 Introduction
Coal Handling
Boiler & Auxillary
 Turbine System
 Ash Handling
 Off- site

CONTENTS
NTPC OPERATION &MAINTENANCE
Boiler Maintenance Department
Turbine Maintenance Department
Ash Handling Departament
Off-site Maintenance Departament
INTRODUCTION

India’s largest power company ,NTPC was set up in 1975 to accelerate
power development in india.NTPC is emerging as a diversified power
major with presence in the entire value chain of the power generation
,which is the mainstary of the company ,NTPC has already ventured into
consultancy.power trading,Ash utilisation and coal mining
kahalgaon super thermal power station (khstpp) is located in kahalgaon in
Bhagalpur district of bihar.The power plant is one of the coal based power
plant of NTPC.
CAPACITY :- The Total installed capacity of the plant is 2340 mw.
NTPC, Kshpp Project
 Location : Kahalgaon ,Dist-Bhagalpur(Bihar),813214
 Total Land : 3,360 acres
 Land for plant : 883 acres
 Land for township : 432 acres
 Land for Ash dyke :1395 acres

 Configuration : stage -1 (4*210 MW)

: stage -2: phase 1 (2*500 MW)
: Phase 2 (1*500 MW)
 Sourse of coal : Rajmahal coal field of ECL
 Fuel Requirement : 4.1 million ton per year stage -1
: 6.62 million ton per year for stage -2
: 3 million ton per year for stage -2
 Sourse of water : Ganga River
NTPC

 Make of water Requirement : 7500 m3/hr (stage-1)

: 6000 m3/hr (stage-2)
 Cooling water system : closed cycles induced Draft cooling
tower
 Approved capacity : stage 1. 840 mw + stage 2. 500 mw
 Commersilation :unit 1.-(210 mw) march ,1992
: unit 2.- (210 mw) march, 1994
: unit 3.- (210 mw) march ,1995
: unit 4.- (210 mw) march , 1996
:unit 5.-(500 mw) march ,2007
:unit 6.- (500 mw) march ,2008
: unit 7- (500 mw) june, 2009
NTPC

LAYOUT OF POWER PLANT :-
Coal Handling System Equipment
 Wagon Trippler
 Conveyor Belt

 Pulleys
 Take Ups
 Skirt Board

 Scrappers
 Magnetic seprator
 Vibrating screen
 Crushers
CRUSHERS
To crush the coal from 200mmto 20mm size received
from vibrating screen
Crusher hammer are made of MAGNEESE STEEL .
Hammer row -4(stage 1)
(a)Row-1 & 2 =18 hammer each
(b)Row-3&4=20 hammers each

1 December 2013

No of hammer in each Crusher•stage-1 = 76 hammers
•stage-2 = 92 hammers
•Weight of each hammer=18.5kg
•Crushing motor rating -740kw/3.3kv
•Life of hammer =4 lac MT of coal
•Normal capacity=600 tons/hr
PMI Revision 00

9
CONVEYOR BELTS
Made of diff. Layers or piles of fabric duck with rubber
protected by a rubber cover on both sides & edges.
Fabric duck are designed to withstand tension created in
carrying the load .
Nylon rubber cover protect the fabric duck.
Material =fire resistant grade.
Belt Width=1600 mm.
Strength= 1000/1250 kN.
Belt speed=3.2-3 m/s.
Belt length=20km.

1 December 2013

PMI Revision 00

10
PULLEYS

 NTPC

•Made of mild steel.

• Rubber coating is used to increase friction
• factor between belt & pulley (rubber lagging

•Shell dia-500mm.
•Shaft dia-1400mm.
•Pulley length-1800mm.
•Shaft length-2350mm(bearing centre to
centre)
1 December 2013

PMI Revision 00

11
DRIVE UNIT



NTPC

Motors coupled to reduction gear with the help
of flexible/fluid coupling on the high speed shaft of the
Gear box
Flexible coupling on the input side

TAKE UPS
Take up pulley to facilitates –
Necessary tension for the drive to operate the belt
Sag at a point where requires horse power will be
at a minimum and load will move with least
disturbance over idlers
1 December 2013

PMI Revision 00

12


NTPC

SKIRT BOARD
Used with chutes at trail end.
Guides material centrally on the belt while loading
until it has settle down on the belt

SCRAPPERS
Placed at discharge pulley in order to clean the
carrying side of belt.
It avoids the wear of return idlers due to build up
material.

1 December 2013

PMI Revision 00

13
BOILER MAINTENANACE DEPARTMENT
 BOILER: Steam generating device for specific purpose.
 Capable to meet variation in load demand.
 Capable of generating steam in a range of operating pressure and temperature.
 For utility purpose ,it should generate steam uninterrupediy at operating

pressure and temperature for running steam turbine.
 BOILER/STEAM GENERATOR : Raw material for design of boiler
 1.coal frommines 0 Generating heat energy
 2. Ambient air 0 Air for combustion
 3. Water from natutal resources (river ,ponds ) 0 Working fluid for steam
generation possessing heat energy


 A 500 MW steam generator consumers about 8000 tonnes of coal every day.
 It will be considered if it requires about 200 cubic meter of D M water in a day

.
 It will produce about 9500 tonnes of carbon di- oxide evert day.
BOILER AUXILARIES
There are three part of Boiler :1.Milling system
2.Rotatory part
3.pressure part
 1.MILLING SYSTEM: Coal Bunker:- These are in process storage silos used for storing crushed coal
from the coal handling system .generally,these are made of welded steel plates
normally these are six such bunker supplying coal of the corresponding mills
.Those are located on top of the mill so as aid in gravity feeding of coal.
 Coal feeder:- Each mill is provided with a drag link chain/rotary /gravametic
feeder to transport raw coal from the bunker to the inlet chute leading to mill at
desired rate .
 MILLS:- These are six mill (25persent capacity each) for every 200mw unit
,located adjacent to the furnace at (o) m level .There mills pulverise coal to be
desired fineness to be feed to the furnace for combustion.

