SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
National Aeronautics and Space Administration




      Stennis @ 50
                              50 facts spanning 50 years




NASA’s John C. Stennis Space Center marks the 50th anniversary of the establishment of
the center on Oct. 25, 2011. Following are 50 facts that offer a glimpse of the historic site,
which has powered the nation’s space dreams and travels for five decades and counting.

                                                Historical facts
• NASA publicly announced plans to open a rocket         • Tree-cutting for construction of rocket engine test
  engine test facility in Hancock County in south Mis-     facilities at Stennis Space Center began May 17, 1963.
  sissippi on Oct. 25, 1961.
                                                         • At the height of construction of Stennis facilities in
• Construction of Stennis facilities necessitated the      the 1960s, some 6,100 employees were onsite with 30
  relocation of 660 families to other areas.               prime and 250 subcontractor companies.
• During the early years of the nation’s space program,       • In 2010, more than half of all Stennis employees (53
  famed rocket scientist Dr. Wernher von Braun af-              percent) held a bachelor’s degree or greater.
  firmed the importance of Stennis test facilities by
  stating, “I don’t know yet what method we will use to       • The StenniSphere visitor center and museum features
  get to the moon, but I do know that we have to go             informative and interactive exhibits, including a moon
  through Mississippi to get there!”                            rock and other space program artifacts.

• NASA first                                                                                                • Each
                                                                                                           year, the
  called its
                                                                                                           StenniSphere
  engine test
                                                                                                           visitor center
  facility Mis-
                                                                                                           and museum
  sissippi Test
                                                                                                           hosts more
  Operations,
                                                                                                           than 36,000
  then Na-
                                                                                                           visitors on
  tional Space
                                                                                                           tours.
  Technol-
  ogy Labo-                                                                                                • In 2009,
  ratories.                                                                                                Stennis
  On May                                                                                                   unveiled an
  20, 1988,                                                                                                “all hazards
  President                                                                                                network” sys-
  Ronald Rea-                                                                                              tem (HazNet)
  gan signed                                                                                               that provides
                   May 10, 1966 – Operators at what then was known as Mississippi Test Operations con-
  an executive duct their second test firing of an S-II Saturn rocket stage on the B Test Stand.            comprehen-
  order nam-                                                                                               sive informa-
  ing the site in honor of U.S. Sen. John C. Stennis of          tion in emergency and disaster situations. Developed
  Mississippi.                                                   through the facility’s Innovative Partnerships Pro-
                                                                 gram, the system was adopted for all NASA centers,
              Stennis Space Center                               as well as by several area communities.

• Stennis features seven-and-a-half miles of canal                            Propulsion testing
  waterways, which include a lock-and-dam system that
                                                              • Stennis is America’s largest rocket engine test facility.
  allows transport of large rocket stages and cryogenic
  barges from the Gulf of Mexico to onsite locations          • Stennis rocket engine test facilities are valued at more
  via the Pearl River.                                          than $2 billion.
• All Stennis facilities are located within a 13,800-acre     • NASA’s Rocket Propulsion Test Program Office
  “fee” area owned by the federal government.                   located at Stennis is responsible for managing test
                                                                facilities across the agency.
• The Stennis fee area is surrounded by a 125,000-acre
  noise buffer zone designated a national asset.              • The three major test stands at Stennis are the single-
                                                                position, vertical-firing A-1 and A-2 tests stands, and
• In April 2008, the American Institute of Aeronautics
                                                                the dual-position, vertical-firing B-1/B-2 Test Stand.
  and Astronautics named Stennis a historic aerospace
  site.                                                       • The versatile three-stand E Test Complex at Stennis
                                                                includes seven separate cells capable of various test
• Stennis has been affected by numerous tropical
                                                                activities.
  storms, including three major hurricanes – Hurricane
  Betsy during construction in 1965, Hurricane Camille        • Stennis is among the world’s largest consumers of liq-
  in 1969 and Hurricane Katrina in 2005.                        uid hydrogen – one of the main fuels used in rocket
                                                                propulsion testing.
• In 2010, the direct global economic impact of Stennis
  was $875 million. The direct economic impact within         • On Aug. 8, 1998, all four test positions at Stennis
  a 50-mile radius of the facility was $616 million.            were occupied for the first time in the center’s history.
Apollo Program                                 • Space shuttle main engines at Stennis were test fired
• The first- and second-stage Saturn V rocket stages                for about eight-and-one-half minutes (520 seconds),
  for NASA’s Apollo Program were tested at Stennis,                the amount of time the engines must fire during an
  including those that propelled humans to the moon                actual flight to enable the shuttle to reach orbit.
  on seven lunar missions from 1969 to 1972.                     • On Aug. 20, 1990, for the first time ever, space shuttle
                                                                   main engines were tested on all three large test stands
• Stennis engineers conducted the first-ever rocket en-
                                                                   in a single day.
  gine test at the facility on April 23, 1966, a 15-second
  firing of a Saturn V second stage prototype (S-II-C).           • The one millionth second of space shuttle main
                                                                   engine test firing was recorded at Stennis on Jan. 24,
• During the Apollo Program years, Stennis engineers               2004, during a test conducted on the A-2 Test Stand.
  conducted 43 test firings. The accumulated experience
  of the test team members amounted to 2,475 man-                • Stennis conducted the last scheduled test of a space
  years of rocket engine test expertise.                           shuttle main engine on July 29, 2009.

