          0.5
                         and others
                                             5,388
                                                                                                                       3Q 2007      4Q 2007      1Q 2008     2Q 2008   3Q 2008

         8,580
                                                                                                                   Net acquisition spending (USD billion)



                                           Change in                           CAPEX
                                                                                1,758
                                            w orking           2,561
                                                                                                                                                               4.2
                                            capital*
                                                                                                                                                                         2.5
                                                                                                   803                               1.7
                                                                             CAPEX                                                                 1.4
                                                                                                                                                   14
                                                                                                                         0.2
        EBITDA                                             Cash-Flow                           Free Cash-
                                                                                                                      3Q 2007      4Q 2007      1Q 2008      2Q 2008   3Q 2008
                                                             from                                 Flow
                                                           operations


               Free cash-flow negatively affected by USD 5.4bn increase in working capital
                                primarily due to price and cost increase
* Changes in working capital is defined as trade accounts receivable plus inventories less trade accounts payable plus prepaid expenses and less accrued expenses.
                                                                                                                                                                         19
Balance sheet highlights

     Net Debt & Equity (USD billion)                             Net Debt (USD billion) and Net debt/EBITDA ratio (x)


                           4.4
           Minority
                                                                                                                     +1.8
                                                                35                                                              2.0

                                                                30

                                                                25
                                                                                                                                1.5
   Shareholders'                                                                                                      1.2x
                                                                20
                          61.8
          Equity
                                                                15
                                                                                                                                1.0
                                                32.5
                                                                10

                                                                5

                                                                0                                                               0.5
                         Equity                Net Debt
                                                                      3Q   4Q   1Q   2Q   3Q   4Q   1Q   2Q   3Q
                                                                     2006 2006 2007 2007 2007 2007 2008 2008 2008
                        Gearing of 49%
                        G   i    f
                                                                      Net Debt (USDbn) - LHS     Net Debt / EBITDA* (x) - RHS




                                               Net Debt / EBITDA ratio reduced to 1 2x*
                                                                                  1.2x*
* Based on latest twelve months (LTM) EBITDA
                                                                                                                      20
Liquidity highlights


                                                                             Credit line utilization at 30/09/08
       Liquidity & short term debt (USD billion)*

                                                                                  16
                            12.0
                                                                                  14
                                                                                  12
                                                                                  10
       Unsused                                                                     8
                             6.0
                                                                                                14.0
       credit line
                                                                                   6
                                                                                                                   8.0
                                                                                   4
                                                                                   2
                                                  4.2                              0
                                                                                          Credit facilities        Used
       Cash &                                                 ST & Others*
                             6.0                  2.5
       Equivalent

                                                              LT repayment         Less than USD 600m of credit line expiring in
                                                  1.7
                                                                                   next 12 months out of a total of USD 14bn
                     Liquidity at 30/09/08   Debt due in Q4




                                   Liquidity in excess of debt coming due in next 12 months
                                                               …
*Excluding USD3.7bn of commercial paper
                                                                                                                                   21
Gross debt maturity

        Repayment schedule at 30/09/08 (USD billion)

         10
                                        7.8                                   7.9
             8

             6        4.7                                  4.1                                                        4.4
             4
                                                                                                   1.8
             2

             0
                      2009              2010              2011                2012                2013             Therafter

             Bond maturity profile   LT Debt maturity (Loans)    LT Debt maturity (Credit facilities)    LT Debt maturity (other)



        Commitment to strong investment grade ratings
                                                                                              Covenants for all bank facilities
        • Standard & Poor’s – BBB+ (stable outlook)
                                                                                                   Net Debt/EBITDA* not greater than 3.5x
         •       Moody’s – Baa2 (stable outlook)
                                                                                                   No material adverse change clauses
         •       Fitch – BBB+ (stable outlook)




                               Upgraded by S&P, Moody’s and Fitch in the last 12 months
                                           S&P Moody s ….…
*Based on last 12 months
                                                                                                                                       22
A cost leader generating free
         cash-flow

       HRC production cost with overhead
           p                                                                                EBITDA and free cash-flow (USD billion)
                                                                                                                      (           )
        1200
                     Cash cost
                     USD/tonne
                                                                                                    EBITDA
        1000
                                                                                                    Free cash-flow *

                                                                      2008
         800


         600                                                                                                                               4.1

                                                                                                                                     3.0
                                                                                                                                     30
                                                    ArcelorMittal weighted                                                                             2.9
         400                                                                                                       2.6
                                                                                                                               2.4
                                                    position 580 USD/t**
                                                                                                      1.9                1.7
         200                                                                                                                                     1.0
                                                                                                                                                             0.8
                                                                                                             0.7
                                                                                              0.4
                                                      Cumulative capacity, m tonnes
                                                                 capacity
             0
                 0     50     100     150     200     250    300    350   400   450   500     1Q   2Q   3Q   4Q   1Q   2Q   3Q   4Q   1Q   2Q   3Q
                                                                                             2006 2006 2006 2006 2007 2007 2007 2007 2008 2008 2008



                                                      A unique free cash-flow track record
                                                                    cash flow

Source: World Steel Dynamics, CRU monitor, ArcelorMittal analysis
                                                                                                                                                       23
*Cash-flow from operation minus CAPEX
** 9 months
Strong potential of working capital
 release
                                                                      Net Debt increase (USD billion)
Net Debt and working capital (USD billion)

35                                                                      35

30                                                                      30
                                                                                                                                   8.5
25                                                                      25
                                                                                                           0.8
20                                                                      20

15                                                                      15
                                                                                                                                  24.0
                                                                                   22.8
10                                                                                                        21.4
                                                                        10

5                                                                       5
0                                                                       0
      3Q      4Q     1Q     2Q     3Q     4Q     1Q     2Q      3Q               30/09/2006            30/09/2007              30/09/2008
     2006    2006   2007   2007   2007   2007   2008   2008    2008               Net Debt increase related to w orking capital increase
                                                                                  Net Debt excluding w orking capital increase
            Net Debt (USDbn)             Working capital (USDbn)



The USD5.4bn increase of working capital during Q3…                          …expected to reverse in Q4 2008 and Q1 2009




                       Current steel market deterioration expected to significantly reduce
                                                            p           g         y
                                          working capital requirement
                                                                                                                                         24
Focusing on net debt reduction


CAPEX plan (USD billion)
      p    (           )                              M&A
                                                      • Less than USD 0.6bn outstanding
                                                        commitments
          Grow th CAPEX adjustm ent
          Grow th CAPEX realised
                                                      Base Dividend 2009
          Maintenance CAPEX
                                                      •   Base dividend maintained at 1.50 USD/share


                                                      Buy-back program
                                       2.5
                              2.9              1.5
                                                      •   Exceptional buy-back program basically
                 2.4
    2.0
                                                          completed
                                                              ltd
                                                      •   Annual buy-back program to be
                                       3.0     3.0
                              2.5
                 2.2
    2.1
                                                          implemented once debt reduction target
                                                          achieved
   2005         2006          2007    2008E   2009E