It is used to crush the coal into powder form (80 micron).These are 10
mills for the 500mw unit ,located adjacent to the furnace at o level .These mills
pulverised coal to the desined fineness to be fed to the furnace for combustion.
CLASSIFICATION OF MILLS
VERTICAL SPINDLE
BOWL/
BALL & RACE
XRP
(BHEL)

TUBE
PRESSURIZED

E MILLS
(BABCOCK)

MPS
BALL MILL ANIMATION
NTPC

2.ROTATORY PART : P A Fan : The primary air fan (2 per unit -50 percent capacity

each ) are designed for handling atmospheric air upto a
temperature of 50 deg c .These fan are located at (0) m level
near the boiler .
 F.D Fan :- The forced draft fans (2 per unit -50 percent
capacity each) are designed for handling secondary air for the
boiler .These fan are located at “o “ m level near the P A fan.
 I D Fan:- There are two indused Draft fans per boiler located
between the electrostatic precipitator and the chimney .
These fans are used for sucking flue gas from furnace
TURBINE MAINTENANCE DEPARTMENT (TMD)
 TURBINE :- A steam turbine is a rotating device which converts thermal

energy into mechanical energy.

 OPERATING PRINCIPLE :- A steam turbine has two main part -1) cylinder

(stater) and the rotor . The cylinder or rotor is a steel or cast iron housing
usually divided at the horizontal centre line.its havies are bolted together for
easy access .The cylinder contains fixed blade carred by rotor .each fixed
biade set is mounted in diphram located in front of each disc on the rotor or
directly in the casing . A disc and diphram pair a turbine stage.steam turbine
can have many stage the rotor is a rotating shaft carries the moving blades .on
the outer edges of either disc or drum . The blade rotate as the rotor revolves
.The rotor of a large steam turbine consists of high intermediate ,low pressure
turbine section .
In a multiple stage ,steam at the high pressure and
high temperature enter s the first row of fixed blades or nozzle through an
inlet value .As the steam passes through the fixed blades or nozzles it expands
and its velocity increases the high velocity jet of steam strkes the first set of
moving blades.
2

1
HPT

3
IP
T

4

5

6

7

LPT
GENERATOR
EXCITER

THREE STAGE TURBINE :
• HIGH PRESSURE TURBINE (HPT)
• INTERMEDIATE PRESSURE TURBINE (IPT)
• LOW PRESSURE TURBINE (LPT)
SEVEN NOS JOURNAL BEARINGS
BEARING N0. 2 THRUST CUM JOURNAL BEARING
FOUR NOS RIGID COUPLINGS BETWEEN
• HP-IP TURBINE
• IP-LP TURBINE
• LP-GENERATOR
•GENERATOR - EXCITER

CONDENSER
 SINGLE STEAM FLOW OF TWO SHELL (CASING) DESIGN
 OUTER CASING IS OF BARREL TYPE AND HAS NEITHER ON AXIAL OR RADIAL FLANGE.
DUE TO THE PERFECT SYMMETRIC DESIGN OF THE OUTER CASING AND UNIFORM WALL
THICKNESS AT ALL SECTIONS, PREVENTS MASS CONCENTRATIONS WHICH WOULD CAUSED
HIHG THERMAL STRESSES AND REMAINS LEAK PROOF DURING QUICK CHANGES IN
TEMPERATURE DURING START UP AND SHUT DOWN.
 THE INNER CASING IS AXIALLY SPLIT IS ALMOST CYLINDRICAL IN SHAPE AS THE JOINTS
FLANGES ARE RELIEVED BY HIGHER PRESSURE ACTING FROM THE OUT SIDE.
 CASING IS MADE OF CREEP RESISTING CHROMIUM-MOLYBDENUM-VANADUIUM (Cr-Mo-V)
STEEL CASTING.
 THE TURBINE HAS 2 MAIN STOP VALVES (ESV) AND 2 CONTROL VALVES (CV)LOCATED
SYMMETRICALLY TO THE RIGHT AND LEFT OF THE CASING. THE VALVES ARE ARRANGED IN
PAIRS WITH ONE STOP VALVE AND ONE CONTROL VALVE IN A COMMON BODY. EACH ESV
AND CV HAS A DEDICATED HYDRAULIC SERVOMOTOR.
 THE STEAM LINES FROM ESV & CV ARE CONNECTED TO THE INLET CONNECTIONS OF
THE OUTER CASING BY BREECH NUTS.
 THE EXHAUST END OF HPT HAS A SINGLE OUT LET CONNECTION FROM BOTTOM.
• THE IP TURBINE IS OF DOUBLE FLOW CONSTRUCTION WITH TWO NOS
HORIZONTALLY SPLIT CASINGS ( INNER & OUTER CASING).
• THE HOT REHEATED (HRH) STEAM INTERS THE INNER CASING AT THE
MID SECTION FROM TOP AND BOTTOM AND EXPENDS IN OPPOSITE SIDE
IN TWO BLADE SECTIONS AND COMPENSATE AXIAL THRUST.
• THE INNER CASING CARRIES THE STATIONARY BLADING.
• THE IP STOP AND CONTROL VALVES 2 NOS ARE SUPPORTED ON THE
FOUNDATION COVER PLATE BELOW EL 17.00 M FLOOR IN FRONT OF
TURBINE –GEN UNIT.

• CASING IS MADE OF CREEP RESISTING CHROMIUM-MOLYBDENUMVANADUIUM (Cr-Mo-V) STEEL CASTING.
• THE SHAFT IS MADE OF HIGH CREEP RESISTANCE Cr-Mo-V STEEL
FORGING.
• LP TURBINE CASING CONSISTS OF DOUBLE FLOW UNIT AND HAS A TRIPLE SHELL
WELDED CASING.
• THE OUTER CASING CONSISTS OF FRONT AND REAR WALLS, TWO LATERAL
LONGITUDINAL SUPPORT BEAMS AND THE UPPER DOME AND CONNECTED TO
CONDENSER BY WELDING.
• THE INNER-INNER & INNER-OUTER CASING CARRIES THE TURBINE GUIDE
BLADES AND DIFFUSER.
• STEAM ADMITTED TO THE LP TURBINE INNER CASING FROM IP TURBINE FROM
BOTH LEFT AND RIGHT SIDE HORIZONTALLY. EXPANSION JOINTS ARE INSTALLED
IN THE STEAM PIPING TO PREVENT ANY UNDESIRABLE DEFORMATION OF THE
CASINGS DUE TO THERMAL EXPANSION OF THE STEAM PIPING.
HP TURBINE MOVING AND STATIONARY BLADES :
•
•
1.
2.
3.
•

