JC Bakery Simulation
2017-2018
Student: Socheat Veng
Content
I. Project description
II. Objective and KPI
III.Scenario and comparing
IV.Discussion and Conclusion
2
I. Project description
• JC Bakery produces 3 types of breads such as Rye Bread, Poppy seed Rolls, and
Rye-wheat Bread
• This bakery has only one production line for producing these 3 differences type of
bread
• The production line of bakery system consists of 10 processes such a: Process
Load Powder to Mixing Machine, Mixing process, Process Unload Powder from
Mixing Machine, Forming Process, Fermentation process, Process load Bread to
Baking Machine, Baking process, Process Unload Bread from Baking Machine,
Cooling process, and Packaging process.
• The current situation is that this bakery spends very long time and less
productivity; the workers are not so busy during working time. One more thing is
that the demand of bakery is increase, so we want to improve productivity of the
product.
3
Baking Process
Mixing Process
Fermentation
Process
Forming Process
Packaging Process
4
Ready Production
Cooling
Process
Model Layout of JC Bakery
Conceptual Flow
Fermentation
Entity 2
Baking Process
Ready
Production
Forming Process
Entity 1
Entity 3
Mixing Process
Process Load
Powder to
Mixing Mc
Process Unload
Powder from
Mixing Mc
Process Load
Bread To
Baking Mc
Process Unload
Bread from
Baking Mc
Packaging
Process
5
Cooling Process
P1= Process
Load Powder to
Mixing Mc
P7= Steaming
Process
P9= Cooling
Entity 2
P7= Baking
Process
Ready Production
Fermentati
on for
what?
Forming
by what?
P4= Manual
Forming
P4= Machine
Forming
P5= Retarder
P5= Proofer
Baking or
steam?
Entity 1
Entity 3
P3= Process
Unload Powder
from Mixing Mc
P2= Mixing
P6= Process
Load to Oven
P6= Process
Load Powder to
steam
P8= Process Unload
from Rack Oven
P8= Process Unload
from Steam Mc
Entity 1
Entity 2, 3
Entity 3
Entity 1, 2
Entity 1, 2
Entity 3
1 Entity = 5kg can produce 100 breads
6:00pm
6:10pm
6:25pm
6
P10= Packaging
Conceptual Model
Summary Necessary Information
Entity schedule
7
Entity ID Entity name Start time Arrival
time(minute)
Entity 1 Rye Bread Powder 6:00am Constant (40)
Entity 2 Poppy seed Rolls Powder 6:10am Constant (40)
Entity 3 Rye-wheat Bread Powder 6:25am Constant (40)
Summary Necessary Information
Process
8
Process ID Process Name
Processing Time
Entity 1 (Minute)
Processing Time
Entity 2
(Minute)
Processing Time
Entity 3
(Minute)
P1 Load Powder to Mc TRAI (1,2,4)
P2 Mixing Process UNIF (5,10)
P3 Unload Powder from Mc TRAI (1,1,3)
P4 Forming Process UNIF (30,40) UNIF (10,15) UNIF (10,15)
P5 Fermentation Process UNIF (10,15) UNIF (10,15) UNIF (25,30)
P6 Load Bread to Backing Mc TRAI (2,3,4)
P7 Backing Process CON (20) CON (20) CON (23)
P8 Unload Bread from Backing Mc TRAI (1,1,3)
P9 Cooling Process UNIF (10,15)
P10 Packaging Process UNIF (10,15)
Summary Necessary Information
Process-Resource
9
Resource ID Resource name Capacity
R1 Load Unload Operator 1
R2 Mixing machine 2
R3 Forming Staff 1
R4 Forming machine 1
R5 Proofer Machine 1
R6 Rack oven 2
R7 Tunnel oven 1
R8 Packer 2
Summary Necessary Information
Resource
10
Process ID Process name Resource ID
P1 Load Unload Operator R1
P2 Mixing machine R1
P3 Load Unload Operator R1
P4 Forming Staff R3
P4 Forming machine R4
P5 Proofer Machine R5
P6 Load Unload Operator R1
P7 Rack oven R6
P7 Tunnel oven R7
P8 Load Unload Operator R1
P9 Cooling No
Summary Necessary Information
Schedul
The official schedule’s working is from Monday to Sunday. They start
working from 6:00AM until 11:00AM and from 1:00PM until 4:00PM.
For a small break, all workers are given 15 minutes break after they
work first 2 hours, and break 1hour break for lunch time after work 4
hours, then break 15min after work 6hours and 8hours.
11
II. Objective and KPI
• Objective : The objective of this project is to increase the production
output of the JC bakery by changing the time sequence of the entity
and share the resource
