Section 7                                                                                 Commercial CalGREEN
                                   BUILDING ENERGY ANALYSIS REPORT




                                                              PROJECT:
                                             Nonresidential Sample Building
                                                     1234 Main St.
                                                Sacramento, CA 95800


                                                        Project Designer:
                                                     Architectural Services
                                                     440 Yuba Dr. Suite C
                                                    Sacramento, CA 95833
                                                        (916) 555-5678


                                                     Report Prepared by:
                                                        Gary Wollin
                                                       Wollin Energy
                                                   3747 Waynesboro Drive
                                                      Ceres, CA 95307
                                                       209-534-7110




                                                            Job Number:
                                                                M98000

                                                                   Date:
                                                                8/5/2011

The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
  authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards.

                                      This program developed by EnergySoft, LLC – www.energysoft.com.

EnergyPro 5.1 by EnergySoft     User Number: 7080           RunCode: 2011-08-05T15:14:13          ID: M98000

        Title 24                                                    8/24                                                    Page 1
Section 7                                           Commercial CalGREEN
                               TABLE OF CONTENTS



       Cover Page                                                                         1
       Table of Contents                                                                  2
       Nonresidential Performance Title 24 Forms                                          3




EnergyPro 5.1 by EnergySoft          Job Number: ID: M98000          User Number: 7080

          Title 24                           8/24                                Page 2
Section 7                                                                               Commercial CalGREEN
PERFORMANCE CERTIFICATE OF COMPLIANCE                                                               (Part 1 of 3)              PERF-1C
Project Name                                                                                                                     Date

Nonresidential Sample Building                                                                                                     8/5/2011
Project Address                                                       Climate Zone                  Total Cond. Floor Area   Addition Floor Area
1234 Main St. Sacramento                                               CA Climate Zone 12                  4,480                    n/a
GENERAL INFORMATION
Building Type:                    Nonresidential                High-Rise Residential      Hotel/Motel Guest Room
                                  Relocatable - indicate        specific climate zone      all climates
Phase of Construction:            New Construction              Addition                   Alteration
STATEMENT OF COMPLIANCE
This certificate of compliance lists the building features and specifications needed to
comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This
certificate applies only to a Building using the performance compliance approach.
The documentation author hereby certifies that the documentation is accurate and complete.
Documentation Author
Name             Gary Wollin                                                         Signature
Company                                                                                                Date
                 Wollin Energy                                                                               8/5/2011
Address          3747 Waynesboro Drive                                                                 Phone 209-534-7110
City/State/Zip   Ceres, CA 95307
The Principal Designer hereby certifies that the proposed building design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with
any other calculations submitted with this permit application. The proposed building has been designed to meet the energy
efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please
check one:
ENV.      LTG.     MECH.
                                I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
                                sign this document as the person responsible for its preparation; and that I am licensed in the State of
                                California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
                                I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section
                                5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
                                contractor performing this work.
                                I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
                                because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
                                Code Sections 5537, 5538 and 6737.1.
Principal Envelope Designer
Name                                                                                 Signature
                 Michael Gray
Company          Architectural Services                                                                Date
Address          440 Yuba Dr. Suite C                                                                  License #
City/State/Zip   Sacramento, CA 95833                                                                  Phone (916) 555-5678

Principal Mechanical Designer
Name             Robert Harper, P.E                                                  Signature
Company          Harper Associates                                                                     Date
Address          4519 E. Hwy 20                                                                        License #
City/State/Zip   Sacramento, CA                                                                        Phone (916) 555-9245

Principal Lighting Designer
Name             Alan Lux                                                            Signature
Company          Luminaire Design                                                                      Date
Address          3030 Pine                                                                             License #
City/State/Zip   Los Altos, CA 92334                                                                   Phone (916) 555-4321

INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included)
      ENV-1C      Certificate of Compliance. Required on plans.         MECH-1C       Certificate of Compliance. Required on plans.
      LTG-1C      Certificate of Compliance. Required on plans.         MECH-2C       Air/Water Side/Service Hot Water & Pool Requirements.
      LTG-2C      Lighting Controls Credit Worksheet.                   MECH-3C       Mechanical Ventilation and Reheat.
      LTG-3C      Indoor Lighting Power Allowance.                      MECH-5C       Mechanical Equipment Details.
EnergyPro 5.1 by EnergySoft        User Number: 7080            RunCode: 2011-08-05T15:14:13         ID: M98000                     Page 3 of 25
          Title 24                                                    8/24                                                   Page 3
Section 7                                                                                   Commercial CalGREEN
PERFORMANCE CERTIFICATE OF COMPLIANCE                                                                  (Part 2 of 3)                PERF-1C
Project Name                                                                                                                           Date
Nonresidential Sample Building                                                                                                         8/5/2011
ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr)
                     Standard     Proposed                                Compliance
Energy Component      Design       Design                                   Margin
Space Heating                0.35         0.76                                           -0.41
Space Cooling              169.79       95.44                                           74.36
Indoor Fans                                    85.22           100.05                   -14.83
Heat Rejection                                  0.00               0.00                  0.00
Pumps & Misc.                                   0.00               0.00                  0.00
Domestic Hot Water                             62.92              62.92                  0.00
Lighting                                       90.33              61.75                 28.57
Receptacle                                     67.78              67.78                  0.00
Process                                        65.00              65.00                  0.00
Process Lighting                               26.81              26.81                  0.00
                 TOTALS                     568.20             480.51                   87.69

Percent better than Standard                                   15.4 %     (    18.4 %   excluding process)

                                                       BUILDING COMPLIES
GENERAL INFORMATION

Building Orientation                    (N) 0 deg            Conditioned Floor Area                                     4,480 sqft.

Number of Stories                          2                 Unconditioned Floor Area                                      800 sqft.

Number of Systems                          3                 Conditioned Footprint Area                                 2,880 sqft.
Number of Zones                            4                 Natural Gas Available On Site                                 Yes



                                         Orientation          Gross Area                         Glazing Area                    Glazing Ratio
Front Elevation                                 (N)                            800  sqft.                      320 sqft.                  40.0 %
Left Elevation                                  (E)                           1,040 sqft.                      320 sqft.                  30.8 %
Rear Elevation                                  (S)                           1,900 sqft.                      260 sqft.                  13.7 %
Right Elevation                                 (W)                            720  sqft.                         0sqft.                      0.0 %

                               Total                                          4,460 sqft.                      900 sqft.                  20.2 %
Roof                                                                          2,880 sqft.                        0 sqft.                      0.0 %



                                                       Standard                           Proposed
                                                                                                                      Prescriptive Values for
Prescriptive Lighting Power Density                           1.157   W/sqft.                      0.844   W/sqft.    Comparison only. See
Prescriptive Envelope TDV Energy                            143,345                              129,246              LTG-1C for allowed LPD.

Remarks:
Standard Building (Compliance)




 EnergyPro 5.1 by EnergySoft      User Number: 7080         RunCode: 2011-08-05T15:14:13             ID: M98000                         Page 4 of 25
          Title 24                                                    8/24                                                       Page 4
Section 7                                                                                         Commercial CalGREEN
PERFORMANCE CERTIFICATE OF COMPLIANCE                                                                            (Part 3 of 3)               PERF-1C
Project Name                                                                                                                                     Date
Nonresidential Sample Building                                                                                                                    8/5/2011
ZONE INFORMATION
                                                                                              Floor      Inst.      Ctrl.       Allowed LPD               Proc.
                                                                                               Area      LPD       Credits     Area    Tailored          Loads
                                                                                                               1          2          3        4
     System Name                       Zone Name                   Occupancy Type             (sqft.)   (W/sf)     (W/sf)     (W/sf)   (W/sf)            (W/sf)
Retail Mech. System            Retail Zone                    Retail Sales, Wholesale           1,280      0.797
                               Unconditioned Storage          Commercial, Industrial Storage      800      0.388      0.058
Office Mech System             Office Zone                    Office > 250 sqft                 1,920      0.717      0.143                                1.000
Restaurant Mech Sys.           Restaurant Zone                Dining                            1,280      1.297                                           2.500




Notes: 1. See LTG-1C                                         2. See LTG-2C    3. See LTG-3C      4. See LTG-4C
                                                                                                                     Items above require special documentation
       (items marked with asterisk, see LTG-1-C by others)                    (by others)
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification to be used with the performance approach. The local enforcement agency
determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the
special justification and documentation submitted.
The HVAC System Retail Mech. System includes Demand Control Ventilation per Standards Section 121.
The HVAC System Retail Mech. System incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System Office Mech System incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System Restaurant Mech Sys. includes Demand Control Ventilation per Standards Section 121.
The HVAC System Restaurant Mech Sys. incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A.
The HVAC System Carrier 48PGM-07---5/6 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System Carrier 48PGL-07---5/6 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.




The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.

Authorized Signature or Stamp _________________________________________

EnergyPro 5.1 by EnergySoft             User Number: 7080              RunCode: 2011-08-05T15:14:13          ID: M98000                            Page 5 of 25


           Title 24                                                          8/24                                                       Page 5
Section 7                                                                                                                                                Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                                                                                             (Part 1 of 3)                                       ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                                                                                                                           Date
Nonresidential Sample Building                                                                                                                                                                                            8/5/2011
Project Address                                                                                                  Climate Zone                                          Total Cond. Floor Area                  Addition Floor Area
1234 Main St. Sacramento                                                                                                            12                                            4,480                                    n/a
GENERAL INFORMATION
Building Type:                         Nonresidential                  High-Rise Residential         Hotel/Motel Guest Room
                                       Relocatable Public School
       Schools (Public School)                                           Conditioned Spaces                Unconditioned Spaces
                                       Bldg.
                                                       2
       Skylight Area for Large Enclosed Space ≥ 8000 ft (If checked include the ENV-4C with submittal)
Phase of Construction:                     New Construction                                                               Addition                                                   Alteration
Approach of Compliance:                    Component                                                                      Overall Envelope                                           Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:                               0 deg

                                           FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS                                                                               INSULATION




                                                                                                                                                                                       Appendix 4
                                                             Orientation




                                                                                                                      Exterior R-




                                                                                                                                                        Interior R-
                                                             N, E, S, W




                                                                                                                                                                                                              Condition
                                           Area (ft2)




                                                                                        U-Factor




                                                                                                                                       Furring3




                                                                                                                                                                       Furring3
                                                                                                                                       Exterior
                                                                                                       R-Value




                                                                                                                                                                       Interior




                                                                                                                                                                                                              Status
                                                                                                       Cavity