• The Stennis team tested 27 Saturn V rocket stages in                           Current and future testing
  the Apollo years. All that were launched performed             • In 1998, Stennis partnered with Pratt & Whitney
  their missions without a single failure.                            Rocketdyne to test RS-68 engines used for Delta IV
                                                                      rocket launches. It marked the first long-term com-
                 Space Shuttle Program                                mitment to allow Stennis rocket engine test facilities
•   Stennis engineers conducted the first full-duration test           to be used for commercial purposes. Pratt & Whitney
    of a space shuttle main engine on June 24, 1975.                  Rocketdyne continues to test RS-68 engines on the
                                                                      site’s B-1/B-2 Test Stand.
•   All of the main engines used on more than 130 space
    shuttle flights were tested at Stennis.                       • In 2007, Stennis broke ground for construction of
                                                                                                                the A-3 Test
•   In April                                                                                                    Stand, the
    1978, Sten-                                                                                                 first large test
    nis con-                                                                                                    facility to be
    ducted the                                                                                                  built onsite
    first test of                                                                                                since the
    the space                                                                                                   1960s.
    shuttle
                                                                                                                • When
    main pro-                                                                                                   activated in
    pulsion test                                                                                                2013, the
    article with                                                                                                new A-3 Test
    three main                                                                                                  Stand at Sten-
    engines                                                                                                     nis will be
    configured                                                                                                   the only test
    as they are                                                                                                 stand in the
    on a space                                                                                                  country with
                    July 29, 2009 – Stennis Space Center operators conduct the final planned space shuttle
    shuttle or-     main engine test on engine No. 0525 at the facility’s A-2 Test Stand.                       the combined
    biter during                                                                                                capabilities to
    flight. All three main engines were fired simultane-                conduct long-duration tests on full-scale engines at
    ously on the B-2 Test Stand to prove the space shuttle            simulated altitudes up to 100,000 feet, and to gimbal,
    propulsion system flight-worthy. Many consider the                 or rotate, the engines during the test as they would
    space shuttle’s propulsion system testing as Stennis’             operate during flight.
    finest hour.
                                                                 • In 2010, Stennis Space Center partnered with Orbital
•   Every modification and configuration of space shut-                 Sciences Corporation to test Aerojet AJ26 rocket en-
    tle main engines were tested and proven flight-worthy              gines that will power commercial cargo flights to the
    at Stennis before being used on a mission.                        International Space Station.
Mission support                                            Federal city
• The Stennis Applied Science & Technology Project           • Stennis is a federal city, home to about 30 federal,
  Office manages the NASA’s Gulf of Mexico Initia-              state, academic and private organizations and sev-
  tive, created in 2007 to enhance the region’s ability to     eral technology-based companies. The companies
  recover from the devastating hurricanes of 2005 and          and agencies share the cost of owning and operating
  to address coastal management issues. Since 2009, the        the south Mississippi facility, making it more cost-
  initiative has provided $14 million to support 300 sci-      effective for each entity to accomplish its independent
  entists conducting 35 research projects in the region.       mission.
• The Applied Science                                                                        •       Since 1998, the
  & Technology Project                                                                       U.S. Navy has conducted
  Office is conducting 15                                                                     training for the Special
  research projects in the                                                                   Boat Team TWENTY-
  Gulf of Mexico region.                                                                     TWO special operations
  The projects monitor                                                                       riverine force on water-
  sensitive ecosystems                                                                       ways at Stennis.
  like coastal marshes
  and barrier islands, or                                                                    •         Since 1987, the
  environmental param-                                                                       Mississippi Technol-
  eters such as water                                                                        ogy Transfer Center has
  quality.                                                                                   been located at Stennis,
                                                                                             working to help busi-
• In 2010, the Sten-                                                                         nesses increase produc-
  nis Education Office                                                                        tivity, improve existing
  created its first teach-                                                                    products and services,
  ing curricula, focused     The A-3 Test Stand under construction at Stennis Space Center   develop new products,
  on teaching differ-        will allow operators to test next-generation rocket engines at  find needed materials and
  ences between mass vs. simulated altitudes up to 100,000 feet.                             realize greater competi-
  weight and on New-                                              tiveness.
  ton’s Laws of Motion. It now is electronically avail-
  able to teachers around the world.                            • Stennis is home to the largest concentration of ocean-
                                                                  ographers in the world.
• The NASA Education Office operates an Educator
  Resource Center that offers materials and training to         • Five area colleges operate a center of higher learning
  school teachers throughout the Louisiana-Mississippi            at Stennis – Mississippi State University, Pearl River
  region. Some 800 teachers a year attend onsite and              Community College, the University of New Orleans,
  offsite workshops sponsored by the center.                      the University of Southern Mississippi and the Uni-
                                                                  versity of Mississippi.
• The NASA Shared Services Center opened at Stennis
  in August 2008. The facility was created by NASA to           • Mississippi State University’s Northern Gulf Institute
  consolidate procurement, human resources, informa-              and the University of Southern Mississippi’s Depart-
  tion technology and finance activities from across the           ment of Marine Science both are located at Stennis.
  agency in one central location.