• KPI:
Production output
Utilization of former-packer, and forming staff
Total cycle time
12
Arena Model
13
III. Scenario and comparing
Scenarios to Compare
In this project, there are 3 scenarios to compare:
Scenario 1: It is the initial model.
Scenario 2: We change the arrival time of the entities that enter into
the process.
Scenario 3: We change the arrival time of the entities that enter into
the process, and also share the resource of packer of the packaging
process to help the forming staff in the process manual forming.
14
III. Scenario and comparing
15
• Below is the schedule of scenario 2 and Scenario 3
Entity ID Entity name Start time Arrival time(minute)
Entity 1 Rye Bread Powder 6:00am Constant (30)
Entity 2 Poppy seed Rolls Powder 6:10am Constant (30)
Entity 3 Rye-wheat Bread Powder 6:25am Constant (30)
For Scenario Comparing, we chose the 3 responses according to our
KPI, such as the number out of all entity out, the Average total time of
entity, and utilization of forming staff and former-packager.
16
III. Scenario and comparing
Result from comparing scenarios
For comparison the entity output or production output, for the
scenario 2 is the best
17
Result from comparing scenarios
For Comparison the utilization of the former-Packer and forming staff,
the scenario 2 is the best, because in scenario 2 the total utilization of
the resource former-packer and forming staff is higher.
18
Result from comparing scenarios
For Comparison total average processing time for all entity, the
scenario 3 is the best.
19
According to these two KPI compare scenarios, we can see that
only the scenario number 2 that is the best one. Because we want to
increase the production output and increase the utilization for the
resource. One more thing is that, the total average processing is higher,
it means that our system is not much idle and not waste the time for
working process.
20
Result from comparing scenarios
Summary Result from Each KPI
Production output
21
IV. Discussion and Conclusion
Entity output Scenario1 Scenario 2
Entity 1 9.96 11.01
Entity 2 10.13 12.92
Entity 3 8.22 10
Total 28.31 32.93
22
For 1 of all entity could produce 100 breads, so the total bread of
this three kind are:
Scenario1: Entity (1 + 2 + 3) = 28.31 × 100 =2831 breads
Scenario2: Entity (1 + 2 + 3) = 32.93 × 100 =3293 breads
IV. Discussion and Conclusion
Utilization of former-packer, and forming staff (%)
23
Resource Scenario1 Scenario 2
former-packer 0.64 0.66
forming staff 0.774 0.811
IV. Discussion and Conclusion
• Total processing time(Minute)
24
Entity output Scenario1 Scenario 2
Entity 1 156.690 mins 187.394 mins
Entity 2 122.070 mins 136.60 mins
Entity 3 152.651 mins 174.138 mins
III. Discussion and Conclusion
 According to the data analysis above, it shows that the scenario 2 is the best
one that could answer to the objective such as the increasing of number
output of entity1, entity 2, and entity 3.
 The utilization of the resource is increasing for the bottle neck process, so
the productivity will be increase.
 For the average total cycle time of entity is increase, it means that the
processing time for our process is increase that it is the way to reduce the
waiting time of the process.
 Thus, the scenarios 2 could be apply to get more production output and also
increasing the utilization of the resource they not free much that could give
the advantage to the bakery, so we choose the scenario 2 for applying to
achieve the objective
25
IV. Discussion and Conclusion
IV. Discussion and Conclusion
In conclusion, for JC bakery that have the problem with the
demand increase, idle time, and production output is not much, they can
use the scenario 3 which change the time interval of the entity and share
the resource to help the bottleneck process, that the production out hut
increase from want increase the production output for solving the
problems of demand increase from 2831 breads to 3293 breads per day.
26

