220 KV GRID SUB STATION IG NAGAR JAIPUR :-
SUBMITTED TO:- SUBMITTED BY:-
Miss. VICKY JAIN SURENDRA KUMAR MEENA
Lecturer
SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY,
JAIPUR
RAJASTHAN TECHNICAL UNIVERSITY, KOTA
In India Electrecal power is Generated at a voltage
of 11kv to 33kv ,which is taken stepped up to the
transmission level in the range of 66kv to 400kv
member of transmission and switching have to be
created these are known as ”Substation”.
Substation is an assembly of apparatus ,which
transform the characteristics of electrical energy
from one form to another say from one voltage
level to another level. hence a substation is an
Intermedate link between the Genrating station
and consumer
Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR
Substations have switching, protection and control equipment and one
or more transformers. In a large substation, circuit breaker are used to
interrupt any short-circuits or overload currents that may occur on the
network
220KV INDRA GANDHI NAGAR
GRID SUBSTATION
220kv IGN s/s is a convensional, hybrid substaion.
It is part of transmission system.
33kv substation is gas insulated substation which is
inside the control room.
 for communication purpose PLCC is used.
INCOMING FEEDER:
 220KV PURANA GHAT LINE-1.
 220KV PURANA GHAT LINE-2.
 220KV BASSI LINE.
 220KV HEERAPURA LINE.
OUTGOING FEEDER:
 132KV PURANAGHAT.
 132KV SITAPURA.
 132KV MNIT(UNDER CONSTRUTION).
33KV FEEDER:
 JAGATPURA.
 INDRA GANDHI NAGAR.
 BISALPUR.
 SIDDHARTH MARG.
 PRADHAN MARG.
CONTENTS:-
 LIGHTNING ARRESTOR.
 INSULATER.
 POWER TRANSFORMER.
 CURRENT TRANSFOMER.
 CIRCUIT BREAKER.
 BUSBARS.
 PROTECTIVE RELAY.
 CONTROL PANEL.
 POTENTIAL TRANSFORMER
 SINGLE LINE DIAGRAM
 WAVE TRAP.
 CONCLUSION
LIGHTNING ARRESTOR
 Lightning arrestor provide protection to all the
equipment against the HV.an electric discharge
between cloud and earth ,between cloud and
charge enters of some loud is known as lightning.
 It is provide to safety transmission &distribution
line.
INSULATER
An electrical insulator is
a material whose
internal electric charge
do not flow freely and
therefor make it very
hard to conduct an
electric current under
the influence of an
electric field.
POWER TRANSFORMER
•For stepping up or down the system voltage, power transformers are used in
the substations. At generating end, the voltage is only stepped up for
transmission of power while at all the subsequent substations the voltage is
gradually stepped down to reach finally to working voltage level
CURRENT TRANSFORMER
The current
transformer are used to
stepped down .
It is used to
measurement/control/
protection.
CIRCUIT BREAKER
 Circuit breaker are used for
switching and protection.
 Brake a circuit and
automatically under fault
condition.
 A circuit breaker consist of
fixed and moving contact
called electrode under
normal condition.
BUSBARS
 Bus bars are common
electrical component
through which a
large no. of feeders
operating at some
voltage have to
connected.
 It is used to connect
to transmission line
which go to
electricity.
 It is used to high
material conductor.
PROTECTIVE REALAY
 A Protective relay is a
device which detect
the fault.
 It is to detect after
their go to command
circuit breaker
 It is provide to safety
in electrical
equipments.
CONTROL PANEL
CONTROL PANEL
 Color coding:-
1. 33kv (Green)
2. 132kv (black)
3. 220kv (Broun)
4. 440kv (indigo)
5. 110kv (orange)
POTENTIAL TRANSFORMER
The potential transformer is used to one electrical
form to another form .
It is used to measurment of current &voltage.
WAVE TRAP:-
SINGLE LINE DIAGRAM:-
CONCLUSION
 An Engineer need to have not just theoretical but
practical as well as and so every student is supposed to
undergo a practical training .session after 3rd year
where I have impaired the knowledge about
transmission ,distribution .during the 45 days training
session. we have acquainted with the repairing of a
transformer and testing of transformer. At last is
would like to say that practical training taken at 220kv
gss ig nagar has broadened my knowledge and
widened my thinking as a professional.
ANY QUERY

Weitere ähnliche Inhalte

Was ist angesagt?

