SlideShare ist ein Scribd-Unternehmen logo
1 von 11
[Insert appropriate disclaimer(s)]
<PROJECT NAME>
TRAINING PLAN
Version <1.0>
<mm/dd/yyyy>
<Project Name>
Page 2 of 11
[Insert appropriate disclaimer(s)]
VERSION HISTORY
[Provide information on how the development and distribution of the Training Plan was
controlled and tracked. Use the table below to provide the version number, the author
implementing the version, the date of the version, the name of the person approving the
version, the date that particular version was approved, and a brief description of the
reason for creating the revised version.]
Versio
n #
Implemented
By
Revision
Date
Approved
By
Approval
Date
Reason
1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <reason>
UP Template Version: 12/31/08
<Project Name>
Page 3 of 11
[Insert appropriate disclaimer(s)]
Note to the Author
[This document is a template of a Training Plan document for a project. The template
includes instructions to the author, boilerplate text, and fields that should be replaced
with the values specific to the project.
 Blue italicized text enclosed in square brackets ([text]) provides instructions to
the document author, or describes the intent, assumptions and context for
content included in this document.
 Blue italicized text enclosed in angle brackets (<text>) indicates a field that
should be replaced with information specific to a particular project.
 Text and tables in black are provided as boilerplate examples of wording and
formats that may be used or modified as appropriate to a specific project. These
are offered only as suggestions to assist in developing project documents; they
are not mandatory formats.
When using this template for your project document, it is recommended that you follow
these steps:
1. Replace all text enclosed in angle brackets (e.g.,, <Project Name>) with the
correct field values. These angle brackets appear in both the body of the
document and in headers and footers. To customize fields in Microsoft Word
(which display a gray background when selected):
a. Select File>Properties>Summary and fill in the Title field with the
Document Name and the Subject field with the Project Name.
b. Select File>Properties>Custom and fill in the Last Modified, Status, and
Version fields with the appropriate information for this document.
c. After you click OK to close the dialog box, update the fields throughout the
document with these values by selecting Edit>Select All (or Ctrl-A) and
pressing F9. Or you can update an individual field by clicking on it and
pressing F9. This must be done separately for Headers and Footers.
2. Modify boilerplate text as appropriate to the specific project.
3. To add any new sections to the document, ensure that the appropriate header
and body text styles are maintained. Styles used for the Section Headings are
Heading 1, Heading 2 and Heading 3. Style used for boilerplate text is Body
Text.
4. To update the Table of Contents, right-click and select “Update field” and choose
the option- “Update entire table”
5. Before submission of the first draft of this document, delete this “Notes to the
Author” page and all instructions to the author, which appear throughout the
document as blue italicized text enclosed in square brackets.]
<Project Name>
Page 4 of 11
[Insert appropriate disclaimer(s)]
TABLE OF CONTENTS
1 INTRODUCTION .....................................................................................................................5
1.1 Purpose ....................................................................................................................5
1.2 Scope........................................................................................................................5
1.2.1 Planning Principles............................................................................................5
1.2.2 Assumptions.......................................................................................................5
1.2.3 Constraints .........................................................................................................5
2 ROLES & RESPONSIBILITIES............................................................................................5
3 REQUIREMENT & PREREQUISITES.................................................................................5
4 STRATEGY & APPROACH ..................................................................................................5
4.1 Training Sources.....................................................................................................6
4.2 Delivery Method ......................................................................................................6
4.3 Dependencies and Limitations..............................................................................6
5 TRAINING RESOURCES......................................................................................................6
5.1 Materials...................................................................................................................6
