What Is Prefabrication?
 Prefabrication is the practice
of assembling components of
a structure in a factory or
other manufacturing site,
and transporting complete
assemblies or sub-assemblies
to the construction site where
the structure is to be located.
AIMS OF PREFABRICATION
1. To speed up the construction time.
2. To lower the labour cost .
3. To ensure precise conformity to building codes , standards and greater
quality assurance.
4. To allow less wastage of materials than in site- built construction.
5. To ensure higher worker safety and comfort level than in site- built
construction
THE LIMITATIONS OF PREFABRICATION ARE:
1.A small number of units required may prove to be uneconomical
2. Special connections, such as special bearings to transmit the vertical and horizontal
loads, can add cost to the system
3. Waterproofing at joints
4. Transportation difficulties
5. Need for cranes
ADVANTAGES OF PREFABRICATION
 High quality product
 Labour related savings
 Savings in time
 Overall efficiency is greatly increased
 Mass production is easier and quick
 Protected and controlled production in
environment
 Potential for lower production costs and other
cost savings
 Independent climate conditions
 The disruption of traffic is avoided
 Ensures high degree of safety
CHARACTERISTICS ARE TO BE
CONSIDERED
 Easy availability
 Light weight for easy handling and
transport, and to economieson sections
and sizes of foundations;
 Thermal insulation property;
 Easy workability;
 Durability in all weather workability;
 Durability in all weather conditions;
 Non combustibility
 Economy in cost, and
 Sound insulation
DISADVANTAGES
 Carefull handling of prefabricated
components such as concrete panels or steel
and glass panels os required.
 Attention has to be paid to the strength and
corrosion- resistance of the joining of the
prefabricated sections to be avoid failure of
the joint
 Similarly, leaks can form at joints in
prefabricated components.
 Transportation costs may be higher for
voluminous prefabricated sections then for
the materials of which they are made, which
can often be packed more compactly.
 Large prefabricated sections required heavy-
duty cranes and precision measurement and
handling to placing position.
MATERIALS TO BE USED IN PREFABRICATED
SYSTEM
• Concrete
• Steel
• Treated wood
• Aluminium
• Cellular concrete
• Light weight concrete
elements
• Ceremic products etc
COMPONENTS OF PREFAB
CONSTRUCTION
Flooring and roofing schemes
Beams
Columns
Walls
Staircase
Lintels
Sunshade/chajja projection
VARIOUS PREFABRICATED CONSTRUCTION SYSTEMS
In conceptual dimension, prefabrication can be categorized as:
1.OPEN PREFAB SYSTEM:
This system is based on the use of the basic structural elements to form whole or part of a
building. The standard prefab concrete components which can be used are:
1. Reinforced concrete channel units.
2. Hollow core slabs
3. Hollow blocks and battens
4. Precast planks and battens
5. Precast joist and tiles
6. Cellular concrete slabs
7. Prestressed/ Reinforced concrete slabs
8. Reinforced / Prestressed concrete beams
9. Reinforced / Prestressed concrete columns
10. Precast lintels and chajjas
11. Reinforced concrete waffle slabs/ shells
12. Room size reinforced/ prestressed concrete panels
13. Reinforced / Prestressed concrete walling elements
14. Reinforced / Prestressed concrete trusses
CATEGORIES OF OPEN PREFEB SYSTEMS
 There are two categories of open prefab systems depending on the extent of
prefabrication used in the construction as given below:
 1. Partial prefab open system
 2. Full prefab open system
 Partial prefab open system: This system basically emphasizes the use of precast
roofing and flooring components and other minor elements like lintels, chajjas, kitchen
sills in conventional building construction. The structural system could be in the form
of in-situ framework or load bearing walls.
 Full prefab open system: In this system almost all the structural components are
prefabricated. The filler walls may be of bricks or any other local material.
PREFABRICATED HOUSING
Bridgetown, Barbados
EXAMPLES OF BUILDINGS WITH
PREFABRICATED CONSTRUCTION SYSTEM
McDonalds, UK
T30A Hotel Tower, China
NAKAGIN CAPSULE TOWER
 LOCATION: TOKYO, JAPAN
BUILDING STATISTICS-
• SITE AREA: 442 SQUARE METRES BUILDING
AREA: 430 SQUARE METRES TOTAL FLOOR
AREA: 3,091 SQUARE METRES.
• STRUCTURE DETAILS: STRUCTURAL STEEL
FRAME PARTLY ENCASED IN CONCRETE MAX
OF 140 CAPSULE UNITS (PREFABRICATED) 11-
13 STORIES INCLUDING 1 BASEMENT
• MATERIAL DETAILS: CAPSULE EXTERIOR:
STEEL WITH SPRAYED PAINT FINISH
CAPSULE INTERIOR: STEEL CAPSULE WITH CLOTH
CEILING AND FLOOR CARPET
TOWERS:CORTEN STRUCTURAL STEEL FRAME
LOWER
LEVELS: FAIR-FACED REINFORCED CONCRETE
• Methodology: Japanese Metabolism,
physical objects are never eternal,
celebrates individualism, response to
long commutes.
• Units of Prefabrication: Capsules
arrive from factory completely
prefabricated, ready to be lifted by
crane and bolted onto the
superstructure.
• Structure: Steel frame with lightweight
concrete shaft which houses
vertical circulation, mechanical shafts.
• Delivery: Dense urban surroundings
meant that capsules were delivered
from factory to site on the same day it
was attached to the superstructure
THE CAPSULE :
THE STEEL FRAME CAPSULES (WHICH
HAVE BEEN DESIGNED TO BE
REPLACEABLE, REMOVABLE, AND
TRANSPORTABLE) WERE PREFABRICATED
IN SPECIALIST FACTORIES AND
ASSEMBLED AT A PLANT BEFORE BEING
DELIVERED TO THE SITE. EACH ONE WAS
LIFTED BY MECHANICAL CRANES AND
WERE ATTACHED TO THE TOWER SHAFTS
USING 4 HIGH-TENSION BOLTS
THE CAPSULE INTERIOR WAS PREASSEMBLED
IN A FACTORY THEN HOISTED
BY CRANE AND FASTENED TO THE
CONCRETE CORE SHAFT.
DETAIL OF SYSTEM OF CAPSULE JOINING TO SHAFT
Capsule Delivery
1. Capsule Base Connections Détail
2. Capsule Bolting Process
3. Capsule Bolting Connection Detail
4. Prefabrication - 3 Hour Assembly
5. Transportation - 500km
6. Construction - 7-8 Months