                                                                                                                      Value




                                                                                                                                                        Value




                                                                                                                                                                                       Joint




                                                                                                                                                                                                                              Pass

                                                                                                                                                                                                                                     Fail2
    Tag/ID           Assembly Type
1             Wall                                 240         (N)                      0.102             R-13                                                                    4.3.1-A3              New
2             Wall                                 160         (E)                      0.102             R-13                                                                    4.3.1-A3              New
3             Slab                          1,280              (N)                      0.730            None                                                                     4.4.7-A1              New
4             Demising                             200         (N)                      0.102             R-13                                                                    4.3.1-A3              New
5             Roof                          1,600              (N)                      0.025             R-38                                                                    4.2.1-A21             New
6             Wall                                 240         (E)                      0.102             R-13                                                                    4.3.1-A3              New
7             Wall                                 240         (S)                      0.102             R-13                                                                    4.3.1-A3              New
8             Wall                                 376         (W)                      0.102             R-13                                                                    4.3.1-A3              New
9             Door                                      24     (W)                      0.500            None                                                                     4.5.1-A4              New
10            Slab                          1,600              (N)                      0.730            None                                                                     4.4.7-A1              New
1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
                                                                                                   Orientation




                                                                                                                                                                                                          Conditions
                                                                                                   N, E, S, W




                                                                                                                                                                                             Overhang
                                                                                                                                                         (R)SHGC
                                                                           Area (ft2)




                                                                                                                   U-Factor


                                                                                                                                    U-Factor
                                                                                                                                               Source




                                                                                                                                                                            Source




                                                                                                                                                                                                          Status
                                                                                                                                                                            SHGC




                                                                                                                                                                                                                              Pass

                                                                                                                                                                                                                                     Fail2
                                                                                                                   Max




                                                                                                                                                         Max




                            Fenestration
     Tag/ID                    Type
1                Window                                                                 200          (N)             0.460               NFRC                0.398            NFRC                      New
2                Window                                                                 120          (N)             0.460               NFRC                0.398            NFRC                      New
3                Window                                                                 320          (E)             0.460               NFRC                0.398            NFRC                      New
4                Window                                                                 260          (S)             0.460               NFRC                0.398            NFRC                      New




1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft          User Number: 7080                                             RunCode: 2011-08-05T15:14:13                                        ID: M98000                                         Page 6 of 25

             Title 24                                                                                            8/24                                                                                     Page 6
Section 7                                                                                                                                               Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                                                                                         (Part 1 of 3)                                   ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                                                                                                                      Date
Nonresidential Sample Building                                                                                                                                                                                     8/5/2011
Project Address                                                                                              Climate Zone                                          Total Cond. Floor Area               Addition Floor Area
1234 Main St. Sacramento                                                                                                        12                                            4,480                                  n/a
GENERAL INFORMATION
Building Type:                         Nonresidential                  High-Rise Residential         Hotel/Motel Guest Room
                                       Relocatable Public School
       Schools (Public School)                                           Conditioned Spaces                Unconditioned Spaces
                                       Bldg.
                                                       2
       Skylight Area for Large Enclosed Space ≥ 8000 ft (If checked include the ENV-4C with submittal)
Phase of Construction:                     New Construction                                                           Addition                                                   Alteration
Approach of Compliance:                    Component                                                                  Overall Envelope                                           Unconditioned (file affidavit)
Front Orientation: N, E, S, W or in Degrees:                           0 deg

                                           FIELD INSPECTION ENERGY CHECKLIST
OPAQUE SURFACE DETAILS                                                                           INSULATION




                                                                                                                                                                                   Appendix 4
                                                         Orientation




                                                                                                                  Exterior R-




                                                                                                                                                    Interior R-
                                                         N, E, S, W




                                                                                                                                                                                                      Condition
                                           Area (ft2)




                                                                                    U-Factor




                                                                                                                                   Furring3




                                                                                                                                                                   Furring3
                                                                                                                                   Exterior
                                                                                                   R-Value




                                                                                                                                                                   Interior




                                                                                                                                                                                                      Status
                                                                                                   Cavity




                                                                                                                  Value




                                                                                                                                                    Value




                                                                                                                                                                                   Joint




                                                                                                                                                                                                                         Pass

                                                                                                                                                                                                                                Fail2
Tag/ID               Assembly Type
11            Roof                          1,280          (N)                      0.025             R-38                                                                    4.2.1-A21             New
12            Wall                                 240     (N)                      0.102             R-13                                                                    4.3.1-A3              New
13            Wall                                 320     (E)                      0.102             R-13                                                                    4.3.1-A3              New
14            Wall                          1,400          (S)                      0.102             R-13                                                                    4.3.1-A3              New
15            Wall                                 320     (W)                      0.102             R-13                                                                    4.3.1-A3              New




1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance.
FENESTRATION SURFACE DETAILS
                                                                                               Orientation




                                                                                                                                                                                                     Conditions
                                                                                               N, E, S, W




                                                                                                                                                                                         Overhang
                                                                                                                                                     (R)SHGC
                                                                       Area (ft2)




                                                                                                               U-Factor


                                                                                                                                U-Factor
                                                                                                                                           Source




                                                                                                                                                                        Source




                                                                                                                                                                                                     Status
                                                                                                                                                                        SHGC




                                                                                                                                                                                                                         Pass

                                                                                                                                                                                                                                Fail2
                                                                                                               Max




                                                                                                                                                     Max




                            Fenestration
     Tag/ID                    Type




1. See Instructions in the Nonresidential Compliance Manual, page 3-96.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
EnergyPro 5.1 by EnergySoft          User Number: 7080                                         RunCode: 2011-08-05T15:14:13                                        ID: M98000                                       Page 7 of 25

          Title 24                                                                                           8/24                                                                                    Page 7
Section 7                                                                                        Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                               (Part 2 of 3)                     ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                                              Date
Nonresidential Sample Building                                                                                                             8/5/2011
ROOFING PRODUCT (COOL ROOFS)
(Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or
Performance Approach.
CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT “COOL ROOF” REQUIREMENTS:                                            Pass     Fail1    N/A
     Roofing compliance not required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less.
     Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 lb/ft2. Greater than 2:12 pitch.
     Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or
     SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C.
     Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI
     that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV-2C.
     The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are
     exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.energy.ca.gov/title24/
     Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb/ft2 are exempt from
     the Cool Roof criteria below.
     High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are
     exempted from the low-sloped roofing criteria.
1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
 CRRC Product ID        Roof Slope       Product Weight                Product              Aged Solar         Thermal
    Number1            ≤ 2:12 > 2:12     < 5lb/ft2 ≥ 5lb/ft2            Type2               Reflectance3      Emmitance         SRI5       Pass      Fail6
                                                                                               4

                                                                                               4

                                                                                               4

                                                                                               4

                                                                                               4

                                                                                               4

1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council’s Rated Product Directory at
www.coolroofs.org/products/search.php
2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc.
3. If the Aged Reflectance is not available in the Cool Roof Rating Council’s Rated Product Directory then use the Initial Reflectance value from the
same directory and use the equation (0.2+0.7(ρinitial – 0.2) to obtain a calculated aged value. Where ρ is the Initial Solar Reflectance from the Cool
Roof Rating Council’s Rated Product Directory.
4. Check box if the Aged Reflectance is a calculated value using the equation above.
5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energy.ca.gov/title24/
6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.
To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage
recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating:

   Aluminum-Pigmented Asphalt Roof Coating               Cement-Based Roof Coating                          Other ______________________

Discrepancies:




EnergyPro 5.1 by EnergySoft        User Number: 7080             RunCode: 2011-08-05T15:14:13              ID: M98000                       Page 8 of 25

        Title 24                                                         8/24                                                        Page 8
Section 7                                                                        Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                               (Part 3 of 3)                ENV-1C
AND FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                         Date
Nonresidential Sample Building                                                                                         8/5/2011
Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope
Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that
require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration
products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices
Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible
party to budget for the scope of work appropriately.

Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new
fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the
boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the
enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled
out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different
fenestration product line must be provided to the owner of the building for their records.

                         Test Description                                         ENV-2A       Test Performed By:
        Fenestration Products Name or ID                Area of like         Building Envelope
         Requiring Testing or Verification               Products            Acceptance Test
Interpane INE-177                                                      900




EnergyPro 5.1 by EnergySoft   User Number: 7080        RunCode: 2011-08-05T15:14:13        ID: M98000                  Page 9 of 25
        Title 24                                             8/24                                               Page 9
Section 7                                                                                             Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                                       (Part 1 of 3)                                            LTG-1C
Project Name                                                                                                                                                          Date
Nonresidential Sample Building                                                                                                                                               8/5/2011
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG-1- INST (Retain a copy and verify form is completed and signed.)                                                 Field Inspector
Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.)     Field Inspector
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:
          CONDITIONED SPACE                                                      UNCONDITIONED SPACE
          The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
          with §146(a).
          Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
          calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
          0.2 watts per square foot is totaled below.
                     Luminaire (Type, Lamps, Ballasts)                                                             Installed Watts
  A                                          B                                      C          D                        E                          F            G                     H
                                                                                                                How wattage                                                       Field
                                                                                                               Was determined                                                  Inspector2




                                                                                                                            To §130 (d or e)




                                                                                                                                                             Watts (D X F)
                                                                                                                                                Luminaires
                                                                                             Luminaire1




                                                                                                                                                Number of
                                                                                                                            According
                                                                                             Watts per




                                                                                                                                                             Installed
 None                                                                                                          CEC
   or                       Complete Luminaire Description1                                                   Default




                                                                                                                                                                               Pass

                                                                                                                                                                                          Fail
 Item                         (i.e, 3 lamp fluorescent troffer,                                                From
 Tag                      F32T8, one dimmable electronic ballasts)                                             NA8
         2 Lamp 18w Compact Quad 4 Pin Elec                                                          38.0                                              20          760
         45w per ft Track Light                                                                      45.0                                              20          900
         2 Lamp 4 ft T8 Rapid Start ElecRO                                                           51.0                                              20     1,020
 A-1     2 Lamp 4 ft T8 Rapid Start ElecRO                                                           51.0                                              27     1,377




                                                                                                            Installed Watts Page Total:                       4,057
                                                                                                          Installed Watts Building Total
                          Building total number of pages:                                                            (Sum of all pages)
                                                                                                                                                              4,057
                                                                                                     Enter into LTG-1C Page 4 of 4

1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.

