29-Dec-15 www.leanteamsusa.com 2
Process Design Criteria
www.leanteamsusa.com 3
Customer
Requirements
Capability
Demand (Current and Future)
Lead Time
Layout Flow
Cellular design, Product design, or Process design
People Required skills
Number
Support departments
Equipment Automation
DFOEE – Design For Overall Equipment Effectiveness
Support (tables, measurement, IT, security, material handling)
Facility Location
Energy
Structure
Health Safety
Environment
Ergonomics, Equipment Safety, Prevention
Hazardous materials
Process Design Tools
• Computer Aided Design (CAD)
• Flowchart
• Value Stream Mapping (VSM)
• Supplier Input Process Output Customer (SIPOC)
• Spaghetti Map
• Process statistical software
29-Dec-15 www.leanteamsusa.com 4
Process Design Steps
1. Business need statement
2. Establish process design team
3. Outline of customer demand and requirement
4. Facility review
5. Layout design
6. Equipment requirements
7. People requirements
8. Health, Safety, and Environment requirements
29-Dec-15 www.leanteamsusa.com 5
29-Dec-15 www.leanteamsusa.com 6
www.leanteamsusa.com 7
0.00
4.00
8.00
12.00
16.00
Task Cycle Time Required Takt Time = 14.98 Sec
Thickness
10.5 mm
Color
3.5 Delta E
Yield
99.05%
Yield
99.75%
X-Y
Position
Pressure
Units Out
5,300/day
Thickness
Heat
Yield
99.75%
Units Out
5,300/day
Units Out
5,300/day
Yield
99.995%
WIP
1800 Units
WIP
1700 Units
WIP
1700 Units
Heat
Height
Viscosity
Pressure
3 SIGMA 3 SIGMA
4 SIGMA
4 SIGMA
Processes Step1 Step 2 Step 3 Step 4 System
Scheduled Time (seconds) 79,207 79,207 79,207 79,207
Throughput (Units/hour) 300 280 342 400
Inventory Time (Hour) 6 6 5 4
Process Lead Time (Hour) 22
Process Yield 99.50%
Process Throughput (Units/hour) 280
Mth. Sales forecast (Units) 121,600
Days in month 23
29-Dec-15 8www.leanteamsusa.com
Visual Management Rules
ALL MUST BE SATISFIED
• 80:20 Manual: Automated data collection
 Simple and Affordable
• Real time measures
• Must provide value
 Value Stream Workers
 Leadership team
• Must inspire conversation in the Gemba
• 80:20 Input measures: Output measures
• Preventative measures (Inputs)
 Quality
 Capability
 Safety
• Provides results of intended design (Outputs)
• Clear indication of continuous improvement and the HOW
29-Dec-15 9www.leanteamsusa.com
Contact Us
• Lean Teams USA Lean Consulting
• View My Profile on LinkedIn
• Lean Teams USA +1 215 353 0696
• Link to 3rd Component
29-Dec-15 www.leanteamsusa.com 10

More Related Content

What's hot

37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutionssashi prabhu
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last PlanningThomas Almore
 
Lean Manufacturing Projects - Introduction
Lean Manufacturing Projects - IntroductionLean Manufacturing Projects - Introduction
Lean Manufacturing Projects - IntroductionVictor Jaimes
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatraDANANG WID
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturingahmad bassiouny
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingAnkit Sharma
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
The Complete Lean Enterprise
The Complete Lean EnterpriseThe Complete Lean Enterprise
The Complete Lean EnterpriseYucika Kalvari
 
Lean Presentation
Lean PresentationLean Presentation
Lean PresentationPam Watkins
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Bill Bearnson
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its toolAnkit Gupta
 
Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013John Cachat
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management BasicsUpendra K
 

What's hot (19)

37022309 lean-simple-solutions
37022309 lean-simple-solutions37022309 lean-simple-solutions
37022309 lean-simple-solutions
 
Lean Management System
Lean Management SystemLean Management System
Lean Management System
 
Lean Methods & Last Planning
Lean Methods & Last PlanningLean Methods & Last Planning
Lean Methods & Last Planning
 