Weitere ähnliche Inhalte

Was ist angesagt?

Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENAAditya Nakate
 
Simulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena softwareSimulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena softwareEast West University
 
Simulation study of Gas Station
Simulation study of Gas StationSimulation study of Gas Station
Simulation study of Gas StationAkul Mahajan
 
Final Report-Poor Yorick's Coffee House
Final Report-Poor Yorick's Coffee HouseFinal Report-Poor Yorick's Coffee House
Final Report-Poor Yorick's Coffee Housekaranchaudhry123
 
Gupta ayank project_report
Gupta ayank project_reportGupta ayank project_report
Gupta ayank project_reportAyank Gupta
 
Habanero Restaurant - Simulation Project
Habanero Restaurant - Simulation ProjectHabanero Restaurant - Simulation Project
Habanero Restaurant - Simulation ProjectJatin Saini
 
Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Kimseng Sok
 
Simulation project on Burger King
Simulation project on Burger KingSimulation project on Burger King
Simulation project on Burger KingKartik Sagar
 
Simulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee CenterSimulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee CenterNiharika Senecha
 
Deone pranilfinalreport
Deone pranilfinalreportDeone pranilfinalreport
Deone pranilfinalreportPranil Deone
 
Stadium Queue Simulation
Stadium Queue SimulationStadium Queue Simulation
Stadium Queue SimulationAditya Singh
 
Arena Model for Coffe Shop
Arena Model for Coffe ShopArena Model for Coffe Shop
Arena Model for Coffe ShopEbru Özmüş
 
A Simulation Model of Starbucks
A Simulation Model of StarbucksA Simulation Model of Starbucks
A Simulation Model of StarbucksSpandana Pothuri
 
Simulation with ARENA - SM Paints
Simulation with ARENA - SM PaintsSimulation with ARENA - SM Paints
Simulation with ARENA - SM Paintshrishik26
 
Chp. 2 simulation examples
Chp. 2 simulation examplesChp. 2 simulation examples
Chp. 2 simulation examplesPravesh Negi
 
Barber Shop Simulation
Barber Shop SimulationBarber Shop Simulation
Barber Shop SimulationRavish Kalra
 
Kroger Store Simulation Using Arena
Kroger Store Simulation Using ArenaKroger Store Simulation Using Arena
Kroger Store Simulation Using ArenaDhivya Rajprasad
 
Chick-fil-A Express outlet Simulation
Chick-fil-A Express outlet SimulationChick-fil-A Express outlet Simulation
Chick-fil-A Express outlet SimulationMaitrik Sanghavi
 
Super 8 gas station model - Arena Simulation
Super 8 gas station model - Arena SimulationSuper 8 gas station model - Arena Simulation
Super 8 gas station model - Arena SimulationArunkumar Jagadeesan
 

Was ist angesagt? (20)

Simulation Project in ARENA
Simulation Project in ARENASimulation Project in ARENA
Simulation Project in ARENA
 
Simulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena softwareSimulation of food serving system of EWU canteen using Arena software
Simulation of food serving system of EWU canteen using Arena software
 
Simulation study of Gas Station
Simulation study of Gas StationSimulation study of Gas Station
Simulation study of Gas Station
 
Final Report-Poor Yorick's Coffee House
Final Report-Poor Yorick's Coffee HouseFinal Report-Poor Yorick's Coffee House
Final Report-Poor Yorick's Coffee House
 
Gupta ayank project_report
Gupta ayank project_reportGupta ayank project_report
Gupta ayank project_report
 
Habanero Restaurant - Simulation Project
Habanero Restaurant - Simulation ProjectHabanero Restaurant - Simulation Project
Habanero Restaurant - Simulation Project
 
Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)Simulation with Arena (Dental Clinic project)
Simulation with Arena (Dental Clinic project)
 
Simulation project on Burger King
Simulation project on Burger KingSimulation project on Burger King
Simulation project on Burger King
 
Simulation Project Report
Simulation Project ReportSimulation Project Report
Simulation Project Report
 
Simulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee CenterSimulation Modeling on Campus Starbucks Coffee Center
Simulation Modeling on Campus Starbucks Coffee Center
 
Deone pranilfinalreport
Deone pranilfinalreportDeone pranilfinalreport
Deone pranilfinalreport
 
Stadium Queue Simulation
Stadium Queue SimulationStadium Queue Simulation
Stadium Queue Simulation
 
Arena Model for Coffe Shop
Arena Model for Coffe ShopArena Model for Coffe Shop
Arena Model for Coffe Shop
 
A Simulation Model of Starbucks
A Simulation Model of StarbucksA Simulation Model of Starbucks
A Simulation Model of Starbucks
 
