Suche senden
Hochladen
Prefabricated structure
•
Als PPT, PDF herunterladen
•
19 gefällt mir
•
12,357 views
Vishvendu pandey
Folgen
Bildung
Business
Technologie
Melden
Teilen
Melden
Teilen
1 von 13
Jetzt herunterladen
Empfohlen
Prefabrication in construction
Prefabrication in construction
Shailja km
Advance structural system. pptx
Advance structural system. pptx
Shivani Nandgowle
Curtain walls - Advanced structural systems
Curtain walls - Advanced structural systems
Pratibha Mohan
Steel-vs-concrete and timber
Steel-vs-concrete and timber
Sheeraz RoMie
High-rise structural systems
High-rise structural systems
Akshay Revekar
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEM
Deepak Verma
Prefabrication construction
Prefabrication construction
Divya Vishnoi
Prefabrication
Prefabrication
Kush Agarwal
Empfohlen
Prefabrication in construction
Prefabrication in construction
Shailja km
Advance structural system. pptx
Advance structural system. pptx
Shivani Nandgowle
Curtain walls - Advanced structural systems
Curtain walls - Advanced structural systems
Pratibha Mohan
Steel-vs-concrete and timber
Steel-vs-concrete and timber
Sheeraz RoMie
High-rise structural systems
High-rise structural systems
Akshay Revekar
ADVANCE FORMWORK SYSTEM
ADVANCE FORMWORK SYSTEM
Deepak Verma
Prefabrication construction
Prefabrication construction
Divya Vishnoi
Prefabrication
Prefabrication
Kush Agarwal
specification of Rcc
specification of Rcc
Prabhat chhirolya
Precast concrete
Precast concrete
Prashant Borge
Types of modern construction formwork
Types of modern construction formwork
adarshkaushik6
Defects and remedies of building
Defects and remedies of building
toshi gupta
Flat slab ppt
Flat slab ppt
nancy debora
The cables structure system
The cables structure system
Mazin Elbashkatib
Roofing
Roofing
Hamzah Meraj, Faculty of Architecture, Jamia Millia Islamia, New delhi
Precast-concrete Details
Precast-concrete Details
Saurav Chaudhary
Shear walls
Shear walls
Rajat Nainwal
Prefabricated Structure and its installation process
Prefabricated Structure and its installation process
Udayram Patil
Prefabricated components
Prefabricated components
Sofia Rajesh
Precast concrete construction
Precast concrete construction
JenilPatel22
Pneumatic structures
Pneumatic structures
Akash Matthew
High rise building
High rise building
Er. Ashis Kashyap
Type of high rise building
Type of high rise building
Zabihullah Nasiri
Shell structure
Shell structure
Taha Padrawala
Defects in construction
Defects in construction
Shivangi Saini
Pre Engineered Steel Buildings
Pre Engineered Steel Buildings
Delta Steel Structures Pvt Ltd
Industrial buildings
Industrial buildings
AkshataFarakate
Speedy construction
Speedy construction
somitra bhardwaj
The Merits of Structural Steelwork
The Merits of Structural Steelwork
ESTRUCAD METÀL·LICS
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Stanford Sustainable Urban Systems Initiative
Weitere ähnliche Inhalte
Was ist angesagt?
specification of Rcc
specification of Rcc
Prabhat chhirolya
Precast concrete
Precast concrete
Prashant Borge
Types of modern construction formwork
Types of modern construction formwork
adarshkaushik6
Defects and remedies of building
Defects and remedies of building
toshi gupta
Flat slab ppt
Flat slab ppt
nancy debora
The cables structure system
The cables structure system
Mazin Elbashkatib
Roofing
Roofing
Hamzah Meraj, Faculty of Architecture, Jamia Millia Islamia, New delhi
Precast-concrete Details
Precast-concrete Details
Saurav Chaudhary
Shear walls
Shear walls
Rajat Nainwal
Prefabricated Structure and its installation process
Prefabricated Structure and its installation process
Udayram Patil
Prefabricated components
Prefabricated components
Sofia Rajesh
Precast concrete construction
Precast concrete construction
JenilPatel22
Pneumatic structures
Pneumatic structures
Akash Matthew
High rise building
High rise building
Er. Ashis Kashyap
Type of high rise building
Type of high rise building
Zabihullah Nasiri
Shell structure
Shell structure
Taha Padrawala
Defects in construction
Defects in construction
Shivangi Saini
Pre Engineered Steel Buildings
Pre Engineered Steel Buildings
Delta Steel Structures Pvt Ltd
Industrial buildings
Industrial buildings
AkshataFarakate
Speedy construction
Speedy construction
somitra bhardwaj
Was ist angesagt?