EnergyPro 5.1 by EnergySoft        User Number: 7080                 RunCode: 2011-08-05T15:14:13                ID: M98000                                              Page 10 of 25


          Title 24                                                          8/24                                                                         Page 10
Section 7                                                                                             Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                                       (Part 1 of 3)                                            LTG-1C
Project Name                                                                                                                                                          Date
Nonresidential Sample Building                                                                                                                                               8/5/2011
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
Installation Certificate, LTG-1- INST (Retain a copy and verify form is completed and signed.)                                                 Field Inspector
Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.)     Field Inspector
A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on
this Lighting Schedule is only for:
          CONDITIONED SPACE                                                      UNCONDITIONED SPACE
          The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance
          with §146(a).
          Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the
          calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of
          0.2 watts per square foot is totaled below.
                     Luminaire (Type, Lamps, Ballasts)                                                             Installed Watts
  A                                          B                                      C          D                        E                          F            G                     H
                                                                                                                How wattage                                                       Field
                                                                                                               Was determined                                                  Inspector2




                                                                                                                            To §130 (d or e)




                                                                                                                                                             Watts (D X F)
                                                                                                                                                Luminaires
                                                                                             Luminaire1




                                                                                                                                                Number of
                                                                                                                            According
                                                                                             Watts per




                                                                                                                                                             Installed
 None                                                                                                          CEC
   or                       Complete Luminaire Description1                                                   Default




                                                                                                                                                                               Pass

                                                                                                                                                                                          Fail
 Item                         (i.e, 3 lamp fluorescent troffer,                                                From
 Tag                      F32T8, one dimmable electronic ballasts)                                             NA8
 F-3     2 Lamp 4 ft T8 Rapid Start Elec                                                             62.0                                                5         310




                                                                                                            Installed Watts Page Total:                            310
                                                                                                          Installed Watts Building Total
                          Building total number of pages:                                                            (Sum of all pages)
                                                                                                                                                                   310
                                                                                                     Enter into LTG-1C Page 4 of 4

1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb.
2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary.

EnergyPro 5.1 by EnergySoft        User Number: 7080                 RunCode: 2011-08-05T15:14:13                ID: M98000                                              Page 11 of 25


          Title 24                                                          8/24                                                                         Page 11
Section 7                                                                                  Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                         (Part 2 of 3)                   LTG-1C
Project Name                                                                                                                    Date
Nonresidential Sample Building                                                                                                     8/5/2011
INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST
                                                                                                                                    2
Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft ,
                                                              2
automatic daylighting controls for daylit areas > 2,500 ft , d) shut-off controls, e) display lighting controls, f) tailored lighting controls –
general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic
                                       2
controls for retail stores > 50,000 ft , in accordance with Section 131.
                                                                                                                                     Field
MANDATORY LIGHTING CONTROLS – FIELD INSPECTION ENERGY CHECKLIST                                                                    Inspector
                                                        Number                                                     Special
                 Type/ Description                      of Units               Location in Building               Features      Pass       Fail




SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of LTG-1C)
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written
justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification,
and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.




Field Inspector’s Notes or Discrepancies:




EnergyPro 5.1 by EnergySoft     User Number: 7080         RunCode: 2011-08-05T15:14:13            ID: M98000                       Page 12 of 25

        Title 24                                                    8/24                                                   Page 12
Section 7                                                                                   Commercial CalGREEN
CERTIFICATE OF COMPLIANCE                                                                            (Part 3 of 3)             LTG-1C
Project Name                                                                                                                  Date
Nonresidential Sample Building                                                                                                 8/5/2011
CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE
          Indoor Lighting Power for Conditioned Spaces                                  Indoor Lighting Power for Unconditioned Spaces
                                                                   Watts                                                             Watts
Installed Lighting                                                       4,057
                                                                               Installed Lighting
                                                                                                                                             310
(from Conditioned LTG-1C, Page 2)                                                (from Unconditioned LTG-1C, Page 2)
Lighting Control Credit                                   -                275
                                                                                 Lighting Control Credit                  -                  47
Conditioned Spaces (from LTG-2C)                                                 Unconditioned Spaces (from LTG-2C)
Adjusted Installed                                        =              3,782 Adjusted Installed                         =                  264
Lighting Power                                                                 Lighting Power

Complies if Installed ≤ Allowed                                      ↕           Complies if Installed ≤ Allowed                      ↕
Allowed Lighting Power                                                           Allowed Lighting Power
                                                                         3,782                                                               480
Conditioned Spaces (from LTG-3C or PERF-1)                                       Unconditioned Spaces (from LTG-3C)

Required Acceptance Tests
Designer:
This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system,
LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space
shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type
requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential
Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the
responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled.
Enforcement Agency:
Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting
system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements.
The LTG-2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless
the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement
agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements
of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can
receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire control(s) must be provided to the
owner of the building for their records.
                                                                                                                             LTG-2A and
                                               Luminaires Controlled                                                            LTG-3A
                                                                                                                             Controls and
                                                                                                                             Sensors and
                                                                         Number of                                             Automatic
                                                                         Luminaires                                       Daylighting Controls
 Equipment Requiring Testing                Description                  controlled                  Location                Acceptance
Occ Sensor - Storage           2 Lamp 4 ft T8 Rapid Start Elec                      5             Storage Room
Occ Sensor - Multi-Level       2 Lamp 4 ft T8 Rapid Start ElecRO                  27                  Office




EnergyPro 5.1 by EnergySoft    User Number: 7080              RunCode: 2011-08-05T15:14:13          ID: M98000                  Page 13 of 25


         Title 24                                                        8/24                                           Page 13
Section 7                                                                                     Commercial CalGREEN
CERTIFICATE OF COMPLIANCE and                                                                    (Part 1 of 4)                     MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                                      Date
Nonresidential Sample Building                                                                                                        8/5/2011
Project Address                                                         Climate Zone                     Total Cond. Floor Area   Addition Floor Area
1234 Main St. Sacramento                                                               12                        4,480                     n/a
GENERAL INFORMATION
Building Type:                            Nonresidential                      High-Rise Residential               Hotel/Motel Guest Room
                                                                                                                         Unconditioned Spaces
     Schools (Public School)              Relocatable Public School Bldg.              Conditioned Spaces
                                                                                                                         (affidavit)
Phase of Construction:                    New Construction                    Addition                            Alteration
                                                                              Overall Envelope TDV
Approach of Compliance:                   Component                                                               Unconditioned (file affidavit)
                                                                              Energy
Front Orientation: N, E, S, W or in Degrees:           0 deg
HVAC SYSTEM DETAILS                                                                                  FIELD INSPECTION ENERGY CHECKLIST
                                                                                                           Meets Criteria or Requirements
             2                                                                                                                                      2
Equipment                                                      Inspection Criteria                        Pass          Fail – Describe Reason
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)                       DHW Heater
                  3
Equipment Type :                               Gas Fired DHW Boiler
Number of Systems                              1
                                    1
Max Allowed Heating Capacity                   40,000 Btu/hr
                               1               0.58 EF
Minimum Heating Efficiency
                                    1
Max Allowed Cooling Capacity                   n/a
                      1
Cooling Efficiency                             n/a
Duct Location/ R-Value                         n/a
When duct testing is required, submit
MECH-4A & MECH-4-HERS                          n/a
Economizer                                     n/a
Thermostat                                     n/a
Fan Control                                    n/a
                                                                                                     FIELD INSPECTION ENERGY CHECKLIST
             2                                                                                                                                      2
Equipment                                                      Inspection Criteria                        Pass          Fail – Describe Reason
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)                       Retail Mech. System
                  3
Equipment Type :                               Packaged DX
Number of Systems                              1
                                    1
Max Allowed Heating Capacity                   91,500 Btu/hr
                               1
Minimum Heating Efficiency                     81% AFUE
                                    1
Max Allowed Cooling Capacity                   72,100 Btu/hr
                      1
Cooling Efficiency                             12.0 EER
Duct Location/ R-Value                         Attic, Ceiling Ins, vented / 8.0
When duct testing is required, submit
MECH-4A & MECH-4-HERS                          Yes
Economizer                                     Diff. Temp (Integrated)
Thermostat                                     Setback Required
Fan Control                                    Constant Volume
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
   the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.

EnergyPro 5.1 by EnergySoft        User Number: 7080        RunCode: 2011-08-05T15:14:13                ID: M98000                       Page 14 of 25

        Title 24                                                       8/24                                                    Page 14
Section 7                                                                                     Commercial CalGREEN
CERTIFICATE OF COMPLIANCE and                                                                    (Part 1 of 4)                     MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                                                      Date
Nonresidential Sample Building                                                                                                        8/5/2011
Project Address                                                         Climate Zone                     Total Cond. Floor Area   Addition Floor Area
1234 Main St. Sacramento                                                               12                        4,480                     n/a
GENERAL INFORMATION
Building Type:                            Nonresidential                      High-Rise Residential               Hotel/Motel Guest Room
                                                                                                                         Unconditioned Spaces
     Schools (Public School)              Relocatable Public School Bldg.              Conditioned Spaces
                                                                                                                         (affidavit)
Phase of Construction:                    New Construction                    Addition                            Alteration
                                                                              Overall Envelope TDV
Approach of Compliance:                   Component                                                               Unconditioned (file affidavit)
                                                                              Energy
Front Orientation: N, E, S, W or in Degrees:           0 deg
HVAC SYSTEM DETAILS                                                                                  FIELD INSPECTION ENERGY CHECKLIST
                                                                                                           Meets Criteria or Requirements
             2                                                                                                                                      2
Equipment                                                      Inspection Criteria                        Pass          Fail – Describe Reason
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)                       Office Mech System
                  3
Equipment Type :                               Packaged DX
Number of Systems                              1
                                    1
Max Allowed Heating Capacity                   60,800 Btu/hr
                               1               81% AFUE
Minimum Heating Efficiency
                                    1
Max Allowed Cooling Capacity                   72,100 Btu/hr
                      1
Cooling Efficiency                             12.0 EER
Duct Location/ R-Value                         Attic, Ceiling Ins, vented / 8.0
When duct testing is required, submit
MECH-4A & MECH-4-HERS                          Yes
Economizer                                     Diff. Temp (Integrated)
Thermostat                                     Setback Required
Fan Control                                    Constant Volume
                                                                                                     FIELD INSPECTION ENERGY CHECKLIST
             2                                                                                                                                      2
Equipment                                                      Inspection Criteria                        Pass          Fail – Describe Reason
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)                       Restaurant Mech Sys.
                  3
Equipment Type :                               Packaged DX
Number of Systems                              1
                                    1
Max Allowed Heating Capacity                   148,400 Btu/hr
                               1
Minimum Heating Efficiency                     82% AFUE
                                    1
Max Allowed Cooling Capacity                   159,900 Btu/hr
                      1
Cooling Efficiency                             11.4 EER
Duct Location/ R-Value                         Attic, Ceiling Ins, vented / 8.0
When duct testing is required, submit
MECH-4A & MECH-4-HERS                          Yes
Economizer                                     Diff. Temp (Integrated)
Thermostat                                     Setback Required
Fan Control                                    Constant Volume
1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from
   the building plans) the responsible party shall resubmit energy compliance to include the new changes.
2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked.
3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other.