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv student
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54Subhash Mahla
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmissionprasantakcs
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppclSunny Daksh
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipurmonga786
 
Substations
SubstationsSubstations
Substationsitfakash
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur Renuka Verma
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSPartha Parida
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurdilkhush009
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work pptDemsew Mitiku
 

Was ist angesagt? (20)

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
substation 220 kv
substation 220 kv substation 220 kv
substation 220 kv
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training Report SM54
 
132 kv sub-station, power transmission
132 kv sub-station, power transmission132 kv sub-station, power transmission
132 kv sub-station, power transmission
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
ppt on summer training on uppcl
ppt on summer training on uppclppt on summer training on uppcl
ppt on summer training on uppcl
 
220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
Switchyard
SwitchyardSwitchyard
Switchyard
 
Substations
SubstationsSubstations
Substations
 
220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur 220kv GSS, VKIA, jaipur
220kv GSS, VKIA, jaipur
 
substation internship report
substation internship report substation internship report
substation internship report
 
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMSSWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
SWITCHYARD EQUIPMENTS & PROTECTION SYSTEMS
 
A training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopurA training report on 132 KV GSS, BHADOTI, sawai madhopur
A training report on 132 KV GSS, BHADOTI, sawai madhopur
 
Overhead line work ppt
Overhead line work pptOverhead line work ppt
Overhead line work ppt
 

Andere mochten auch

Andere mochten auch (12)

Fuses
FusesFuses
Fuses
 
circuit breakers ppt by gaurav
circuit breakers ppt by gauravcircuit breakers ppt by gaurav
circuit breakers ppt by gaurav
 
Physics ppt on fuse
Physics ppt on fuse Physics ppt on fuse
Physics ppt on fuse
 
ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)
 
Circuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software TechnologyCircuit breaker Maintenance By Mobile Agent Software Technology
Circuit breaker Maintenance By Mobile Agent Software Technology
 
Fuses and mcb
Fuses and mcbFuses and mcb
Fuses and mcb
 
Circuit Breaker
Circuit BreakerCircuit Breaker
Circuit Breaker
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Air Circuit breaker
Air Circuit breakerAir Circuit breaker
Air Circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 
Er. rahul sharma circuit breaker
Er. rahul sharma circuit breakerEr. rahul sharma circuit breaker
Er. rahul sharma circuit breaker
 
Circuit breaker
Circuit breakerCircuit breaker
Circuit breaker
 

Ähnlich wie PPT ON 220KV GSS

Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSSPuneet Manghani
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660bhagat ram meena
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSSMohitkalal4
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaAshish Bairwa
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overviewMilind Punj
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG Muneeb Amin Khan
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxfallinhay
 
220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95Sumit Kumar
 
INVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARYINVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARYPANKAJRANJANA143
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxPrabhakarTripathi16
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Gangwal
 
Indian grid system
Indian grid systemIndian grid system
Indian grid systemPRANAY GUPTA
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 

Ähnlich wie PPT ON 220KV GSS (20)

Omprakash mahawar ppt
Omprakash mahawar pptOmprakash mahawar ppt
Omprakash mahawar ppt
 
My training
My trainingMy training
My training
 
33kv substation
33kv substation33kv substation
33kv substation
 
Shashikdoc
ShashikdocShashikdoc
Shashikdoc
 
Training report on 400 kV GSS
Training report on 400 kV GSSTraining report on 400 kV GSS
Training report on 400 kV GSS
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 
PPT ON 220KV GSS
PPT ON 220KV GSSPPT ON 220KV GSS
PPT ON 220KV GSS
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
Switchyard design overview
Switchyard design overviewSwitchyard design overview
Switchyard design overview
 
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG  INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
INDUSTRIAL TRAINING PRESENTATION OF 132/33Kv, 130MVA WANPOH GRID ANANTNAG
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
sub subsation seminar ppt.pptx
sub subsation seminar ppt.pptxsub subsation seminar ppt.pptx
sub subsation seminar ppt.pptx
 
220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95220 kv gss sitapua ppt sk95
220 kv gss sitapua ppt sk95
 
INVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARYINVERTER BY PANKAJ CHAUDHARY
INVERTER BY PANKAJ CHAUDHARY
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptxTRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
TRANSMISSION AND DISTRIBUTION OF ELECTRIC POWER PROJECT.pptx
 
Ashwani kumar
Ashwani kumarAshwani kumar
Ashwani kumar
 
Manish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptxManish Kumar Gangey- 19ESKEE095.pptx
Manish Kumar Gangey- 19ESKEE095.pptx
 
Indian grid system
Indian grid systemIndian grid system
Indian grid system
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 

