12.3 Control Procurement
Overview
Control Procurement Process definition
Buyer obligations
Process ITTO
Procurement performance review?
What is Performance reports?
Claims administrations
Summary
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement Management Processes
Plan Procurement
Management
Conduct Procurement Control Procurement
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Introduction
Manage
relationship
with sellers
Document
contract
Performance
Monitor &
communicate
variance
Manage
contract
Changes
PM is responsible
for
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
The process of managing procurement relationships, monitoring
contract performance, and making changes and corrections to
contracts as appropriate, and closing the contract.
Control Procurement Definition
Monitoring
contract
performance
Making
changes and corrections
to contracts
Managing
procurement
relationships
It ensures both seller’s & buyer’s performance meets
procurement requirements according to agreement.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> Multiple Sellers scenario
Buyer
Seller1
(Buyer for
Seller3)
Seller3
Seller2
Seller 1: Setup IT infrastructure
Seller2 - Develops application
Seller 3 – Data Center setup
Larger project with Multiple providers (sellers):
•Managing communication between various providers
Key aspect of Contract
administration:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Collection of data & managing project records
Refinement of procurement plans & schedules
Set-up for gathering, analyzing procurement related project data & preparation
of reports.
Monitoring of the procurement environment.
Payment of invoices.
Control Procurement -> administrative activities include:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> Buyers Obligation
Buyer ensure that they
follow through on their
own obligations.
Quality will suffer if
obligations are not met.
Schedule/cost will impact
if obligation are not meet.
Process will ensure
adherence to
contract/agreements.
Buyers Obligation
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> Buyers focus
• Monitor technical
performance
Technical:
Scope
Management:
• Ensure seller meets
agreed milestones
Schedule:
time Management:
• Ensure project cost is
within the Budget
Budget:
Cost Management:
• Continually Verify Seller
delivers agreed quality
Verification:
Quality
Management
• Contract risk has to be
mitigated.
Risk Mitigation:
Risk Management:
Major processes where Buyer to focus:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> ITTO
Expert Judgment
Claims administration
Data analysis
Inspection
Audits
Project Management
Plan
Project documents
Agreements
Procurement
Documentation
Approved Change
Request
Work Performance data
Enterprise
environmental factors
Organizational process
assets
Closed procurements
Work Performance
Information
Procurement
Documentation updates
Change Requests
PMP updates
Project document updates
OPA updates
Inputs Tools & Techniques Outputs
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> Input
Project Management
Plan
Project documents Agreements
Procurement
Documentation
Approved Change
Request
Work Performance data
Enterprise
environmental factors
Organizational process
assets
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Control Procurement -> Input -> Project Management Plan
Requirements
management plan
Risk Management
plan
Procurement
Management Plan
Change Management
plan
Schedule baseline
Following subsidiary Project plans may provide input:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project
Management Plan
Requirements management plan:
• How contractor requirements will be analysed,
documented & reviewed.
Risk Management plan
• How risk activities created by sellers will be structured
and performed.
Procurement Management Plan
• Activities to be performed during the control
procurement.
Change Management plan
• How seller created changes will be processed.
Schedule baseline
• How slippage created by seller impacting overall
project performance, to be incorporated
Control Procurement -> Input -> Project Management Plan
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Following Project documents may provide input:
Assumption log
Lessons learned
register
Milestone list
Quality reports
Requirements
documentation
Requirements
Traceability Matrix
Risk Register Stakeholder Register
Control Procurement -> Input -> Project documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Assumption log:
•Document assumptions made during
procurement process.
Lessons learned register:
•Can be used to improve contract performance
& procurement processes.
Milestone list:
•List majors milestones, when seller has to
deliver expected results.
Quality reports:
•Identify, if anything is out of compliance. e.g.,
processes, procedures or product itself.
Control Procurement -> Input -> Project documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project documents
Requirements documentation
• Technical requirements
• Requirement with contractual & legal implications.
E.g., Health, safety, security, performance etc.
Requirements Traceability Matrix
• Links product requirements from its origin to
deliverables.
Risk Register
• Each approved seller comes with its own set of risks.
• e.g., Sellers organization, Contract duration, project
delivery method, contract type, final agreed price etc.
Stakeholder Register
• Information about stakeholders. E.g., contracted team
member, selected sellers, contracting officer, other
stakeholders involved in procurement.
Control Procurement -> Input -> Project documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
documentation
Complete supporting records for administration of procurement processes:
Procurement
SOW
Payment
information
Contractor
WPI
Plans Drawings Correspondence
Control Procurement ->Input->Procurement documents
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Work Performance
Data
The raw observations & measurements of activities performed by seller:
Deliverables produced
Cost - committed Vs
incurred
Seller invoices
(submitted, paid)
Quality standards
Control Procurement ->Input->WPD
Cost Invoices
Deliverables Quality
Direct and Manage
Project work
Control
Procurement
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Approved Change
Requests
Includes modification to the Terms & conditions of the contract including:
Procurement SOW Pricing Product description
Services or results to be
provided
Formally documented in writing
Approved before implemented though control procurement
process
In complex projects: CR from one seller may influence otherr
seller
Project should have capability of identifying, communicating &
resolving changes that impact multiple sellers.
Control Procurement ->Input -> Approved Change Requests
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Agreements
Agreements are understanding between parties, including understanding of the duty of each
party.
Reviewed to verify terms & conditions are meet.
Control Procurement -> Input -> Agreements
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Enterprise
environmental factors
Contract change control system
Market place conditions
Financial / accounting systems
Buying organizations code of ethics
Control Procurement -> Input -> EEF
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Organizational
process assets
OPA that can influence control procurement processes.
E.g., Procurement policies
Control Procurement -> Input -> OPA
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement-> Tools & Techniques