Targeting USD 10bn of Net Debt reduction by end of 2009 to increase financial flexibility

                                                                                                   25
Divisional highlights




                        26
Flat Carbon Europe


         Steel shipments (Mt)                                         Average steel selling price (USD/t)                                  EBITDA (USD million)


                                                                                                              +4.1%*
                                                                                                                                                                              -15.1%*
                                                -16 9%*
                                                 16.9%


                                                                                                                 1,125
                                                                                              1,081                                                             2,146
                                9.88
                                                                                                                                                                                   1,821
                                                                            861
                                                   8.21
             7.80
                                                                                                                                             1,368
                                                                                                                                             1 368




                                                                                                                                            Q3 2007            Q2 2008         Q3 2008
           Q3 2007            Q2 2008            Q3 2008                  Q3 2007            Q2 2008            Q3 2008




                                                                    222 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008
•   As from January 1, 2008, the operations of Annaba flat and Skopje previously reported in the AACIS segment have been transferred to the Flat Carbon Europe division. In
    addition, the entire operations of Galati are reported within the Flat Carbon Europe division                                                                             27
•   Historical Q3 2007 figures have not been recast to reflect the new scope changes
•   Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+295kt) and EBITDA (-USD 13 million)
Steel Services and Solutions


         Steel shipments (Mt)                                      Average steel selling price (USD/t)                                EBITDA (USD million)



                                                                                                                                                                       +14.0%*
                                                                                                          +14.4%*
                                             -24.9%*


                               5.69
                                                                                                                                                                            390
                                                                                                             1,361
                                                                                                                                                            342
                                                                                           1,190
                                                  4.27
                                                                          999
             3.52

                                                                                                                                         153



                                                                                                                                       Q3 2007           Q2 2008        Q3 2008
           Q3 2007           Q2 2008            Q3 2008                Q3 2007            Q2 2008           Q3 2008




                                                               91 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008
 • As from January 1, 2008, the operations of ArcelorMittal wire drawing activities previously reported within the Long Carbon Americas and Europe segment have been
   transferred to the AM3S division.
                                                                                                                                                                       28
 • Historical Q3 2007 figures have not been recast to reflect the new scope changes
 • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+113kt) and EBITDA (-USD 25 million)
 • Total shipments for the group are calculated as the sum of the shipments of steel producing segments. AM3S shipments are not consolidated
Long Carbon Steel


         Steel shipments (Mt)                                     Average steel selling price (USD/t)                               EBITDA (USD million)



                                                                                                                                                                    +5.7%*
                                                                                                        +16.2%*
                                              -17.4%*


                                                                                                                                                                          2,258
                               8.10                                                                         1,258                                        2,137
                                                                                          1,083
                                                 6.69
             5.66                                                        801
                                                                                                                                      1,080




                                                                                                                                     Q3 2007           Q2 2008           Q3 2008
           Q3 2007           Q2 2008           Q3 2008                 Q3 2007           Q2 2008           Q3 2008




                                                                 338 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008
 • As from January 1, 2008, the Long Carbon Americas and Europe segment include the operations of Annaba long, Sonasid, Zenica, global pipes and tubes business
   previously reported in the AACIS segment, and Mittal Canada flat previously reported in the Flat Carbon Americas segment. The wire drawing businesses has been
                                                                                                                                                                    29
   transferred to the AM3S segment.
 • Historical Q3 2007 figures have not been recast to reflect the new scope changes
 • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+1,048kt) and EBITDA (+USD 161 million)
Stainless Steel


        Steel shipments (Mt)                Average steel selling price (USD/t)   EBITDA (USD million)




                                                                       -7.9%*
                                  -15.7%*
                                                                                                         -36.2%*
                                                                                              390
                                                           4,299
                         0.58                  4,182                    3,960
                                   0.49
           0.43
                                                                                                              249
                                                                                   225




         Q3 2007        Q2 2008   Q3 2008                                         Q3 2007    Q2 2008      Q3 2008
                                              Q3 2007     Q2 2008      Q3 2008




                                            511 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008


                                                                                                         30
Asia, Africa and CIS


         Steel shipments (Mt)                                        Average steel selling price (USD/t)                                 EBITDA (USD million)


                                                                                                                                                                             +18.1%*
                                                                                                             +25.1%*


                                               -14.0%*
             5.26                                                                                                                                                                 1,635
                                                                                                                1,070
                                                                                                                                                              1,385
                                                                                              855
                                3.88
                                                   3.34                    641                                                              935




           Q3 2007            Q2 2008            Q3 2008                 Q3 2007            Q2 2008            Q3 2008                   Q3 2007            Q2 2008           Q3 2008




                                                                   490 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008
 • As from January 1, 2008, the pipes and tubes business has been transferred to the Long Carbon Americas and Europe division. In addition, the operations of Annaba long,
    Sonasid and Zenica have been transferred to Long Carbon Americas and Europe segment and the operations of Annaba flat and Skopje to the Flat Carbon Europe
                                                                                                                                                                             31
    segment.
 • Historical Q3 2007 figures have not been recast to reflect the new scope changes
 • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (-1,145kt) and EBITDA (-USD 86 million)
Flat Carbon Americas


        Steel shipments (Mt)                                       Average steel selling price (USD/t)                                 EBITDA (USD million)



                                                                                                          +25.2%*
                                              -7.0%**
                                                                                                                                                                   +44.8%*



                               7.40                                                                          1,103
             6.89                                 6.88
                                                                                                                                                                        2,435
                                                                                            881
                                                                         707
                                                                                                                                                           1,682
                                                                                                                                                           1 682
                                                                                                                                        1,104



           Q3 2007           Q2 2008            Q3 2008                Q3 2007           Q2 2008            Q3 2008                    Q3 2007           Q2 2008    Q3 2008




                                                                  354 USD/t of EBITDA in Q3 2008
* Compared to Q2 2008
 ** Compared to Q2 2008. Excludies Sparrows Point, which was sold Q2 2008, shipments decreased from 7.138mt in Q2 2008 to 6.878mt in Q3 2008 (down 3.6%)
                                                                                                                                                                   32
•   As from January 1, 2008, Mittal Canada and pipes and tubes businesses from Dofasco have been transferred to the Long Carbon Americas and Europe division.
•   Historical Q3 2007 figures have not been recast to reflect the new scope changes
•   Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (-311kt) and EBITDA (-USD 37 million)
Guidance




           33
Guidance for Q4 and FY 2008


        ArcelorMittal EBITDA*


                                                                    USD24.2-24.7bn

                                                        USD19.4bn

              USD16bn           USD14.9bn   USD15.3bn




                  2004           2005         2006        2007      2008 Guidance



                   Due to increased voluntary production cuts, EBITDA expected to be
                               between USD 2 5bn and USD 3bn in Q4 2008
                                            2.5bn
*Proforma 2004, 2005 and 2006
                                                                                       34
Q&A




      35

Weitere ähnliche Inhalte

Was ist angesagt?

