1
TA CAC Meeting
November 3, 2016
Item # 11a
US 101 / 92
Interchange
Presentation Outline
• Preliminary Planning Study (PPS) Overview
• Previous Studies, Existing Conditions and P&N
• Alternatives Development and Overview
• Recommendations
• Next Steps
2
2
Preliminary Planning Study (PPS) Overview
• SMCTA (Funding & Implementer) & C/CAG
(Sponsor) joint effort with input from Caltrans,
City of San Mateo, City of Foster City, and consultant
• Assess traffic deficiencies, develop project
Purpose and Need
• Develop alternatives with stakeholders;
evaluate costs, impacts and benefits
• Recommend Short- and Long Term projects to
move forward into the Caltrans Project Initiation
Document (PID) Phase
3
Previous Studies
SR 92
PSR-PDS
(2001)
SR92/SR82
PR
(2014)
US101/SR92
Area Study
(2013)
US101 HOV
PSR-PDS
(2015)
4
3
92/82 I/C Reconfiguration
x
x 5
AM QUEUES –
EXISTING AND 2040 NO-BUILD
PM QUEUES –
EXISTING AND 2040 NO-BUILD
6
4
AM QUEUES –
EXISTING AND 2040 NO-BUILD
PM QUEUES –
EXISTING AND 2040 NO-BUILD
7
AM QUEUES –
EXISTING AND 2040 NO-BUILD
PM QUEUES –
EXISTING AND 2040 NO-BUILD
8
5
PURPOSE
Improve traffic flow and safety, and increase mobility
through the 101/92 Interchange area by minimizing
traffic conflict locations and improving peak-period
travel times within project limits along 101 and 92
NEED
Overall substantial delay and congestion at the
101/92 Interchange
Project Purpose and Need
9
101/92 Deficiencies
6
101/92 Deficiencies - N/B 101
101/92 Deficiencies - S/B 101
7
101/92 Deficiencies - W/B 92
101/92 Deficiencies - E/B 92
8
101/92 Deficiencies
Alternatives Development
• Evaluated seven Short Term and twenty-one
Long Term alternatives
• Brain-storming session with Cities of San Mateo
and Foster City, C/CAG and SMCTA
• Shortlisted nine basic alternatives
• Presented to Caltrans
• Revised alternatives based on Caltrans comments.
Cost estimates, impact evaluations, design exceptions
and traffic operations benefits incorporated into final
PPS June 2016.
16
9
Naming Convention for Alternatives
Short Term Alternatives: A
• Projects that can be implemented more quickly through
streamlined Permit Engineering Evaluation Report (PEER)
Caltrans Process
• Projects with relatively low total cost (<$10M)
Long Term Alternatives: X, Y, Z
• Projects that require full Caltrans Oversight Process
(Planning, Environmental, Design) and take longer
to implement
• Projects with relatively high total cost (>$10M)
• Projects that provide more traffic and safety improvements
17
Alternatives at 101/92 Interchange
18
10
Alternative Ratings
From Agencies:
19
Alternatives Ratings
Not Likely to Support Neutral Very Likely to Support
ALTERNATIVE 1 2 3 4 5
1X
1Y
2X
3A
3B
3X
4A
4X
4XY
4Y
4Y-1, 4Y-2
4Z
5X
5Y
6A
6X
7A
8A
8X
8Y
8Z
8ZX
8ZX Ramp
Options 1 & 2
9A
9X
9Y
A and B = Short Term Alternatives X,Y and Z = Long Term Alternatives
C/CAG Foster City City of San Mateo
Short Term Alternative 7A:
WB 92 to SB 101 Loop Ramp Connector ML Addition
$7M
20
SHORT TERM ALTERNATIVE 7A:
Proposes an additional ML preferential lane to compliment the existing mixed-flow
lane. The connector traffic will be ramp metered before entering SM US 101.
11
Short Term Alternative 8A:
EB 92 Merge Reconfiguration and Lane Add
$3.5M
21
$52M
22
Long Term Alternative 1X:
101 Braided Ramps
POTENTIAL
ROW IMPACTS
POTENTIAL
ROW IMPACTS
12
Long Term Alternative 2X:
WB 92 to 101 Managed Lane Direct Connectors
$93M
LONG TERM ALTERNATIVE 2X:
The proposed ML connectors from westbound SR 92 to 101
NB and SB would provide direct access to ML lane.
New ML Direct
Connectors
LONG TERM ALTERNATIVE 2X:
The proposed ML connectors from west bound SR 92 to
US 101 NB and SB would provide direct access to ML lane.
23
POTENTIAL
ROW IMPACTS
POTENTIAL
ROW IMPACTS
Long Term Alternative 8X:
SB 101 to WB 92 Added Inside Direct Connector
$40M 24
13
Long Term Alternative 8ZX:
EB 92 Collector Distributor System
$154M 25
POTENTIAL
ROW IMPACTS
POTENTIAL
ROW IMPACTS
Alternatives Rated on Various Criteria
SAFETY
Low: No improvement to weave/merge areas; minimal mobility
improvement could potentially lower rear-end type of accidents
High: Clear safety improvement by eliminating unsafe merges at
weave conflict locations
ENVIRONMENTAL
Low: Minimal impact that could likely be cleared with CE/CE approval
Medium: Not CE/CE, but avoids adverse impacts and may qualify for
IS/EA approval
High: Adverse impacts requiring EIR/EIS approval
RIGHT OF WAY
Low: May have only temporary construction easement requirements
Medium: May require partial right of way acquisitions or sliver takes
High: Full right of way acquisitions potentially requiring relocations
26
14
Summary of Alternatives Along 101
Alternative
Estimated
Total Cost
(in millions)
Operational
Benefit
Safety
Benefit
Impact to
Local Traffic
Circulation
Environmental
Impact
Right of Way
Impact
1X* $52M
Improves weaving
and operations
High
Needs further
evaluation
Medium Medium
1Y $89M
Improves weaving
and operations
(NB only)
High
Needs further
evaluation
Medium High
2X* $93M
Improves operations
for ML users
(WB 92 to 101)
and operations
for 101
Low None Medium to High Medium
3A $3.3M
Low operations
benefit
Low to
Medium
None Low None
3X* $6.5M
Operational benefit
(NB only)
Low to
Medium
None Low Low
*Recommended alternative 27
Summary of Alternatives Along 92
Alternative
Estimated
Total Cost
(in millions)
Operational
Benefit
Safety
Benefit
Impact to
Local Traffic
Circulation
Environmental
Impact
Right of Way
Impact
7A* $7M
Improves operations
for ML users
(WB 92 to
SB 101 only)
Low None Low None
8A* $3.5M
Improves weaving
and operations
High None Low None
8X $40M
Improves weaving
and operations
High None High Low
8Y $58M
Low weaving
improvement
Low None High Medium
8Z* $103M
Improves weaving
and operations
High
Needs further
evaluation
High Medium
8ZX* $154M
Improves weaving
and operations
High
Needs further
evaluation
High High
9A $0.5M Low operations benefit Low
Needs further
evaluation
Low None
9Y* $47M
Improves weaving
and operations
High
Needs further
evaluation
High Medium
*Recommended alternative 28
15
Recommended Alternatives and Packages
Short Term:
Alternatives 3A, 7A, 8A and 9A ($14M)
Long Term Reduced Package:
1X, 3X, 8X, 9Y ($146M)
Long Term Alternate Package:
1Y, 3X, 8Z and 9Y ($246M)
Long Term Primary Package:
1X, 2X, 3X, 8ZX and 9Y ($353M)
29
• Project sponsor(s) to determine which alternatives
to advance using stakeholder input, regional goals
and anticipated funding ranges
• Sponsor to pursue Measure A or other source to
fund effort
• Engage Caltrans with Pre-PID meeting to discuss
project Purpose & Need and project development path
• Prepare PEER, PID and PR or PID as appropriate
to program funding; gain project approval
Next Steps
30
16