Expert Judgment Claims administration Data analysis
Inspection Audits
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Expert Judgment
Expert with specialised knowledge or training in:
Control Procurement-> Tools & Techniques-> Expert Judgement
Functional expert:
• Finance
• Engineering
• Design
• Development
• Supply chain etc.
Laws, regulation &
compliance
Claim
administration
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Control Procurement-> Tools & Techniques-> Data analysis
Performance
Reviews
Earn value analysis Trend analysis
Following Data analysis tools may be used:
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Performance Reviews:
•Review of seller’s progress to deliver project scope & quality, within cost & on
schedule.
Identify
work
packages:
Ahead of
schedule
Behind
schedule
Over or
under
budget
Has resource
or quality
issues
Measure, compare & analyses as per agreement:
Quality Resource Schedule Cost performance
Control Procurement-> T &T -> Data analysis-> Performance Reviews
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Data analysis
Earn value analysis:
• Determine degree of variance from budget based on:
• Schedule & Cost variances
• Schedule & Cost performance indexes
Trend analysis:
• Develop a forecast Estimate at completion (AEC)
• Verify performance is improving or deteriorating.
Control Procurement-> Tools & Techniques-> Data analysis
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Inspection
Structured review of work being performed by the contractor
Review of the deliverables Actual physical review of the work.
• Inspection involve walkthrough of site
• Contractor ensure mutual understanding of
work in progress.
E.g., Construction /
Engineering or
infrastructure project:
Control Procurement-> Tools & Techniques -> Inspection
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Audits
Structured, independent process used to determine if project activities comply with
organizational & project policies, processes & procedures.
Usually conducted by external team. E.g., Internal Audit dept., PMO or Auditor external to
organization
Audit Rights & obligation should be documented in
Procurement contract
Audit observation should be communicated to both Sellers
& buyers PM's for adjustment to project
Control Procurement-> T&T->Audits
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Audits
Control Procurement-> T&T->Audits
Audit Objectives may be:
Identify non conformity, gaps & short
comings.
Identify good & best practices implemented
Sharing good practices
Proactive assistance to improve process
implantation
Contribute to lessons learned.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Claims
Administration
The process of processing, adjudicating, and communicating contract claims.
Claim / Contested changes: are those requested changes where the buyer & seller can
not reach an agreement:
on compensation of change Can’t agree that change is happened.
Control Procurement-> T&T->Claim Administration
How to resolve disputes
Manage according to
the terms of contract.
If not resolved follow alternative
dispute resolution (ADR)
Claims
Documented
Processed Monitored
Managed
If not resolved,
they become
disputes
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement ->Output
Closed procurements
Work Performance
Information
Procurement
Documentation updates
Change Requests
PMP updates
Project document
updates
OPA updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Closed
procurements
Providing a formal written notice through procurement administrator, about contract completion
All deliverables should have been provided on time, and meet technical & quality requirements.
Project Management team should approved those deliverables.
No outstanding claims, or invoices, and all final payments should have been done.
Control Procurement ->Output -> Closed procurements
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Procurement
Documentation updates
Following Procurement Documents may be updated:
Control Procurement ->Output -> Procurement Documentation update
Contract with
supporting schedule
Requested unapproved
contract changes
Seller developed
technical
documentation
WPI - Deliverables
Seller performance
reports
Warranties
Financial documents
(Invoices & payment
records)
Results of inspections
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Performance data collected from various controlling processes and analysed in
contractual context.
Control Procurement ->Output->WPI
Information on how seller is performing
against SOW:
Comparing deliverables received
Technical performance achieved
Cost incurred & accepted
Work Performance
Information
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Change Requests
A formal proposal to modify any document, deliverable, or baseline.
Control Procurement ->Output->change Request
Processed
through
Integrated
Change Control
Requested but
unresolved
changes which
are documented
leads to disputes.
Change requests
going through
disputes are not
implemented.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
PMP updates
Following subsidiary plans & baselines may get updated.
Control Procurement ->Output-> PMP Updates
Risk Management
Plan
Procurement
management Plan
Schedule baseline Cost Baseline
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
PMP updates
Risk Management Plan
•Each agreement & seller has its own set of risks which may lead
to updates.
Procurement management Plan
•Update may require depending on the result of the performance
of the seller.
Schedule baseline
•Delivery changes created by seller may impact overall schedule
performance.
•baseline need to be updated to reflect current expectations.
Cost Baseline
•Contractor & material prices can change frequently due to
fluctuating material & labour prices.
•Baseline need to be updated to reflect agreed contract value.
Control Procurement ->Output-> PMP Updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Updates
Control Procurement ->Output-> Project documents Updates
Lessons learned
register
Resource
requirements
Requirements
Traceability Matrix
Risk Register
Stakeholder
Register
Following Project Documents may get updated.
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Project Documents
Updates
Lessons learned register
•Effective techniques to maintain scope, schedule &cost of procured items.
•Variance details, corrective actions & their effectiveness.
•Claim details & information on procurement process improvement.
Resource requirements:
•Changes to the resource requirements due to work done which is not in
accordance with planned work schedule.
Requirements Traceability Matrix:
•Updated with requirements that has been satisfied.
Risk Register
•Each approved seller comes with its own set of risks.
•e.g., Sellers organization, Contract duration, project delivery method, contract
type, final agreed price etc.
Stakeholder Register
•Change in contractor or supplier should reflect in the stakeholder register.
Control Procurement ->Output-> Project documents Updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
OPA Updates
Payment schedule & requests
Sellers performance evaluation documentation
Prequalified seller list update
Lessons learned respository
PRocurement file
Control Procurement ->Output->OPA Updates
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)
Control Procurement -> Review
Overview
Control Procurement Process definition
Buyer obligations
Process ITTO
Procurement performance review?
What is Performance reports?
Claims administrations
PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)