Weitere ähnliche Inhalte

Was ist angesagt?

Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionJenilPatel22
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure pptAbhishekM45
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated ColumnAnees Khan
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMSagar Shah
 
Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Simran Aggarwal
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONsreestr18
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresKrishnagnr
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structuresAkash Matthew
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 

Was ist angesagt? (20)

Shell structure
Shell structureShell structure
Shell structure
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Prefabrication​ structure ppt
Prefabrication​ structure pptPrefabrication​ structure ppt
Prefabrication​ structure ppt
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
PRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEMPRECAST BUILDING SYSTEM
PRECAST BUILDING SYSTEM
 
Long span structures
Long span structures  Long span structures
Long span structures
 
Folded plates
Folded platesFolded plates
Folded plates
 
Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC) Reinforced Cement Concrete (RCC)
Reinforced Cement Concrete (RCC)
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATION
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Pneumatic structures
Pneumatic structuresPneumatic structures
Pneumatic structures
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 

Andere mochten auch

Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structuresYogi Yogesh
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesAr Jitendra
 
HPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONHPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONJohn Miranda
 
SIEL PRECAST BUILDING SYSTEM
SIEL PRECAST  BUILDING SYSTEMSIEL PRECAST  BUILDING SYSTEM
SIEL PRECAST BUILDING SYSTEMsegun ilori
 
Strategy and Structure - UX Strategy Forum, Tokyo
Strategy and Structure - UX Strategy Forum, TokyoStrategy and Structure - UX Strategy Forum, Tokyo
Strategy and Structure - UX Strategy Forum, TokyoDan Klyn
 