SEB Facts And Figures January September 2008
SEB Facts And Figures January September 2008SEB Facts And Figures January September 2008
SEB Facts And Figures January September 2008SEBgroup
 
newmont mining Q4Presentation_update
newmont mining Q4Presentation_updatenewmont mining Q4Presentation_update
newmont mining Q4Presentation_updatefinance37
 
SEB Facts And Figures January March 2008
SEB Facts And Figures January March 2008SEB Facts And Figures January March 2008
SEB Facts And Figures January March 2008SEBgroup
 
SEB Ubs Nordic Financials Sept 2008
SEB Ubs Nordic Financials Sept 2008SEB Ubs Nordic Financials Sept 2008
SEB Ubs Nordic Financials Sept 2008SEBgroup
 
newmont mining feb_BMO_Presentation
newmont mining feb_BMO_Presentationnewmont mining feb_BMO_Presentation
newmont mining feb_BMO_Presentationfinance37
 
Executive Summary 2008 Q2
Executive Summary 2008 Q2Executive Summary 2008 Q2
Executive Summary 2008 Q2SEBgroup
 
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010evraz_company
 
Metso Interim Review January-September 2012 presentation
Metso Interim Review January-September 2012 presentationMetso Interim Review January-September 2012 presentation
Metso Interim Review January-September 2012 presentationMetso Group
 
newmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conferencenewmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conferencefinance37
 
Presentation 4Q12
Presentation 4Q12Presentation 4Q12
Presentation 4Q12Braskem_RI
 
SEB Telephone Conference Presentation 2008 Q2
SEB Telephone Conference Presentation 2008 Q2SEB Telephone Conference Presentation 2008 Q2
SEB Telephone Conference Presentation 2008 Q2SEBgroup
 
SNC : Opp day Nov 5, 2012
SNC : Opp day Nov 5, 2012SNC : Opp day Nov 5, 2012
SNC : Opp day Nov 5, 2012TonHor Hor
 
EASTW : Opp day Sep 4, 2012
EASTW : Opp day Sep 4, 2012 EASTW : Opp day Sep 4, 2012
EASTW : Opp day Sep 4, 2012 TonHor Hor
 
SEB's second-quarter 2012 results presentation
SEB's second-quarter 2012 results presentationSEB's second-quarter 2012 results presentation
SEB's second-quarter 2012 results presentationSEBgroup
 
Unique case of Latvia: internal adjustment
Unique case of Latvia: internal adjustmentUnique case of Latvia: internal adjustment
Unique case of Latvia: internal adjustmentRoberts Zīle
 
Duratex - 2007 Results
Duratex - 2007 ResultsDuratex - 2007 Results
Duratex - 2007 ResultsDuratex
 

Was ist angesagt? (17)

SEB Facts And Figures January September 2008
SEB Facts And Figures January September 2008SEB Facts And Figures January September 2008
SEB Facts And Figures January September 2008
 
newmont mining Q4Presentation_update
newmont mining Q4Presentation_updatenewmont mining Q4Presentation_update
newmont mining Q4Presentation_update
 
SEB Facts And Figures January March 2008
SEB Facts And Figures January March 2008SEB Facts And Figures January March 2008
SEB Facts And Figures January March 2008
 
SEB Ubs Nordic Financials Sept 2008
SEB Ubs Nordic Financials Sept 2008SEB Ubs Nordic Financials Sept 2008
SEB Ubs Nordic Financials Sept 2008
 
newmont mining feb_BMO_Presentation
newmont mining feb_BMO_Presentationnewmont mining feb_BMO_Presentation
newmont mining feb_BMO_Presentation
 
Executive Summary 2008 Q2
Executive Summary 2008 Q2Executive Summary 2008 Q2
Executive Summary 2008 Q2
 
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
презентация для инвесторов, Non deal roadshow, европа и сша, 5-9 апреля 2010
 
Metso Interim Review January-September 2012 presentation
Metso Interim Review January-September 2012 presentationMetso Interim Review January-September 2012 presentation
Metso Interim Review January-September 2012 presentation
 
Se 2012-09 en
Se 2012-09 enSe 2012-09 en
Se 2012-09 en
 
newmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conferencenewmont mining 5_20_08_GS_Basic_Materials_Conference
newmont mining 5_20_08_GS_Basic_Materials_Conference
 
Presentation 4Q12
Presentation 4Q12Presentation 4Q12
Presentation 4Q12
 
SEB Telephone Conference Presentation 2008 Q2
SEB Telephone Conference Presentation 2008 Q2SEB Telephone Conference Presentation 2008 Q2
SEB Telephone Conference Presentation 2008 Q2
 
SNC : Opp day Nov 5, 2012
SNC : Opp day Nov 5, 2012SNC : Opp day Nov 5, 2012
SNC : Opp day Nov 5, 2012
 
EASTW : Opp day Sep 4, 2012
EASTW : Opp day Sep 4, 2012 EASTW : Opp day Sep 4, 2012
EASTW : Opp day Sep 4, 2012
 
SEB's second-quarter 2012 results presentation
SEB's second-quarter 2012 results presentationSEB's second-quarter 2012 results presentation
SEB's second-quarter 2012 results presentation
 
Unique case of Latvia: internal adjustment
Unique case of Latvia: internal adjustmentUnique case of Latvia: internal adjustment
Unique case of Latvia: internal adjustment
 
Duratex - 2007 Results
Duratex - 2007 ResultsDuratex - 2007 Results
Duratex - 2007 Results
 

Andere mochten auch

Intesa Sanpaolo 2008 Third Quarter Results
Intesa Sanpaolo 2008 Third Quarter ResultsIntesa Sanpaolo 2008 Third Quarter Results
Intesa Sanpaolo 2008 Third Quarter Resultsearningsreport
 
Custom CD Compilations
Custom CD CompilationsCustom CD Compilations
Custom CD Compilationsbeckyrickett
 
Unicameral bone cysts
Unicameral bone cystsUnicameral bone cysts
Unicameral bone cystsorthoprince
 
Dexia 3Q Financial Earnings 2008
Dexia 3Q Financial Earnings 2008Dexia 3Q Financial Earnings 2008
Dexia 3Q Financial Earnings 2008earningsreport
 
初見面一分鐘
初見面一分鐘初見面一分鐘
初見面一分鐘guestcea096
 

Andere mochten auch (7)

Intesa Sanpaolo 2008 Third Quarter Results
Intesa Sanpaolo 2008 Third Quarter ResultsIntesa Sanpaolo 2008 Third Quarter Results
Intesa Sanpaolo 2008 Third Quarter Results
 
Custom CD Compilations
Custom CD CompilationsCustom CD Compilations
Custom CD Compilations
 
Unicameral bone cysts
Unicameral bone cystsUnicameral bone cysts
Unicameral bone cysts
 
Wind South
Wind SouthWind South
Wind South
 
Dexia 3Q Financial Earnings 2008
Dexia 3Q Financial Earnings 2008Dexia 3Q Financial Earnings 2008
Dexia 3Q Financial Earnings 2008
 
初見面一分鐘
初見面一分鐘初見面一分鐘
初見面一分鐘
 
Projeto Qualidade de Vida: ArcelorMittal
Projeto Qualidade de Vida: ArcelorMittalProjeto Qualidade de Vida: ArcelorMittal
Projeto Qualidade de Vida: ArcelorMittal
 