More Related Content

What's hot

2004 Paving Conference CTTCP
2004 Paving Conference CTTCP2004 Paving Conference CTTCP
2004 Paving Conference CTTCPJoe Sanchez, P.E.
 
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...Hossam Shafiq I
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...Hossam Shafiq I
 
Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liupeggydrouet
 
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and EmissionsTraffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and EmissionsSociety of Women Engineers
 
RTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataRTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataJerry Dinzes
 
L20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging MovementsL20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging MovementsHossam Shafiq I
 
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...Hossam Shafiq I
 
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council PresentationCity Brandon
 
MBTA Green Line Positive Train Control Project
MBTA Green Line Positive Train Control ProjectMBTA Green Line Positive Train Control Project
MBTA Green Line Positive Train Control ProjectMarc Ebuña
 
Traffic signal design (1)
Traffic signal design (1)Traffic signal design (1)
Traffic signal design (1)Syed Ali
 
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...Hossam Shafiq I
 

What's hot (14)

2004 Paving Conference CTTCP
2004 Paving Conference CTTCP2004 Paving Conference CTTCP
2004 Paving Conference CTTCP
 
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...
06 Volume Studies and Characteristics (Traffic Engineering هندسة المرور & Pro...
 
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
 
Sr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liuSr710 cost benefit analysis comments 7 7 15 liu
Sr710 cost benefit analysis comments 7 7 15 liu
 
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and EmissionsTraffic Signal Re-timing Studies to Reduce Congestion and Emissions
Traffic Signal Re-timing Studies to Reduce Congestion and Emissions
 
RTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical DataRTE Roundabout Analysis - Technical Data
RTE Roundabout Analysis - Technical Data
 
L20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging MovementsL20 Weaving Merging and Diverging Movements
L20 Weaving Merging and Diverging Movements
 
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
8 capacity-analysis ( Transportation and Traffic Engineering Dr. Sheriff El-B...
 
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
 
Brandon Signals Council Presentation
Brandon Signals Council PresentationBrandon Signals Council Presentation
Brandon Signals Council Presentation
 
MBTA Green Line Positive Train Control Project
MBTA Green Line Positive Train Control ProjectMBTA Green Line Positive Train Control Project
MBTA Green Line Positive Train Control Project
 
Traffic signal design (1)
Traffic signal design (1)Traffic signal design (1)
Traffic signal design (1)
 
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
10 Capacity and LOS Analysis for Freeway (Traffic Engineering هندسة المرور & ...
 
SSRP 2
SSRP 2SSRP 2
SSRP 2
 

Similar to 2016 11-03 ta bod highway-101-92 interchange

March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshoppublicinvolvement
 
Benefit-Cost Analysis of Florida High-Friction Surface Treatments
Benefit-Cost Analysis of Florida High-Friction Surface TreatmentsBenefit-Cost Analysis of Florida High-Friction Surface Treatments
Benefit-Cost Analysis of Florida High-Friction Surface TreatmentsTexas A&M Transportation Institute
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateAdina Levin
 
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility Study
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility StudyKadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility Study
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility StudyJeffrey Riegle
 
Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08bucknam
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finNathan Baker
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04HartTWI
 
Final Newea 9 09 10 Mh Rehab
Final Newea 9 09 10 Mh RehabFinal Newea 9 09 10 Mh Rehab
Final Newea 9 09 10 Mh Rehabmfrench62
 
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxMULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxPanagiotaAmmanatidou
 
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...SPREP
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectMichael R. Barr
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTTrailnet
 
LTCP meeting 03-02-05
LTCP meeting 03-02-05LTCP meeting 03-02-05
LTCP meeting 03-02-05HartTWI
 
CALSTART Presentation - VanAmburg (HDV Emissions)
CALSTART Presentation - VanAmburg (HDV Emissions)CALSTART Presentation - VanAmburg (HDV Emissions)
CALSTART Presentation - VanAmburg (HDV Emissions)CALSTART
 
Implementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction ProgramImplementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction Programheilmann
 
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...Harry Black
 

Similar to 2016 11-03 ta bod highway-101-92 interchange (20)

March 9, 2011 City Council Workshop
March 9, 2011 City Council WorkshopMarch 9, 2011 City Council Workshop
March 9, 2011 City Council Workshop
 
Benefit-Cost Analysis of Florida High-Friction Surface Treatments
Benefit-Cost Analysis of Florida High-Friction Surface TreatmentsBenefit-Cost Analysis of Florida High-Friction Surface Treatments
Benefit-Cost Analysis of Florida High-Friction Surface Treatments
 
Nov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule UpdateNov 14 - Caltrain Modernization Cost and Schedule Update
Nov 14 - Caltrain Modernization Cost and Schedule Update
 