(20)
specification of Rcc
specification of Rcc
Precast concrete
Precast concrete
Types of modern construction formwork
Types of modern construction formwork
Defects and remedies of building
Defects and remedies of building
Flat slab ppt
Flat slab ppt
The cables structure system
The cables structure system
Roofing
Roofing
Precast-concrete Details
Precast-concrete Details
Shear walls
Shear walls
Prefabricated Structure and its installation process
Prefabricated Structure and its installation process
Prefabricated components
Prefabricated components
Precast concrete construction
Precast concrete construction
Pneumatic structures
Pneumatic structures
High rise building
High rise building
Type of high rise building
Type of high rise building
Shell structure
Shell structure
Defects in construction
Defects in construction
Pre Engineered Steel Buildings
Pre Engineered Steel Buildings
Industrial buildings
Industrial buildings
Speedy construction
Speedy construction
Ähnlich wie Prefabricated structure
The Merits of Structural Steelwork
The Merits of Structural Steelwork
ESTRUCAD METÀL·LICS
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Stanford Sustainable Urban Systems Initiative
High Performance Building Design Workshop
High Performance Building Design Workshop
Jerry Yudelson
E SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptx
AnupamKumar555628
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
ravi795059
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY for const
PradeepPandya1
6th Modular & Precast Construction event
6th Modular & Precast Construction event
Paco Conde Fernández
Genesis Manazil Group Presentation
Genesis Manazil Group Presentation
Ahmed Shalaby
The National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan Davis
sustainableCoRE
bim ppt 2 final
bim ppt 2 final
Adil Ahmad Khan
Construction mirror oct2014
Construction mirror oct2014
Param Saxena
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
Michael Khalil
Curriculum vita mohamed nabil
Curriculum vita mohamed nabil
Mohamed Omer
02 Construction Projects
02 Construction Projects
akashpadole
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
SiharaGallage
Conversions of buildings
Conversions of buildings
Julian Swindell
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
Association for Project Management
Presentation buro cite english
Presentation buro cite english
Buro CITE
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
Aconex
NAKO_LBE_Profile_email
NAKO_LBE_Profile_email
Nolan Pillay, Pr Eng
Ähnlich wie Prefabricated structure
(20)
The Merits of Structural Steelwork
The Merits of Structural Steelwork
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
High Performance Building Design Workshop
High Performance Building Design Workshop
E SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY for const
6th Modular & Precast Construction event
6th Modular & Precast Construction event
Genesis Manazil Group Presentation
Genesis Manazil Group Presentation
The National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan Davis
bim ppt 2 final
bim ppt 2 final
Construction mirror oct2014
Construction mirror oct2014
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
Curriculum vita mohamed nabil
Curriculum vita mohamed nabil
02 Construction Projects
02 Construction Projects
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
Conversions of buildings
Conversions of buildings
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
Presentation buro cite english
Presentation buro cite english
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
NAKO_LBE_Profile_email
NAKO_LBE_Profile_email
Mehr von Vishvendu pandey
Power of gratitude
Power of gratitude
Vishvendu pandey
Infusing your brain with mastery
Infusing your brain with mastery
Vishvendu pandey
Finding your-true-passion
Finding your-true-passion
Vishvendu pandey
50 simple-stress-relief-strategies
50 simple-stress-relief-strategies
Vishvendu pandey
17 ways to attract abundance
17 ways to attract abundance
Vishvendu pandey
Urban design hand book
Urban design hand book
Vishvendu pandey
I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)
Vishvendu pandey
9296 2001 inspection and maintenance
9296 2001 inspection and maintenance
Vishvendu pandey
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper
Vishvendu pandey
Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013
Vishvendu pandey
portfolio
portfolio
Vishvendu pandey
portfolio
portfolio
Vishvendu pandey
Basu resume 12
Basu resume 12
Vishvendu pandey
Basu Resume-12
Basu Resume-12
Vishvendu pandey
The origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occurs
Vishvendu pandey
From planning-to-execution-wp-352123
From planning-to-execution-wp-352123
Vishvendu pandey
Municipal business bye laws
Municipal business bye laws
Vishvendu pandey
Le corbusier in furniture design
Le corbusier in furniture design
Vishvendu pandey
75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reduced
Vishvendu pandey
Matrimandir final
Matrimandir final
Vishvendu pandey
Mehr von Vishvendu pandey
(20)
Power of gratitude
Power of gratitude
Infusing your brain with mastery
Infusing your brain with mastery
Finding your-true-passion
Finding your-true-passion
50 simple-stress-relief-strategies
50 simple-stress-relief-strategies
17 ways to attract abundance
17 ways to attract abundance
Urban design hand book
Urban design hand book
I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)
9296 2001 inspection and maintenance
9296 2001 inspection and maintenance
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013
portfolio
portfolio
portfolio
portfolio
Basu resume 12
Basu resume 12
Basu Resume-12
Basu Resume-12
The origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occurs
From planning-to-execution-wp-352123
From planning-to-execution-wp-352123
Municipal business bye laws
Municipal business bye laws
Le corbusier in furniture design
Le corbusier in furniture design
75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reduced
Matrimandir final
Matrimandir final
Kürzlich hochgeladen
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
Patidar M
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
Nguyen Thanh Tu Collection
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
DhatriParmar
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
mary850239
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
mary850239
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Quiz Club NITW
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
Prerana Jadhav
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
chesterberbo7
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
Mae Pangan
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
Quiz Club NITW
Scientific Writing :Research Discourse
Scientific Writing :Research Discourse
Anita GoswamiGiri
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
VanesaIglesias10
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
JOYLYNSAMANIEGO
Visit to a blind student's school🧑🦯🧑🦯(community medicine)
Visit to a blind student's school🧑🦯🧑🦯(community medicine)
lakshayb543
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
DhatriParmar
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
GloryAnnCastre1
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
karenfajardo43
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
Seán Kennedy
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
JonalynLegaspi2
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
Celine George
Kürzlich hochgeladen
(20)
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
Scientific Writing :Research Discourse
Scientific Writing :Research Discourse
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
Visit to a blind student's school🧑🦯🧑🦯(community medicine)
Visit to a blind student's school🧑🦯🧑🦯(community medicine)
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Decoding the Tweet _ Practical Criticism in the Age of Hashtag.pptx
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Grade Three -ELLNA-REVIEWER-ENGLISH.pptx
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
Prefabricated structure
1.
© akaidpl 2010.
All Rights Reserved. PREFABRICATED STRUCTURE PANKAJ KUMAR PANKAJ KUMAR SAGAR VISHVENDU PANDEY
2.
© akaidpl 2010.
All Rights Reserved. 21st century design technologies present us with endless possibilities to ‘rethink’ how we design and manufacture and: • create a shift from mass- production to mass-customisation; • embrace parametric modelling for site specific, value driven responses; • maximize the interface of these technologies with manufacturing. Social, economic and environmental factors suggest an urgent need to consider new ways to build. These factors include: • shortages of skilled trade labour in many communities; • need for increased construction quality and lower costs; • need to improve construction productivity; • need for more sustainable, cradle to cradle solutions; • increased acceptance of quality prefabrication.
3.
© akaidpl 2010.
All Rights Reserved. Why prefabricated structure? •Speed •Quality •Safety •Skills •Sustainability •Cost •Impermanent site
4.
© akaidpl 2010.