Ähnlich wie ArcelorMittal Q3 2008 results

SEB's third quarter 2011 results presentation
SEB's third quarter 2011 results presentationSEB's third quarter 2011 results presentation
SEB's third quarter 2011 results presentationSEBgroup
 
Press conference 2010 Q1
Press conference 2010 Q1Press conference 2010 Q1
Press conference 2010 Q1SEBgroup
 
BASF Q3-2010 results
BASF Q3-2010 resultsBASF Q3-2010 results
BASF Q3-2010 resultsBASF
 
Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.earningreport earningreport
 
Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.earningreport earningreport
 
SEB second quarter 2011 results presentation
SEB second quarter 2011 results presentationSEB second quarter 2011 results presentation
SEB second quarter 2011 results presentationSEBgroup
 
1st quarter 2009 results - Santander Brasil
1st quarter 2009 results - Santander Brasil1st quarter 2009 results - Santander Brasil
1st quarter 2009 results - Santander Brasilmariomori
 
Thompson Creek Investor Presentation - November 9, 2012
Thompson Creek Investor Presentation - November 9, 2012Thompson Creek Investor Presentation - November 9, 2012
Thompson Creek Investor Presentation - November 9, 2012Company Spotlight
 
energy future holindings txu_110906slides
energy future holindings txu_110906slidesenergy future holindings txu_110906slides
energy future holindings txu_110906slidesfinance29
 
energy future holindings txu_110906slides
energy future holindings txu_110906slidesenergy future holindings txu_110906slides
energy future holindings txu_110906slidesfinance29
 
2012-2016 Business and Management Plan
2012-2016 Business and Management Plan2012-2016 Business and Management Plan
2012-2016 Business and Management PlanPetrobras
 
SEB Executive Summary January September 2008
SEB Executive Summary January September 2008SEB Executive Summary January September 2008
SEB Executive Summary January September 2008SEBgroup
 
2008, First Half Results
2008, First Half Results2008, First Half Results
2008, First Half Resultsve-finance
 
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...Manya Mohan
 
2012 UIC Fed Challenge Presentation
2012 UIC Fed Challenge Presentation2012 UIC Fed Challenge Presentation
2012 UIC Fed Challenge PresentationMichael Cassidy
 
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.com
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.comDividend idea Philip Morris (PM) By http://long-term-investments.blogspot.com
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.comDividend Yield
 

Ähnlich wie ArcelorMittal Q3 2008 results (20)

SEB's third quarter 2011 results presentation
SEB's third quarter 2011 results presentationSEB's third quarter 2011 results presentation
SEB's third quarter 2011 results presentation
 
Press conference 2010 Q1
Press conference 2010 Q1Press conference 2010 Q1
Press conference 2010 Q1
 
Ebay 2008 Q4 results
Ebay  2008 Q4 resultsEbay  2008 Q4 results
Ebay 2008 Q4 results
 
BASF Q3-2010 results
BASF Q3-2010 resultsBASF Q3-2010 results
BASF Q3-2010 results
 
credit suisse Presentation slides
credit suisse Presentation slidescredit suisse Presentation slides
credit suisse Presentation slides
 
Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.
 
Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.Q1 2009 Earning Report of Independent Bank Corp.
Q1 2009 Earning Report of Independent Bank Corp.
 
4Q08 Results
4Q08 Results4Q08 Results
4Q08 Results
 
SEB second quarter 2011 results presentation
SEB second quarter 2011 results presentationSEB second quarter 2011 results presentation
SEB second quarter 2011 results presentation
 
1st quarter 2009 results - Santander Brasil
1st quarter 2009 results - Santander Brasil1st quarter 2009 results - Santander Brasil
1st quarter 2009 results - Santander Brasil
 
Thompson Creek Investor Presentation - November 9, 2012
Thompson Creek Investor Presentation - November 9, 2012Thompson Creek Investor Presentation - November 9, 2012
Thompson Creek Investor Presentation - November 9, 2012
 
energy future holindings txu_110906slides
energy future holindings txu_110906slidesenergy future holindings txu_110906slides
energy future holindings txu_110906slides
 
energy future holindings txu_110906slides
energy future holindings txu_110906slidesenergy future holindings txu_110906slides
energy future holindings txu_110906slides
 
HSBC Global Banking and Markets
HSBC Global Banking and MarketsHSBC Global Banking and Markets
HSBC Global Banking and Markets
 
2012-2016 Business and Management Plan
2012-2016 Business and Management Plan2012-2016 Business and Management Plan
2012-2016 Business and Management Plan
 
SEB Executive Summary January September 2008
SEB Executive Summary January September 2008SEB Executive Summary January September 2008
SEB Executive Summary January September 2008
 
2008, First Half Results
2008, First Half Results2008, First Half Results
2008, First Half Results
 
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...
Conco Phillips- Presentations & Conference Calls Howard Weil Annual Energy Co...
 
2012 UIC Fed Challenge Presentation
2012 UIC Fed Challenge Presentation2012 UIC Fed Challenge Presentation
2012 UIC Fed Challenge Presentation
 
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.com
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.comDividend idea Philip Morris (PM) By http://long-term-investments.blogspot.com
Dividend idea Philip Morris (PM) By http://long-term-investments.blogspot.com
 

Mehr von earningsreport

Eastman 4Q and Full Year 2008 Earnings
Eastman 4Q and Full Year 2008 Earnings Eastman 4Q and Full Year 2008 Earnings
Eastman 4Q and Full Year 2008 Earnings earningsreport
 
Gentex investor presentation
Gentex investor presentationGentex investor presentation
Gentex investor presentationearningsreport
 
L.B. Foster Reports Fourth Quarter Operating Results
L.B. Foster Reports Fourth Quarter Operating ResultsL.B. Foster Reports Fourth Quarter Operating Results
L.B. Foster Reports Fourth Quarter Operating Resultsearningsreport
 
Data Domain, Inc. Reports Fourth Quarter Financial Results
Data Domain, Inc. Reports Fourth Quarter Financial ResultsData Domain, Inc. Reports Fourth Quarter Financial Results
Data Domain, Inc. Reports Fourth Quarter Financial Resultsearningsreport
 
First Banks Announces 4Q 2008 Results
First Banks Announces 4Q  2008 ResultsFirst Banks Announces 4Q  2008 Results
First Banks Announces 4Q 2008 Resultsearningsreport
 
Questar 3Q-2008 EARNINGS
Questar 3Q-2008 EARNINGSQuestar 3Q-2008 EARNINGS
Questar 3Q-2008 EARNINGSearningsreport
 
Mitsubishi electric 3Q financial results of Fiscal 2009
Mitsubishi electric 3Q financial results of Fiscal 2009Mitsubishi electric 3Q financial results of Fiscal 2009
Mitsubishi electric 3Q financial results of Fiscal 2009earningsreport
 