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility Study
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility StudyKadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility Study
Kadena USAF Air Base, Okinawa, Japan; Waste To Energy Feasibility Study
 
Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08Pavement 101 Presentation 10 17 08
Pavement 101 Presentation 10 17 08
 
Code Blue Implementation
Code Blue ImplementationCode Blue Implementation
Code Blue Implementation
 
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_finForum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
Forum presentation #4 innovative signal control at mlk cve5022 c-5110c_fin
 
CPAC Meeting 10-25-04
CPAC Meeting 10-25-04CPAC Meeting 10-25-04
CPAC Meeting 10-25-04
 
Final Newea 9 09 10 Mh Rehab
Final Newea 9 09 10 Mh RehabFinal Newea 9 09 10 Mh Rehab
Final Newea 9 09 10 Mh Rehab
 
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptxMULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
MULTICRITERIA ANALYSIS SELECTION ROUNDABOUT VS SIGNALISED JUNCTION.pptx
 
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
Incorporating Cost‐Benefit Analysis into AF project proposals: Example applic...
 
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) ProjectCrumb Rubber Life Cycle Cost Assessment (LCCA) Project
Crumb Rubber Life Cycle Cost Assessment (LCCA) Project
 
Building a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRTBuilding a Better Metro: Possibilities for BRT
Building a Better Metro: Possibilities for BRT
 
LTCP meeting 03-02-05
LTCP meeting 03-02-05LTCP meeting 03-02-05
LTCP meeting 03-02-05
 
CALSTART Presentation - VanAmburg (HDV Emissions)
CALSTART Presentation - VanAmburg (HDV Emissions)CALSTART Presentation - VanAmburg (HDV Emissions)
CALSTART Presentation - VanAmburg (HDV Emissions)
 
Implementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction ProgramImplementing Contract Manager On A Large Scale Construction Program
Implementing Contract Manager On A Large Scale Construction Program
 
Public Workshop #3
Public Workshop #3Public Workshop #3
Public Workshop #3
 
Public Workshop #3
Public Workshop #3Public Workshop #3
Public Workshop #3
 
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...
City of Cincinnati Capital Acceleration Plan Presentation 012716 final [compa...
 
T16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouseT16 addressing pavement assest management-galehouse
T16 addressing pavement assest management-galehouse
 

More from Adina Levin

Project Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfProject Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfAdina Levin
 
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdfSPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdfAdina Levin
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfAdina Levin
 
Southeast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain StationsSoutheast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain StationsAdina Levin
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governanceAdina Levin
 
SF resolution Caltrain sales tax
SF resolution Caltrain sales taxSF resolution Caltrain sales tax
SF resolution Caltrain sales taxAdina Levin
 
Senator Hill letter SB797 Caltrain
Senator Hill letter SB797 CaltrainSenator Hill letter SB797 Caltrain
Senator Hill letter SB797 CaltrainAdina Levin
 
Caltrain tax legal opinion
Caltrain tax legal opinionCaltrain tax legal opinion
Caltrain tax legal opinionAdina Levin
 
West Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measureWest Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measureAdina Levin
 
Caltrain_Equity_522
Caltrain_Equity_522Caltrain_Equity_522
Caltrain_Equity_522Adina Levin
 
San Jose Transit first policy nomination
San Jose Transit first policy nominationSan Jose Transit first policy nomination
San Jose Transit first policy nominationAdina Levin
 
More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20Adina Levin
 
More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20Adina Levin
 
More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20Adina Levin
 
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)Adina Levin
 
Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)Adina Levin
 
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
High speed rail eir preferred alternative   sf-sj - fo c (1) (1)High speed rail eir preferred alternative   sf-sj - fo c (1) (1)
High speed rail eir preferred alternative sf-sj - fo c (1) (1)Adina Levin
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay Adina Levin
 
San Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance ResolutionSan Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance ResolutionAdina Levin
 
Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18Adina Levin
 

More from Adina Levin (20)

Project Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdfProject Delivery Workshop # 2 Slides.pdf
Project Delivery Workshop # 2 Slides.pdf
 
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdfSPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
SPUR + TransbayCoalition-Project Delivery Workshop 1 08.31.22.pdf
 
megaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdfmegaprojects, SPUR 2022.pdf
megaprojects, SPUR 2022.pdf
 