Weitere ähnliche Inhalte

Was ist angesagt?

Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify RisksAnand Bobade
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement ManagementDavidMcLachlan1
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2Anand Bobade
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management OverviewDavidMcLachlan1
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workAnand Bobade
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1Anand Bobade
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control CostAnand Bobade
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CycleAnand Bobade
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop TeamAnand Bobade
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1Anand Bobade
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control ResourcesAnand Bobade
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management DetailsAnand Bobade
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewAnand Bobade
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2Anand Bobade
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management Serdar Temiz
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2Anand Bobade
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage TeamAnand Bobade
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement ManagementYogender Singh Rana
 

Was ist angesagt? (20)

Chap 11.2 Identify Risks
Chap 11.2 Identify RisksChap 11.2 Identify Risks
Chap 11.2 Identify Risks
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement Management
 
PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2PMP Chap 7 - Project Cost Management - Part 2
PMP Chap 7 - Project Cost Management - Part 2
 
12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview12.0 Project Procurement Management Overview
12.0 Project Procurement Management Overview
 
Chap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project workChap 4.3 Direct and Manage Project work
Chap 4.3 Direct and Manage Project work
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Pmp chap 11 - project risk management v0.1
Pmp   chap 11 - project risk management v0.1Pmp   chap 11 - project risk management v0.1
Pmp chap 11 - project risk management v0.1
 
Chap 7.4 Control Cost
Chap 7.4   Control CostChap 7.4   Control Cost
Chap 7.4 Control Cost
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
Chap 9.4 Develop Team
Chap 9.4  Develop TeamChap 9.4  Develop Team
Chap 9.4 Develop Team
 
PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1PMP Chap 5 - Project Scope Management - Part1
PMP Chap 5 - Project Scope Management - Part1
 
Chap 9.6 Control Resources
Chap 9.6  Control ResourcesChap 9.6  Control Resources
Chap 9.6 Control Resources
 
PMP_Project Procurement Management
PMP_Project Procurement ManagementPMP_Project Procurement Management
PMP_Project Procurement Management
 