National Aeronautics and Space Administration

John C. Stennis Space Center
Stennis Space Center, MS 39529-6000
(228) 688-3333

www.nasa.gov


FS-2011-02-00106-SSC                                                                                             NASA facts

Weitere ähnliche Inhalte

Andere mochten auch

Happy Mothers Day
Happy  Mothers  DayHappy  Mothers  Day
Happy Mothers Daymcbs101
 
Social Media Strategy
Social Media StrategySocial Media Strategy
Social Media StrategyMisty Montano
 
Orientació professional
Orientació professional   Orientació professional
Orientació professional rsalip
 
Antzerkia prestatzen
Antzerkia prestatzenAntzerkia prestatzen
Antzerkia prestatzenmtenesit
 
Spring Summer2012
Spring Summer2012Spring Summer2012
Spring Summer2012brianna1
 
หน่วยประมวลผลของเครื่องคอมพิวเตอร์ บี
หน่วยประมวลผลของเครื่องคอมพิวเตอร์  บีหน่วยประมวลผลของเครื่องคอมพิวเตอร์  บี
หน่วยประมวลผลของเครื่องคอมพิวเตอร์ บีPheeranan Thetkham
 
Hdl talk final
Hdl talk finalHdl talk final
Hdl talk finalIndy Johar
 
What the Tweet? Beyond Twitter basics.
What the Tweet? Beyond Twitter basics.What the Tweet? Beyond Twitter basics.
What the Tweet? Beyond Twitter basics.Misty Montano
 
What You Need To Know About Privacy Now!
What You Need To Know About Privacy   Now!What You Need To Know About Privacy   Now!
What You Need To Know About Privacy Now!catherinecoulter
 
лермонтов шүлэгчийн үхэл
лермонтов шүлэгчийн үхэллермонтов шүлэгчийн үхэл
лермонтов шүлэгчийн үхэлrentsenkhandj
 
Alternative energy sources
Alternative energy sourcesAlternative energy sources
Alternative energy sourcesLetter1234
 
20150413 IoT 시대 개인정보보호법제 개선 구태언
20150413 IoT 시대 개인정보보호법제 개선 구태언20150413 IoT 시대 개인정보보호법제 개선 구태언
20150413 IoT 시대 개인정보보호법제 개선 구태언TEK & LAW, LLP
 
Iuavcamp social-network
Iuavcamp social-networkIuavcamp social-network
Iuavcamp social-networkRiccardo Bona
 

Andere mochten auch (19)