Southeast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain StationsSoutheast San Francisco New Caltrain Stations
Southeast San Francisco New Caltrain Stations
 
Regional options for caltrain governance
Regional options for caltrain governanceRegional options for caltrain governance
Regional options for caltrain governance
 
SF resolution Caltrain sales tax
SF resolution Caltrain sales taxSF resolution Caltrain sales tax
SF resolution Caltrain sales tax
 
Senator Hill letter SB797 Caltrain
Senator Hill letter SB797 CaltrainSenator Hill letter SB797 Caltrain
Senator Hill letter SB797 Caltrain
 
Caltrain tax legal opinion
Caltrain tax legal opinionCaltrain tax legal opinion
Caltrain tax legal opinion
 
West Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measureWest Bay Legislators support Caltrain ballot measure
West Bay Legislators support Caltrain ballot measure
 
Caltrain_Equity_522
Caltrain_Equity_522Caltrain_Equity_522
Caltrain_Equity_522
 
San Jose Transit first policy nomination
San Jose Transit first policy nominationSan Jose Transit first policy nomination
San Jose Transit first policy nomination
 
More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20More Homes Less Driving TransForm 2-6-20
More Homes Less Driving TransForm 2-6-20
 
More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20More Homes Less Driving Sares Regis 2-6-20
More Homes Less Driving Sares Regis 2-6-20
 
More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20More Homes Less Driving First Community Housing 2-6-20
More Homes Less Driving First Community Housing 2-6-20
 
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
Fj pa-friendsof caltrain-levin-responseltr-10-09-2019 (1) (1)
 
Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)Caltrain 20190822 (1) (1)
Caltrain 20190822 (1) (1)
 
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
High speed rail eir preferred alternative   sf-sj - fo c (1) (1)High speed rail eir preferred alternative   sf-sj - fo c (1) (1)
High speed rail eir preferred alternative sf-sj - fo c (1) (1)
 
Dumbarton Crossbay
Dumbarton Crossbay Dumbarton Crossbay
Dumbarton Crossbay
 
San Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance ResolutionSan Francisco Board of Supervisors Caltrain Governance Resolution
San Francisco Board of Supervisors Caltrain Governance Resolution
 
Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18Connecting Communities Optimizing Highways Event April 18
Connecting Communities Optimizing Highways Event April 18
 

Recently uploaded

call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...saminamagar
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfCharlynTorres1
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfAmir Saranga
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdfilocosnortegovph
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...yalehistoricalreview
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证mbetknu
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Sonam Pathan
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Christina Parmionova
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...narwatsonia7
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25JSchaus & Associates
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26JSchaus & Associates
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...narwatsonia7
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️saminamagar
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILChristina Parmionova
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxLizelle Coombs
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...Christina Parmionova
 

Recently uploaded (20)

Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Palam Vihar🔝 9953056974 🔝 escort Service
 
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
call girls in West Patel Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service ...
 
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Tilak Nagar DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdfMonastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
Monastic-Supremacy-in-the-Philippines-_20240328_092725_0000.pdf
 
Yellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdfYellow is My Favorite Color By Annabelle.pdf
Yellow is My Favorite Color By Annabelle.pdf
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf2023 Ecological Profile of Ilocos Norte.pdf
2023 Ecological Profile of Ilocos Norte.pdf
 
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...Jewish Efforts to Influence American Immigration Policy in the Years Before t...
Jewish Efforts to Influence American Immigration Policy in the Years Before t...
 
(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证(多少钱)Dal毕业证国外本科学位证
(多少钱)Dal毕业证国外本科学位证
 
Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170Call Girls Near Surya International Hotel New Delhi 9873777170
Call Girls Near Surya International Hotel New Delhi 9873777170
 
Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.Action Toolkit - Earth Day 2024 - April 22nd.
Action Toolkit - Earth Day 2024 - April 22nd.
 
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vasant Kunj DELHI 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
Russian Call Girl Hebbagodi ! 7001305949 ₹2999 Only and Free Hotel Delivery 2...
 
2024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 252024: The FAR, Federal Acquisition Regulations - Part 25
2024: The FAR, Federal Acquisition Regulations - Part 25
 
2024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 262024: The FAR, Federal Acquisition Regulations - Part 26
2024: The FAR, Federal Acquisition Regulations - Part 26
 
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
Premium Call Girls Btm Layout - 7001305949 Escorts Service with Real Photos a...
 