Simulation with ARENA - SM Paints
Simulation with ARENA - SM PaintsSimulation with ARENA - SM Paints
Simulation with ARENA - SM Paints
 
Chp. 2 simulation examples
Chp. 2 simulation examplesChp. 2 simulation examples
Chp. 2 simulation examples
 
Barber Shop Simulation
Barber Shop SimulationBarber Shop Simulation
Barber Shop Simulation
 
Kroger Store Simulation Using Arena
Kroger Store Simulation Using ArenaKroger Store Simulation Using Arena
Kroger Store Simulation Using Arena
 
Chick-fil-A Express outlet Simulation
Chick-fil-A Express outlet SimulationChick-fil-A Express outlet Simulation
Chick-fil-A Express outlet Simulation
 
Super 8 gas station model - Arena Simulation
Super 8 gas station model - Arena SimulationSuper 8 gas station model - Arena Simulation
Super 8 gas station model - Arena Simulation
 

Ähnlich wie Bakery Production Using Arena Simulation

Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helpsSF Lau
 
Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...IRJET Journal
 
Case study of Nebico Pvt Ltd
Case study of Nebico Pvt LtdCase study of Nebico Pvt Ltd
Case study of Nebico Pvt LtdSunilShah57
 
Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Baozheng (Michael) Ge
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Ukesh Simulation Project
Ukesh Simulation ProjectUkesh Simulation Project
Ukesh Simulation ProjectChawal Ukesh
 
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments IndustryShohag Ahammed
 
Final Lafarge Presentation
Final Lafarge PresentationFinal Lafarge Presentation
Final Lafarge Presentationmardiah johani
 
Sample answers unit 17 - q1
Sample answers   unit 17 - q1Sample answers   unit 17 - q1
Sample answers unit 17 - q1Maria Aragone
 
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...Shubhangi Gurway
 
Operations Research & Methodology project report
Operations Research & Methodology  project reportOperations Research & Methodology  project report
Operations Research & Methodology project reportPankaj Kumar Dwivedi
 

Ähnlich wie Bakery Production Using Arena Simulation (20)

Litttle knowledge of lean concept helps
Litttle knowledge of lean  concept helpsLitttle knowledge of lean  concept helps
Litttle knowledge of lean concept helps
 
Project CharterWeek2.docx
Project CharterWeek2.docxProject CharterWeek2.docx
Project CharterWeek2.docx
 
Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...Reformation in Existing Micro Size Laundry System by using Product Design and...
Reformation in Existing Micro Size Laundry System by using Product Design and...
 
Case study of Nebico Pvt Ltd
Case study of Nebico Pvt LtdCase study of Nebico Pvt Ltd
Case study of Nebico Pvt Ltd
 
Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2Team L - Six Sigma Project (The Sloopy's) - Revised.2
Team L - Six Sigma Project (The Sloopy's) - Revised.2
 
Process analysis
Process analysisProcess analysis
Process analysis
 
1
11
1
 
Vini[1][1][1]
Vini[1][1][1]Vini[1][1][1]
Vini[1][1][1]
 
Value stream map
Value stream mapValue stream map
Value stream map
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Ukesh Simulation Project
Ukesh Simulation ProjectUkesh Simulation Project
Ukesh Simulation Project
 
FINAL PROJECT
FINAL PROJECTFINAL PROJECT
FINAL PROJECT
 
Capacity Planning In Garments Industry
Capacity Planning In Garments IndustryCapacity Planning In Garments Industry
Capacity Planning In Garments Industry
 
Dhiraj.pdf
Dhiraj.pdfDhiraj.pdf
Dhiraj.pdf
 
Final Lafarge Presentation
Final Lafarge PresentationFinal Lafarge Presentation
Final Lafarge Presentation
 
Sample answers unit 17 - q1
Sample answers   unit 17 - q1Sample answers   unit 17 - q1
Sample answers unit 17 - q1
 
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
CASE STUDY ON IMPLEMENTATION OF KAIZEN AND 5S TECHNIQUES IN SMALL MANUFACTURI...
 