EnergyPro 5.1 by EnergySoft        User Number: 7080        RunCode: 2011-08-05T15:14:13                ID: M98000                       Page 15 of 25

        Title 24                                                       8/24                                                    Page 15
Section 7                                                                   Commercial CalGREEN
CERTIFICATE OF COMPLIANCE and                                                    (Part 2 of 4)      MECH-1C
FIELD INSPECTION ENERGY CHECKLIST
Project Name                                                                                        Date
Nonresidential Sample Building                                                                        8/5/2011
Discrepancies:




EnergyPro 5.1 by EnergySoft   User Number: 7080   RunCode: 2011-08-05T15:14:13       ID: M98000        Page 16 of 25

       Title 24                                        8/24                                       Page 16
Section 7                                                                                                                               Commercial CalGREEN
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST                                                                                   (Part 3 of 4)            MECH-1C
Project Name                                                                                                                                                        Date
Nonresidential Sample Building                                                                                                                                             8/5/2011
Required Acceptance Tests

Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable
boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and
the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be
part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately.

Building Departments:
Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for
normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements.

The MECH-1C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing,
person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following
checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans,
specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the
properly filled out and signed forms before the building can receive final occupancy.


                TEST DESCRIPTION                          MECH-2A       MECH-3A       MECH-4A        MECH-5A      MECH-6A       MECH-7A    MECH-8A    MECH-9A    MECH-10A      MECH-11A
                                                                                                                                                                  Hydronic
                                                           Outdoor       Constant                                  Demand                              Supply     System        Automatic
                                                          Ventilation    Volume &         Air                      Control       Supply      Valve     Water      Variable      Demand
                                                             For        Single-Zone   Distribution   Economizer   Ventilation     Fan       Leakage    Temp.       Flow           Shed
 Equipment Requiring Testing or Verification       Qty.   VAV & CAV       Unitary        Ducts        Controls      DCV           VAV         Test     Reset      Control        Control
Carrier 48PGM-07---5/6                         1
Carrier 48PGL-07---5/6                         1
Carrier 48PGL-14---5/6                         1




EnergyPro 5.1 by EnergySoft             User Number: 7080                         RunCode: 2011-08-05T15:14:13                       ID: M98000                              Page 17 of 25

          Title 24                                                                              8/24                                                                Page 17
Section 7                                                                                                                   Commercial CalGREEN
CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST                                                                       (Part 4 of 4)                 MECH-1C
Project Name                                                                                                                                                 Date
Nonresidential Sample Building                                                                                                                                      8/5/2011
               TEST DESCRIPTION                      MECH-12A       MECH-13A            MECH-14A          MECH-15A
                                                        Fault      Automatic Fault       Distributed
                                                    Detection &     Detection &        Energy Storage   Thermal Energy
                                                    Diagnostics    Diagnostics for         DX AC         Storage (TES)
       Equipment Requiring Testing           Qty.   for DX Units     Air & Zone           Systems           Systems                     Test Performed By:
Carrier 48PGM-07---5/6                   1
Carrier 48PGL-07---5/6                   1
Carrier 48PGL-14---5/6                   1




EnergyPro 5.1 by EnergySoft          User Number: 7080                               RunCode: 2011-08-05T15:14:13        ID: M98000                                   Page 18 of 25

          Title 24                                                                         8/24                                                              Page 18
Section 7                                                                                      Commercial CalGREEN
LIGHTING CONTROLS CREDIT WORKSHEET                                                                       (Part 1 of 2)                     LTG-2C
Project Name                                                                                                                              Date
Nonresidential Sample Building                                                                                                              8/5/2011
POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS
A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this
schedule are only for:
      CONDITIONED SPACES                                         UNCONDITIONED SPACES
         A                             B                               C                D                 E                  F                    G
                                                                                                       Watts of            Power               Control
 Room # Zone ID                                                       Plan         Room Area           Control          Adjustments          Credit Watts
     Areas               Lighting Control Description1              Reference         (ft2)            Lighting           Factor2              (E x F)
Office              Occ Sensor - Multi-Level                  A-1                           1,920             1,377                0.20                275




                                                                                                                        PAGE TOTAL                     275

Note:                                           Building total of non-daylight control credit watts for all pages of LTG-2C Page 1 of 2
Conditioned and                                                                                                                                             0
Unconditioned                                       Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2
Space shall be                                                              BUILDING TOTAL OF ALL CONTROL CREDIT WATTS
separately                                                  (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS)
                                                Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED                        275
totaled
                                                                                                          or UNCONDITIONED Spaces
1. Description shall be consistent with Type of Control defined in Table 146-C
2. Power Adjustment Factor taken from Table 146-C

EnergyPro 5.1 by EnergySoft     User Number: 7080             RunCode: 2011-08-05T15:14:13               ID: M98000                         Page 19 of 25


         Title 24                                                        8/24                                                     Page 19
Section 7                                                                                       Commercial CalGREEN
LIGHTING CONTROLS CREDIT WORKSHEET                                                                       (Part 1 of 2)                     LTG-2C
Project Name                                                                                                                              Date
Nonresidential Sample Building                                                                                                              8/5/2011
POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS
A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this
schedule are only for:
      CONDITIONED SPACES                                         UNCONDITIONED SPACES
       A                               B                               C                D                 E                  F                    G
                                                                                                       Watts of            Power               Control
 Room # Zone ID                                                       Plan         Room Area           Control          Adjustments          Credit Watts
     Areas               Lighting Control Description1              Reference         (ft2)            Lighting           Factor2              (E x F)
Storage Room       Occ Sensor - Storage                       F-3                            800                  310              0.15                 47




                                                                                                                        PAGE TOTAL                      47

Note:                                           Building total of non-daylight control credit watts for all pages of LTG-2C Page 1 of 2
Conditioned and                                                                                                                                             0
Unconditioned                                       Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2
Space shall be                                                              BUILDING TOTAL OF ALL CONTROL CREDIT WATTS
separately                                                  (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS)
                                                Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED                         47
totaled
                                                                                                          or UNCONDITIONED Spaces
1. Description shall be consistent with Type of Control defined in Table 146-C
2. Power Adjustment Factor taken from Table 146-C

EnergyPro 5.1 by EnergySoft     User Number: 7080             RunCode: 2011-08-05T15:14:13               ID: M98000                         Page 20 of 25


        Title 24                                                         8/24                                                     Page 20
Section 7                                                                                  Commercial CalGREEN
INDOOR LIGHTING POWER ALLOWANCE                                                                                                          LTG-3C
Project Name                                                                                                                             Date
Nonresidential Sample Building                                                                                                            8/5/2011
ALLOWED LIGHTING POWER (Chose One Method)
A Separate LTG-3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this
page are only for:
    CONDITIONED SPACES                                UNCONDITIONED SPACES
COMPLETE BUILDING METHOD
                                                                                       WATTS                  COMPLETE                    ALLOWED
              BUILDING CATEGORY (From §146 Table 146-E)
                                                                                              2
                                                                                       PER (ft )        X     BLDG. AREA             =     WATTS




                                                                                           TOTALS
                                                                                                                  AREA                     WATTS
AREA CATEGORY METHOD
                                                                                       WATTS                                              ALLOWED
              BUILDING CATEGORY (From §146 Table 146-F)
                                                                                              2
                                                                                       PER (ft )        X        Area ft
                                                                                                                           2
                                                                                                                                     =     WATTS
Commercial, Industrial Storage                                                                   0.60                          800                 480




                                                                                           TOTALS                              800                 480
                                                                                                                  AREA                     WATTS
TAILORED METHOD
                                   Total Allowed Watts using the Tailored Method taken from LTG-4C (Page 1 of 4) Row 3                               0

The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set of forms. A separate set of LTG-
4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces
EnergyPro 5.1 by EnergySoft        User Number: 7080       RunCode: 2011-08-05T15:14:13             ID: M98000                         Page 21 of 25
          Title 24                                                    8/24                                                      Page 21
Section 7                                                                                            Commercial CalGREEN
AIR SYSTEM REQUIREMENTS                                                                                      (Part 1 of 2)                   MECH-2C
Project Name                                                                                                                             Date
Nonresidential Sample Building                                                                                                                  8/5/2011
                                                       Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc…)
Item or System Tags
(i.e. AC-1, RTU-1, HP-1)                                          Retail Mech. System               Office Mech System              Restaurant Mech Sys.

Number of Systems                                                            1                                1                                  1

                                             Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s)
MANDATORY MEASURES                        T-24 Sections

Heating Equipment Efficiency              112(a)                       81% AFUE                          81% AFUE                         82% AFUE

Cooling Equipment Efficiency              112(a)                        12.0 EER                         12.0 EER                          11.4 EER

HVAC Heat Pump Thermostat                 112(b), 112(c)                    n/a                              n/a                                n/a

Furnace Controls/Thermostat               112(c), 115(a)                    n/a                              n/a                                n/a

Natural Ventilation                       121(b)                            No                               No                                 No

Mechanical Ventilation                    121(b)                         320 cfm                          288 cfm                           640 cfm

VAV Minimum Position Control              121(c)                            No                               No                                 No

Demand Control Ventilation                121(c)                           Yes                               No                                 Yes

Time Control                              122(e)                 Programmable Switch               Programmable Switch              Programmable Switch

Setback and Setup Control                 122(e)                    Setback Required                 Setback Required                  Setback Required

Outdoor Damper Control                    122(f)                         Gravity                           Gravity                          Gravity

Isolation Zones                           122(g)                            n/a                              n/a                                n/a

Pipe Insulation                           123                              N/A                               N/A                                N/A

Duct Location/ R-value                    124                Attic, Ceiling Ins, vented / 8.0 Attic, Ceiling Ins, vented / 8.0 Attic, Ceiling Ins, vented / 8.0




PRESCRIPTIVE MEASURES
Calculated Design Heating Load            144(a & b)                        n/a                              n/a                                n/a

Proposed Heating Capacity                 144(a & b)                  91,500 Btu/hr                     60,800 Btu/hr                   148,400 Btu/hr

Calculated Design Cooling Load            144(a & b)                        n/a                              n/a                                n/a

Proposed Cooling Capacity                 144(a & b)                  60,397 Btu/hr                     63,007 Btu/hr                   123,299 Btu/hr

Fan Control                               144(c)                    Constant Volume                   Constant Volume                  Constant Volume

DP Sensor Location                        144(c)                           N/A                               N/A                                N/A

Supply Pressure Reset (DDC only)          144(c)                            No                               No                                 No

Simultaneous Heat/Cool                    144(d)                            No                               No                                 No

Economizer                                144(e)                 Diff. Temp (Integrated)           Diff. Temp (Integrated)          Diff. Temp (Integrated)

Heat Air Supply Reset                     144(f)                     Constant Temp                     Constant Temp                    Constant Temp

Cool Air Supply Reset                     144(f)                     Constant Temp                     Constant Temp                    Constant Temp
                              1
Electric Resistance Heating               144(g)

Air Cooled Chiller Limitation             144(i)
Duct Leakage Sealing. If Yes, a
MECH-4-A must be submitted                144(k)                           Yes                               Yes                                Yes




1.   Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used
     explain which exception(s) to §144(g) apply.