•

•

HP TURBINE BLADING CONSISTS OF 17 REACTION STAGES WITH 50 %
REACTION.
BLADES ARE HAVING THREE MAIN PARTS :
AEROFOIL : IT IS THE WORKING PART OF THE BLADE WHERE STEAM
EXPANSION TAKES PLACE.
ROOT : TI IS THE PORTION OF THE BLADE WHICH IS HELD WITH ROTOR OR
CASING
SHROUDS : END PORTION OF BLADES ARE HELD TOGETHER
THE STATIONARY AND MOVING BLADES OF ALL STAGES ARE PROVIDED WITH
INVERTED T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH INTEGRAL
SHROUDS WHICH AFTER INSTALLATION FORM A CONTINUOUS SHROUD.
THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE
CORRESPONDING GROOVES IN THE SHAFT AND INNER CASING. THE
INSERTION SLOT IN THE SHAFT IS CLOSED BY A LOCKING BLADE WHICH IS
FIXED BY GRUB SCREWS.
SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO
REDUCE LEAKAGES LOSSES AT THE BLADE TIPS.
IP TURBINE MOVING AND STATIONARY BLADES :
• IP TURBINE BLADING CONSISTS OF 12 REACTION STAGES PER FLOW WITH 50 %

REACTION.

• THE STATIONARY AND MOVING BLADES OF ALL STAGES ARE PROVIDED WITH INVERTED
T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH INTEGRAL SHROUDS WHICH AFTER
INSTALLATION FORM A CONTINUOUS SHROUD.
• THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE CORRESPONDING
GROOVES IN THE SHAFT AND INNER CASING. THE INSERTION SLOT IN THE SHAFT IS
CLOSED BY A LOCKING BLADE WHICH IS FIXED BY GRUB SCREWS.
• SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO REDUCE
LEAKAGES LOSSES AT THE BLADE TIPS.
LP TURBINE MOVING AND STATIONARY BLADES (FIRST 3
STAGES) :
• LP TURBINE BLADING CONSISTS OF 6 REACTION STAGES PER FLOW WITH 50

% REACTION.

• THE STATIONARY AND MOVING BLADES OF FIRST THREE STAGES ARE
PROVIDED WITH INVERTED T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH
INTEGRAL SHROUDS WHICH AFTER INSTALLATION FORM A CONTINUOUS
SHROUD. FIRST THREE GUIDE BLADES ARE MOUNTED ON INNER-INNER CASING.
• THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE
CORRESPONDING GROOVES IN THE SHAFT AND INNER CASING. THE INSERTION
SLOT IN THE SHAFT IS CLOSED BY A LOCKING BLADE WHICH IS FIXED BY GRUB
SCREWS.
• SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO
REDUCE LEAKAGES LOSSES AT THE BLADE TIPS.
CONDENSER IS A SURFACE TYPE CONDENSER WITH TWO PASS ARRANGEMENT. COOLING
WATER IS PUMPED INTO EACH OF CONDENSER PASS BY VERTICAL CW PUMPS THROUGH THE
INLET PIPE. WATER ENTERS THE INLET CHAMBER OF FRONT WATER BOX AT THE BOTTOM
PASSES HORIZONTALLY THROUGH THE TITANIUM TUBES TO THE WATER BOX AT THE OTHER
END, TAKES A TURN PASSES THROUGH THE UPPER CLUSTER OF THE TUBES AND REACHES
THE OUT LET CHAMBER AT THE TOP IN THE FRONT WATER BOX AND LEAVES THE
CONDENSER THROUGH OUTLET PIPE.
STEAM EXHAUSTED FROM THE LP TURBINE WASHING THE OUTSIDE OF THE
CONDENSER TUBES LOSSES ITS LATENT HEAT TO THE COOLING WATER AND CONVERTED
INTO WATER IN THE STEAM SIDE OF THE CONDENSER. THIS CONDENSATE COLLECTS IN THE
HOT WELL, WELDED TO THE BOTTOM OF THE CONDENSER.

CONDENSER DESIGN DATA :
• COOLING WATER FLOW : 54300 M3/Hr.
• COOLING WATER SURFACE AREA : 35603 M2
• NO. OF COOLING TUBES : 24398 NOS ( CONDENSING ZONE:22688 NOS AND AIR COOLING
ZONE :1710 NOS)
•TUBE MATERIAL : TITANIUM SB-338 GRADE-II
• MAIN TUBE PLATE : MS WITH TITANIUM CLADED.
• WATER BOX : MS WITH FRE LINING ( GLASS FIBRE REINFORCED EPOXY LINING) OF 3MM
THICKNESS.
ASH HANDLING DEPARTMENT
WHAT IS ASH ?
Ash is the residue remaining after the coal has been
incinerated to constant weight under standard
conditions.
Ash is oxidised form of the mineral matters present in
coal.
Typical ash composition : SiO2, Al2O3, Fe2O3, CaO,
MgO etc.
Coal with more SiO2 & Al2O3, Ash MP > 1400ºC
Coal with more Fe2O3, CaO & MgO, Ash MP < 1100ºC
28
WHY ASH HANDLING?
Ash

content of Indian coal used in power station is
about 30 to 40 %.
A typical 2000 MW station produce around 9000T to
12000T of ash per day.
This huge amount of ash needs to be disposed off
continuously.
Necessary care to be taken for preventing pollution
Ash

Handling system takes care the above requirement

29
Fly Ash Handling System
FA is

collected from Air heater hopper, Eco hopper and
ESP hopper.
Either through flushing apparatus or hydrobactur system.
In Flushing apparatus system ash is allowed to fall in
flushing apparatus under gravitation.
Water jet in flushing apparatus carries away the ash to FA
trench
High pressure jets further carries it to FA sump.
Series pumping carries the ash slurry to FA pond.