Happy Mothers Day
Happy  Mothers  DayHappy  Mothers  Day
Happy Mothers Day
 
Social Media Strategy
Social Media StrategySocial Media Strategy
Social Media Strategy
 
Orientació professional
Orientació professional   Orientació professional
Orientació professional
 
9health
9health9health
9health
 
Programa coloquio patrimonio_corregido
Programa coloquio patrimonio_corregidoPrograma coloquio patrimonio_corregido
Programa coloquio patrimonio_corregido
 
Antzerkia prestatzen
Antzerkia prestatzenAntzerkia prestatzen
Antzerkia prestatzen
 
Spring Summer2012
Spring Summer2012Spring Summer2012
Spring Summer2012
 
หน่วยประมวลผลของเครื่องคอมพิวเตอร์ บี
หน่วยประมวลผลของเครื่องคอมพิวเตอร์  บีหน่วยประมวลผลของเครื่องคอมพิวเตอร์  บี
หน่วยประมวลผลของเครื่องคอมพิวเตอร์ บี
 
Ulzii1
Ulzii1Ulzii1
Ulzii1
 
Hdl talk final
Hdl talk finalHdl talk final
Hdl talk final
 
Parametric design
Parametric designParametric design
Parametric design
 
What the Tweet? Beyond Twitter basics.
What the Tweet? Beyond Twitter basics.What the Tweet? Beyond Twitter basics.
What the Tweet? Beyond Twitter basics.
 
What You Need To Know About Privacy Now!
What You Need To Know About Privacy   Now!What You Need To Know About Privacy   Now!
What You Need To Know About Privacy Now!
 
лермонтов шүлэгчийн үхэл
лермонтов шүлэгчийн үхэллермонтов шүлэгчийн үхэл
лермонтов шүлэгчийн үхэл
 
Alternative energy sources
Alternative energy sourcesAlternative energy sources
Alternative energy sources
 
20150413 IoT 시대 개인정보보호법제 개선 구태언
20150413 IoT 시대 개인정보보호법제 개선 구태언20150413 IoT 시대 개인정보보호법제 개선 구태언
20150413 IoT 시대 개인정보보호법제 개선 구태언
 
Proximity
ProximityProximity
Proximity
 
English
EnglishEnglish
English
 
Iuavcamp social-network
Iuavcamp social-networkIuavcamp social-network
Iuavcamp social-network
 

Ähnlich wie Stennis@50

Markets in Motion: Developing Markets in Low Earth Orbit
Markets in Motion: Developing Markets in Low Earth OrbitMarkets in Motion: Developing Markets in Low Earth Orbit
Markets in Motion: Developing Markets in Low Earth OrbitISSRDC
 
Opening presentationjun01
Opening presentationjun01Opening presentationjun01
Opening presentationjun01Clifford Stone
 
John A Chapman mining the moon 20060723
John A Chapman mining the moon 20060723John A Chapman mining the moon 20060723
John A Chapman mining the moon 20060723John Chapman
 
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...grssieee
 
Lockwood.scott
Lockwood.scottLockwood.scott
Lockwood.scottNASAPMC
 

Ähnlich wie Stennis@50 (7)

Markets in Motion: Developing Markets in Low Earth Orbit
Markets in Motion: Developing Markets in Low Earth OrbitMarkets in Motion: Developing Markets in Low Earth Orbit
Markets in Motion: Developing Markets in Low Earth Orbit
 
Opening presentationjun01
Opening presentationjun01Opening presentationjun01
Opening presentationjun01
 
legtc_resume
legtc_resumelegtc_resume
legtc_resume
 
John A Chapman mining the moon 20060723
John A Chapman mining the moon 20060723John A Chapman mining the moon 20060723
John A Chapman mining the moon 20060723
 
Earthquake ppt
Earthquake pptEarthquake ppt
Earthquake ppt
 
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...
WE4.L10.1: OPERATIONAL ENVIRONMENTAL DATA IN 2010: CONNECTING GLOBAL AND LOCA...
 