EnergyPro 5.1 by EnergySoft        User Number: 7080            RunCode: 2011-08-05T15:14:13                 ID: M98000                              Page 22 of 25


        Title 24                                                           8/24                                                         Page 22
Commercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis Report
Commercial CalGreen - Building Enery Analysis Report

Más contenido relacionado

Ähnlich wie Commercial CalGreen - Building Enery Analysis Report

Aerospace Solutions Llc Overview Ckj
Aerospace Solutions Llc Overview CkjAerospace Solutions Llc Overview Ckj
Aerospace Solutions Llc Overview CkjJonkosky
 
Ryan Booth's Resume_032016
Ryan Booth's Resume_032016Ryan Booth's Resume_032016
Ryan Booth's Resume_032016Ryan Booth
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George ResumeGeorge Ward
 
SAFE HAVEN Project Experience and Performance 2014
SAFE HAVEN Project Experience and Performance 2014SAFE HAVEN Project Experience and Performance 2014
SAFE HAVEN Project Experience and Performance 2014Jeffrey T. Evans
 
Borg Warner Presentation
Borg Warner PresentationBorg Warner Presentation
Borg Warner Presentationbtharp
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projectsalejolop
 
Government Facilities - Turnkey Energy Solutions
Government Facilities - Turnkey Energy SolutionsGovernment Facilities - Turnkey Energy Solutions
Government Facilities - Turnkey Energy SolutionsMcKenney's Inc
 
Alan_Baird_Buchanan_BA_gen
Alan_Baird_Buchanan_BA_genAlan_Baird_Buchanan_BA_gen
Alan_Baird_Buchanan_BA_genAlan Buchanan
 
Asets Defense Presentation Fpwj 07 Feb2011
Asets Defense Presentation Fpwj 07 Feb2011Asets Defense Presentation Fpwj 07 Feb2011
Asets Defense Presentation Fpwj 07 Feb2011williebloom
 
Ahart resume
Ahart resumeAhart resume
Ahart resumeAndy Hart
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015Jim Reaves
 
Electrical Hazards and Safety Measures
Electrical Hazards and Safety MeasuresElectrical Hazards and Safety Measures
Electrical Hazards and Safety MeasuresAda Abner
 
06 jerome crotteux - 3 e
06   jerome crotteux - 3 e06   jerome crotteux - 3 e
06 jerome crotteux - 3 eLinea Trovata
 
Distribution Automation &amp; Grid Modernization Business Case Summit 2013
Distribution Automation &amp; Grid Modernization Business Case Summit 2013Distribution Automation &amp; Grid Modernization Business Case Summit 2013
Distribution Automation &amp; Grid Modernization Business Case Summit 2013philbrown49
 
2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference 2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference Dean Murphy
 

Ähnlich wie Commercial CalGreen - Building Enery Analysis Report (20)

Aerospace Solutions Llc Overview Ckj
Aerospace Solutions Llc Overview CkjAerospace Solutions Llc Overview Ckj
Aerospace Solutions Llc Overview Ckj
 
Ryan Booth's Resume_032016
Ryan Booth's Resume_032016Ryan Booth's Resume_032016
Ryan Booth's Resume_032016
 
CV
CVCV
CV
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
SAFE HAVEN Project Experience and Performance 2014
SAFE HAVEN Project Experience and Performance 2014SAFE HAVEN Project Experience and Performance 2014
SAFE HAVEN Project Experience and Performance 2014
 
Borg Warner Presentation
Borg Warner PresentationBorg Warner Presentation
Borg Warner Presentation
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
Developing Solar Projects
Developing Solar ProjectsDeveloping Solar Projects
Developing Solar Projects
 
Government Facilities - Turnkey Energy Solutions
Government Facilities - Turnkey Energy SolutionsGovernment Facilities - Turnkey Energy Solutions
Government Facilities - Turnkey Energy Solutions
 
RhiZone Energy Solutions
RhiZone Energy SolutionsRhiZone Energy Solutions
RhiZone Energy Solutions
 
Alan_Baird_Buchanan_BA_gen
Alan_Baird_Buchanan_BA_genAlan_Baird_Buchanan_BA_gen
Alan_Baird_Buchanan_BA_gen
 
Asets Defense Presentation Fpwj 07 Feb2011
Asets Defense Presentation Fpwj 07 Feb2011Asets Defense Presentation Fpwj 07 Feb2011
Asets Defense Presentation Fpwj 07 Feb2011
 
Ahart resume
Ahart resumeAhart resume
Ahart resume
 
Resume Apr 2015
Resume Apr 2015Resume Apr 2015
Resume Apr 2015
 
Resume 02082016
Resume 02082016Resume 02082016
Resume 02082016
 
Electrical Hazards and Safety Measures
Electrical Hazards and Safety MeasuresElectrical Hazards and Safety Measures
Electrical Hazards and Safety Measures
 
06 jerome crotteux - 3 e
06   jerome crotteux - 3 e06   jerome crotteux - 3 e
06 jerome crotteux - 3 e
 
Distribution Automation &amp; Grid Modernization Business Case Summit 2013
Distribution Automation &amp; Grid Modernization Business Case Summit 2013Distribution Automation &amp; Grid Modernization Business Case Summit 2013
Distribution Automation &amp; Grid Modernization Business Case Summit 2013
 
2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference 2nd annual nuclear power uprate conference
2nd annual nuclear power uprate conference
 

Mehr von Center for Sustainable Energy

San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentSan Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentCenter for Sustainable Energy
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...Center for Sustainable Energy
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsCenter for Sustainable Energy
 
California Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCalifornia Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCenter for Sustainable Energy
 
Updating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesUpdating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesCenter for Sustainable Energy
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsCenter for Sustainable Energy
 
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes. Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.Center for Sustainable Energy
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)Center for Sustainable Energy
 

Mehr von Center for Sustainable Energy (20)

Appendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness PlanAppendix: San Joaquin Valley PEV Readiness Plan
Appendix: San Joaquin Valley PEV Readiness Plan
 
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV AssessmentSan Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
San Joaquin Valley PEV Readiness Plan: Phase One Regional PEV Assessment
 
Appendix: San Diego PEV Readiness Plan
Appendix: San Diego PEV Readiness PlanAppendix: San Diego PEV Readiness Plan
Appendix: San Diego PEV Readiness Plan
 
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
San Diego Regional Plug-in Electric Vehicle Readiness Plan: Phase One Regiona...
 
Sustainable communities - Porrecca
Sustainable communities  - PorreccaSustainable communities  - Porrecca
Sustainable communities - Porrecca
 
Sustainable communities - Blackson
Sustainable communities  - BlacksonSustainable communities  - Blackson
Sustainable communities - Blackson
 
Sustainable communities - Benfield
Sustainable communities -   BenfieldSustainable communities -   Benfield
Sustainable communities - Benfield
 
SJVAPCD: Drive Clean! Rebate Program
SJVAPCD: Drive Clean! Rebate ProgramSJVAPCD: Drive Clean! Rebate Program
SJVAPCD: Drive Clean! Rebate Program
 
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility BillsModesto Irrigation District: PEV Impact to Grid and Utility Bills
Modesto Irrigation District: PEV Impact to Grid and Utility Bills
 
California Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and IncentivesCalifornia Center for Sustainable Energy: PEV Benefits and Incentives
California Center for Sustainable Energy: PEV Benefits and Incentives
 
Michelle Kaufmann Presents - Simplicity -
Michelle Kaufmann Presents   - Simplicity -Michelle Kaufmann Presents   - Simplicity -
Michelle Kaufmann Presents - Simplicity -
 
Updating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency CodesUpdating the 2013 Title 24 Building Efficiency Codes
Updating the 2013 Title 24 Building Efficiency Codes
 
Water Harvesting for Landscape Irrigation
Water Harvesting for Landscape IrrigationWater Harvesting for Landscape Irrigation
Water Harvesting for Landscape Irrigation
 
The Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial BuildingsThe Economics & Financial Options in Retrofitting Commercial Buildings
The Economics & Financial Options in Retrofitting Commercial Buildings
 
Sustainable Architecture Without Architects
Sustainable Architecture Without ArchitectsSustainable Architecture Without Architects
Sustainable Architecture Without Architects
 
Examining Window Retrofit Options
Examining Window Retrofit OptionsExamining Window Retrofit Options
Examining Window Retrofit Options
 
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes. Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
Residential Title-24 Lighting & ASHRAE 62.2 Ventilation Codes.
 