1 December 2013

PMI Revision 00

30
Bottom ash Handling System
BA can

be collected at furnace bottom as Wet or Dry form.
Wet bottom ash system consists of i)Trough seal, ii)BA
gate, iii)Hopper, iv)Scrapper Conveyer, v)Clinker grinder,
vi)BA trench, vii)BA tank, viii)BA pump, ix)BA pond.
Dry BA consists of i)Trough seal, ii)BA gate, iii)Hopper,
iv)Scrapper Conveyer, v)Clinker grinder, vi)Silo.
Trough seal : A channel around the furnace bottom
filled with water where the furnace bottom end is
immersed in water. This is to prevent air ingression in the
boiler during operation.

31
Overburden

Surge Pile
Pulverize (-150)

Coal Seam

Electrostatic Precipitator

Boiler

Flue Gas

Flue Gas
Fly Ash
Bottom Ash

Fly Ash

Fly Ash

Bottom
Ash

Smoke
Stack
32
Ash volumes and properties
Furnace

ESP

(1300 - 1500 C)
Economizer

100 %

Stack

10-20 %

1%

Stage C: 3 %

Stage A: 80 %

Bottom Ash Eco Ash

Stage B: 17 %

Air
preheater
APH

Pulverize
d
Coal

Coal

Electrostatic
Precipitator

APH Ash Fly ash

1%

80-90 % Ash

Fineness
33
OFF-SITE DEPARTMENT
 Water Treatment
 Cooling Tower
Why water treatment?
 Raw water contains many dissolved minerals and organic







materials.
At high temperature certain minerals left scaling on the
tube metal of the boiler and cause permanent damage.
Some dissolved minerals leads to corrosion of tube metals.
Some leads to foaming
At high pressure and temperature an element, silica can be
carried away with steam causing damage to turbine low
pressure stage.
A Thermal Power Station needs water of varying quality for
different process and hence the requirement.
The performance and life expectancy of the station greatly
depends on water chemistry compliance.

1 December 2013

PMI Revision 00

36
Type of water treatment
 the type of demineralization process chosen for a power

station depends on three main factors :
 The quality of the raw water.
 The degree of deionisation i.e. treated water quality
 Selectivity of resins.

1 December 2013

PMI Revision 00

37
Steps of treatment process
 Aeration of raw water
 Adding chemicals for bacteria removal
 Adding chemicals for sedimentation of suspended





particles
Flocculation
Filtration
Ion Exchange process
water treatment process is generally made up of two
sections :
 Pretreatment section
 Demineralisation section

1 December 2013

PMI Revision 00

38
Description

Stage-I

Tower Type

Stage-II

Induced Draft
Multi Fill
Counter Flow
Make
M/S Gammon
India
Circulating water flow 30,000
/ tower
M3/hr./tower.
Hot CW inlet temp.
43oC

Induced
Draft Multi Fill
Counter Flow
M/S NPCC
Ltd.
33,000 M3/hr.

Cold CW Out let temp. 33oC

33oC

Range

9oC

10oC

42oC
COOLING FAN
Description

Stage-I

Stage-II

Type

Axial Flow

Axial Flow

No. of fans / tower

16

12

Diameter

24 feet

28 feet

No. of blade

6

7

Blade angle

13o

13o

Fan speed

151 Rpm

118 Rpm

35 KW

56 KW

Absorbed

power
NTPC
Maintenance practices in CT
 Daily walk down monitoring of CT cells
 Cold water basin cleaning
 Algae removal from splash bars
 Tree trimming /pruning at nearby CT area
 Maintaining clean walkway around CT
 Gear box to be run for an hour fortnightly during open

cycle
 Prevention of air ingress at inspection door, transmission
shaft, oil piping, expansion joints etc
 Fabricated nozzle fitting in hot water channel in CT ST # II
NTPC

Weitere ähnliche Inhalte

Was ist angesagt?

Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plantHîmãńshu Mêęńä
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipatpratikguptateddy
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantViren Patel
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantRonak Thakare
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILERanjan kumar
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC RamagunadamAbhinay Angari
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant vishal patel
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON pptRanjan kumar
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)sometech
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharABHINAV KUMAR
 

Was ist angesagt? (20)

Project report of kota super thermal power plant
Project report of kota super thermal power plantProject report of kota super thermal power plant
Project report of kota super thermal power plant
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plant
 
Ntpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILENtpc KAHALGAON REPORT FILE
Ntpc KAHALGAON REPORT FILE
 
Report on Boilers at NTPC Ramagunadam
Report on  Boilers at NTPC RamagunadamReport on  Boilers at NTPC Ramagunadam
Report on Boilers at NTPC Ramagunadam
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Ranjan NTPC KAHALGAON ppt
Ranjan  NTPC KAHALGAON pptRanjan  NTPC KAHALGAON ppt
Ranjan NTPC KAHALGAON ppt
 
Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)Thermal Plant report (Mechanical)
Thermal Plant report (Mechanical)
 
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharAbhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd Unchahar
 

Ähnlich wie ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH

Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Abhijeet Thakur
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal powerShishupal03012015
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawarKeshav Meena
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andalANIL kumar
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORTUday Wankar
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavmukesh yadav
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant pptPrakash Jarotia
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Ppt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationPpt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationajeet singh choudhary
 
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESSTUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESMohammed Sameer
 
presentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptxpresentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptxrajam575648
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-reportAnil Saharan
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPCricha khatri
 
presentation_thermal_power.pptx
presentation_thermal_power.pptxpresentation_thermal_power.pptx
presentation_thermal_power.pptxSumitSingh855565
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.pptAbhishek Awasthi
 

Ähnlich wie ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH (20)

Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT Presentation on THERMAL POWER PLANT
Presentation on THERMAL POWER PLANT
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
 
vocational training at DVC andal
 vocational training at DVC andal vocational training at DVC andal
vocational training at DVC andal
 
CSTPS training REPORT
CSTPS training REPORTCSTPS training REPORT
CSTPS training REPORT
 
suratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadavsuratgarh thermal power station by mk yadav
suratgarh thermal power station by mk yadav
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
kstps training report
kstps training reportkstps training report
kstps training report
 