Kürzlich hochgeladen

Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfChristianCDAM
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Kürzlich hochgeladen (20)

Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Ch10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdfCh10-Global Supply Chain - Cadena de Suministro.pdf
Ch10-Global Supply Chain - Cadena de Suministro.pdf
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

PPT ON 220KV GSS

  • 1. 220 KV GRID SUB STATION IG NAGAR JAIPUR :- SUBMITTED TO:- SUBMITTED BY:- Miss. VICKY JAIN SURENDRA KUMAR MEENA Lecturer SINE INTERNATIONAL INSTITUTE OF TECHNOLOGY, JAIPUR RAJASTHAN TECHNICAL UNIVERSITY, KOTA
  • 2. In India Electrecal power is Generated at a voltage of 11kv to 33kv ,which is taken stepped up to the transmission level in the range of 66kv to 400kv member of transmission and switching have to be created these are known as ”Substation”. Substation is an assembly of apparatus ,which transform the characteristics of electrical energy from one form to another say from one voltage level to another level. hence a substation is an Intermedate link between the Genrating station and consumer
  • 3. Fig.1 – 220 KV GSS ,IG NAGAR JAIPUR Substations have switching, protection and control equipment and one or more transformers. In a large substation, circuit breaker are used to interrupt any short-circuits or overload currents that may occur on the network
  • 4. 220KV INDRA GANDHI NAGAR GRID SUBSTATION 220kv IGN s/s is a convensional, hybrid substaion. It is part of transmission system. 33kv substation is gas insulated substation which is inside the control room.  for communication purpose PLCC is used.
  • 5. INCOMING FEEDER:  220KV PURANA GHAT LINE-1.  220KV PURANA GHAT LINE-2.  220KV BASSI LINE.  220KV HEERAPURA LINE.
  • 6. OUTGOING FEEDER:  132KV PURANAGHAT.  132KV SITAPURA.  132KV MNIT(UNDER CONSTRUTION). 33KV FEEDER:  JAGATPURA.  INDRA GANDHI NAGAR.  BISALPUR.  SIDDHARTH MARG.  PRADHAN MARG.
  • 7. CONTENTS:-  LIGHTNING ARRESTOR.  INSULATER.  POWER TRANSFORMER.  CURRENT TRANSFOMER.  CIRCUIT BREAKER.  BUSBARS.  PROTECTIVE RELAY.  CONTROL PANEL.  POTENTIAL TRANSFORMER  SINGLE LINE DIAGRAM  WAVE TRAP.  CONCLUSION
  • 8. LIGHTNING ARRESTOR  Lightning arrestor provide protection to all the equipment against the HV.an electric discharge between cloud and earth ,between cloud and charge enters of some loud is known as lightning.  It is provide to safety transmission &distribution line.
  • 9. INSULATER An electrical insulator is a material whose internal electric charge do not flow freely and therefor make it very hard to conduct an electric current under the influence of an electric field.
  • 10. POWER TRANSFORMER •For stepping up or down the system voltage, power transformers are used in the substations. At generating end, the voltage is only stepped up for transmission of power while at all the subsequent substations the voltage is gradually stepped down to reach finally to working voltage level
  • 11. CURRENT TRANSFORMER The current transformer are used to stepped down . It is used to measurement/control/ protection.
  • 12. CIRCUIT BREAKER  Circuit breaker are used for switching and protection.  Brake a circuit and automatically under fault condition.  A circuit breaker consist of fixed and moving contact called electrode under normal condition.
  • 13. BUSBARS  Bus bars are common electrical component through which a large no. of feeders operating at some voltage have to connected.  It is used to connect to transmission line which go to electricity.  It is used to high material conductor.
  • 14. PROTECTIVE REALAY  A Protective relay is a device which detect the fault.  It is to detect after their go to command circuit breaker  It is provide to safety in electrical equipments.
  • 16. CONTROL PANEL  Color coding:- 1. 33kv (Green) 2. 132kv (black) 3. 220kv (Broun) 4. 440kv (indigo) 5. 110kv (orange)
  • 17. POTENTIAL TRANSFORMER The potential transformer is used to one electrical form to another form . It is used to measurment of current &voltage.
  • 20. CONCLUSION  An Engineer need to have not just theoretical but practical as well as and so every student is supposed to undergo a practical training .session after 3rd year where I have impaired the knowledge about transmission ,distribution .during the 45 days training session. we have acquainted with the repairing of a transformer and testing of transformer. At last is would like to say that practical training taken at 220kv gss ig nagar has broadened my knowledge and widened my thinking as a professional.
  • 21.