Thesis presentation
Thesis presentationThesis presentation
Thesis presentation
 
Bengkel POM
Bengkel POMBengkel POM
Bengkel POM
 
Operations Research & Methodology project report
Operations Research & Methodology  project reportOperations Research & Methodology  project report
Operations Research & Methodology project report
 

Kürzlich hochgeladen

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptxNikhil Raut
 

Kürzlich hochgeladen (20)

System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Steel Structures - Building technology.pptx
Steel Structures - Building technology.pptxSteel Structures - Building technology.pptx
Steel Structures - Building technology.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

Bakery Production Using Arena Simulation

  • 1. Mahidol University Asst. Prof. Dr. Waressara Weerawat 1 Faculty of Engineering JC Bakery Simulation 2017-2018 Student: Socheat Veng
  • 2. Content I. Project description II. Objective and KPI III.Scenario and comparing IV.Discussion and Conclusion 2
  • 3. I. Project description • JC Bakery produces 3 types of breads such as Rye Bread, Poppy seed Rolls, and Rye-wheat Bread • This bakery has only one production line for producing these 3 differences type of bread • The production line of bakery system consists of 10 processes such a: Process Load Powder to Mixing Machine, Mixing process, Process Unload Powder from Mixing Machine, Forming Process, Fermentation process, Process load Bread to Baking Machine, Baking process, Process Unload Bread from Baking Machine, Cooling process, and Packaging process. • The current situation is that this bakery spends very long time and less productivity; the workers are not so busy during working time. One more thing is that the demand of bakery is increase, so we want to improve productivity of the product. 3
  • 4. Baking Process Mixing Process Fermentation Process Forming Process Packaging Process 4 Ready Production Cooling Process Model Layout of JC Bakery
  • 5. Conceptual Flow Fermentation Entity 2 Baking Process Ready Production Forming Process Entity 1 Entity 3 Mixing Process Process Load Powder to Mixing Mc Process Unload Powder from Mixing Mc Process Load Bread To Baking Mc Process Unload Bread from Baking Mc Packaging Process 5 Cooling Process
  • 6. P1= Process Load Powder to Mixing Mc P7= Steaming Process P9= Cooling Entity 2 P7= Baking Process Ready Production Fermentati on for what? Forming by what? P4= Manual Forming P4= Machine Forming P5= Retarder P5= Proofer Baking or steam? Entity 1 Entity 3 P3= Process Unload Powder from Mixing Mc P2= Mixing P6= Process Load to Oven P6= Process Load Powder to steam P8= Process Unload from Rack Oven P8= Process Unload from Steam Mc Entity 1 Entity 2, 3 Entity 3 Entity 1, 2 Entity 1, 2 Entity 3 1 Entity = 5kg can produce 100 breads 6:00pm 6:10pm 6:25pm 6 P10= Packaging Conceptual Model
  • 7. Summary Necessary Information Entity schedule 7 Entity ID Entity name Start time Arrival time(minute) Entity 1 Rye Bread Powder 6:00am Constant (40) Entity 2 Poppy seed Rolls Powder 6:10am Constant (40) Entity 3 Rye-wheat Bread Powder 6:25am Constant (40)
  • 8. Summary Necessary Information Process 8 Process ID Process Name Processing Time Entity 1 (Minute) Processing Time Entity 2 (Minute) Processing Time Entity 3 (Minute) P1 Load Powder to Mc TRAI (1,2,4) P2 Mixing Process UNIF (5,10) P3 Unload Powder from Mc TRAI (1,1,3) P4 Forming Process UNIF (30,40) UNIF (10,15) UNIF (10,15) P5 Fermentation Process UNIF (10,15) UNIF (10,15) UNIF (25,30) P6 Load Bread to Backing Mc TRAI (2,3,4) P7 Backing Process CON (20) CON (20) CON (23) P8 Unload Bread from Backing Mc TRAI (1,1,3) P9 Cooling Process UNIF (10,15) P10 Packaging Process UNIF (10,15)
  • 9. Summary Necessary Information Process-Resource 9 Resource ID Resource name Capacity R1 Load Unload Operator 1 R2 Mixing machine 2 R3 Forming Staff 1 R4 Forming machine 1 R5 Proofer Machine 1 R6 Rack oven 2 R7 Tunnel oven 1 R8 Packer 2
  • 10. Summary Necessary Information Resource 10 Process ID Process name Resource ID P1 Load Unload Operator R1 P2 Mixing machine R1 P3 Load Unload Operator R1 P4 Forming Staff R3 P4 Forming machine R4 P5 Proofer Machine R5 P6 Load Unload Operator R1 P7 Rack oven R6 P7 Tunnel oven R7 P8 Load Unload Operator R1 P9 Cooling No