Kota thermal power plant ppt
Kota thermal power plant pptKota thermal power plant ppt
Kota thermal power plant ppt
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Ppt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power stationPpt of ajeet on suratgarh super thermal power station
Ppt of ajeet on suratgarh super thermal power station
 
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESSTUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
presentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptxpresentation_thermal_power_plant_1447503788_165600.pptx
presentation_thermal_power_plant_1447503788_165600.pptx
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
thermal power plant at NTPC
thermal power plant at NTPCthermal power plant at NTPC
thermal power plant at NTPC
 
Richappt
RichapptRichappt
Richappt
 
presentation_thermal_power.pptx
presentation_thermal_power.pptxpresentation_thermal_power.pptx
presentation_thermal_power.pptx
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 
panki power plant training.ppt
panki power plant training.pptpanki power plant training.ppt
panki power plant training.ppt
 

Kürzlich hochgeladen

Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfAijun Zhang
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Websitedgelyza
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioChristian Posta
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UbiTrack UK
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceMartin Humpolec
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URLRuncy Oommen
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfAnna Loughnan Colquhoun
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAshyamraj55
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6DianaGray10
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdfJamie (Taka) Wang
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding TeamAdam Moalla
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 

Kürzlich hochgeladen (20)

Machine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdfMachine Learning Model Validation (Aijun Zhang 2024).pdf
Machine Learning Model Validation (Aijun Zhang 2024).pdf
 
COMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a WebsiteCOMPUTER 10 Lesson 8 - Building a Website
COMPUTER 10 Lesson 8 - Building a Website
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Comparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and IstioComparing Sidecar-less Service Mesh from Cilium and Istio
Comparing Sidecar-less Service Mesh from Cilium and Istio
 
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
UWB Technology for Enhanced Indoor and Outdoor Positioning in Physiological M...
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your Salesforce
 
Designing A Time bound resource download URL
Designing A Time bound resource download URLDesigning A Time bound resource download URL
Designing A Time bound resource download URL
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdf
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6UiPath Studio Web workshop series - Day 6
UiPath Studio Web workshop series - Day 6
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
 
9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team9 Steps For Building Winning Founding Team
9 Steps For Building Winning Founding Team
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 

ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH

  • 1. A SUMMER TRAINING PRESENTATION 0N NATIONAL THERMAL POWER PLANT KAHALGAON (BIHAR) SUBMITTED TO:Prof. R K Mathur sir Dept. Of mechanical SUBMITTED BY: Akhilesh kumar Roll No-11001184006 B.Tech(Mechanical engg.)
  • 2.  Introduction Coal Handling Boiler & Auxillary  Turbine System  Ash Handling  Off- site CONTENTS
  • 3. NTPC OPERATION &MAINTENANCE Boiler Maintenance Department Turbine Maintenance Department Ash Handling Departament Off-site Maintenance Departament
  • 4. INTRODUCTION India’s largest power company ,NTPC was set up in 1975 to accelerate power development in india.NTPC is emerging as a diversified power major with presence in the entire value chain of the power generation ,which is the mainstary of the company ,NTPC has already ventured into consultancy.power trading,Ash utilisation and coal mining kahalgaon super thermal power station (khstpp) is located in kahalgaon in Bhagalpur district of bihar.The power plant is one of the coal based power plant of NTPC. CAPACITY :- The Total installed capacity of the plant is 2340 mw.
  • 5. NTPC, Kshpp Project  Location : Kahalgaon ,Dist-Bhagalpur(Bihar),813214  Total Land : 3,360 acres  Land for plant : 883 acres  Land for township : 432 acres  Land for Ash dyke :1395 acres  Configuration : stage -1 (4*210 MW) : stage -2: phase 1 (2*500 MW) : Phase 2 (1*500 MW)  Sourse of coal : Rajmahal coal field of ECL  Fuel Requirement : 4.1 million ton per year stage -1 : 6.62 million ton per year for stage -2 : 3 million ton per year for stage -2  Sourse of water : Ganga River
  • 6. NTPC  Make of water Requirement : 7500 m3/hr (stage-1) : 6000 m3/hr (stage-2)  Cooling water system : closed cycles induced Draft cooling tower  Approved capacity : stage 1. 840 mw + stage 2. 500 mw  Commersilation :unit 1.-(210 mw) march ,1992 : unit 2.- (210 mw) march, 1994 : unit 3.- (210 mw) march ,1995 : unit 4.- (210 mw) march , 1996 :unit 5.-(500 mw) march ,2007 :unit 6.- (500 mw) march ,2008 : unit 7- (500 mw) june, 2009
  • 8. Coal Handling System Equipment  Wagon Trippler  Conveyor Belt  Pulleys  Take Ups  Skirt Board  Scrappers  Magnetic seprator  Vibrating screen  Crushers
  • 9. CRUSHERS To crush the coal from 200mmto 20mm size received from vibrating screen Crusher hammer are made of MAGNEESE STEEL . Hammer row -4(stage 1) (a)Row-1 & 2 =18 hammer each (b)Row-3&4=20 hammers each 1 December 2013 No of hammer in each Crusher•stage-1 = 76 hammers •stage-2 = 92 hammers •Weight of each hammer=18.5kg •Crushing motor rating -740kw/3.3kv •Life of hammer =4 lac MT of coal •Normal capacity=600 tons/hr PMI Revision 00 9
  • 10. CONVEYOR BELTS Made of diff. Layers or piles of fabric duck with rubber protected by a rubber cover on both sides & edges. Fabric duck are designed to withstand tension created in carrying the load . Nylon rubber cover protect the fabric duck. Material =fire resistant grade. Belt Width=1600 mm. Strength= 1000/1250 kN. Belt speed=3.2-3 m/s. Belt length=20km. 1 December 2013 PMI Revision 00 10
  • 11. PULLEYS  NTPC •Made of mild steel. • Rubber coating is used to increase friction • factor between belt & pulley (rubber lagging •Shell dia-500mm. •Shaft dia-1400mm. •Pulley length-1800mm. •Shaft length-2350mm(bearing centre to centre) 1 December 2013 PMI Revision 00 11
  • 12. DRIVE UNIT  NTPC Motors coupled to reduction gear with the help of flexible/fluid coupling on the high speed shaft of the Gear box Flexible coupling on the input side TAKE UPS Take up pulley to facilitates – Necessary tension for the drive to operate the belt Sag at a point where requires horse power will be at a minimum and load will move with least disturbance over idlers 1 December 2013 PMI Revision 00 12
  • 13.  NTPC SKIRT BOARD Used with chutes at trail end. Guides material centrally on the belt while loading until it has settle down on the belt SCRAPPERS Placed at discharge pulley in order to clean the carrying side of belt. It avoids the wear of return idlers due to build up material. 1 December 2013 PMI Revision 00 13
  • 14. BOILER MAINTENANACE DEPARTMENT  BOILER: Steam generating device for specific purpose.  Capable to meet variation in load demand.  Capable of generating steam in a range of operating pressure and temperature.  For utility purpose ,it should generate steam uninterrupediy at operating pressure and temperature for running steam turbine.  BOILER/STEAM GENERATOR : Raw material for design of boiler  1.coal frommines 0 Generating heat energy  2. Ambient air 0 Air for combustion  3. Water from natutal resources (river ,ponds ) 0 Working fluid for steam generation possessing heat energy   A 500 MW steam generator consumers about 8000 tonnes of coal every day.  It will be considered if it requires about 200 cubic meter of D M water in a day .  It will produce about 9500 tonnes of carbon di- oxide evert day.
  • 15. BOILER AUXILARIES There are three part of Boiler :1.Milling system 2.Rotatory part 3.pressure part  1.MILLING SYSTEM: Coal Bunker:- These are in process storage silos used for storing crushed coal from the coal handling system .generally,these are made of welded steel plates normally these are six such bunker supplying coal of the corresponding mills .Those are located on top of the mill so as aid in gravity feeding of coal.  Coal feeder:- Each mill is provided with a drag link chain/rotary /gravametic feeder to transport raw coal from the bunker to the inlet chute leading to mill at desired rate .  MILLS:- These are six mill (25persent capacity each) for every 200mw unit ,located adjacent to the furnace at (o) m level .There mills pulverise coal to be desired fineness to be feed to the furnace for combustion.  It is used to crush the coal into powder form (80 micron).These are 10 mills for the 500mw unit ,located adjacent to the furnace at o level .These mills pulverised coal to the desined fineness to be fed to the furnace for combustion.
  • 16. CLASSIFICATION OF MILLS VERTICAL SPINDLE BOWL/ BALL & RACE XRP (BHEL) TUBE PRESSURIZED E MILLS (BABCOCK) MPS