PMP Chap 10 - Project Communication Management Details
PMP  Chap 10 - Project Communication Management DetailsPMP  Chap 10 - Project Communication Management Details
PMP Chap 10 - Project Communication Management Details
 
Chap 8.0 Quality Management Overview
Chap 8.0 Quality Management OverviewChap 8.0 Quality Management Overview
Chap 8.0 Quality Management Overview
 
PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2PMP Chap4-Project Integration Management Details: Part-2
PMP Chap4-Project Integration Management Details: Part-2
 
Project Procurement Management
 Project Procurement Management  Project Procurement Management
Project Procurement Management
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 
Chap 9.5 Manage Team
Chap 9.5  Manage TeamChap 9.5  Manage Team
Chap 9.5 Manage Team
 
Project Management-Project procurement Management
Project Management-Project procurement ManagementProject Management-Project procurement Management
Project Management-Project procurement Management
 

Ähnlich wie Chap 12.3 Control Procurement

Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scopeAnand Bobade
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scopeAnand Bobade
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirementsAnand Bobade
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlAnand Bobade
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality managementAnand Bobade
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define ActivityAnand Bobade
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseAnand Bobade
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control ScopeAnand Bobade
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost ManagementAnand Bobade
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterAnand Bobade
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementAnand Bobade
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor RisksAnand Bobade
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control QualityAnand Bobade
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid Daoud
 
Software metrics in contracts
Software metrics in contractsSoftware metrics in contracts
Software metrics in contractsNesma
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage CommunicationAnand Bobade
 
Part Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxPart Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxGetanehMulualemGelaw
 

Ähnlich wie Chap 12.3 Control Procurement (20)

Chap 5.5 validate scope
Chap 5.5 validate scopeChap 5.5 validate scope
Chap 5.5 validate scope
 
Chap 5.3 define scope
Chap 5.3 define scopeChap 5.3 define scope
Chap 5.3 define scope
 
Chap 5.2 Collect requirements
Chap 5.2 Collect requirementsChap 5.2 Collect requirements
Chap 5.2 Collect requirements
 
Chap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change ControlChap 4.6 Perform Integrated Change Control
Chap 4.6 Perform Integrated Change Control
 
Chap 8.1 Plan quality management
Chap 8.1 Plan quality managementChap 8.1 Plan quality management
Chap 8.1 Plan quality management
 
Chap 6.2 Define Activity
Chap 6.2 Define ActivityChap 6.2 Define Activity
Chap 6.2 Define Activity
 
Chap 4.7 Project or Phase Close
Chap 4.7 Project or Phase CloseChap 4.7 Project or Phase Close
Chap 4.7 Project or Phase Close
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Chap 5.6 Control Scope
Chap 5.6 Control ScopeChap 5.6 Control Scope
Chap 5.6 Control Scope
 
Chap 7.1 Plan Cost Management
Chap 7.1  Plan Cost ManagementChap 7.1  Plan Cost Management
Chap 7.1 Plan Cost Management
 
Chap 4.1- Develop Project Charter
Chap 4.1- Develop Project CharterChap 4.1- Develop Project Charter
Chap 4.1- Develop Project Charter
 
Chap 5.1 Plan Scope Management
Chap 5.1 Plan Scope ManagementChap 5.1 Plan Scope Management
Chap 5.1 Plan Scope Management
 
Chap 11.7 Monitor Risks
Chap 11.7 Monitor RisksChap 11.7 Monitor Risks
Chap 11.7 Monitor Risks
 
Pmp procurement rev
Pmp procurement revPmp procurement rev
Pmp procurement rev
 
Chap 8.3 Control Quality
Chap 8.3  Control QualityChap 8.3  Control Quality
Chap 8.3 Control Quality
 
Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016Faid daoud updated cv 19 july 2016
Faid daoud updated cv 19 july 2016
 
Software metrics in contracts
Software metrics in contractsSoftware metrics in contracts
Software metrics in contracts
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
Chap 10.2 Manage Communication
Chap 10.2  Manage CommunicationChap 10.2  Manage Communication
Chap 10.2 Manage Communication
 
Part Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptxPart Three - The Role of Strategy in PPM - 2022.pptx
Part Three - The Role of Strategy in PPM - 2022.pptx
 

Mehr von Anand Bobade

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationAnand Bobade
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication ManagementAnand Bobade
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire ResourcesAnand Bobade
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity ResourceAnand Bobade
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overviewAnand Bobade
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate CostAnand Bobade
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budgetAnand Bobade
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewAnand Bobade
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control ScheduleAnand Bobade
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define ScheduleAnand Bobade
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationAnand Bobade
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityAnand Bobade
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementAnand Bobade
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewAnand Bobade
 