Lockwood.scott
Lockwood.scottLockwood.scott
Lockwood.scott
 

Kürzlich hochgeladen

Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 

Kürzlich hochgeladen (20)

Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 

Stennis@50

  • 1. National Aeronautics and Space Administration Stennis @ 50 50 facts spanning 50 years NASA’s John C. Stennis Space Center marks the 50th anniversary of the establishment of the center on Oct. 25, 2011. Following are 50 facts that offer a glimpse of the historic site, which has powered the nation’s space dreams and travels for five decades and counting. Historical facts • NASA publicly announced plans to open a rocket • Tree-cutting for construction of rocket engine test engine test facility in Hancock County in south Mis- facilities at Stennis Space Center began May 17, 1963. sissippi on Oct. 25, 1961. • At the height of construction of Stennis facilities in • Construction of Stennis facilities necessitated the the 1960s, some 6,100 employees were onsite with 30 relocation of 660 families to other areas. prime and 250 subcontractor companies.
  • 2. • During the early years of the nation’s space program, • In 2010, more than half of all Stennis employees (53 famed rocket scientist Dr. Wernher von Braun af- percent) held a bachelor’s degree or greater. firmed the importance of Stennis test facilities by stating, “I don’t know yet what method we will use to • The StenniSphere visitor center and museum features get to the moon, but I do know that we have to go informative and interactive exhibits, including a moon through Mississippi to get there!” rock and other space program artifacts. • NASA first • Each year, the called its StenniSphere engine test visitor center facility Mis- and museum sissippi Test hosts more Operations, than 36,000 then Na- visitors on tional Space tours. Technol- ogy Labo- • In 2009, ratories. Stennis On May unveiled an 20, 1988, “all hazards President network” sys- Ronald Rea- tem (HazNet) gan signed that provides May 10, 1966 – Operators at what then was known as Mississippi Test Operations con- an executive duct their second test firing of an S-II Saturn rocket stage on the B Test Stand. comprehen- order nam- sive informa- ing the site in honor of U.S. Sen. John C. Stennis of tion in emergency and disaster situations. Developed Mississippi. through the facility’s Innovative Partnerships Pro- gram, the system was adopted for all NASA centers, Stennis Space Center as well as by several area communities. • Stennis features seven-and-a-half miles of canal Propulsion testing waterways, which include a lock-and-dam system that • Stennis is America’s largest rocket engine test facility. allows transport of large rocket stages and cryogenic barges from the Gulf of Mexico to onsite locations • Stennis rocket engine test facilities are valued at more via the Pearl River. than $2 billion. • All Stennis facilities are located within a 13,800-acre • NASA’s Rocket Propulsion Test Program Office “fee” area owned by the federal government. located at Stennis is responsible for managing test facilities across the agency. • The Stennis fee area is surrounded by a 125,000-acre noise buffer zone designated a national asset. • The three major test stands at Stennis are the single- position, vertical-firing A-1 and A-2 tests stands, and • In April 2008, the American Institute of Aeronautics the dual-position, vertical-firing B-1/B-2 Test Stand. and Astronautics named Stennis a historic aerospace site. • The versatile three-stand E Test Complex at Stennis includes seven separate cells capable of various test • Stennis has been affected by numerous tropical activities. storms, including three major hurricanes – Hurricane Betsy during construction in 1965, Hurricane Camille • Stennis is among the world’s largest consumers of liq- in 1969 and Hurricane Katrina in 2005. uid hydrogen – one of the main fuels used in rocket propulsion testing. • In 2010, the direct global economic impact of Stennis was $875 million. The direct economic impact within • On Aug. 8, 1998, all four test positions at Stennis a 50-mile radius of the facility was $616 million. were occupied for the first time in the center’s history.
  • 3. Apollo Program • Space shuttle main engines at Stennis were test fired • The first- and second-stage Saturn V rocket stages for about eight-and-one-half minutes (520 seconds), for NASA’s Apollo Program were tested at Stennis, the amount of time the engines must fire during an including those that propelled humans to the moon actual flight to enable the shuttle to reach orbit. on seven lunar missions from 1969 to 1972. • On Aug. 20, 1990, for the first time ever, space shuttle main engines were tested on all three large test stands • Stennis engineers conducted the first-ever rocket en- in a single day. gine test at the facility on April 23, 1966, a 15-second firing of a Saturn V second stage prototype (S-II-C). • The one millionth second of space shuttle main engine test firing was recorded at Stennis on Jan. 24, • During the Apollo Program years, Stennis engineers 2004, during a test conducted on the A-2 Test Stand. conducted 43 test firings. The accumulated experience of the test