  • 18. NTPC 2.ROTATORY PART : P A Fan : The primary air fan (2 per unit -50 percent capacity each ) are designed for handling atmospheric air upto a temperature of 50 deg c .These fan are located at (0) m level near the boiler .  F.D Fan :- The forced draft fans (2 per unit -50 percent capacity each) are designed for handling secondary air for the boiler .These fan are located at “o “ m level near the P A fan.  I D Fan:- There are two indused Draft fans per boiler located between the electrostatic precipitator and the chimney . These fans are used for sucking flue gas from furnace
  • 19. TURBINE MAINTENANCE DEPARTMENT (TMD)  TURBINE :- A steam turbine is a rotating device which converts thermal energy into mechanical energy.  OPERATING PRINCIPLE :- A steam turbine has two main part -1) cylinder (stater) and the rotor . The cylinder or rotor is a steel or cast iron housing usually divided at the horizontal centre line.its havies are bolted together for easy access .The cylinder contains fixed blade carred by rotor .each fixed biade set is mounted in diphram located in front of each disc on the rotor or directly in the casing . A disc and diphram pair a turbine stage.steam turbine can have many stage the rotor is a rotating shaft carries the moving blades .on the outer edges of either disc or drum . The blade rotate as the rotor revolves .The rotor of a large steam turbine consists of high intermediate ,low pressure turbine section . In a multiple stage ,steam at the high pressure and high temperature enter s the first row of fixed blades or nozzle through an inlet value .As the steam passes through the fixed blades or nozzles it expands and its velocity increases the high velocity jet of steam strkes the first set of moving blades.
  • 20. 2 1 HPT 3 IP T 4 5 6 7 LPT GENERATOR EXCITER THREE STAGE TURBINE : • HIGH PRESSURE TURBINE (HPT) • INTERMEDIATE PRESSURE TURBINE (IPT) • LOW PRESSURE TURBINE (LPT) SEVEN NOS JOURNAL BEARINGS BEARING N0. 2 THRUST CUM JOURNAL BEARING FOUR NOS RIGID COUPLINGS BETWEEN • HP-IP TURBINE • IP-LP TURBINE • LP-GENERATOR •GENERATOR - EXCITER CONDENSER
  • 21.  SINGLE STEAM FLOW OF TWO SHELL (CASING) DESIGN  OUTER CASING IS OF BARREL TYPE AND HAS NEITHER ON AXIAL OR RADIAL FLANGE. DUE TO THE PERFECT SYMMETRIC DESIGN OF THE OUTER CASING AND UNIFORM WALL THICKNESS AT ALL SECTIONS, PREVENTS MASS CONCENTRATIONS WHICH WOULD CAUSED HIHG THERMAL STRESSES AND REMAINS LEAK PROOF DURING QUICK CHANGES IN TEMPERATURE DURING START UP AND SHUT DOWN.  THE INNER CASING IS AXIALLY SPLIT IS ALMOST CYLINDRICAL IN SHAPE AS THE JOINTS FLANGES ARE RELIEVED BY HIGHER PRESSURE ACTING FROM THE OUT SIDE.  CASING IS MADE OF CREEP RESISTING CHROMIUM-MOLYBDENUM-VANADUIUM (Cr-Mo-V) STEEL CASTING.  THE TURBINE HAS 2 MAIN STOP VALVES (ESV) AND 2 CONTROL VALVES (CV)LOCATED SYMMETRICALLY TO THE RIGHT AND LEFT OF THE CASING. THE VALVES ARE ARRANGED IN PAIRS WITH ONE STOP VALVE AND ONE CONTROL VALVE IN A COMMON BODY. EACH ESV AND CV HAS A DEDICATED HYDRAULIC SERVOMOTOR.  THE STEAM LINES FROM ESV & CV ARE CONNECTED TO THE INLET CONNECTIONS OF THE OUTER CASING BY BREECH NUTS.  THE EXHAUST END OF HPT HAS A SINGLE OUT LET CONNECTION FROM BOTTOM.
  • 22. • THE IP TURBINE IS OF DOUBLE FLOW CONSTRUCTION WITH TWO NOS HORIZONTALLY SPLIT CASINGS ( INNER & OUTER CASING). • THE HOT REHEATED (HRH) STEAM INTERS THE INNER CASING AT THE MID SECTION FROM TOP AND BOTTOM AND EXPENDS IN OPPOSITE SIDE IN TWO BLADE SECTIONS AND COMPENSATE AXIAL THRUST. • THE INNER CASING CARRIES THE STATIONARY BLADING. • THE IP STOP AND CONTROL VALVES 2 NOS ARE SUPPORTED ON THE FOUNDATION COVER PLATE BELOW EL 17.00 M FLOOR IN FRONT OF TURBINE –GEN UNIT. • CASING IS MADE OF CREEP RESISTING CHROMIUM-MOLYBDENUMVANADUIUM (Cr-Mo-V) STEEL CASTING. • THE SHAFT IS MADE OF HIGH CREEP RESISTANCE Cr-Mo-V STEEL FORGING.
  • 23. • LP TURBINE CASING CONSISTS OF DOUBLE FLOW UNIT AND HAS A TRIPLE SHELL WELDED CASING. • THE OUTER CASING CONSISTS OF FRONT AND REAR WALLS, TWO LATERAL LONGITUDINAL SUPPORT BEAMS AND THE UPPER DOME AND CONNECTED TO CONDENSER BY WELDING. • THE INNER-INNER & INNER-OUTER CASING CARRIES THE TURBINE GUIDE BLADES AND DIFFUSER. • STEAM ADMITTED TO THE LP TURBINE INNER CASING FROM IP TURBINE FROM BOTH LEFT AND RIGHT SIDE HORIZONTALLY. EXPANSION JOINTS ARE INSTALLED IN THE STEAM PIPING TO PREVENT ANY UNDESIRABLE DEFORMATION OF THE CASINGS DUE TO THERMAL EXPANSION OF THE STEAM PIPING.
  • 24. HP TURBINE MOVING AND STATIONARY BLADES : • • 1. 2. 3. • • • HP TURBINE BLADING CONSISTS OF 17 REACTION STAGES WITH 50 % REACTION. BLADES ARE HAVING THREE MAIN PARTS : AEROFOIL : IT IS THE WORKING PART OF THE BLADE WHERE STEAM EXPANSION TAKES PLACE. ROOT : TI IS THE PORTION OF THE BLADE WHICH IS HELD WITH ROTOR OR CASING SHROUDS : END PORTION OF BLADES ARE HELD TOGETHER THE STATIONARY AND MOVING BLADES OF ALL STAGES ARE PROVIDED WITH INVERTED T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH INTEGRAL SHROUDS WHICH AFTER INSTALLATION FORM A CONTINUOUS SHROUD. THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE CORRESPONDING GROOVES IN THE SHAFT AND INNER CASING. THE INSERTION SLOT IN THE SHAFT IS CLOSED BY A LOCKING BLADE WHICH IS FIXED BY GRUB SCREWS. SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO REDUCE LEAKAGES LOSSES AT THE BLADE TIPS.
  • 25. IP TURBINE MOVING AND STATIONARY BLADES : • IP TURBINE BLADING CONSISTS OF 12 REACTION STAGES PER FLOW WITH 50 % REACTION. • THE STATIONARY AND MOVING BLADES OF ALL STAGES ARE PROVIDED WITH INVERTED T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH INTEGRAL SHROUDS WHICH AFTER INSTALLATION FORM A CONTINUOUS SHROUD. • THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE CORRESPONDING GROOVES IN THE SHAFT AND INNER CASING. THE INSERTION SLOT IN THE SHAFT IS CLOSED BY A LOCKING BLADE WHICH IS FIXED BY GRUB SCREWS. • SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO REDUCE LEAKAGES LOSSES AT THE BLADE TIPS.