Mehr von Anand Bobade (15)

PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
Chap 10.3 Monitor Communication
Chap 10.3 Monitor CommunicationChap 10.3 Monitor Communication
Chap 10.3 Monitor Communication
 
Chap 10.1 Plan Communication Management
Chap 10.1  Plan Communication ManagementChap 10.1  Plan Communication Management
Chap 10.1 Plan Communication Management
 
Chap 9.3 Acquire Resources
Chap 9.3   Acquire ResourcesChap 9.3   Acquire Resources
Chap 9.3 Acquire Resources
 
Chap 9.2 Estimate Activity Resource
Chap 9.2   Estimate Activity ResourceChap 9.2   Estimate Activity Resource
Chap 9.2 Estimate Activity Resource
 
Chap 9.0 Project Resource Management overview
Chap 9.0   Project Resource Management overviewChap 9.0   Project Resource Management overview
Chap 9.0 Project Resource Management overview
 
Chap 7.2 Estimate Cost
Chap 7.2 Estimate CostChap 7.2 Estimate Cost
Chap 7.2 Estimate Cost
 
Chap 7.3 Determine budget
Chap 7.3   Determine budgetChap 7.3   Determine budget
Chap 7.3 Determine budget
 
Chap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management OverviewChap 7.0 Project Cost Management Overview
Chap 7.0 Project Cost Management Overview
 
Chap 6.6 Control Schedule
Chap 6.6 Control ScheduleChap 6.6 Control Schedule
Chap 6.6 Control Schedule
 
Chap 6.5 Define Schedule
Chap 6.5 Define ScheduleChap 6.5 Define Schedule
Chap 6.5 Define Schedule
 
Chap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity DurationChap 6.4 Estimate Activity Duration
Chap 6.4 Estimate Activity Duration
 
Chap 6.3 Sequence Activity
Chap 6.3 Sequence ActivityChap 6.3 Sequence Activity
Chap 6.3 Sequence Activity
 
Chap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule ManagementChap 6.1 Plan Schedule Management
Chap 6.1 Plan Schedule Management
 
Chap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management OverviewChap 6.0 Schedule Management Overview
Chap 6.0 Schedule Management Overview
 

Kürzlich hochgeladen

Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersEmpowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersMahmoud Rabie
 
Making Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsMaking Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsCIToolkit
 
HR for Non HR_Learning and Development.
HR for Non HR_Learning  and Development.HR for Non HR_Learning  and Development.
HR for Non HR_Learning and Development.azischin
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingCIToolkit
 
Tackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanTackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanStefan Wolpers
 
Value Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationValue Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationCIToolkit
 
An Important Step Toward Process Improvement
An Important Step Toward Process ImprovementAn Important Step Toward Process Improvement
An Important Step Toward Process ImprovementCIToolkit
 
A3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingA3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingCIToolkit
 
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementApplying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementCIToolkit
 
Forget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsForget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsStephan Koning
 
How the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioHow the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioChristopher Totten
 
Roadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint PresentationRoadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint Presentationgdscghrcem
 
From Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMFrom Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMGloria Chow
 
Test_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenTest_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenolgaz9
 
The Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectThe Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectCIToolkit
 
Performance Management Notes for MBA Students
Performance Management Notes for MBA StudentsPerformance Management Notes for MBA Students
Performance Management Notes for MBA StudentsManickam Gajapathy
 
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...AgileNetwork
 
Improving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksImproving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksCIToolkit
 
Organizations in a Future with Generative AI
Organizations in a Future with Generative AIOrganizations in a Future with Generative AI
Organizations in a Future with Generative AIKye Andersson
 

Kürzlich hochgeladen (20)

Capacity2 - Briefing and Facilitation training slides
Capacity2 - Briefing and Facilitation training slidesCapacity2 - Briefing and Facilitation training slides
Capacity2 - Briefing and Facilitation training slides
 
Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging LeadersEmpowering Resilience & Strategic Growth: Insights for Emerging Leaders
Empowering Resilience & Strategic Growth: Insights for Emerging Leaders
 
Making Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity DiagramsMaking Sense of Multiple Ideas with Affinity Diagrams
Making Sense of Multiple Ideas with Affinity Diagrams
 
HR for Non HR_Learning and Development.
HR for Non HR_Learning  and Development.HR for Non HR_Learning  and Development.
HR for Non HR_Learning and Development.
 
Analyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value MappingAnalyzing and Monitoring Processes through Time Value Mapping
Analyzing and Monitoring Processes through Time Value Mapping
 
Tackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna RothmanTackling Fake Agility w/ Johanna Rothman
Tackling Fake Agility w/ Johanna Rothman
 
Value Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process OptimizationValue Stream Map: A Visual Approach to Process Optimization
Value Stream Map: A Visual Approach to Process Optimization
 
An Important Step Toward Process Improvement
An Important Step Toward Process ImprovementAn Important Step Toward Process Improvement
An Important Step Toward Process Improvement
 
A3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem SolvingA3 Thinking: A Structured Approach to Problem Solving
A3 Thinking: A Structured Approach to Problem Solving
 
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous ImprovementApplying the PDCA Cycle: A Blueprint for Continuous Improvement
Applying the PDCA Cycle: A Blueprint for Continuous Improvement
 
Forget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outsForget Fiverr : Fractional Employment the ins and outs
Forget Fiverr : Fractional Employment the ins and outs
 
How the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the StudioHow the Heck do you Teach Level Design? Educating in the Studio
How the Heck do you Teach Level Design? Educating in the Studio
 
Roadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint PresentationRoadway to GDSC- Session 1 Powerpoint Presentation
Roadway to GDSC- Session 1 Powerpoint Presentation
 
From Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EMFrom Command Line to Reporting Line: The Diary of a First-Time EM
From Command Line to Reporting Line: The Diary of a First-Time EM
 
Test_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteenTest_document_upload_SQL_minimum_fourteen
Test_document_upload_SQL_minimum_fourteen
 
The Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and EffectThe Role of Fishbone Diagram in Analyzing Cause and Effect
The Role of Fishbone Diagram in Analyzing Cause and Effect
 
Performance Management Notes for MBA Students
Performance Management Notes for MBA StudentsPerformance Management Notes for MBA Students
Performance Management Notes for MBA Students
 
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
ANIn Coimbatore March 2024 | Agile & AI in Project Management by Dhilipkumar ...
 
Improving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba WalksImproving Operations through Observation and Gemba Walks
Improving Operations through Observation and Gemba Walks
 
Organizations in a Future with Generative AI
Organizations in a Future with Generative AIOrganizations in a Future with Generative AI
Organizations in a Future with Generative AI
 