The Green Real Estate Investing Opportunity
The Green Real Estate Investing OpportunityThe Green Real Estate Investing Opportunity
The Green Real Estate Investing Opportunity
 
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
ENERGY STAR’s Portfolio Manager Tool and Benchmarking in CA (AB 1103)
 
Residential lighting technologies
Residential lighting technologiesResidential lighting technologies
Residential lighting technologies
 

Último

Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - Tech
Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - TechWebinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - Tech
Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - TechProduct School
 
Patch notes explaining DISARM Version 1.4 update
Patch notes explaining DISARM Version 1.4 updatePatch notes explaining DISARM Version 1.4 update
Patch notes explaining DISARM Version 1.4 updateadam112203
 
The New Cloud World Order Is FinOps (Slideshow)
The New Cloud World Order Is FinOps (Slideshow)The New Cloud World Order Is FinOps (Slideshow)
The New Cloud World Order Is FinOps (Slideshow)codyslingerland1
 
Trailblazer Community - Flows Workshop (Session 2)
Trailblazer Community - Flows Workshop (Session 2)Trailblazer Community - Flows Workshop (Session 2)
Trailblazer Community - Flows Workshop (Session 2)Muhammad Tiham Siddiqui
 
UiPath Studio Web workshop series - Day 2
UiPath Studio Web workshop series - Day 2UiPath Studio Web workshop series - Day 2
UiPath Studio Web workshop series - Day 2DianaGray10
 
Where developers are challenged, what developers want and where DevEx is going
Where developers are challenged, what developers want and where DevEx is goingWhere developers are challenged, what developers want and where DevEx is going
Where developers are challenged, what developers want and where DevEx is goingFrancesco Corti
 
Top 10 Squarespace Development Companies
Top 10 Squarespace Development CompaniesTop 10 Squarespace Development Companies
Top 10 Squarespace Development CompaniesTopCSSGallery
 
IT Service Management (ITSM) Best Practices for Advanced Computing
IT Service Management (ITSM) Best Practices for Advanced ComputingIT Service Management (ITSM) Best Practices for Advanced Computing
IT Service Management (ITSM) Best Practices for Advanced ComputingMAGNIntelligence
 
How to release an Open Source Dataweave Library
How to release an Open Source Dataweave LibraryHow to release an Open Source Dataweave Library
How to release an Open Source Dataweave Libraryshyamraj55
 
My key hands-on projects in Quantum, and QAI
My key hands-on projects in Quantum, and QAIMy key hands-on projects in Quantum, and QAI
My key hands-on projects in Quantum, and QAIVijayananda Mohire
 
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptx
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptxGraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptx
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptxNeo4j
 
LF Energy Webinar - Unveiling OpenEEMeter 4.0
LF Energy Webinar - Unveiling OpenEEMeter 4.0LF Energy Webinar - Unveiling OpenEEMeter 4.0
LF Energy Webinar - Unveiling OpenEEMeter 4.0DanBrown980551
 
Automation Ops Series: Session 2 - Governance for UiPath projects
Automation Ops Series: Session 2 - Governance for UiPath projectsAutomation Ops Series: Session 2 - Governance for UiPath projects
Automation Ops Series: Session 2 - Governance for UiPath projectsDianaGray10
 
The Importance of Indoor Air Quality (English)
The Importance of Indoor Air Quality (English)The Importance of Indoor Air Quality (English)
The Importance of Indoor Air Quality (English)IES VE
 
Extra-120324-Visite-Entreprise-icare.pdf
Extra-120324-Visite-Entreprise-icare.pdfExtra-120324-Visite-Entreprise-icare.pdf
Extra-120324-Visite-Entreprise-icare.pdfInfopole1
 
March Patch Tuesday
March Patch TuesdayMarch Patch Tuesday
March Patch TuesdayIvanti
 
Stobox 4: Revolutionizing Investment in Real-World Assets Through Tokenization
Stobox 4: Revolutionizing Investment in Real-World Assets Through TokenizationStobox 4: Revolutionizing Investment in Real-World Assets Through Tokenization
Stobox 4: Revolutionizing Investment in Real-World Assets Through TokenizationStobox
 
AI Workshops at Computers In Libraries 2024
AI Workshops at Computers In Libraries 2024AI Workshops at Computers In Libraries 2024
AI Workshops at Computers In Libraries 2024Brian Pichman
 
Introduction to RAG (Retrieval Augmented Generation) and its application
Introduction to RAG (Retrieval Augmented Generation) and its applicationIntroduction to RAG (Retrieval Augmented Generation) and its application
Introduction to RAG (Retrieval Augmented Generation) and its applicationKnoldus Inc.
 

Último (20)

Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - Tech
Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - TechWebinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - Tech
Webinar: The Art of Prioritizing Your Product Roadmap by AWS Sr PM - Tech
 
Patch notes explaining DISARM Version 1.4 update
Patch notes explaining DISARM Version 1.4 updatePatch notes explaining DISARM Version 1.4 update
Patch notes explaining DISARM Version 1.4 update
 
The New Cloud World Order Is FinOps (Slideshow)
The New Cloud World Order Is FinOps (Slideshow)The New Cloud World Order Is FinOps (Slideshow)
The New Cloud World Order Is FinOps (Slideshow)
 
Trailblazer Community - Flows Workshop (Session 2)
Trailblazer Community - Flows Workshop (Session 2)Trailblazer Community - Flows Workshop (Session 2)
Trailblazer Community - Flows Workshop (Session 2)
 
UiPath Studio Web workshop series - Day 2
UiPath Studio Web workshop series - Day 2UiPath Studio Web workshop series - Day 2
UiPath Studio Web workshop series - Day 2
 
Where developers are challenged, what developers want and where DevEx is going
Where developers are challenged, what developers want and where DevEx is goingWhere developers are challenged, what developers want and where DevEx is going
Where developers are challenged, what developers want and where DevEx is going
 
Top 10 Squarespace Development Companies
Top 10 Squarespace Development CompaniesTop 10 Squarespace Development Companies
Top 10 Squarespace Development Companies
 
IT Service Management (ITSM) Best Practices for Advanced Computing
IT Service Management (ITSM) Best Practices for Advanced ComputingIT Service Management (ITSM) Best Practices for Advanced Computing
IT Service Management (ITSM) Best Practices for Advanced Computing
 
How to release an Open Source Dataweave Library
How to release an Open Source Dataweave LibraryHow to release an Open Source Dataweave Library
How to release an Open Source Dataweave Library
 
My key hands-on projects in Quantum, and QAI
My key hands-on projects in Quantum, and QAIMy key hands-on projects in Quantum, and QAI
My key hands-on projects in Quantum, and QAI
 
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptx
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptxGraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptx
GraphSummit Copenhagen 2024 - Neo4j Vision and Roadmap.pptx
 
LF Energy Webinar - Unveiling OpenEEMeter 4.0
LF Energy Webinar - Unveiling OpenEEMeter 4.0LF Energy Webinar - Unveiling OpenEEMeter 4.0
LF Energy Webinar - Unveiling OpenEEMeter 4.0
 
Automation Ops Series: Session 2 - Governance for UiPath projects
Automation Ops Series: Session 2 - Governance for UiPath projectsAutomation Ops Series: Session 2 - Governance for UiPath projects
Automation Ops Series: Session 2 - Governance for UiPath projects
 
The Importance of Indoor Air Quality (English)
The Importance of Indoor Air Quality (English)The Importance of Indoor Air Quality (English)
The Importance of Indoor Air Quality (English)
 
Extra-120324-Visite-Entreprise-icare.pdf
Extra-120324-Visite-Entreprise-icare.pdfExtra-120324-Visite-Entreprise-icare.pdf
Extra-120324-Visite-Entreprise-icare.pdf
 
March Patch Tuesday
March Patch TuesdayMarch Patch Tuesday
March Patch Tuesday
 
Stobox 4: Revolutionizing Investment in Real-World Assets Through Tokenization
Stobox 4: Revolutionizing Investment in Real-World Assets Through TokenizationStobox 4: Revolutionizing Investment in Real-World Assets Through Tokenization
Stobox 4: Revolutionizing Investment in Real-World Assets Through Tokenization
 
AI Workshops at Computers In Libraries 2024
AI Workshops at Computers In Libraries 2024AI Workshops at Computers In Libraries 2024
AI Workshops at Computers In Libraries 2024
 
SheDev 2024
SheDev 2024SheDev 2024
SheDev 2024
 
Introduction to RAG (Retrieval Augmented Generation) and its application
Introduction to RAG (Retrieval Augmented Generation) and its applicationIntroduction to RAG (Retrieval Augmented Generation) and its application
Introduction to RAG (Retrieval Augmented Generation) and its application
 