Static load testing and prediction bengt h. fellenius
Static load testing  and prediction   bengt h. felleniusStatic load testing  and prediction   bengt h. fellenius
Static load testing and prediction bengt h. felleniuscfpbolivia
 
Kisho Kurokawa: Nakagin Capsule Tower
Kisho Kurokawa: Nakagin Capsule TowerKisho Kurokawa: Nakagin Capsule Tower
Kisho Kurokawa: Nakagin Capsule TowerDanny Tong
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge SystemAltosMarketing
 
Meta design hku5
Meta design hku5Meta design hku5
Meta design hku5Jenny Chou
 
Kisho Kurokawa
Kisho KurokawaKisho Kurokawa
Kisho KurokawaHitomii
 
History of Prefabrication (by Farzam Kharvari)
History of Prefabrication (by Farzam Kharvari)History of Prefabrication (by Farzam Kharvari)
History of Prefabrication (by Farzam Kharvari)Farzam Kharvari
 
Spaceframe and prefabrication
Spaceframe and prefabricationSpaceframe and prefabrication
Spaceframe and prefabricationkaiwan1996
 

Andere mochten auch (20)

Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Introduction of Prefabricated structures
Introduction  of Prefabricated structuresIntroduction  of Prefabricated structures
Introduction of Prefabricated structures
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Penta_Engineering
Penta_EngineeringPenta_Engineering
Penta_Engineering
 
AJA 5 finish Gay
AJA 5 finish GayAJA 5 finish Gay
AJA 5 finish Gay
 
Kisho kurokawa lozano+vega
Kisho kurokawa lozano+vegaKisho kurokawa lozano+vega
Kisho kurokawa lozano+vega
 
49 Kurokawacapsule
49 Kurokawacapsule49 Kurokawacapsule
49 Kurokawacapsule
 
Lowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure servicesLowcost prefebrication and infrastructure services
Lowcost prefebrication and infrastructure services
 
The Stone Strong System
The Stone Strong SystemThe Stone Strong System
The Stone Strong System
 
HPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONHPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATION
 
SIEL PRECAST BUILDING SYSTEM
SIEL PRECAST  BUILDING SYSTEMSIEL PRECAST  BUILDING SYSTEM
SIEL PRECAST BUILDING SYSTEM
 
Strategy and Structure - UX Strategy Forum, Tokyo
Strategy and Structure - UX Strategy Forum, TokyoStrategy and Structure - UX Strategy Forum, Tokyo
Strategy and Structure - UX Strategy Forum, Tokyo
 
Static load testing and prediction bengt h. fellenius
Static load testing  and prediction   bengt h. felleniusStatic load testing  and prediction   bengt h. fellenius
Static load testing and prediction bengt h. fellenius
 
Kisho Kurokawa: Nakagin Capsule Tower
Kisho Kurokawa: Nakagin Capsule TowerKisho Kurokawa: Nakagin Capsule Tower
Kisho Kurokawa: Nakagin Capsule Tower
 
Innovative Precast Bridge System
Innovative Precast Bridge SystemInnovative Precast Bridge System
Innovative Precast Bridge System
 
Meta design hku5
Meta design hku5Meta design hku5
Meta design hku5
 
Kisho Kurokawa
Kisho KurokawaKisho Kurokawa
Kisho Kurokawa
 
History of Prefabrication (by Farzam Kharvari)
History of Prefabrication (by Farzam Kharvari)History of Prefabrication (by Farzam Kharvari)
History of Prefabrication (by Farzam Kharvari)
 
Spaceframe and prefabrication
Spaceframe and prefabricationSpaceframe and prefabrication
Spaceframe and prefabrication
 

Ähnlich wie Bc open pre fabricated construction system

national building code
national building codenational building code
national building codeRuhiya Garg
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptxdharmveersingh60
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingAnchitSharma17
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfGourhariBiswas1
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated StructuresBoopathi Raja
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptxssuserc0bf9b
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildingsYamini K
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost constructionManisha Singh
 