Chap 12.3 Control Procurement

  • 1. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Chapter 12 – Project Procurement Management PMP Trainer: Anand BobadePMBOK 6th Edition, 2019, All rights reserved. Control Procurement SIXTH EDITION
  • 2. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) 12.3 Control Procurement Overview Control Procurement Process definition Buyer obligations Process ITTO Procurement performance review? What is Performance reports? Claims administrations Summary
  • 3. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Management Processes Plan Procurement Management Conduct Procurement Control Procurement
  • 4. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Introduction Manage relationship with sellers Document contract Performance Monitor & communicate variance Manage contract Changes PM is responsible for
  • 5. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) The process of managing procurement relationships, monitoring contract performance, and making changes and corrections to contracts as appropriate, and closing the contract. Control Procurement Definition Monitoring contract performance Making changes and corrections to contracts Managing procurement relationships It ensures both seller’s & buyer’s performance meets procurement requirements according to agreement.
  • 6. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> Multiple Sellers scenario Buyer Seller1 (Buyer for Seller3) Seller3 Seller2 Seller 1: Setup IT infrastructure Seller2 - Develops application Seller 3 – Data Center setup Larger project with Multiple providers (sellers): •Managing communication between various providers Key aspect of Contract administration:
  • 7. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Collection of data & managing project records Refinement of procurement plans & schedules Set-up for gathering, analyzing procurement related project data & preparation of reports. Monitoring of the procurement environment. Payment of invoices. Control Procurement -> administrative activities include:
  • 8. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> Buyers Obligation Buyer ensure that they follow through on their own obligations. Quality will suffer if obligations are not met. Schedule/cost will impact if obligation are not meet. Process will ensure adherence to contract/agreements. Buyers Obligation
  • 9. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> Buyers focus • Monitor technical performance Technical: Scope Management: • Ensure seller meets agreed milestones Schedule: time Management: • Ensure project cost is within the Budget Budget: Cost Management: • Continually Verify Seller delivers agreed quality Verification: Quality Management • Contract risk has to be mitigated. Risk Mitigation: Risk Management: Major processes where Buyer to focus:
  • 10. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> ITTO Expert Judgment Claims administration Data analysis Inspection Audits Project Management Plan Project documents Agreements Procurement Documentation Approved Change Request Work Performance data Enterprise environmental factors Organizational process assets Closed procurements Work Performance Information Procurement Documentation updates Change Requests PMP updates Project document updates OPA updates Inputs Tools & Techniques Outputs
  • 11. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> Input Project Management Plan Project documents Agreements Procurement Documentation Approved Change Request Work Performance data Enterprise environmental factors Organizational process assets
  • 12. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Control Procurement -> Input -> Project Management Plan Requirements management plan Risk Management plan Procurement Management Plan Change Management plan Schedule baseline Following subsidiary Project plans may provide input:
  • 13. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Management Plan Requirements management plan: • How contractor requirements will be analysed, documented & reviewed. Risk Management plan • How risk activities created by sellers will be structured and performed. Procurement Management Plan • Activities to be performed during the control procurement. Change Management plan • How seller created changes will be processed. Schedule baseline • How slippage created by seller impacting overall project performance, to be incorporated Control Procurement -> Input -> Project Management Plan
  • 14. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Following Project documents may provide input: Assumption log Lessons learned register Milestone list Quality reports Requirements documentation Requirements Traceability Matrix Risk Register Stakeholder Register Control Procurement -> Input -> Project documents
  • 15. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Assumption log: •Document assumptions made during procurement process. Lessons learned register: •Can be used to improve contract performance & procurement processes. Milestone list: •List majors milestones, when seller has to deliver expected results. Quality reports: •Identify, if anything is out of compliance. e.g., processes, procedures or product itself. Control Procurement -> Input -> Project documents
  • 16. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project documents Requirements documentation • Technical requirements • Requirement with contractual & legal implications. E.g., Health, safety, security, performance etc. Requirements Traceability Matrix • Links product requirements from its origin to deliverables. Risk Register • Each approved seller comes with its own set of risks. • e.g., Sellers organization, Contract duration, project delivery method, contract type, final agreed price etc. Stakeholder Register • Information about stakeholders. E.g., contracted team member, selected sellers, contracting officer, other stakeholders involved in procurement. Control Procurement -> Input -> Project documents
  • 17. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement documentation Complete supporting records for administration of procurement processes: Procurement SOW Payment information Contractor WPI Plans Drawings Correspondence Control Procurement ->Input->Procurement documents
  • 18. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Work Performance Data The raw observations & measurements of activities performed by seller: Deliverables produced Cost - committed Vs incurred Seller invoices (submitted, paid) Quality standards Control Procurement ->Input->WPD Cost Invoices Deliverables Quality Direct and Manage Project work Control Procurement
  • 19. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Approved Change Requests Includes modification to the Terms & conditions of the contract including: Procurement SOW Pricing Product description Services or results to be provided Formally documented in writing Approved before implemented though control procurement process In complex projects: CR from one seller may influence otherr seller Project should have capability of identifying, communicating & resolving changes that impact multiple sellers. Control Procurement ->Input -> Approved Change Requests
  • 20. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Agreements Agreements are understanding between parties, including understanding of the duty of each party. Reviewed to verify terms & conditions are meet. Control Procurement -> Input -> Agreements
  • 21. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Enterprise environmental factors Contract change control system Market place conditions Financial / accounting systems Buying organizations code of ethics Control Procurement -> Input -> EEF
  • 22. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Organizational process assets OPA that can influence control procurement processes. E.g., Procurement policies Control Procurement -> Input -> OPA