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️call girls in sector 22 Gurgaon  🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
call girls in sector 22 Gurgaon 🔝 >༒9540349809 🔝 genuine Escort Service 🔝✔️✔️
 
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRILPanet vs.Plastics - Earth Day 2024 - 22 APRIL
Panet vs.Plastics - Earth Day 2024 - 22 APRIL
 
Angels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptxAngels_EDProgrammes & Services 2024.pptx
Angels_EDProgrammes & Services 2024.pptx
 
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
High-Level Thematic Event on Tourism - SUSTAINABILITY WEEK 2024- United Natio...
 

2016 11-03 ta bod highway-101-92 interchange

  • 1. 1 TA CAC Meeting November 3, 2016 Item # 11a US 101 / 92 Interchange Presentation Outline • Preliminary Planning Study (PPS) Overview • Previous Studies, Existing Conditions and P&N • Alternatives Development and Overview • Recommendations • Next Steps 2
  • 2. 2 Preliminary Planning Study (PPS) Overview • SMCTA (Funding & Implementer) & C/CAG (Sponsor) joint effort with input from Caltrans, City of San Mateo, City of Foster City, and consultant • Assess traffic deficiencies, develop project Purpose and Need • Develop alternatives with stakeholders; evaluate costs, impacts and benefits • Recommend Short- and Long Term projects to move forward into the Caltrans Project Initiation Document (PID) Phase 3 Previous Studies SR 92 PSR-PDS (2001) SR92/SR82 PR (2014) US101/SR92 Area Study (2013) US101 HOV PSR-PDS (2015) 4
  • 3. 3 92/82 I/C Reconfiguration x x 5 AM QUEUES – EXISTING AND 2040 NO-BUILD PM QUEUES – EXISTING AND 2040 NO-BUILD 6
  • 4. 4 AM QUEUES – EXISTING AND 2040 NO-BUILD PM QUEUES – EXISTING AND 2040 NO-BUILD 7 AM QUEUES – EXISTING AND 2040 NO-BUILD PM QUEUES – EXISTING AND 2040 NO-BUILD 8
  • 5. 5 PURPOSE Improve traffic flow and safety, and increase mobility through the 101/92 Interchange area by minimizing traffic conflict locations and improving peak-period travel times within project limits along 101 and 92 NEED Overall substantial delay and congestion at the 101/92 Interchange Project Purpose and Need 9 101/92 Deficiencies
  • 6. 6 101/92 Deficiencies - N/B 101 101/92 Deficiencies - S/B 101
  • 7. 7 101/92 Deficiencies - W/B 92 101/92 Deficiencies - E/B 92
  • 8. 8 101/92 Deficiencies Alternatives Development • Evaluated seven Short Term and twenty-one Long Term alternatives • Brain-storming session with Cities of San Mateo and Foster City, C/CAG and SMCTA • Shortlisted nine basic alternatives • Presented to Caltrans • Revised alternatives based on Caltrans comments. Cost estimates, impact evaluations, design exceptions and traffic operations benefits incorporated into final PPS June 2016. 16
  • 9. 9 Naming Convention for Alternatives Short Term Alternatives: A • Projects that can be implemented more quickly through streamlined Permit Engineering Evaluation Report (PEER) Caltrans Process • Projects with relatively low total cost (<$10M) Long Term Alternatives: X, Y, Z • Projects that require full Caltrans Oversight Process (Planning, Environmental, Design) and take longer to implement • Projects with relatively high total cost (>$10M) • Projects that provide more traffic and safety improvements 17 Alternatives at 101/92 Interchange 18
  • 10. 10 Alternative Ratings From Agencies: 19 Alternatives Ratings Not Likely to Support Neutral Very Likely to Support ALTERNATIVE 1 2 3 4 5 1X 1Y 2X 3A 3B 3X 4A 4X 4XY 4Y 4Y-1, 4Y-2 4Z 5X 5Y 6A 6X 7A 8A 8X 8Y 8Z 8ZX 8ZX Ramp Options 1 & 2 9A 9X 9Y A and B = Short Term Alternatives X,Y and Z = Long Term Alternatives C/CAG Foster City City of San Mateo Short Term Alternative 7A: WB 92 to SB 101 Loop Ramp Connector ML Addition $7M 20 SHORT TERM ALTERNATIVE 7A: Proposes an additional ML preferential lane to compliment the existing mixed-flow lane. The connector traffic will be ramp metered before entering SM US 101.