Maxim 2Q FISCAL 2009 RESULTS
Maxim 2Q FISCAL 2009 RESULTSMaxim 2Q FISCAL 2009 RESULTS
Maxim 2Q FISCAL 2009 RESULTSearningsreport
 
Conexant Q1 2009 financial results
Conexant Q1 2009 financial resultsConexant Q1 2009 financial results
Conexant Q1 2009 financial resultsearningsreport
 
Flagstar Bancorp Q42008 earnings report
Flagstar Bancorp Q42008 earnings reportFlagstar Bancorp Q42008 earnings report
Flagstar Bancorp Q42008 earnings reportearningsreport
 
Capital Product Partners Fourth Quarter 2008 Earnings
Capital Product Partners Fourth Quarter 2008 EarningsCapital Product Partners Fourth Quarter 2008 Earnings
Capital Product Partners Fourth Quarter 2008 Earningsearningsreport
 
Gannett 4Q 2008 earnings release
Gannett 4Q 2008 earnings releaseGannett 4Q 2008 earnings release
Gannett 4Q 2008 earnings releaseearningsreport
 
Exxon mobil 4Q 2008 earnings release
Exxon mobil 4Q 2008 earnings releaseExxon mobil 4Q 2008 earnings release
Exxon mobil 4Q 2008 earnings releaseearningsreport
 
Chevron Q4 2008 earnings release
Chevron Q4 2008 earnings releaseChevron Q4 2008 earnings release
Chevron Q4 2008 earnings releaseearningsreport
 
Horizon Lines Fourth Quarter 2008 Earnings Release
Horizon Lines Fourth Quarter 2008 Earnings ReleaseHorizon Lines Fourth Quarter 2008 Earnings Release
Horizon Lines Fourth Quarter 2008 Earnings Releaseearningsreport
 
Sony Q3 2008 financial results
Sony Q3 2008 financial resultsSony Q3 2008 financial results
Sony Q3 2008 financial resultsearningsreport
 
Peugeot Q3 2008 financial results
Peugeot Q3 2008 financial resultsPeugeot Q3 2008 financial results
Peugeot Q3 2008 financial resultsearningsreport
 
Peugeot Financial Results for the 1st half of 2008
Peugeot  Financial Results for the 1st half of 2008Peugeot  Financial Results for the 1st half of 2008
Peugeot Financial Results for the 1st half of 2008earningsreport
 
Tesco Q3 fianancial results
Tesco Q3 fianancial resultsTesco Q3 fianancial results
Tesco Q3 fianancial resultsearningsreport
 
tesco Annual Report and Financial Statements 2008
tesco Annual Report and Financial Statements 2008tesco Annual Report and Financial Statements 2008
tesco Annual Report and Financial Statements 2008earningsreport
 

Mehr von earningsreport (20)

Eastman 4Q and Full Year 2008 Earnings
Eastman 4Q and Full Year 2008 Earnings Eastman 4Q and Full Year 2008 Earnings
Eastman 4Q and Full Year 2008 Earnings
 
Gentex investor presentation
Gentex investor presentationGentex investor presentation
Gentex investor presentation
 
L.B. Foster Reports Fourth Quarter Operating Results
L.B. Foster Reports Fourth Quarter Operating ResultsL.B. Foster Reports Fourth Quarter Operating Results
L.B. Foster Reports Fourth Quarter Operating Results
 
Data Domain, Inc. Reports Fourth Quarter Financial Results
Data Domain, Inc. Reports Fourth Quarter Financial ResultsData Domain, Inc. Reports Fourth Quarter Financial Results
Data Domain, Inc. Reports Fourth Quarter Financial Results
 
First Banks Announces 4Q 2008 Results
First Banks Announces 4Q  2008 ResultsFirst Banks Announces 4Q  2008 Results
First Banks Announces 4Q 2008 Results
 
Questar 3Q-2008 EARNINGS
Questar 3Q-2008 EARNINGSQuestar 3Q-2008 EARNINGS
Questar 3Q-2008 EARNINGS
 
Mitsubishi electric 3Q financial results of Fiscal 2009
Mitsubishi electric 3Q financial results of Fiscal 2009Mitsubishi electric 3Q financial results of Fiscal 2009
Mitsubishi electric 3Q financial results of Fiscal 2009
 
Maxim 2Q FISCAL 2009 RESULTS
Maxim 2Q FISCAL 2009 RESULTSMaxim 2Q FISCAL 2009 RESULTS
Maxim 2Q FISCAL 2009 RESULTS
 
Conexant Q1 2009 financial results
Conexant Q1 2009 financial resultsConexant Q1 2009 financial results
Conexant Q1 2009 financial results
 
Flagstar Bancorp Q42008 earnings report
Flagstar Bancorp Q42008 earnings reportFlagstar Bancorp Q42008 earnings report
Flagstar Bancorp Q42008 earnings report
 
Capital Product Partners Fourth Quarter 2008 Earnings
Capital Product Partners Fourth Quarter 2008 EarningsCapital Product Partners Fourth Quarter 2008 Earnings
Capital Product Partners Fourth Quarter 2008 Earnings
 
Gannett 4Q 2008 earnings release
Gannett 4Q 2008 earnings releaseGannett 4Q 2008 earnings release
Gannett 4Q 2008 earnings release
 
Exxon mobil 4Q 2008 earnings release
Exxon mobil 4Q 2008 earnings releaseExxon mobil 4Q 2008 earnings release
Exxon mobil 4Q 2008 earnings release
 
Chevron Q4 2008 earnings release
Chevron Q4 2008 earnings releaseChevron Q4 2008 earnings release
Chevron Q4 2008 earnings release
 
Horizon Lines Fourth Quarter 2008 Earnings Release
Horizon Lines Fourth Quarter 2008 Earnings ReleaseHorizon Lines Fourth Quarter 2008 Earnings Release
Horizon Lines Fourth Quarter 2008 Earnings Release
 
Sony Q3 2008 financial results
Sony Q3 2008 financial resultsSony Q3 2008 financial results
Sony Q3 2008 financial results
 
Peugeot Q3 2008 financial results
Peugeot Q3 2008 financial resultsPeugeot Q3 2008 financial results
Peugeot Q3 2008 financial results
 
Peugeot Financial Results for the 1st half of 2008
Peugeot  Financial Results for the 1st half of 2008Peugeot  Financial Results for the 1st half of 2008
Peugeot Financial Results for the 1st half of 2008
 
Tesco Q3 fianancial results
Tesco Q3 fianancial resultsTesco Q3 fianancial results
Tesco Q3 fianancial results
 
tesco Annual Report and Financial Statements 2008
tesco Annual Report and Financial Statements 2008tesco Annual Report and Financial Statements 2008
tesco Annual Report and Financial Statements 2008
 

Kürzlich hochgeladen

Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxuzma244191
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economiccinemoviesu
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantagesjayjaymabutot13
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managmentfactical
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...Amil Baba Dawood bangali
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyTyöeläkeyhtiö Elo
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Sapana Sha
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companiesprashantbhati354
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...Amil baba
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarHarsh Kumar
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证rjrjkk
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Sonam Pathan
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfMichael Silva
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfMichael Silva
 

Kürzlich hochgeladen (20)

Current Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptxCurrent Economic situation of Pakistan .pptx
Current Economic situation of Pakistan .pptx
 
Tenets of Physiocracy History of Economic
Tenets of Physiocracy History of EconomicTenets of Physiocracy History of Economic
Tenets of Physiocracy History of Economic
 
Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024Bladex Earnings Call Presentation 1Q2024
Bladex Earnings Call Presentation 1Q2024
 
Financial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and DisadvantagesFinancial Leverage Definition, Advantages, and Disadvantages
Financial Leverage Definition, Advantages, and Disadvantages
 
SBP-Market-Operations and market managment
SBP-Market-Operations and market managmentSBP-Market-Operations and market managment
SBP-Market-Operations and market managment
 
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
NO1 Certified Ilam kala Jadu Specialist Expert In Bahawalpur, Sargodha, Sialk...
 