  • 23. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement-> Tools & Techniques Expert Judgment Claims administration Data analysis Inspection Audits
  • 24. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Expert Judgment Expert with specialised knowledge or training in: Control Procurement-> Tools & Techniques-> Expert Judgement Functional expert: • Finance • Engineering • Design • Development • Supply chain etc. Laws, regulation & compliance Claim administration
  • 25. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Control Procurement-> Tools & Techniques-> Data analysis Performance Reviews Earn value analysis Trend analysis Following Data analysis tools may be used:
  • 26. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Performance Reviews: •Review of seller’s progress to deliver project scope & quality, within cost & on schedule. Identify work packages: Ahead of schedule Behind schedule Over or under budget Has resource or quality issues Measure, compare & analyses as per agreement: Quality Resource Schedule Cost performance Control Procurement-> T &T -> Data analysis-> Performance Reviews
  • 27. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Data analysis Earn value analysis: • Determine degree of variance from budget based on: • Schedule & Cost variances • Schedule & Cost performance indexes Trend analysis: • Develop a forecast Estimate at completion (AEC) • Verify performance is improving or deteriorating. Control Procurement-> Tools & Techniques-> Data analysis
  • 28. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Inspection Structured review of work being performed by the contractor Review of the deliverables Actual physical review of the work. • Inspection involve walkthrough of site • Contractor ensure mutual understanding of work in progress. E.g., Construction / Engineering or infrastructure project: Control Procurement-> Tools & Techniques -> Inspection
  • 29. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Audits Structured, independent process used to determine if project activities comply with organizational & project policies, processes & procedures. Usually conducted by external team. E.g., Internal Audit dept., PMO or Auditor external to organization Audit Rights & obligation should be documented in Procurement contract Audit observation should be communicated to both Sellers & buyers PM's for adjustment to project Control Procurement-> T&T->Audits
  • 30. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Audits Control Procurement-> T&T->Audits Audit Objectives may be: Identify non conformity, gaps & short comings. Identify good & best practices implemented Sharing good practices Proactive assistance to improve process implantation Contribute to lessons learned.
  • 31. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Claims Administration The process of processing, adjudicating, and communicating contract claims. Claim / Contested changes: are those requested changes where the buyer & seller can not reach an agreement: on compensation of change Can’t agree that change is happened. Control Procurement-> T&T->Claim Administration How to resolve disputes Manage according to the terms of contract. If not resolved follow alternative dispute resolution (ADR) Claims Documented Processed Monitored Managed If not resolved, they become disputes
  • 32. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement ->Output Closed procurements Work Performance Information Procurement Documentation updates Change Requests PMP updates Project document updates OPA updates
  • 33. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Closed procurements Providing a formal written notice through procurement administrator, about contract completion All deliverables should have been provided on time, and meet technical & quality requirements. Project Management team should approved those deliverables. No outstanding claims, or invoices, and all final payments should have been done. Control Procurement ->Output -> Closed procurements
  • 34. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Procurement Documentation updates Following Procurement Documents may be updated: Control Procurement ->Output -> Procurement Documentation update Contract with supporting schedule Requested unapproved contract changes Seller developed technical documentation WPI - Deliverables Seller performance reports Warranties Financial documents (Invoices & payment records) Results of inspections
  • 35. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Performance data collected from various controlling processes and analysed in contractual context. Control Procurement ->Output->WPI Information on how seller is performing against SOW: Comparing deliverables received Technical performance achieved Cost incurred & accepted Work Performance Information
  • 36. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Change Requests A formal proposal to modify any document, deliverable, or baseline. Control Procurement ->Output->change Request Processed through Integrated Change Control Requested but unresolved changes which are documented leads to disputes. Change requests going through disputes are not implemented.
  • 37. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) PMP updates Following subsidiary plans & baselines may get updated. Control Procurement ->Output-> PMP Updates Risk Management Plan Procurement management Plan Schedule baseline Cost Baseline
  • 38. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) PMP updates Risk Management Plan •Each agreement & seller has its own set of risks which may lead to updates. Procurement management Plan •Update may require depending on the result of the performance of the seller. Schedule baseline •Delivery changes created by seller may impact overall schedule performance. •baseline need to be updated to reflect current expectations. Cost Baseline •Contractor & material prices can change frequently due to fluctuating material & labour prices. •Baseline need to be updated to reflect agreed contract value. Control Procurement ->Output-> PMP Updates
  • 39. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Updates Control Procurement ->Output-> Project documents Updates Lessons learned register Resource requirements Requirements Traceability Matrix Risk Register Stakeholder Register Following Project Documents may get updated.
  • 40. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Project Documents Updates Lessons learned register •Effective techniques to maintain scope, schedule &cost of procured items. •Variance details, corrective actions & their effectiveness. •Claim details & information on procurement process improvement. Resource requirements: •Changes to the resource requirements due to work done which is not in accordance with planned work schedule. Requirements Traceability Matrix: •Updated with requirements that has been satisfied. Risk Register •Each approved seller comes with its own set of risks. •e.g., Sellers organization, Contract duration, project delivery method, contract type, final agreed price etc. Stakeholder Register •Change in contractor or supplier should reflect in the stakeholder register. Control Procurement ->Output-> Project documents Updates
  • 41. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) OPA Updates Payment schedule & requests Sellers performance evaluation documentation Prequalified seller list update Lessons learned respository PRocurement file Control Procurement ->Output->OPA Updates
  • 42. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com) Control Procurement -> Review Overview Control Procurement Process definition Buyer obligations Process ITTO Procurement performance review? What is Performance reports? Claims administrations
  • 43. PMBOK 6 - All rights reserved; By: Anand Bobade (nmbobade@gmail.com)