5.2 Staffing......................................................................................................................6
5.3 Equipment................................................................................................................6
5.4 Environment.............................................................................................................6
6 TRAINING SCHEDULE .........................................................................................................7
7 TRAINING EVALUATION .....................................................................................................7
8 TRAINING SECURITY & UPDATES...................................................................................7
8.1 Access to Training Material...................................................................................7
8.2 Access to Training Environment...........................................................................7
8.3 Updating Training Resources ...............................................................................7
APPENDIX A: TRAINING PLAN APPROVAL ....................................................................... 8
APPENDIX B: TRAINING CURRICULUM.............................................................................. 9
APPENDIX C: REFERENCES................................................................................................10
APPENDIX D: KEY TERMS....................................................................................................11
<Project Name>
Page 5 of 11
[Insert appropriate disclaimer(s)]
1 INTRODUCTION
1.1 PURPOSE
This <Project Name> Training Plan establishes procedures to plan, develop,
implement, and maintain the <Project Name> training program and curriculum.
The following objectives have been established for this plan:
 [Enter objectives as appropriate]
1.2 SCOPE
1.2.1 Planning Principles
Various scenarios were considered to form a basis for the plan, and multiple
assumptions were made. The applicability of the plan is predicated on:
[Enter various assumptions/variables taken into account when developing this
plan, or that the successful execution of this plan is dependent upon]
1.2.2 Assumptions
This section identifies the statements believed to be true and from which a
conclusion was drawn to define this plan.
1. [Insert description of the first assumption.]
2. [Insert description of the second assumption.]
1.2.3 Constraints
This section identifies any limitation that must be taken into consideration
regarding the content of this plan.
1.[Insert description of the first constraint.]
2.[Insert description of the second constraint.]
2 ROLES & RESPONSIBILITIES
[Describe roles and responsibilities of training staff and associated stakeholders,
as it relates to the effort outlined in this training plan.]
3 REQUIREMENT & PREREQUISITES
[Describe general requirements as they relate to the planned training program.
Include requirements relevant to items such as training environment, prerequisite
skills, the training audience, individuals or positions needing specific training,
training time frame, expectations, evaluation criteria, success factors, etc.
Describe any required prerequisite skills required to support project lifecycle
activities. Match those requirements to the existing personnel skill sets to
determine the training need for the project or provide a reference to where it is
stored.]
4 STRATEGY & APPROACH
[Describe the training approach, schedule, duration, location, dates, etc or provide
a reference to where it is stored.]
<Project Name>
Page 6 of 11
[Insert appropriate disclaimer(s)]
4.1 TRAINING SOURCES
[Identify the source of the training (developed in-house, contracted to external
agency, commercial off the shelf (COTS), etc. If in-house development is chosen,
expand upon this training plan to include associated development activities and
timeline for task completion and delivery of source materials.]
4.2 DELIVERY METHOD
[Describe the method of delivery selected for the training program. Include
reference to any plans to pilot test training. If multiple delivery methods are
planned, provide an explanation detailing this or provide a reference to where it is
stored.]
4.3 DEPENDENCIES AND LIMITATIONS
[Identify any dependencies and/or limitations that may impact the training
strategy/program, course curriculum, materials, schedule, etc or provide a
reference to where it is stored.]
5 TRAINING RESOURCES
[Identify resources necessary to support the training program. This should include
human resources as well as hardware, software, facilities, etc or provide a
reference to where it is stored.]
5.1 MATERIALS
[Identify the types of training materials required to support the training
requirements outlined within this plan. Include reference to training items such as
instructor and student guides, presentation materials, visual aids, hand outs,
workbooks, manuals, demonstrations, etc or provide a reference to where it is
stored.]
5.2 STAFFING