Building technology report
Building technology reportBuilding technology report
Building technology reportChong Yi Hui
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System ashleyyeap
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.pptssusera0ac221
 
Precast structure
Precast structurePrecast structure
Precast structurepiyush9392
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques Deepak Pradhan
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 

Ähnlich wie Bc open pre fabricated construction system (20)

Prefabrication
PrefabricationPrefabrication
Prefabrication
 
national building code
national building codenational building code
national building code
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
 
Pre fabricatted and pre engineered building
Pre fabricatted and pre engineered buildingPre fabricatted and pre engineered building
Pre fabricatted and pre engineered building
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
Chapters-3,4,5.pptx
Chapters-3,4,5.pptxChapters-3,4,5.pptx
Chapters-3,4,5.pptx
 
Pre Engineered buildings
Pre Engineered buildingsPre Engineered buildings
Pre Engineered buildings
 
BSS552 LECT 2.pptx
BSS552 LECT 2.pptxBSS552 LECT 2.pptx
BSS552 LECT 2.pptx
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
study of usage factor in low cost construction
study of usage factor in low cost constructionstudy of usage factor in low cost construction
study of usage factor in low cost construction
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 
PREFABRICATION.pdf
PREFABRICATION.pdfPREFABRICATION.pdf
PREFABRICATION.pdf
 
CT III IBS Formwork System
CT III IBS Formwork System CT III IBS Formwork System
CT III IBS Formwork System
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
Precast structure
Precast structurePrecast structure
Precast structure
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques
 
Site report
Site reportSite report
Site report
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 

Kürzlich hochgeladen

『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 

Kürzlich hochgeladen (20)