team members amounted to 2,475 man- • Stennis conducted the last scheduled test of a space years of rocket engine test expertise. shuttle main engine on July 29, 2009. • The Stennis team tested 27 Saturn V rocket stages in Current and future testing the Apollo years. All that were launched performed • In 1998, Stennis partnered with Pratt & Whitney their missions without a single failure. Rocketdyne to test RS-68 engines used for Delta IV rocket launches. It marked the first long-term com- Space Shuttle Program mitment to allow Stennis rocket engine test facilities • Stennis engineers conducted the first full-duration test to be used for commercial purposes. Pratt & Whitney of a space shuttle main engine on June 24, 1975. Rocketdyne continues to test RS-68 engines on the site’s B-1/B-2 Test Stand. • All of the main engines used on more than 130 space shuttle flights were tested at Stennis. • In 2007, Stennis broke ground for construction of the A-3 Test • In April Stand, the 1978, Sten- first large test nis con- facility to be ducted the built onsite first test of since the the space 1960s. shuttle • When main pro- activated in pulsion test 2013, the article with new A-3 Test three main Stand at Sten- engines nis will be configured the only test as they are stand in the on a space country with July 29, 2009 – Stennis Space Center operators conduct the final planned space shuttle shuttle or- main engine test on engine No. 0525 at the facility’s A-2 Test Stand. the combined biter during capabilities to flight. All three main engines were fired simultane- conduct long-duration tests on full-scale engines at ously on the B-2 Test Stand to prove the space shuttle simulated altitudes up to 100,000 feet, and to gimbal, propulsion system flight-worthy. Many consider the or rotate, the engines during the test as they would space shuttle’s propulsion system testing as Stennis’ operate during flight. finest hour. • In 2010, Stennis Space Center partnered with Orbital • Every modification and configuration of space shut- Sciences Corporation to test Aerojet AJ26 rocket en- tle main engines were tested and proven flight-worthy gines that will power commercial cargo flights to the at Stennis before being used on a mission. International Space Station.
  • 4. Mission support Federal city • The Stennis Applied Science & Technology Project • Stennis is a federal city, home to about 30 federal, Office manages the NASA’s Gulf of Mexico Initia- state, academic and private organizations and sev- tive, created in 2007 to enhance the region’s ability to eral technology-based companies. The companies recover from the devastating hurricanes of 2005 and and agencies share the cost of owning and operating to address coastal management issues. Since 2009, the the south Mississippi facility, making it more cost- initiative has provided $14 million to support 300 sci- effective for each entity to accomplish its independent entists conducting 35 research projects in the region. mission. • The Applied Science • Since 1998, the & Technology Project U.S. Navy has conducted Office is conducting 15 training for the Special research projects in the Boat Team TWENTY- Gulf of Mexico region. TWO special operations The projects monitor riverine force on water- sensitive ecosystems ways at Stennis. like coastal marshes and barrier islands, or • Since 1987, the environmental param- Mississippi Technol- eters such as water ogy Transfer Center has quality. been located at Stennis, working to help busi- • In 2010, the Sten- nesses increase produc- nis Education Office tivity, improve existing created its first teach- products and services, ing curricula, focused The A-3 Test Stand under construction at Stennis Space Center develop new products, on teaching differ- will allow operators to test next-generation rocket engines at find needed materials and ences between mass vs. simulated altitudes up to 100,000 feet. realize greater competi- weight and on New- tiveness. ton’s Laws of Motion. It now is electronically avail- able to teachers around the world. • Stennis is home to the largest concentration of ocean- ographers in the world. • The NASA Education Office operates an Educator Resource Center that offers materials and training to • Five area colleges operate a center of higher learning school teachers throughout the Louisiana-Mississippi at Stennis – Mississippi State University, Pearl River region. Some 800 teachers a year attend onsite and Community College, the University of New Orleans, offsite workshops sponsored by the center. the University of Southern Mississippi and the Uni- versity of Mississippi. • The NASA Shared Services Center opened at Stennis in August 2008. The facility was created by NASA to • Mississippi State University’s Northern Gulf Institute consolidate procurement, human resources, informa- and the University of Southern Mississippi’s Depart- tion technology and finance activities from across the ment of Marine Science both are located at Stennis. agency in one central location. National Aeronautics and Space Administration John C. Stennis Space Center Stennis Space Center, MS 39529-6000 (228) 688-3333 www.nasa.gov FS-2011-02-00106-SSC NASA facts