Commercial CalGreen - Building Enery Analysis Report

  • 1. Section 7 Commercial CalGREEN BUILDING ENERGY ANALYSIS REPORT PROJECT: Nonresidential Sample Building 1234 Main St. Sacramento, CA 95800 Project Designer: Architectural Services 440 Yuba Dr. Suite C Sacramento, CA 95833 (916) 555-5678 Report Prepared by: Gary Wollin Wollin Energy 3747 Waynesboro Drive Ceres, CA 95307 209-534-7110 Job Number: M98000 Date: 8/5/2011 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC – www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Title 24 8/24 Page 1
  • 2. Section 7 Commercial CalGREEN TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 EnergyPro 5.1 by EnergySoft Job Number: ID: M98000 User Number: 7080 Title 24 8/24 Page 2
  • 3. Section 7 Commercial CalGREEN PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1C Project Name Date Nonresidential Sample Building 8/5/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1234 Main St. Sacramento CA Climate Zone 12 4,480 n/a GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Relocatable - indicate specific climate zone all climates Phase of Construction: New Construction Addition Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Gary Wollin Signature Company Date Wollin Energy 8/5/2011 Address 3747 Waynesboro Drive Phone 209-534-7110 City/State/Zip Ceres, CA 95307 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Michael Gray Company Architectural Services Date Address 440 Yuba Dr. Suite C License # City/State/Zip Sacramento, CA 95833 Phone (916) 555-5678 Principal Mechanical Designer Name Robert Harper, P.E Signature Company Harper Associates Date Address 4519 E. Hwy 20 License # City/State/Zip Sacramento, CA Phone (916) 555-9245 Principal Lighting Designer Name Alan Lux Signature Company Luminaire Design Date Address 3030 Pine License # City/State/Zip Los Altos, CA 92334 Phone (916) 555-4321 INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) ENV-1C Certificate of Compliance. Required on plans. MECH-1C Certificate of Compliance. Required on plans. LTG-1C Certificate of Compliance. Required on plans. MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. LTG-2C Lighting Controls Credit Worksheet. MECH-3C Mechanical Ventilation and Reheat. LTG-3C Indoor Lighting Power Allowance. MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 3 of 25 Title 24 8/24 Page 3
  • 4. Section 7 Commercial CalGREEN PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1C Project Name Date Nonresidential Sample Building 8/5/2011 ANNUAL TDV ENERGY USE SUMMARY (kBtu/sqft-yr) Standard Proposed Compliance Energy Component Design Design Margin Space Heating 0.35 0.76 -0.41 Space Cooling 169.79 95.44 74.36 Indoor Fans 85.22 100.05 -14.83 Heat Rejection 0.00 0.00 0.00 Pumps & Misc. 0.00 0.00 0.00 Domestic Hot Water 62.92 62.92 0.00 Lighting 90.33 61.75 28.57 Receptacle 67.78 67.78 0.00 Process 65.00 65.00 0.00 Process Lighting 26.81 26.81 0.00 TOTALS 568.20 480.51 87.69 Percent better than Standard 15.4 % ( 18.4 % excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (N) 0 deg Conditioned Floor Area 4,480 sqft. Number of Stories 2 Unconditioned Floor Area 800 sqft. Number of Systems 3 Conditioned Footprint Area 2,880 sqft. Number of Zones 4 Natural Gas Available On Site Yes Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (N) 800 sqft. 320 sqft. 40.0 % Left Elevation (E) 1,040 sqft. 320 sqft. 30.8 % Rear Elevation (S) 1,900 sqft. 260 sqft. 13.7 % Right Elevation (W) 720 sqft. 0sqft. 0.0 % Total 4,460 sqft. 900 sqft. 20.2 % Roof 2,880 sqft. 0 sqft. 0.0 % Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.157 W/sqft. 0.844 W/sqft. Comparison only. See Prescriptive Envelope TDV Energy 143,345 129,246 LTG-1C for allowed LPD. Remarks: Standard Building (Compliance) EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 4 of 25 Title 24 8/24 Page 4
  • 5. Section 7 Commercial CalGREEN PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF-1C Project Name Date Nonresidential Sample Building 8/5/2011 ZONE INFORMATION Floor Inst. Ctrl. Allowed LPD Proc. Area LPD Credits Area Tailored Loads 1 2 3 4 System Name Zone Name Occupancy Type (sqft.) (W/sf) (W/sf) (W/sf) (W/sf) (W/sf) Retail Mech. System Retail Zone Retail Sales, Wholesale 1,280 0.797 Unconditioned Storage Commercial, Industrial Storage 800 0.388 0.058 Office Mech System Office Zone Office > 250 sqft 1,920 0.717 0.143 1.000 Restaurant Mech Sys. Restaurant Zone Dining 1,280 1.297 2.500 Notes: 1. See LTG-1C 2. See LTG-2C 3. See LTG-3C 4. See LTG-4C Items above require special documentation (items marked with asterisk, see LTG-1-C by others) (by others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System Retail Mech. System includes Demand Control Ventilation per Standards Section 121. The HVAC System Retail Mech. System incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System Office Mech System incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System Restaurant Mech Sys. includes Demand Control Ventilation per Standards Section 121. The HVAC System Restaurant Mech Sys. incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-4-A. The HVAC System Carrier 48PGM-07---5/6 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC System Carrier 48PGL-07---5/6 includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp _________________________________________ EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 5 of 25 Title 24 8/24 Page 5
  • 6. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1234 Main St. Sacramento 12 4,480 n/a GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Relocatable Public School Schools (Public School) Conditioned Spaces Unconditioned Spaces Bldg. 2 Skylight Area for Large Enclosed Space ≥ 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: New Construction Addition Alteration Approach of Compliance: Component Overall Envelope Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Appendix 4 Orientation Exterior R- Interior R- N, E, S, W Condition Area (ft2) U-Factor Furring3 Furring3 Exterior R-Value Interior Status Cavity Value Value Joint Pass Fail2 Tag/ID Assembly Type 1 Wall 240 (N) 0.102 R-13 4.3.1-A3 New 2 Wall 160 (E) 0.102 R-13 4.3.1-A3 New 3 Slab 1,280 (N) 0.730 None 4.4.7-A1 New 4 Demising 200 (N) 0.102 R-13 4.3.1-A3 New 5 Roof 1,600 (N) 0.025 R-38 4.2.1-A21 New 6 Wall 240 (E) 0.102 R-13 4.3.1-A3 New 7 Wall 240 (S) 0.102 R-13 4.3.1-A3 New 8 Wall 376 (W) 0.102 R-13 4.3.1-A3 New 9 Door 24 (W) 0.500 None 4.5.1-A4 New 10 Slab 1,600 (N) 0.730 None 4.4.7-A1 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Orientation Conditions N, E, S, W Overhang (R)SHGC Area (ft2) U-Factor U-Factor Source Source Status SHGC Pass Fail2 Max Max Fenestration Tag/ID Type 1 Window 200 (N) 0.460 NFRC 0.398 NFRC New 2 Window 120 (N) 0.460 NFRC 0.398 NFRC New 3 Window 320 (E) 0.460 NFRC 0.398 NFRC New 4 Window 260 (S) 0.460 NFRC 0.398 NFRC New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 6 of 25 Title 24 8/24 Page 6
  • 7. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1234 Main St. Sacramento 12 4,480 n/a GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Relocatable Public School Schools (Public School) Conditioned Spaces Unconditioned Spaces Bldg. 2 Skylight Area for Large Enclosed Space ≥ 8000 ft (If checked include the ENV-4C with submittal) Phase of Construction: New Construction Addition Alteration Approach of Compliance: Component Overall Envelope Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Appendix 4 Orientation Exterior R- Interior R- N, E, S, W Condition Area (ft2) U-Factor Furring3 Furring3 Exterior R-Value Interior Status Cavity Value Value Joint Pass Fail2 Tag/ID Assembly Type 11 Roof 1,280 (N) 0.025 R-38 4.2.1-A21 New 12 Wall 240 (N) 0.102 R-13 4.3.1-A3 New 13 Wall 320 (E) 0.102 R-13 4.3.1-A3 New 14 Wall 1,400 (S) 0.102 R-13 4.3.1-A3 New 15 Wall 320 (W) 0.102 R-13 4.3.1-A3 New 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Orientation Conditions N, E, S, W Overhang (R)SHGC Area (ft2) U-Factor U-Factor Source Source Status SHGC Pass Fail2 Max Max Fenestration Tag/ID Type 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 7 of 25 Title 24 8/24 Page 7
  • 8. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 2 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 ROOFING PRODUCT (COOL ROOFS) (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT “COOL ROOF” REQUIREMENTS: Pass Fail1 N/A Roofing compliance not required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less. Roofing compliance not required in Climate Zone 1 with a Steep-Sloped with less than 5 lb/ft2. Greater than 2:12 pitch. Low-sloped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV-2C. Low-sloped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-factor of 0.048 or lower. See Opaque Surface Details roof assembly below, Column H of ENV-2C. The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, see spreadsheet calculator at www.energy.ca.gov/title24/ Roof constructions that have thermal mass over the roof membrane with a weight of at least 25 lb/ft2 are exempt from the Cool Roof criteria below. High-rise residential buildings and hotels and motels with low-sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low-sloped roofing criteria. 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Roof Slope Product Weight Product Aged Solar Thermal Number1 ≤ 2:12 > 2:12 < 5lb/ft2 ≥ 5lb/ft2 Type2 Reflectance3 Emmitance SRI5 Pass Fail6 4 4 4 4 4 4 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council’s Rated Product Directory at www.coolroofs.org/products/search.php 2. Indicate the type of product is being used for the roof top, i.e. single-ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council’s Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(ρinitial – 0.2) to obtain a calculated aged value. Where ρ is the Initial Solar Reflectance from the Cool Roof Rating Council’s Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at http://www.energy.ca.gov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: Aluminum-Pigmented Asphalt Roof Coating Cement-Based Roof Coating Other ______________________ Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 8 of 25 Title 24 8/24 Page 8
  • 9. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the building for their records. Test Description ENV-2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test Interpane INE-177 900 EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 9 of 25 Title 24 8/24 Page 9
  • 10. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG-1C Project Name Date Nonresidential Sample Building 8/5/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG-1- INST (Retain a copy and verify form is completed and signed.) Field Inspector Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.) Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts) Installed Watts A B C D E F G H How wattage Field Was determined Inspector2 To §130 (d or e) Watts (D X F) Luminaires Luminaire1 Number of According Watts per Installed None CEC or Complete Luminaire Description1 Default Pass Fail Item (i.e, 3 lamp fluorescent troffer, From Tag F32T8, one dimmable electronic ballasts) NA8 2 Lamp 18w Compact Quad 4 Pin Elec 38.0 20 760 45w per ft Track Light 45.0 20 900 2 Lamp 4 ft T8 Rapid Start ElecRO 51.0 20 1,020 A-1 2 Lamp 4 ft T8 Rapid Start ElecRO 51.0 27 1,377 Installed Watts Page Total: 4,057 Installed Watts Building Total Building total number of pages: (Sum of all pages) 4,057 Enter into LTG-1C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 10 of 25 Title 24 8/24 Page 10
  • 11. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG-1C Project Name Date Nonresidential Sample Building 8/5/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG-1- INST (Retain a copy and verify form is completed and signed.) Field Inspector Certificate of Acceptance, LTG-2A and LTG-3A (Retain a copy and verify form is completed and signed.) Field Inspector A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: CONDITIONED SPACE UNCONDITIONED SPACE The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts) Installed Watts A B C D E F G H How wattage Field Was determined Inspector2 To §130 (d or e) Watts (D X F) Luminaires Luminaire1 Number of According Watts per Installed None CEC or Complete Luminaire Description1 Default Pass Fail Item (i.e, 3 lamp fluorescent troffer, From Tag F32T8, one dimmable electronic ballasts) NA8 F-3 2 Lamp 4 ft T8 Rapid Start Elec 62.0 5 310 Installed Watts Page Total: 310 Installed Watts Building Total Building total number of pages: (Sum of all pages) 310 Enter into LTG-1C Page 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 11 of 25 Title 24 8/24 Page 11