『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 

Bc open pre fabricated construction system

  • 1. OPEN PREFAB CONSTRUCTION SYSTEM SUBMITTED BY : ANUJ SINGHAL GITANSHU AVNISH HARSHIT PANT DIVYANSH HIMANSHU CH.
  • 2. What Is Prefabrication?  Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located.
  • 3. AIMS OF PREFABRICATION 1. To speed up the construction time. 2. To lower the labour cost . 3. To ensure precise conformity to building codes , standards and greater quality assurance. 4. To allow less wastage of materials than in site- built construction. 5. To ensure higher worker safety and comfort level than in site- built construction THE LIMITATIONS OF PREFABRICATION ARE: 1.A small number of units required may prove to be uneconomical 2. Special connections, such as special bearings to transmit the vertical and horizontal loads, can add cost to the system 3. Waterproofing at joints 4. Transportation difficulties 5. Need for cranes
  • 4. ADVANTAGES OF PREFABRICATION  High quality product  Labour related savings  Savings in time  Overall efficiency is greatly increased  Mass production is easier and quick  Protected and controlled production in environment  Potential for lower production costs and other cost savings  Independent climate conditions  The disruption of traffic is avoided  Ensures high degree of safety
  • 5. CHARACTERISTICS ARE TO BE CONSIDERED  Easy availability  Light weight for easy handling and transport, and to economieson sections and sizes of foundations;  Thermal insulation property;  Easy workability;  Durability in all weather workability;  Durability in all weather conditions;  Non combustibility  Economy in cost, and  Sound insulation
  • 6. DISADVANTAGES  Carefull handling of prefabricated components such as concrete panels or steel and glass panels os required.  Attention has to be paid to the strength and corrosion- resistance of the joining of the prefabricated sections to be avoid failure of the joint  Similarly, leaks can form at joints in prefabricated components.  Transportation costs may be higher for voluminous prefabricated sections then for the materials of which they are made, which can often be packed more compactly.  Large prefabricated sections required heavy- duty cranes and precision measurement and handling to placing position.
  • 7. MATERIALS TO BE USED IN PREFABRICATED SYSTEM • Concrete • Steel • Treated wood • Aluminium • Cellular concrete • Light weight concrete elements • Ceremic products etc
  • 8. COMPONENTS OF PREFAB CONSTRUCTION Flooring and roofing schemes Beams Columns Walls Staircase Lintels Sunshade/chajja projection
  • 9. VARIOUS PREFABRICATED CONSTRUCTION SYSTEMS In conceptual dimension, prefabrication can be categorized as: 1.OPEN PREFAB SYSTEM: This system is based on the use of the basic structural elements to form whole or part of a building. The standard prefab concrete components which can be used are: 1. Reinforced concrete channel units. 2. Hollow core slabs 3. Hollow blocks and battens 4. Precast planks and battens 5. Precast joist and tiles 6. Cellular concrete slabs 7. Prestressed/ Reinforced concrete slabs 8. Reinforced / Prestressed concrete beams 9. Reinforced / Prestressed concrete columns 10. Precast lintels and chajjas 11. Reinforced concrete waffle slabs/ shells 12. Room size reinforced/ prestressed concrete panels 13. Reinforced / Prestressed concrete walling elements 14. Reinforced / Prestressed concrete trusses
  • 10. CATEGORIES OF OPEN PREFEB SYSTEMS  There are two categories of open prefab systems depending on the extent of prefabrication used in the construction as given below:  1. Partial prefab open system  2. Full prefab open system  Partial prefab open system: This system basically emphasizes the use of precast roofing and flooring components and other minor elements like lintels, chajjas, kitchen sills in conventional building construction. The structural system could be in the form of in-situ framework or load bearing walls.  Full prefab open system: In this system almost all the structural components are prefabricated. The filler walls may be of bricks or any other local material.
  • 12. Bridgetown, Barbados EXAMPLES OF BUILDINGS WITH PREFABRICATED CONSTRUCTION SYSTEM McDonalds, UK T30A Hotel Tower, China
  • 14.  LOCATION: TOKYO, JAPAN BUILDING STATISTICS- • SITE AREA: 442 SQUARE METRES BUILDING AREA: 430 SQUARE METRES TOTAL FLOOR AREA: 3,091 SQUARE METRES. • STRUCTURE DETAILS: STRUCTURAL STEEL FRAME PARTLY ENCASED IN CONCRETE MAX OF 140 CAPSULE UNITS (PREFABRICATED) 11- 13 STORIES INCLUDING 1 BASEMENT • MATERIAL DETAILS: CAPSULE EXTERIOR: STEEL WITH SPRAYED PAINT FINISH CAPSULE INTERIOR: STEEL CAPSULE WITH CLOTH CEILING AND FLOOR CARPET TOWERS:CORTEN STRUCTURAL STEEL FRAME LOWER LEVELS: FAIR-FACED REINFORCED CONCRETE
  • 15. • Methodology: Japanese Metabolism, physical objects are never eternal, celebrates individualism, response to long commutes. • Units of Prefabrication: Capsules arrive from factory completely prefabricated, ready to be lifted by crane and bolted onto the superstructure. • Structure: Steel frame with lightweight concrete shaft which houses vertical circulation, mechanical shafts. • Delivery: Dense urban surroundings meant that capsules were delivered from factory to site on the same day it was attached to the superstructure
  • 16. THE CAPSULE : THE STEEL FRAME CAPSULES (WHICH HAVE BEEN DESIGNED TO BE REPLACEABLE, REMOVABLE, AND TRANSPORTABLE) WERE PREFABRICATED IN SPECIALIST FACTORIES AND ASSEMBLED AT A PLANT BEFORE BEING DELIVERED TO THE SITE. EACH ONE WAS LIFTED BY MECHANICAL CRANES AND WERE ATTACHED TO THE TOWER SHAFTS USING 4 HIGH-TENSION BOLTS THE CAPSULE INTERIOR WAS PREASSEMBLED IN A FACTORY THEN HOISTED BY CRANE AND FASTENED TO THE CONCRETE CORE SHAFT. DETAIL OF SYSTEM OF CAPSULE JOINING TO SHAFT
  • 17. Capsule Delivery 1. Capsule Base Connections Détail 2. Capsule Bolting Process 3. Capsule Bolting Connection Detail 4. Prefabrication - 3 Hour Assembly 5. Transportation - 500km 6. Construction - 7-8 Months