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance CompanyInterimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
Interimreport1 January–31 March2024 Elo Mutual Pension Insurance Company
 
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in  Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Nand Nagri (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111Call Girls In Yusuf Sarai Women Seeking Men 9654467111
Call Girls In Yusuf Sarai Women Seeking Men 9654467111
 
Quantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector CompaniesQuantitative Analysis of Retail Sector Companies
Quantitative Analysis of Retail Sector Companies
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
 
The Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh KumarThe Triple Threat | Article on Global Resession | Harsh Kumar
The Triple Threat | Article on Global Resession | Harsh Kumar
 
🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road🔝+919953056974 🔝young Delhi Escort service Pusa Road
🔝+919953056974 🔝young Delhi Escort service Pusa Road
 
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
原版1:1复刻温哥华岛大学毕业证Vancouver毕业证留信学历认证
 
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
Call Girls Near Delhi Pride Hotel, New Delhi|9873777170
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
Stock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdfStock Market Brief Deck for "this does not happen often".pdf
Stock Market Brief Deck for "this does not happen often".pdf
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
Stock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdfStock Market Brief Deck for 4/24/24 .pdf
Stock Market Brief Deck for 4/24/24 .pdf
 

ArcelorMittal Q3 2008 results

  • 1. Third quarter results 2008 5th November 2008
  • 2. Disclaimer •Forward-Looking Statements This document may contain forward-looking information and statements about ArcelorMittal and its subsidiaries. These statements include financial projections and estimates and their underlying assumptions, statements regarding plans, objectives and expectations with respect to future operations, products and services, and statements regarding future performance. Forward-looking statements may be identified by the words “believe,” “expect,” “anticipate,” “target” or similar expressions. Although ArcelorMittal’s management believes that the expectations reflected in such forward-looking statements are reasonable, investors and holders forward looking of ArcelorMittal’s securities are cautioned that forward-looking information and statements are subject to numerous risks and uncertainties, many of which are difficult to predict and generally beyond the control of ArcelorMittal, that could cause actual results and developments to differ materially and adversely from those expressed in, or implied or projected by, the forward-looking information and statements. These risks and uncertainties include those discussed or identified in statements the filings with the Luxembourg Stock Market Authority for the Financial Markets (Commission de Surveillance du Secteur Financier) and the United States Securities and Exchange Commission (the “SEC”) made or to be made by ArcelorMittal, including ArcelorMittal’s Annual Report on Form 20-F for the year ended December 31, 2007 filed with the SEC. ArcelorMittal undertakes no y obligation to publicly update its forward-looking statements, whether as a result of new information, future events, or otherwise. 1
  • 3. Agenda • Introduction and overview • Health and safety • Environment and steel market • Industrial plan • Q3 results and financial plan • Divisional highlights • Guidance 2
  • 5. Introduction and overview • Health & Safety – Frequency rate* down to 2.1 • Strong third quarter earnings supported by unique 3-dimensional strategy – EBITDA increased 6.6% to USD 8.6bn in Q3 2008 as compared to Q2 2008 • Solid financial structure – Net Debt** of USD 32.5bn resulting in a Net Debt/EBITDA ratio of 1.2x *** – Liquidity of USD 12bn • Response to current economic environment – Adaptation of existing growth plan to reflect market conditions – Increasing management gains t I i t i target from USD 4bn to USD 5bn through additional SG&A savings tf 4b t 5b th h dditi l i – Increasing voluntary production cuts to accelerate inventory reduction – Targeting USD 10bn Net Debt reduction by end of 2009 to increase financial flexibility • Guidance EBITDA in Q4 08 reflecting increased voluntary production cuts – EBITDA is expected to be in the range of USD 2 5bn – USD 3bn 2.5bn • Base dividend maintained in 2009 – Base dividend maintained at 1.50 USD/share * Lost time injuries per 1,000,000 worked hours ** Net Debt is equal to long-term debt, net of current portion plus our payable to banks and current portion of long-term debt, less cash and cash equivalents, restricted cash 4 and short-term investments *** Based on last twelve months EBITDA
  • 7. Health and Safety Steel frequency rate* 4.1 3.9 3.8 3.7 3.5 3.2 3.0 2.7 2.4 2.1 2.3 Q1 06 Q2 06 Q3 06 Q4 06 Q1 07 Q2 07 Q3 07 Q4 07 Q108 Q208 Q308 Heath and safety performance progressively improving IISI-standard: Fr = Lost Time Injuries per 1.000.000 worked hours 6
  • 9. Historic production cuts in China as industry faces heavy losses Crude steel production in China (y/y change %)* Chinese and Asian spot price for HRC** 35 1150 30 25 950 20 750 15 10 550 5 350 0 150 -5 07 08 02 03 04 05 06 -10 n n n n n n n Ja Ja Ja Ja Ja Ja Ja -15 HRC / China domestic FOB Shanghai (incl. 17% vat) $/t 02 03 04 05 06 07 08 HRC / East Asia import CFR $/t J- J- J- J- J- J- J- Strong destocking to prompt price improvement before end of 2008 * Source: IISI 8 ** Source: SBB
  • 10. Rapid inventory reduction following production cuts in the US HRC – N th America domestic FOB US Midwest mill North A id ti Mid t ill Crude t l C d steel production in the US (y/y change %)* d ti i th (/ h $/short ton** 30 1200 25 1100 20 1000 000 15 900 10 800 5 700 0 600 -5 5 500 -10 400 -15 300 -20 200 02 03 04 05 06 07 08 02 03 04 05 06 07 08 J- J- J- J- J- J- J- J- J- J- J- J- J- J- Destocking phase expected to be completed and prices to stabilise by end of 2008 * Source: IISI 9 ** Source: SBB
  • 11. Market expected to progressively stabilise in Europe Crude steel production in EU 27 (y/y change %) EU-27 %)* HRC –South Europe domestic Ex-Works Euro/t** S th E d ti E W k E /t** 20 800 15 700 10 600 5 500 0 400 -5 300 -10 -15 200 02 03 04 05 06 07 08 02 06 03 04 05 07 08 J- J- J- J- J- J- J- J- J- J- J- J- J- J- Production cuts and destocking expected to continue into 2009 * Source: IISI 10 ** Source: SBB