  • 11. Summary Necessary Information Schedul The official schedule’s working is from Monday to Sunday. They start working from 6:00AM until 11:00AM and from 1:00PM until 4:00PM. For a small break, all workers are given 15 minutes break after they work first 2 hours, and break 1hour break for lunch time after work 4 hours, then break 15min after work 6hours and 8hours. 11
  • 12. II. Objective and KPI • Objective : The objective of this project is to increase the production output of the JC bakery by changing the time sequence of the entity and share the resource • KPI: Production output Utilization of former-packer, and forming staff Total cycle time 12
  • 14. III. Scenario and comparing Scenarios to Compare In this project, there are 3 scenarios to compare: Scenario 1: It is the initial model. Scenario 2: We change the arrival time of the entities that enter into the process. Scenario 3: We change the arrival time of the entities that enter into the process, and also share the resource of packer of the packaging process to help the forming staff in the process manual forming. 14
  • 15. III. Scenario and comparing 15 • Below is the schedule of scenario 2 and Scenario 3 Entity ID Entity name Start time Arrival time(minute) Entity 1 Rye Bread Powder 6:00am Constant (30) Entity 2 Poppy seed Rolls Powder 6:10am Constant (30) Entity 3 Rye-wheat Bread Powder 6:25am Constant (30)
  • 16. For Scenario Comparing, we chose the 3 responses according to our KPI, such as the number out of all entity out, the Average total time of entity, and utilization of forming staff and former-packager. 16 III. Scenario and comparing
  • 17. Result from comparing scenarios For comparison the entity output or production output, for the scenario 2 is the best 17
  • 18. Result from comparing scenarios For Comparison the utilization of the former-Packer and forming staff, the scenario 2 is the best, because in scenario 2 the total utilization of the resource former-packer and forming staff is higher. 18
  • 19. Result from comparing scenarios For Comparison total average processing time for all entity, the scenario 3 is the best. 19
  • 20. According to these two KPI compare scenarios, we can see that only the scenario number 2 that is the best one. Because we want to increase the production output and increase the utilization for the resource. One more thing is that, the total average processing is higher, it means that our system is not much idle and not waste the time for working process. 20 Result from comparing scenarios
  • 21. Summary Result from Each KPI Production output 21 IV. Discussion and Conclusion Entity output Scenario1 Scenario 2 Entity 1 9.96 11.01 Entity 2 10.13 12.92 Entity 3 8.22 10 Total 28.31 32.93
  • 22. 22 For 1 of all entity could produce 100 breads, so the total bread of this three kind are: Scenario1: Entity (1 + 2 + 3) = 28.31 × 100 =2831 breads Scenario2: Entity (1 + 2 + 3) = 32.93 × 100 =3293 breads IV. Discussion and Conclusion
  • 23. Utilization of former-packer, and forming staff (%) 23 Resource Scenario1 Scenario 2 former-packer 0.64 0.66 forming staff 0.774 0.811 IV. Discussion and Conclusion
  • 24. • Total processing time(Minute) 24 Entity output Scenario1 Scenario 2 Entity 1 156.690 mins 187.394 mins Entity 2 122.070 mins 136.60 mins Entity 3 152.651 mins 174.138 mins III. Discussion and Conclusion
  • 25.  According to the data analysis above, it shows that the scenario 2 is the best one that could answer to the objective such as the increasing of number output of entity1, entity 2, and entity 3.  The utilization of the resource is increasing for the bottle neck process, so the productivity will be increase.  For the average total cycle time of entity is increase, it means that the processing time for our process is increase that it is the way to reduce the waiting time of the process.  Thus, the scenarios 2 could be apply to get more production output and also increasing the utilization of the resource they not free much that could give the advantage to the bakery, so we choose the scenario 2 for applying to achieve the objective 25 IV. Discussion and Conclusion
  • 26. IV. Discussion and Conclusion In conclusion, for JC bakery that have the problem with the demand increase, idle time, and production output is not much, they can use the scenario 3 which change the time interval of the entity and share the resource to help the bottleneck process, that the production out hut increase from want increase the production output for solving the problems of demand increase from 2831 breads to 3293 breads per day. 26