[Identify resources necessary to support the training program. Include any specific
requirements related to items such as skill set, knowledge, education, experience,
etc or provide a reference to where it is stored.]
5.3 EQUIPMENT
[Identify resources necessary to support the training program and the environment
in which it will be implemented. Include specific requirements related to items such
as hardware, software, networking, vendor selection, product type, version
number, etc or provide a reference to where it is stored.]
5.4 ENVIRONMENT
[Describe any conditions, facilities requirements, size, location, temperature, etc
needed to perform the training or provide a reference to where it is stored.]
<Project Name>
Page 7 of 11
[Insert appropriate disclaimer(s)]
6 TRAINING SCHEDULE
[Include a training schedule that is as comprehensive as possible. The schedule
may change later to reflect new/updated information and project progress. This
section should be organized to best illustrate for the reader of this document the
planned training program or provide a reference to where it is stored.]
ID Course Name Instructor Location Date/Time Duration
<ID> <Course One> <Instructor> <Location> <Date/Time> <Duration>
<ID> <Course Two> <Instructor> <Location> <Date/Time> <Duration>
<ID> <Course Three> <Instructor> <Location> <Date/Time> <Duration>
7 TRAINING EVALUATION
[Describe how the overall training program and curriculums will be evaluated.
Describe evaluation metrics and tools. Define how they will be evaluated. Explain
how they may influence changes in the program, curriculums, course materials,
and training approaches or provide a reference to where it is stored.]
8 TRAINING SECURITY & UPDATES
8.1 ACCESS TO TRAINING MATERIAL
[Identify resources, access, permissions, and access duration allowed to training
materials. Describe the process for obtaining and changing access permissions
and any resources used to secure such materials or provide a reference to where
it is stored.]
8.2 ACCESS TO TRAINING ENVIRONMENT
[Identify resources, access, permissions, and access duration allowed to training
environment. Describe the process for obtaining and changing access permissions
and any resources used to secure the environment or provide a reference to
where it is stored.]
8.3 UPDATING TRAINING RESOURCES
[Describe the process for updating training programs, curriculums, environments,
and supporting materials. Include the process for identifying and collecting
required/requested changes, how prospective change will be evaluated,
prioritized, and incorporated into future iterations of training. Explain how revision
history will be maintained and tracked or provide a reference to where it is stored.]
<Project Name>
Page 8 of 11
[Insert appropriate disclaimer(s)]
Appendix A: Training Plan Approval
The undersigned acknowledge they have reviewed the <Project Name> Training
Plan and agree with the approach it presents. Changes to this Training Plan will
be coordinated with and approved by the undersigned or their designated
representatives.
[List the individuals whose signatures are desired. Examples of such individuals
are Business Steward, Implementation Manager or Project Sponsor. Add
additional lines for signature as necessary. Although signatures are desired, they
are not always required to move forward with the practices outlined within this
document.]
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
<Project Name>
Page 9 of 11
[Insert appropriate disclaimer(s)]
APPENDIX B: TRAINING CURRICULUM
[Describe the curriculum for each proposed training class or provide a reference
to where it is stored.]
Curriculum One
[Describe training curriculum one or provide a reference to where it is stored.]
Curriculum Two
[Describe training curriculum two or provide a reference to where it is stored.]
Curriculum Three
[Describe training curriculum three or provide a reference to where it is stored.]
<Project Name>
Page 10 of 11
[Insert appropriate disclaimer(s)]
APPENDIX C: REFERENCES
[Insert the name, version number, description, and physical location of any
documents referenced in this document. Add rows to the table as necessary.]
The following table summarizes the documents referenced in this document.
Document
Name and
Version
Description Location
<Document
Name and
Version
Number>
[Provide description of the
document]
<URL or Network path where
document is located>
<Project Name>
Page 11 of 11
[Insert appropriate disclaimer(s)]
APPENDIX D: KEY TERMS
[Insert terms and definitions used in this document. Add rows to the table as
necessary. Follow the link below to for definitions of project management terms
and acronyms used in this and other documents.
http://www2.cdc.gov/cdcup/library/other/help.htm
The following table provides definitions for terms relevant to this document.
Term Definition
[Insert Term] [Provide definition of the term used in this document.]
[Insert Term] [Provide definition of the term used in this document.]
[Insert Term] [Provide definition of the term used in this document.]