  • 12. Stainless steel market deterioration to continue CR304 – European base price and alloy surcharge* CR304 – Asian and European total price* 7,000 7 000 6,900 6,000 5,900 5,000 4,900 3,900 4,000 2,900 Alloy surcharge 3,000 1,900 2,000 900 1,000 02 03 04 05 06 07 08 04 05 06 07 08 n n n n n n n Ja Ja Ja Ja Ja Ja Ja n n n n n Ja Ja Ja Ja Ja CR 304 - North Europe domestic base price delivered (USD/t) CR 304 - East Asia import CFR (USD/t) CR 304 - North Europe domestic total price delivered (USD/t) CR 304 - North Europe domestic total price delivered (USD/t) No market improvement expected before 2009 11 * Source: SBB
  • 14. Increasing production cuts to accelerate inventory reduction AM Planned production cuts in Q4 2008 AM Quarterly crude steel production (million tonnes) 32 >35% Flat Carbon America 30 Long Carbon >30% Flat Carbon Europe 28 26 Flat Carbon Europe -9mt ~30% Long Carbon 24 est. 22 >35% Asia, Africa & CIS Asia, Africa, CIS 20 ~30% 18 Stainless steel Stainless steel 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 2006 2006 2006 2006 2007 2007 2007 2007 2008 2008 2008 2008 ArcelorMittal capacity utilisation to be voluntarily reduced below 65% 13
  • 15. Accelerating and increasing management gains Management gains breakdown (USD billion) 6.0 60 5.0 1.0 4.0 0.5 05 3.0 1.2 5.0 4.0 2.0 0.9 3.5 2.3 0.8 1.0 1.5 0.6 0.6 0.0 Manpow er Energy Yield and quality Input cost effect Other Initial Additionnal New productivity d ii consumption i improvement i management SG&A savings i management gains plan gains plan Increasing management gains target from USD 4bn to USD 5bn through additional g g g g g SG&A savings over the next 5 years 14
  • 16. Adjusting growth plan to market conditions Products and value chain growth AM3S 50% Growth plan Distribution AM3S 39% 2012* +3% per Steel Value-added Value-added 57% year in and speciality and speciality shipments products products 110mt line with market Iron ore Mining 46% Iron ore 65% 2007 Growth Medium/long term Growth plan adjusted 15
  • 17. Investment completed in 2008 Main projects to be completed in 2008 Status - Belgium-Liege (FCE): Restart of blast furnace no.6 of 1.2mt Completed in Q1 √ leading to a 2.7mt capacity. - Argentina-Acindar (LC): Steel capacity increase by 300,000t. √ Completed in Q3 - Luxembourg-Rodange Luxembourg Rodange (LC): Revamping of mill adding √ Completed in Q2 C l t di Growth 150,000t of sheet piles. plan - Luxembourg-Differdange (LC): Revamping of electrical arc √ Completed in Q3 furnace adding 160,000t. - Bosnia-Zenica (LC): Restart of 1mt integrated route. √ Completed in Q2 - South Africa Vanderbijlpark (AACIS): Two additional direct Africa-Vanderbijlpark Completion expected in Q4 reduction kilns and de-bottlenecking adding 350,000t. - Mexico-Mining: Iron ore project of 2mt Completion expected in Q4 Value - Poland-Huta Warszawa (LC): New rolling mill of 650,000t √ Completed in Q2 chain - Italy-Piombino (FCE): New galvanising line of 310,000t y ( ) g g , Completion expected in Q4 and - Kazakhstan-Temirtau (AACIS): New bar mill of 400,000t √ Completed in Q2 product - Poland-Krakow(AM3S): New steel service centre of 450,000t √ Completed in Q1 growth √ - France-Dunkerque (FCE): Continuous caster revamping. Completed in Q1 MGT √ - France-Fos France Fos (FCE): Continuous caster revamping revamping. Completed in Q1 gains and i d √ - Poland-ZKZ (LC): New Coke battery of 734,000t. Completed in Q1 other - Mexico-Lazaro (FCA): CO2 absorption system 2nd phase. Completion delay to 2009 USD 1.8bn of CAPEX realised in Q3 and USD 5.5bn of CAPEX expected for 2008 16
  • 18. Q3 results and financial plan 17
  • 19. P&L highlights EBITDA to Net Income (USD million) EBITDA (USD billion) +7%*** Depreciation 1,414 & impairment 8.6 8.0 FOREX & 5.0 4.9 4.8 1,699 other** 386 394 Non Tax 529 3Q 2007 4Q 2007 1Q 2008 2Q 2008 3Q 2008 Income recurring 695 from Net interest item* 8,580 equity Earnings per share (USD) 414 Minority 5,467 - 4,930 34%*** 3,821 4.20 2.79 2.10 1.72 1.69 EBITDA Operating Pre-tax Net 3Q 2007 4Q 2007 1Q 2008 2Q 2008 3Q 2008 incom e incom e EBITDA increased 7% in Q3 2008 versus Q2 2008 * USD 1,699m due to one-time impact of USA Labour agreement 18 ** Includes revaluation of derivative instruments *** Compared to Q2 2008
  • 20. Cash-flow highlights Free Cash-Flow (USD million) Return to shareholders (USD billion) Buy-backs 631 Dividends Net 2.1 1.8 financials, 1.3 tax 0.7 0.5 expenses 0.5 0.5 0.5 0.5 0.5 and others 5,388 3Q 2007 4Q 2007 1Q 2008 2Q 2008 3Q 2008 8,580 Net acquisition spending (USD billion) Change in CAPEX 1,758 w orking 2,561 4.2 capital* 2.5 803 1.7 CAPEX 1.4 14 0.2 EBITDA Cash-Flow Free Cash- 3Q 2007 4Q 2007 1Q 2008 2Q 2008 3Q 2008 from Flow operations Free cash-flow negatively affected by USD 5.4bn increase in working capital primarily due to price and cost increase * Changes in working capital is defined as trade accounts receivable plus inventories less trade accounts payable plus prepaid expenses and less accrued expenses. 19
  • 21. Balance sheet highlights Net Debt & Equity (USD billion) Net Debt (USD billion) and Net debt/EBITDA ratio (x) 4.4 Minority +1.8 35 2.0 30 25 1.5 Shareholders' 1.2x 20 61.8 Equity 15 1.0 32.5 10 5 0 0.5 Equity Net Debt 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 2006 2006 2007 2007 2007 2007 2008 2008 2008 Gearing of 49% G i f Net Debt (USDbn) - LHS Net Debt / EBITDA* (x) - RHS Net Debt / EBITDA ratio reduced to 1 2x* 1.2x* * Based on latest twelve months (LTM) EBITDA 20
  • 22. Liquidity highlights Credit line utilization at 30/09/08 Liquidity & short term debt (USD billion)* 16 12.0 14 12 10 Unsused 8 6.0 14.0 credit line 6 8.0 4 2 4.2 0 Credit facilities Used Cash & ST & Others* 6.0 2.5 Equivalent LT repayment Less than USD 600m of credit line expiring in 1.7 next 12 months out of a total of USD 14bn Liquidity at 30/09/08 Debt due in Q4 Liquidity in excess of debt coming due in next 12 months … *Excluding USD3.7bn of commercial paper 21
  • 23. Gross debt maturity Repayment schedule at 30/09/08 (USD billion) 10 7.8 7.9 8 6 4.7 4.1 4.4 4 1.8 2 0 2009 2010 2011 2012 2013 Therafter Bond maturity profile LT Debt maturity (Loans) LT Debt maturity (Credit facilities) LT Debt maturity (other) Commitment to strong investment grade ratings Covenants for all bank facilities • Standard & Poor’s – BBB+ (stable outlook) Net Debt/EBITDA* not greater than 3.5x • Moody’s – Baa2 (stable outlook) No material adverse change clauses • Fitch – BBB+ (stable outlook) Upgraded by S&P, Moody’s and Fitch in the last 12 months S&P Moody s ….… *Based on last 12 months 22