  • 12. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG-1C Project Name Date Nonresidential Sample Building 8/5/2011 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST 2 Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft , 2 automatic daylighting controls for daylit areas > 2,500 ft , d) shut-off controls, e) display lighting controls, f) tailored lighting controls – general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic 2 controls for retail stores > 50,000 ft , in accordance with Section 131. Field MANDATORY LIGHTING CONTROLS – FIELD INSPECTION ENERGY CHECKLIST Inspector Number Special Type/ Description of Units Location in Building Features Pass Fail SPECIAL FEATURES INSPECTION CHECKLIST (See Page 2 of 4 of LTG-1C) The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field Inspector’s Notes or Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 12 of 25 Title 24 8/24 Page 12
  • 13. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1C Project Name Date Nonresidential Sample Building 8/5/2011 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned Spaces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 4,057 Installed Lighting 310 (from Conditioned LTG-1C, Page 2) (from Unconditioned LTG-1C, Page 2) Lighting Control Credit - 275 Lighting Control Credit - 47 Conditioned Spaces (from LTG-2C) Unconditioned Spaces (from LTG-2C) Adjusted Installed = 3,782 Adjusted Installed = 264 Lighting Power Lighting Power Complies if Installed ≤ Allowed ↕ Complies if Installed ≤ Allowed ↕ Allowed Lighting Power Allowed Lighting Power 3,782 480 Conditioned Spaces (from LTG-3C or PERF-1) Unconditioned Spaces (from LTG-3C) Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG-2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG-2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. LTG-2A and Luminaires Controlled LTG-3A Controls and Sensors and Number of Automatic Luminaires Daylighting Controls Equipment Requiring Testing Description controlled Location Acceptance Occ Sensor - Storage 2 Lamp 4 ft T8 Rapid Start Elec 5 Storage Room Occ Sensor - Multi-Level 2 Lamp 4 ft T8 Rapid Start ElecRO 27 Office EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 13 of 25 Title 24 8/24 Page 13
  • 14. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1234 Main St. Sacramento 12 4,480 n/a GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Unconditioned Spaces Schools (Public School) Relocatable Public School Bldg. Conditioned Spaces (affidavit) Phase of Construction: New Construction Addition Alteration Overall Envelope TDV Approach of Compliance: Component Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements 2 2 Equipment Inspection Criteria Pass Fail – Describe Reason Item or System Tags (i.e. AC-1, RTU-1, HP-1) DHW Heater 3 Equipment Type : Gas Fired DHW Boiler Number of Systems 1 1 Max Allowed Heating Capacity 40,000 Btu/hr 1 0.58 EF Minimum Heating Efficiency 1 Max Allowed Cooling Capacity n/a 1 Cooling Efficiency n/a Duct Location/ R-Value n/a When duct testing is required, submit MECH-4A & MECH-4-HERS n/a Economizer n/a Thermostat n/a Fan Control n/a FIELD INSPECTION ENERGY CHECKLIST 2 2 Equipment Inspection Criteria Pass Fail – Describe Reason Item or System Tags (i.e. AC-1, RTU-1, HP-1) Retail Mech. System 3 Equipment Type : Packaged DX Number of Systems 1 1 Max Allowed Heating Capacity 91,500 Btu/hr 1 Minimum Heating Efficiency 81% AFUE 1 Max Allowed Cooling Capacity 72,100 Btu/hr 1 Cooling Efficiency 12.0 EER Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 When duct testing is required, submit MECH-4A & MECH-4-HERS Yes Economizer Diff. Temp (Integrated) Thermostat Setback Required Fan Control Constant Volume 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 14 of 25 Title 24 8/24 Page 14
  • 15. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 1234 Main St. Sacramento 12 4,480 n/a GENERAL INFORMATION Building Type: Nonresidential High-Rise Residential Hotel/Motel Guest Room Unconditioned Spaces Schools (Public School) Relocatable Public School Bldg. Conditioned Spaces (affidavit) Phase of Construction: New Construction Addition Alteration Overall Envelope TDV Approach of Compliance: Component Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Meets Criteria or Requirements 2 2 Equipment Inspection Criteria Pass Fail – Describe Reason Item or System Tags (i.e. AC-1, RTU-1, HP-1) Office Mech System 3 Equipment Type : Packaged DX Number of Systems 1 1 Max Allowed Heating Capacity 60,800 Btu/hr 1 81% AFUE Minimum Heating Efficiency 1 Max Allowed Cooling Capacity 72,100 Btu/hr 1 Cooling Efficiency 12.0 EER Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 When duct testing is required, submit MECH-4A & MECH-4-HERS Yes Economizer Diff. Temp (Integrated) Thermostat Setback Required Fan Control Constant Volume FIELD INSPECTION ENERGY CHECKLIST 2 2 Equipment Inspection Criteria Pass Fail – Describe Reason Item or System Tags (i.e. AC-1, RTU-1, HP-1) Restaurant Mech Sys. 3 Equipment Type : Packaged DX Number of Systems 1 1 Max Allowed Heating Capacity 148,400 Btu/hr 1 Minimum Heating Efficiency 82% AFUE 1 Max Allowed Cooling Capacity 159,900 Btu/hr 1 Cooling Efficiency 11.4 EER Duct Location/ R-Value Attic, Ceiling Ins, vented / 8.0 When duct testing is required, submit MECH-4A & MECH-4-HERS Yes Economizer Diff. Temp (Integrated) Thermostat Setback Required Fan Control Constant Volume 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 15 of 25 Title 24 8/24 Page 15
  • 16. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Date Nonresidential Sample Building 8/5/2011 Discrepancies: EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 16 of 25 Title 24 8/24 Page 16
  • 17. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 3 of 4) MECH-1C Project Name Date Nonresidential Sample Building 8/5/2011 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space-conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: HVAC installer, TAB contractor, controls contractor, PE in charge of project) and what Acceptance test must be conducted. The following checked-off forms are required for ALL newly installed equipment. In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title-24 Part 6. The building inspector must receive the properly filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MECH-4A MECH-5A MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A Hydronic Outdoor Constant Demand Supply System Automatic Ventilation Volume & Air Control Supply Valve Water Variable Demand For Single-Zone Distribution Economizer Ventilation Fan Leakage Temp. Flow Shed Equipment Requiring Testing or Verification Qty. VAV & CAV Unitary Ducts Controls DCV VAV Test Reset Control Control Carrier 48PGM-07---5/6 1 Carrier 48PGL-07---5/6 1 Carrier 48PGL-14---5/6 1 EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 17 of 25 Title 24 8/24 Page 17
  • 18. Section 7 Commercial CalGREEN CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST (Part 4 of 4) MECH-1C Project Name Date Nonresidential Sample Building 8/5/2011 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Fault Automatic Fault Distributed Detection & Detection & Energy Storage Thermal Energy Diagnostics Diagnostics for DX AC Storage (TES) Equipment Requiring Testing Qty. for DX Units Air & Zone Systems Systems Test Performed By: Carrier 48PGM-07---5/6 1 Carrier 48PGL-07---5/6 1 Carrier 48PGL-14---5/6 1 EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 18 of 25 Title 24 8/24 Page 18
  • 19. Section 7 Commercial CalGREEN LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG-2C Project Name Date Nonresidential Sample Building 8/5/2011 POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: CONDITIONED SPACES UNCONDITIONED SPACES A B C D E F G Watts of Power Control Room # Zone ID Plan Room Area Control Adjustments Credit Watts Areas Lighting Control Description1 Reference (ft2) Lighting Factor2 (E x F) Office Occ Sensor - Multi-Level A-1 1,920 1,377 0.20 275 PAGE TOTAL 275 Note: Building total of non-daylight control credit watts for all pages of LTG-2C Page 1 of 2 Conditioned and 0 Unconditioned Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2 Space shall be BUILDING TOTAL OF ALL CONTROL CREDIT WATTS separately (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED 275 totaled or UNCONDITIONED Spaces 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 19 of 25 Title 24 8/24 Page 19
  • 20. Section 7 Commercial CalGREEN LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG-2C Project Name Date Nonresidential Sample Building 8/5/2011 POWER ADJUSTMENT FACTORS (PAF) FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: CONDITIONED SPACES UNCONDITIONED SPACES A B C D E F G Watts of Power Control Room # Zone ID Plan Room Area Control Adjustments Credit Watts Areas Lighting Control Description1 Reference (ft2) Lighting Factor2 (E x F) Storage Room Occ Sensor - Storage F-3 800 310 0.15 47 PAGE TOTAL 47 Note: Building total of non-daylight control credit watts for all pages of LTG-2C Page 1 of 2 Conditioned and 0 Unconditioned Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2 Space shall be BUILDING TOTAL OF ALL CONTROL CREDIT WATTS separately (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED 47 totaled or UNCONDITIONED Spaces 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 20 of 25 Title 24 8/24 Page 20
  • 21. Section 7 Commercial CalGREEN INDOOR LIGHTING POWER ALLOWANCE LTG-3C Project Name Date Nonresidential Sample Building 8/5/2011 ALLOWED LIGHTING POWER (Chose One Method) A Separate LTG-3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: CONDITIONED SPACES UNCONDITIONED SPACES COMPLETE BUILDING METHOD WATTS COMPLETE ALLOWED BUILDING CATEGORY (From §146 Table 146-E) 2 PER (ft ) X BLDG. AREA = WATTS TOTALS AREA WATTS AREA CATEGORY METHOD WATTS ALLOWED BUILDING CATEGORY (From §146 Table 146-F) 2 PER (ft ) X Area ft 2 = WATTS Commercial, Industrial Storage 0.60 800 480 TOTALS 800 480 AREA WATTS TAILORED METHOD Total Allowed Watts using the Tailored Method taken from LTG-4C (Page 1 of 4) Row 3 0 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG-4C set of forms. A separate set of LTG- 4C forms shall be filled out for CONDITIONED and UNCONDITIONED spaces EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 21 of 25 Title 24 8/24 Page 21
  • 22. Section 7 Commercial CalGREEN AIR SYSTEM REQUIREMENTS (Part 1 of 2) MECH-2C Project Name Date Nonresidential Sample Building 8/5/2011 Indicate Air Systems Type (Central, Single Zone, Package, VAV, or etc…) Item or System Tags (i.e. AC-1, RTU-1, HP-1) Retail Mech. System Office Mech System Restaurant Mech Sys. Number of Systems 1 1 1 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 81% AFUE 81% AFUE 82% AFUE Cooling Equipment Efficiency 112(a) 12.0 EER 12.0 EER 11.4 EER HVAC Heat Pump Thermostat 112(b), 112(c) n/a n/a n/a Furnace Controls/Thermostat 112(c), 115(a) n/a n/a n/a Natural Ventilation 121(b) No No No Mechanical Ventilation 121(b) 320 cfm 288 cfm 640 cfm VAV Minimum Position Control 121(c) No No No Demand Control Ventilation 121(c) Yes No Yes Time Control 122(e) Programmable Switch Programmable Switch Programmable Switch Setback and Setup Control 122(e) Setback Required Setback Required Setback Required Outdoor Damper Control 122(f) Gravity Gravity Gravity Isolation Zones 122(g) n/a n/a n/a Pipe Insulation 123 N/A N/A N/A Duct Location/ R-value 124 Attic, Ceiling Ins, vented / 8.0 Attic, Ceiling Ins, vented / 8.0 Attic, Ceiling Ins, vented / 8.0 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b) n/a n/a n/a Proposed Heating Capacity 144(a & b) 91,500 Btu/hr 60,800 Btu/hr 148,400 Btu/hr Calculated Design Cooling Load 144(a & b) n/a n/a n/a Proposed Cooling Capacity 144(a & b) 60,397 Btu/hr 63,007 Btu/hr 123,299 Btu/hr Fan Control 144(c) Constant Volume Constant Volume Constant Volume DP Sensor Location 144(c) N/A N/A N/A Supply Pressure Reset (DDC only) 144(c) No No No Simultaneous Heat/Cool 144(d) No No No Economizer 144(e) Diff. Temp (Integrated) Diff. Temp (Integrated) Diff. Temp (Integrated) Heat Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp Cool Air Supply Reset 144(f) Constant Temp Constant Temp Constant Temp 1 Electric Resistance Heating 144(g) Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) Yes Yes Yes 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 7080 RunCode: 2011-08-05T15:14:13 ID: M98000 Page 22 of 25 Title 24 8/24 Page 22