Lean Manufacturing Projects - Introduction
Lean Manufacturing Projects - IntroductionLean Manufacturing Projects - Introduction
Lean Manufacturing Projects - Introduction
 
Lean manufacturing mitramatra
Lean manufacturing mitramatraLean manufacturing mitramatra
Lean manufacturing mitramatra
 
What Is Lean Manufacturing
What Is Lean ManufacturingWhat Is Lean Manufacturing
What Is Lean Manufacturing
 
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma TrainingThe 8 waste in Lean Manufacturing - Lean Six Sigma Training
The 8 waste in Lean Manufacturing - Lean Six Sigma Training
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
Basics of lean
Basics of leanBasics of lean
Basics of lean
 
The Complete Lean Enterprise
The Complete Lean EnterpriseThe Complete Lean Enterprise
The Complete Lean Enterprise
 
Lean Presentation
Lean PresentationLean Presentation
Lean Presentation
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015
 
Fundamentals of Lean
Fundamentals of LeanFundamentals of Lean
Fundamentals of Lean
 
Lean manufacturing and its tool
Lean manufacturing and its toolLean manufacturing and its tool
Lean manufacturing and its tool
 
Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013Bridging the gap between quality and finance may 2013
Bridging the gap between quality and finance may 2013
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Lean Management Basics
Lean Management BasicsLean Management Basics
Lean Management Basics
 

Similar to Process Design and Visual Value Streams

Applying BPM Methodology to Tackle the Complexity
Applying BPM Methodology to Tackle the ComplexityApplying BPM Methodology to Tackle the Complexity
Applying BPM Methodology to Tackle the ComplexityTom Judd
 
Nilesh Patil PLM Teamcenter manufacturing
Nilesh Patil PLM Teamcenter manufacturingNilesh Patil PLM Teamcenter manufacturing
Nilesh Patil PLM Teamcenter manufacturingNilesh Patil
 
Plant design management system1
Plant design management system1Plant design management system1
Plant design management system1MathiVanan79
 
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC Advisory Group
 
Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionChirag Patel
 
Bsec Introduction 1 July 2010 Mm
Bsec Introduction 1 July 2010 MmBsec Introduction 1 July 2010 Mm
Bsec Introduction 1 July 2010 Mmmaglothinm
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions managementShimelis Mutera
 
PLCM Module -5-Dr.GMS JSSATEB.pdf
PLCM Module -5-Dr.GMS JSSATEB.pdfPLCM Module -5-Dr.GMS JSSATEB.pdf
PLCM Module -5-Dr.GMS JSSATEB.pdfswamy62
 
Chapter 2 digital manufacturing
Chapter 2   digital manufacturingChapter 2   digital manufacturing
Chapter 2 digital manufacturingN. A. Sutisna
 
Pro engineer package overview new
Pro engineer package overview newPro engineer package overview new
Pro engineer package overview newpraveen99950
 
Issue Management System
Issue Management SystemIssue Management System
Issue Management SystemPratik Vipul
 

Similar to Process Design and Visual Value Streams (20)

Applying BPM Methodology to Tackle the Complexity
Applying BPM Methodology to Tackle the ComplexityApplying BPM Methodology to Tackle the Complexity
Applying BPM Methodology to Tackle the Complexity
 
Nilesh Patil PLM Teamcenter manufacturing
Nilesh Patil PLM Teamcenter manufacturingNilesh Patil PLM Teamcenter manufacturing
Nilesh Patil PLM Teamcenter manufacturing
 
Plant design management system1
Plant design management system1Plant design management system1
Plant design management system1
 
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
ARC's Greg Gorbach's Global Manufacturing Presentation at ARC's 2008 Industry...
 