  • 24. A cost leader generating free cash-flow HRC production cost with overhead p EBITDA and free cash-flow (USD billion) ( ) 1200 Cash cost USD/tonne EBITDA 1000 Free cash-flow * 2008 800 600 4.1 3.0 30 ArcelorMittal weighted 2.9 400 2.6 2.4 position 580 USD/t** 1.9 1.7 200 1.0 0.8 0.7 0.4 Cumulative capacity, m tonnes capacity 0 0 50 100 150 200 250 300 350 400 450 500 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 2006 2006 2006 2006 2007 2007 2007 2007 2008 2008 2008 A unique free cash-flow track record cash flow Source: World Steel Dynamics, CRU monitor, ArcelorMittal analysis 23 *Cash-flow from operation minus CAPEX ** 9 months
  • 25. Strong potential of working capital release Net Debt increase (USD billion) Net Debt and working capital (USD billion) 35 35 30 30 8.5 25 25 0.8 20 20 15 15 24.0 22.8 10 21.4 10 5 5 0 0 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 30/09/2006 30/09/2007 30/09/2008 2006 2006 2007 2007 2007 2007 2008 2008 2008 Net Debt increase related to w orking capital increase Net Debt excluding w orking capital increase Net Debt (USDbn) Working capital (USDbn) The USD5.4bn increase of working capital during Q3… …expected to reverse in Q4 2008 and Q1 2009 Current steel market deterioration expected to significantly reduce p g y working capital requirement 24
  • 26. Focusing on net debt reduction CAPEX plan (USD billion) p ( ) M&A • Less than USD 0.6bn outstanding commitments Grow th CAPEX adjustm ent Grow th CAPEX realised Base Dividend 2009 Maintenance CAPEX • Base dividend maintained at 1.50 USD/share Buy-back program 2.5 2.9 1.5 • Exceptional buy-back program basically 2.4 2.0 completed ltd • Annual buy-back program to be 3.0 3.0 2.5 2.2 2.1 implemented once debt reduction target achieved 2005 2006 2007 2008E 2009E Targeting USD 10bn of Net Debt reduction by end of 2009 to increase financial flexibility 25
  • 28. Flat Carbon Europe Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) +4.1%* -15.1%* -16 9%* 16.9% 1,125 1,081 2,146 9.88 1,821 861 8.21 7.80 1,368 1 368 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 222 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 • As from January 1, 2008, the operations of Annaba flat and Skopje previously reported in the AACIS segment have been transferred to the Flat Carbon Europe division. In addition, the entire operations of Galati are reported within the Flat Carbon Europe division 27 • Historical Q3 2007 figures have not been recast to reflect the new scope changes • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+295kt) and EBITDA (-USD 13 million)
  • 29. Steel Services and Solutions Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) +14.0%* +14.4%* -24.9%* 5.69 390 1,361 342 1,190 4.27 999 3.52 153 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 91 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 • As from January 1, 2008, the operations of ArcelorMittal wire drawing activities previously reported within the Long Carbon Americas and Europe segment have been transferred to the AM3S division. 28 • Historical Q3 2007 figures have not been recast to reflect the new scope changes • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+113kt) and EBITDA (-USD 25 million) • Total shipments for the group are calculated as the sum of the shipments of steel producing segments. AM3S shipments are not consolidated
  • 30. Long Carbon Steel Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) +5.7%* +16.2%* -17.4%* 2,258 8.10 1,258 2,137 1,083 6.69 5.66 801 1,080 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 338 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 • As from January 1, 2008, the Long Carbon Americas and Europe segment include the operations of Annaba long, Sonasid, Zenica, global pipes and tubes business previously reported in the AACIS segment, and Mittal Canada flat previously reported in the Flat Carbon Americas segment. The wire drawing businesses has been 29 transferred to the AM3S segment. • Historical Q3 2007 figures have not been recast to reflect the new scope changes • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (+1,048kt) and EBITDA (+USD 161 million)
  • 31. Stainless Steel Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) -7.9%* -15.7%* -36.2%* 390 4,299 0.58 4,182 3,960 0.49 0.43 249 225 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 511 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 30
  • 32. Asia, Africa and CIS Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) +18.1%* +25.1%* -14.0%* 5.26 1,635 1,070 1,385 855 3.88 3.34 641 935 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 490 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 • As from January 1, 2008, the pipes and tubes business has been transferred to the Long Carbon Americas and Europe division. In addition, the operations of Annaba long, Sonasid and Zenica have been transferred to Long Carbon Americas and Europe segment and the operations of Annaba flat and Skopje to the Flat Carbon Europe 31 segment. • Historical Q3 2007 figures have not been recast to reflect the new scope changes • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (-1,145kt) and EBITDA (-USD 86 million)
  • 33. Flat Carbon Americas Steel shipments (Mt) Average steel selling price (USD/t) EBITDA (USD million) +25.2%* -7.0%** +44.8%* 7.40 1,103 6.89 6.88 2,435 881 707 1,682 1 682 1,104 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 Q3 2007 Q2 2008 Q3 2008 354 USD/t of EBITDA in Q3 2008 * Compared to Q2 2008 ** Compared to Q2 2008. Excludies Sparrows Point, which was sold Q2 2008, shipments decreased from 7.138mt in Q2 2008 to 6.878mt in Q3 2008 (down 3.6%) 32 • As from January 1, 2008, Mittal Canada and pipes and tubes businesses from Dofasco have been transferred to the Long Carbon Americas and Europe division. • Historical Q3 2007 figures have not been recast to reflect the new scope changes • Impact of scope changes in Q3 2007 compared to Q3 2008: shipments (-311kt) and EBITDA (-USD 37 million)
  • 34. Guidance 33
  • 35. Guidance for Q4 and FY 2008 ArcelorMittal EBITDA* USD24.2-24.7bn USD19.4bn USD16bn USD14.9bn USD15.3bn 2004 2005 2006 2007 2008 Guidance Due to increased voluntary production cuts, EBITDA expected to be between USD 2 5bn and USD 3bn in Q4 2008 2.5bn *Proforma 2004, 2005 and 2006 34
  • 36. Q&A 35