  • 11. 11 Short Term Alternative 8A: EB 92 Merge Reconfiguration and Lane Add $3.5M 21 $52M 22 Long Term Alternative 1X: 101 Braided Ramps POTENTIAL ROW IMPACTS POTENTIAL ROW IMPACTS
  • 12. 12 Long Term Alternative 2X: WB 92 to 101 Managed Lane Direct Connectors $93M LONG TERM ALTERNATIVE 2X: The proposed ML connectors from westbound SR 92 to 101 NB and SB would provide direct access to ML lane. New ML Direct Connectors LONG TERM ALTERNATIVE 2X: The proposed ML connectors from west bound SR 92 to US 101 NB and SB would provide direct access to ML lane. 23 POTENTIAL ROW IMPACTS POTENTIAL ROW IMPACTS Long Term Alternative 8X: SB 101 to WB 92 Added Inside Direct Connector $40M 24
  • 13. 13 Long Term Alternative 8ZX: EB 92 Collector Distributor System $154M 25 POTENTIAL ROW IMPACTS POTENTIAL ROW IMPACTS Alternatives Rated on Various Criteria SAFETY Low: No improvement to weave/merge areas; minimal mobility improvement could potentially lower rear-end type of accidents High: Clear safety improvement by eliminating unsafe merges at weave conflict locations ENVIRONMENTAL Low: Minimal impact that could likely be cleared with CE/CE approval Medium: Not CE/CE, but avoids adverse impacts and may qualify for IS/EA approval High: Adverse impacts requiring EIR/EIS approval RIGHT OF WAY Low: May have only temporary construction easement requirements Medium: May require partial right of way acquisitions or sliver takes High: Full right of way acquisitions potentially requiring relocations 26
  • 14. 14 Summary of Alternatives Along 101 Alternative Estimated Total Cost (in millions) Operational Benefit Safety Benefit Impact to Local Traffic Circulation Environmental Impact Right of Way Impact 1X* $52M Improves weaving and operations High Needs further evaluation Medium Medium 1Y $89M Improves weaving and operations (NB only) High Needs further evaluation Medium High 2X* $93M Improves operations for ML users (WB 92 to 101) and operations for 101 Low None Medium to High Medium 3A $3.3M Low operations benefit Low to Medium None Low None 3X* $6.5M Operational benefit (NB only) Low to Medium None Low Low *Recommended alternative 27 Summary of Alternatives Along 92 Alternative Estimated Total Cost (in millions) Operational Benefit Safety Benefit Impact to Local Traffic Circulation Environmental Impact Right of Way Impact 7A* $7M Improves operations for ML users (WB 92 to SB 101 only) Low None Low None 8A* $3.5M Improves weaving and operations High None Low None 8X $40M Improves weaving and operations High None High Low 8Y $58M Low weaving improvement Low None High Medium 8Z* $103M Improves weaving and operations High Needs further evaluation High Medium 8ZX* $154M Improves weaving and operations High Needs further evaluation High High 9A $0.5M Low operations benefit Low Needs further evaluation Low None 9Y* $47M Improves weaving and operations High Needs further evaluation High Medium *Recommended alternative 28
  • 15. 15 Recommended Alternatives and Packages Short Term: Alternatives 3A, 7A, 8A and 9A ($14M) Long Term Reduced Package: 1X, 3X, 8X, 9Y ($146M) Long Term Alternate Package: 1Y, 3X, 8Z and 9Y ($246M) Long Term Primary Package: 1X, 2X, 3X, 8ZX and 9Y ($353M) 29 • Project sponsor(s) to determine which alternatives to advance using stakeholder input, regional goals and anticipated funding ranges • Sponsor to pursue Measure A or other source to fund effort • Engage Caltrans with Pre-PID meeting to discuss project Purpose & Need and project development path • Prepare PEER, PID and PR or PID as appropriate to program funding; gain project approval Next Steps 30
  • 16. 16