UNIT VI-3.pptx
UNIT VI-3.pptxUNIT VI-3.pptx
UNIT VI-3.pptx
 
Product design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introductionProduct design and value engineering (PDVE) Ch 1 introduction
Product design and value engineering (PDVE) Ch 1 introduction
 
Bsec Introduction 1 July 2010 Mm
Bsec Introduction 1 July 2010 MmBsec Introduction 1 July 2010 Mm
Bsec Introduction 1 July 2010 Mm
 
Presentation of se
Presentation of sePresentation of se
Presentation of se
 
Lecture9
Lecture9Lecture9
Lecture9
 
Production & opeartions management
Production & opeartions managementProduction & opeartions management
Production & opeartions management
 
Resume_210415
Resume_210415Resume_210415
Resume_210415
 
Kingshir-KADMS features
Kingshir-KADMS featuresKingshir-KADMS features
Kingshir-KADMS features
 
PLCM Module -5-Dr.GMS JSSATEB.pdf
PLCM Module -5-Dr.GMS JSSATEB.pdfPLCM Module -5-Dr.GMS JSSATEB.pdf
PLCM Module -5-Dr.GMS JSSATEB.pdf
 
Chapter 2 digital manufacturing
Chapter 2   digital manufacturingChapter 2   digital manufacturing
Chapter 2 digital manufacturing
 
Pro engineer package overview new
Pro engineer package overview newPro engineer package overview new
Pro engineer package overview new
 
DOC of Crank shaft
DOC of Crank shaftDOC of Crank shaft
DOC of Crank shaft
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
 
Issue Management System
Issue Management SystemIssue Management System
Issue Management System
 
context-sdm-brochure
context-sdm-brochurecontext-sdm-brochure
context-sdm-brochure
 
CAD/CAM Lecture #5
CAD/CAM Lecture #5CAD/CAM Lecture #5
CAD/CAM Lecture #5
 

More from Lean Teams USA

The 1st component - Leadership and Mentoring
The 1st component - Leadership and MentoringThe 1st component - Leadership and Mentoring
The 1st component - Leadership and MentoringLean Teams USA
 
The 4th component – fast knowledge sharing
The 4th component – fast knowledge sharingThe 4th component – fast knowledge sharing
The 4th component – fast knowledge sharingLean Teams USA
 
The 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for SustainmentThe 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for SustainmentLean Teams USA
 
Productive meetings by lean
Productive meetings by leanProductive meetings by lean
Productive meetings by leanLean Teams USA
 
Autonomous Team Requirements
Autonomous Team RequirementsAutonomous Team Requirements
Autonomous Team RequirementsLean Teams USA
 
Leadership skill of momentum
Leadership skill of momentumLeadership skill of momentum
Leadership skill of momentumLean Teams USA
 
Value stream mapping for service
Value stream mapping for serviceValue stream mapping for service
Value stream mapping for serviceLean Teams USA
 
Creating a Creative Culture
Creating a Creative CultureCreating a Creative Culture
Creating a Creative CultureLean Teams USA
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)Lean Teams USA
 
Lean for Small Business
Lean for Small BusinessLean for Small Business
Lean for Small BusinessLean Teams USA
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementLean Teams USA
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leadersLean Teams USA
 
Four components of fast pace
Four components of fast paceFour components of fast pace
Four components of fast paceLean Teams USA
 
Dpi dynamic process improvement
Dpi dynamic process improvementDpi dynamic process improvement
Dpi dynamic process improvementLean Teams USA
 

More from Lean Teams USA (20)

5s slideshare
5s slideshare5s slideshare
5s slideshare
 
The 1st component - Leadership and Mentoring
The 1st component - Leadership and MentoringThe 1st component - Leadership and Mentoring
The 1st component - Leadership and Mentoring
 
The 4th component – fast knowledge sharing
The 4th component – fast knowledge sharingThe 4th component – fast knowledge sharing
The 4th component – fast knowledge sharing
 
The 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for SustainmentThe 3rd component - Organization Structure for Sustainment
The 3rd component - Organization Structure for Sustainment
 
Productive meetings by lean
Productive meetings by leanProductive meetings by lean
Productive meetings by lean
 
Output improvement
Output improvementOutput improvement
Output improvement
 
Autonomous Team Requirements
Autonomous Team RequirementsAutonomous Team Requirements
Autonomous Team Requirements
 