All Rights Reserved. Relocatables> Common problems •Heat gain and loss: difficult to manage in current ‘generic’ products; •Indoor environment quality: acoustics and light levels are often less than ideal; •Floors: generally low thermal mass, sometimes undesirable floor movement; •Floor level: typically circa 600mm above ground for connection crawl space; •Connections and views: generally limited, both visually and physically; •Placement: often disconnected from other school buildings, hidden from view; •Toilets: usually not provided due to distance from soil waste connections; •Extras: no standard range of ‘extras’ that are also ‘relocatable’; •Temporary: often look and feel temporary, yet can become permanent; •Details: joins between modules and other details add to ‘temporary feel’; •Appearance: utilitarian in appearance, generally designed by manufacturers; •Transport: design is largely defined by transport logistics rather than end use.
5.
© akaidpl 2010.
All Rights Reserved. Future needs Relocatables of the future will need to respond to: • a range of climate zones; • a range of architectural vernacular; • a wide variety of physical contexts; • a range of pedagogies and student ages; • and address the common problems. How do you: • develop a design idea that responds to a range of parameters and contexts? • develop a design idea that is both customisable and economical? • make it easy to add elements that allow buildings to evolve as needs change? • deal with the relocation of buildings to new contexts at some point in the future? Other issues to consider are: • procurement models • the role of architects • the role of manufacturers • the interface with end users.
6.
© akaidpl 2010.
All Rights Reserved.
7.
© akaidpl 2010.
All Rights Reserved. “Prefabricated structure cannot transform poor design, but prefabricated structure can be transformed by good design and considered details.” Key Lessons • Importance of a strong, innovative industry body with a research and development wing; • Investment in cutting edge manufacturing equipment is a significant investment that requires a certainty of volume; • The housing market plays a vital role in creating demand for prefabrication innovation; • Lean manufacturing principles and systems thinking are critical to innovation and development in prefabrication; • Prefabrication Structure has a vital role to play in the future of a more sustainable, efficient construction industry; • Architects have an important role to play in the design and development of future prefabrication systems; • Architecture Schools in Europe will increasingly include more teaching of industrial design thinking to help bridge the gap between architecture and manufacture.
8.
© akaidpl 2010.
All Rights Reserved. “Prefabricated structure “The Bauzentrum near Munich is a display village with something for every taste and budget... wonderful! It demonstrates a range of prefabricated structure approaches and style choices from different manufacturers... excellent quality, energy performance and value for money are common to all the products.” DaVinci Haus Elk Gruber Baufritz Rubner Huf Haus The Energy Centre Rubner
9.
© akaidpl 2010.
All Rights Reserved. Gymnasium-Amsterdam “This is a temporarily sited school building that is moveable and most importantly of a permament design and construction quality.”
10.
© akaidpl 2010.
All Rights Reserved. Gymnasium -Amsterdam Key Lessons • Permanent quality yet moveable; • Prefabrication fundamental to the design strategy, and vice versa; • 3D off-site modular approach; • Cladding and rainscreen as a ‘skin’ that can be changed over time; • Clever details; • Life Cycle costing supported argument for increased build quality; • The role of good design in urban regeneration, even when buildings are temporary.
11.
© akaidpl 2010.
All Rights Reserved. Crissy Field - Key Lessons • Prefabrication fundamental to the design strategy, and vice versa; • 2D off-site kit of parts approach; • The ’configurator’ software allows for a level of controlled customisation; • Parametric modelling is core to the mass customisation of the product; • Product can be fabricated local to the site to avert long distance haulage; • Straightforward assembly, so no specialist assembly contractors.
12.
© akaidpl 2010.
All Rights Reserved. McDonalds use prefabricated structures for their buildings, and set a record of constructing a building and opening for business within 13 hours. CONCLUSION Because of the design simplifications modern architecture provides many in the manufactured housing sector generally feel that modern architecture designs are better suited for prefab home construction.
13.
© akaidpl 2010.
All Rights Reserved. REFERENCES Because of the design simplification www.slideshare.com (Prefabrication | Future Proofing Schools) www.Wikipedia.com www.google.com
Jetzt herunterladen