  • 26. LP TURBINE MOVING AND STATIONARY BLADES (FIRST 3 STAGES) : • LP TURBINE BLADING CONSISTS OF 6 REACTION STAGES PER FLOW WITH 50 % REACTION. • THE STATIONARY AND MOVING BLADES OF FIRST THREE STAGES ARE PROVIDED WITH INVERTED T-ROOTS. ALL THESE BLADES ARE PROVIDED WITH INTEGRAL SHROUDS WHICH AFTER INSTALLATION FORM A CONTINUOUS SHROUD. FIRST THREE GUIDE BLADES ARE MOUNTED ON INNER-INNER CASING. • THE MOVING AND STATIONARY BLADES ARE INSERTED INTO THE CORRESPONDING GROOVES IN THE SHAFT AND INNER CASING. THE INSERTION SLOT IN THE SHAFT IS CLOSED BY A LOCKING BLADE WHICH IS FIXED BY GRUB SCREWS. • SEALING STRIPS ARE CAULKED INTO THE INNER CASING AND THE SHAFT TO REDUCE LEAKAGES LOSSES AT THE BLADE TIPS.
  • 27. CONDENSER IS A SURFACE TYPE CONDENSER WITH TWO PASS ARRANGEMENT. COOLING WATER IS PUMPED INTO EACH OF CONDENSER PASS BY VERTICAL CW PUMPS THROUGH THE INLET PIPE. WATER ENTERS THE INLET CHAMBER OF FRONT WATER BOX AT THE BOTTOM PASSES HORIZONTALLY THROUGH THE TITANIUM TUBES TO THE WATER BOX AT THE OTHER END, TAKES A TURN PASSES THROUGH THE UPPER CLUSTER OF THE TUBES AND REACHES THE OUT LET CHAMBER AT THE TOP IN THE FRONT WATER BOX AND LEAVES THE CONDENSER THROUGH OUTLET PIPE. STEAM EXHAUSTED FROM THE LP TURBINE WASHING THE OUTSIDE OF THE CONDENSER TUBES LOSSES ITS LATENT HEAT TO THE COOLING WATER AND CONVERTED INTO WATER IN THE STEAM SIDE OF THE CONDENSER. THIS CONDENSATE COLLECTS IN THE HOT WELL, WELDED TO THE BOTTOM OF THE CONDENSER. CONDENSER DESIGN DATA : • COOLING WATER FLOW : 54300 M3/Hr. • COOLING WATER SURFACE AREA : 35603 M2 • NO. OF COOLING TUBES : 24398 NOS ( CONDENSING ZONE:22688 NOS AND AIR COOLING ZONE :1710 NOS) •TUBE MATERIAL : TITANIUM SB-338 GRADE-II • MAIN TUBE PLATE : MS WITH TITANIUM CLADED. • WATER BOX : MS WITH FRE LINING ( GLASS FIBRE REINFORCED EPOXY LINING) OF 3MM THICKNESS.
  • 28. ASH HANDLING DEPARTMENT WHAT IS ASH ? Ash is the residue remaining after the coal has been incinerated to constant weight under standard conditions. Ash is oxidised form of the mineral matters present in coal. Typical ash composition : SiO2, Al2O3, Fe2O3, CaO, MgO etc. Coal with more SiO2 & Al2O3, Ash MP > 1400ºC Coal with more Fe2O3, CaO & MgO, Ash MP < 1100ºC 28
  • 29. WHY ASH HANDLING? Ash content of Indian coal used in power station is about 30 to 40 %. A typical 2000 MW station produce around 9000T to 12000T of ash per day. This huge amount of ash needs to be disposed off continuously. Necessary care to be taken for preventing pollution Ash Handling system takes care the above requirement 29
  • 30. Fly Ash Handling System FA is collected from Air heater hopper, Eco hopper and ESP hopper. Either through flushing apparatus or hydrobactur system. In Flushing apparatus system ash is allowed to fall in flushing apparatus under gravitation. Water jet in flushing apparatus carries away the ash to FA trench High pressure jets further carries it to FA sump. Series pumping carries the ash slurry to FA pond. 1 December 2013 PMI Revision 00 30
  • 31. Bottom ash Handling System BA can be collected at furnace bottom as Wet or Dry form. Wet bottom ash system consists of i)Trough seal, ii)BA gate, iii)Hopper, iv)Scrapper Conveyer, v)Clinker grinder, vi)BA trench, vii)BA tank, viii)BA pump, ix)BA pond. Dry BA consists of i)Trough seal, ii)BA gate, iii)Hopper, iv)Scrapper Conveyer, v)Clinker grinder, vi)Silo. Trough seal : A channel around the furnace bottom filled with water where the furnace bottom end is immersed in water. This is to prevent air ingression in the boiler during operation. 31
  • 32. Overburden Surge Pile Pulverize (-150) Coal Seam Electrostatic Precipitator Boiler Flue Gas Flue Gas Fly Ash Bottom Ash Fly Ash Fly Ash Bottom Ash Smoke Stack 32
  • 33. Ash volumes and properties Furnace ESP (1300 - 1500 C) Economizer 100 % Stack 10-20 % 1% Stage C: 3 % Stage A: 80 % Bottom Ash Eco Ash Stage B: 17 % Air preheater APH Pulverize d Coal Coal Electrostatic Precipitator APH Ash Fly ash 1% 80-90 % Ash Fineness 33
  • 34. OFF-SITE DEPARTMENT  Water Treatment  Cooling Tower
  • 35. Why water treatment?  Raw water contains many dissolved minerals and organic      materials. At high temperature certain minerals left scaling on the tube metal of the boiler and cause permanent damage. Some dissolved minerals leads to corrosion of tube metals. Some leads to foaming At high pressure and temperature an element, silica can be carried away with steam causing damage to turbine low pressure stage. A Thermal Power Station needs water of varying quality for different process and hence the requirement. The performance and life expectancy of the station greatly depends on water chemistry compliance. 1 December 2013 PMI Revision 00 36
  • 36. Type of water treatment  the type of demineralization process chosen for a power station depends on three main factors :  The quality of the raw water.  The degree of deionisation i.e. treated water quality  Selectivity of resins. 1 December 2013 PMI Revision 00 37
  • 37. Steps of treatment process  Aeration of raw water  Adding chemicals for bacteria removal  Adding chemicals for sedimentation of suspended     particles Flocculation Filtration Ion Exchange process water treatment process is generally made up of two sections :  Pretreatment section  Demineralisation section 1 December 2013 PMI Revision 00 38
  • 38. Description Stage-I Tower Type Stage-II Induced Draft Multi Fill Counter Flow Make M/S Gammon India Circulating water flow 30,000 / tower M3/hr./tower. Hot CW inlet temp. 43oC Induced Draft Multi Fill Counter Flow M/S NPCC Ltd. 33,000 M3/hr. Cold CW Out let temp. 33oC 33oC Range 9oC 10oC 42oC
  • 39. COOLING FAN Description Stage-I Stage-II Type Axial Flow Axial Flow No. of fans / tower 16 12 Diameter 24 feet 28 feet No. of blade 6 7 Blade angle 13o 13o Fan speed 151 Rpm 118 Rpm 35 KW 56 KW Absorbed power
  • 40. NTPC
  • 41. Maintenance practices in CT  Daily walk down monitoring of CT cells  Cold water basin cleaning  Algae removal from splash bars  Tree trimming /pruning at nearby CT area  Maintaining clean walkway around CT  Gear box to be run for an hour fortnightly during open cycle  Prevention of air ingress at inspection door, transmission shaft, oil piping, expansion joints etc  Fabricated nozzle fitting in hot water channel in CT ST # II
  • 42. NTPC