Leadership skill of momentum
Leadership skill of momentumLeadership skill of momentum
Leadership skill of momentum
 
Go to gemba
Go to gembaGo to gemba
Go to gemba
 
Value stream mapping for service
Value stream mapping for serviceValue stream mapping for service
Value stream mapping for service
 
Lean Leadership
Lean LeadershipLean Leadership
Lean Leadership
 
Creating a Creative Culture
Creating a Creative CultureCreating a Creative Culture
Creating a Creative Culture
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
Lean office
Lean officeLean office
Lean office
 
Lean for Small Business
Lean for Small BusinessLean for Small Business
Lean for Small Business
 
OEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component ImprovementOEE Financial Benefits From Component Improvement
OEE Financial Benefits From Component Improvement
 
5S numbers game
5S numbers game5S numbers game
5S numbers game
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
 
Four components of fast pace
Four components of fast paceFour components of fast pace
Four components of fast pace
 
Dpi dynamic process improvement
Dpi dynamic process improvementDpi dynamic process improvement
Dpi dynamic process improvement
 

Recently uploaded

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Recently uploaded (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 

Process Design and Visual Value Streams

  • 1.  Robert Baird President +1 215 353 0696 The 2nd Component Process Design and Visual Value Streams 29-Dec-15 www.leanteamsusa.com
  • 3. Process Design Criteria www.leanteamsusa.com 3 Customer Requirements Capability Demand (Current and Future) Lead Time Layout Flow Cellular design, Product design, or Process design People Required skills Number Support departments Equipment Automation DFOEE – Design For Overall Equipment Effectiveness Support (tables, measurement, IT, security, material handling) Facility Location Energy Structure Health Safety Environment Ergonomics, Equipment Safety, Prevention Hazardous materials
  • 4. Process Design Tools • Computer Aided Design (CAD) • Flowchart • Value Stream Mapping (VSM) • Supplier Input Process Output Customer (SIPOC) • Spaghetti Map • Process statistical software 29-Dec-15 www.leanteamsusa.com 4
  • 5. Process Design Steps 1. Business need statement 2. Establish process design team 3. Outline of customer demand and requirement 4. Facility review 5. Layout design 6. Equipment requirements 7. People requirements 8. Health, Safety, and Environment requirements 29-Dec-15 www.leanteamsusa.com 5
  • 7. www.leanteamsusa.com 7 0.00 4.00 8.00 12.00 16.00 Task Cycle Time Required Takt Time = 14.98 Sec Thickness 10.5 mm Color 3.5 Delta E Yield 99.05% Yield 99.75% X-Y Position Pressure Units Out 5,300/day Thickness Heat Yield 99.75% Units Out 5,300/day Units Out 5,300/day Yield 99.995% WIP 1800 Units WIP 1700 Units WIP 1700 Units Heat Height Viscosity Pressure 3 SIGMA 3 SIGMA 4 SIGMA 4 SIGMA Processes Step1 Step 2 Step 3 Step 4 System Scheduled Time (seconds) 79,207 79,207 79,207 79,207 Throughput (Units/hour) 300 280 342 400 Inventory Time (Hour) 6 6 5 4 Process Lead Time (Hour) 22 Process Yield 99.50% Process Throughput (Units/hour) 280 Mth. Sales forecast (Units) 121,600 Days in month 23
  • 9. Visual Management Rules ALL MUST BE SATISFIED • 80:20 Manual: Automated data collection  Simple and Affordable • Real time measures • Must provide value  Value Stream Workers  Leadership team • Must inspire conversation in the Gemba • 80:20 Input measures: Output measures • Preventative measures (Inputs)  Quality  Capability  Safety • Provides results of intended design (Outputs) • Clear indication of continuous improvement and the HOW 29-Dec-15 9www.leanteamsusa.com
  • 10. Contact Us • Lean Teams USA Lean Consulting • View My Profile on LinkedIn • Lean Teams USA +1 215 353 0696 • Link to 3rd Component 29-Dec-15 www.leanteamsusa.com 10