3. Objectives
To study pre engineered building.
To prepare a model of P.E.B.
To analyze structure using Staad Pro.
To design sections, connections etc.
To study the effect of P.E.B. for following issues:
To reduce complexity on site.
To achieve accuracy.
Speed of work.
4. Pre Engineered Building
Steel buildings in which excess steel is avoided by
Tapering the sections.
Tapering is done as per Bending Moment
requirements.
Components are manufactured in factory and
assembled on site.
Larger plate dimensions are used in areas of higher
load effects.
9. Problem statement
Internal dimensions of building: l=60 m, b=15 m
Height of building up to eaves level= 6 m
Location of building= Islampur (pune region)
Type of roofing = G.I.sheets
Area of opening (permeability of building 5% to 20%)
Angle of rafter = < 100
Spacing between two columns = 6 m
Number of frames = 10
10. Load calculation
Dead load:
1. Wight of purlin :5 kg/m2
2. Weight of sheeting :5 kg/m2
Total weight :10 kg/m2=0.1kN/m2
3. Self weight of tapered section
11. Live load
Live load =0.75 kN/m2 (Angle lesthan 10 0)
= 0.75*6
Live load =4.5 kN/m2
Collateral load:
Collateral load = 0.2* 6 =1.2 KN/M
(Assumed)
20. Results Sl. No. Description PEB CSB
1 Steel Take Off (kN) 12.194 84.595
2 Support Reaction (kN) 10.62 375.582
3 Maximum deflection (mm) 39.48 8.611
4 Maximum Shear Force (kN) 66.894 453.981
5 Maximum Moment (kNm) 175.52 908.577
21. Advantages
PEB System is zero maintenance & superior in strength
than conventional.
Lower Cost.
Quality Control.
Large Clear Spans.
strict quality control environment, thereby ensuring
superior quality & finish.
Easier to incorporate future expansions
22. Disadvantages
Not used for multi-storey building.
Technical person is required on site.
Special Machinery is required.
Design of member takes more time.
23. Conclusion
Using of PEB instead of CSB may be reducing the steel
quantity.
Reduction in the steel quantity definitely reducing the
dead load.
Reduction in the dead load reducing the size of
Foundation.
Using of PEB increase the Aesthetic view of structure.
24. Applications
WARE HOUSES
INDUSTRIAL SHEDS
FACTORIES
WORKSHOPS
OFFICES
GAS STATIONS
VEHICLE PARKING SHEDS
SHOW ROOMS
AIRCRAFT HANGERS
SCHOOLS
SPORTS AND RECREATIONAL FACILITIES
27. Reference
Limit State Design in Structural Steel- M. Y . Shiyekar.
Pre-Engineered metal Buildings the latest trend in building
construction‖ by K.K.Mitra – Gen. Manager (marketing)
Lloyd Insulations (India) Limited
IS : 800 - 2007 :- General Construction In Steel - Code of
Practice.
IS : 875 (Part 1) - 1987 :- Code of Practice for Design Loads
(Other Than Earthquake) for Buildings
IS : 875 (Part 2) - 1987 :- Code of Practice for Design
Loads (Other Than Earthquake) for Buildings and
Structures- Live Loads.
IS : 875 (Part 3) - 1987 :- Code of Practice for Design