Weitere ähnliche Inhalte

Ähnlich wie Training Plan for <Project Name

Cdc up project_management_plan_template
Cdc up project_management_plan_templateCdc up project_management_plan_template
Cdc up project_management_plan_templateSreenivasan G
 
Project Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxProject Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxbriancrawford30935
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxgalerussel59292
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxbobbywlane695641
 
Cdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateCdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateSreenivasan G
 
Impact Analysis Template
Impact Analysis TemplateImpact Analysis Template
Impact Analysis Templatevadapav123
 
Small projectlifecycleplantemplatev
Small projectlifecycleplantemplatevSmall projectlifecycleplantemplatev
Small projectlifecycleplantemplatevaftabsaeedi
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxwoodruffeloisa
 
Project NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxProject NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxbriancrawford30935
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan templateRina Wijaya
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907ahmady
 
Eplc risk management_template
Eplc risk management_templateEplc risk management_template
Eplc risk management_templategguinle
 
Project management plan_template
Project management plan_templateProject management plan_template
Project management plan_templateRaquel Shirazi
 
Did template
Did templateDid template
Did templateadeoke
 
Cdc up business_impact_analysis_template
Cdc up business_impact_analysis_templateCdc up business_impact_analysis_template
Cdc up business_impact_analysis_templatedimakarmi
 
Project resource plan for manager
Project resource plan for managerProject resource plan for manager
Project resource plan for managerhangngoainhapcomvn
 
Business case template for project
Business case template for projectBusiness case template for project
Business case template for projectLinkedin connect
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxmelbruce90096
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxARIV4
 

Ähnlich wie Training Plan for <Project Name (20)

Cdc up project_management_plan_template
Cdc up project_management_plan_templateCdc up project_management_plan_template
Cdc up project_management_plan_template
 
Project Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docxProject Name Project Management PlanVersion 1.0 Draf.docx
Project Name Project Management PlanVersion 1.0 Draf.docx
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docx
 
Adeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docxAdeptus Health InternationalProject Name Project Management .docx
Adeptus Health InternationalProject Name Project Management .docx
 
Cdc up wbs_dictionary_template
Cdc up wbs_dictionary_templateCdc up wbs_dictionary_template
Cdc up wbs_dictionary_template
 
Impact Analysis Template
Impact Analysis TemplateImpact Analysis Template
Impact Analysis Template
 
Small projectlifecycleplantemplatev
Small projectlifecycleplantemplatevSmall projectlifecycleplantemplatev
Small projectlifecycleplantemplatev
 
Project Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docxProject Name Communications Management PlanVersion 1.0.docx
Project Name Communications Management PlanVersion 1.0.docx
 
Project NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docxProject NameVersion 1.0 DraftProject NameP.docx
Project NameVersion 1.0 DraftProject NameP.docx
 
Software development plan template
Software development plan templateSoftware development plan template
Software development plan template
 
Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907Softwaredevelopmentplantemplate 170323125907
Softwaredevelopmentplantemplate 170323125907
 
Eplc risk management_template
Eplc risk management_templateEplc risk management_template
Eplc risk management_template
 
Project management plan_template
Project management plan_templateProject management plan_template
Project management plan_template
 
Did template
Did templateDid template
Did template
 
Cdc up business_impact_analysis_template
Cdc up business_impact_analysis_templateCdc up business_impact_analysis_template
Cdc up business_impact_analysis_template
 
CDC Risk Mgmt Template
CDC Risk Mgmt TemplateCDC Risk Mgmt Template
CDC Risk Mgmt Template
 
Project resource plan for manager
Project resource plan for managerProject resource plan for manager
Project resource plan for manager
 
Business case template for project
Business case template for projectBusiness case template for project
Business case template for project
 
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docxWeek 2 Individual Assignment Project Plan Part 1 Purpose .docx
Week 2 Individual Assignment Project Plan Part 1 Purpose .docx
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 

Training Plan for <Project Name

  • 1. [Insert appropriate disclaimer(s)] <PROJECT NAME> TRAINING PLAN Version <1.0> <mm/dd/yyyy>
  • 2. <Project Name> Page 2 of 11 [Insert appropriate disclaimer(s)] VERSION HISTORY [Provide information on how the development and distribution of the Training Plan was controlled and tracked. Use the table below to provide the version number, the author implementing the version, the date of the version, the name of the person approving the version, the date that particular version was approved, and a brief description of the reason for creating the revised version.] Versio n # Implemented By Revision Date Approved By Approval Date Reason 1.0 <Author name> <mm/dd/yy> <name> <mm/dd/yy> <reason> UP Template Version: 12/31/08
  • 3. <Project Name> Page 3 of 11 [Insert appropriate disclaimer(s)] Note to the Author [This document is a template of a Training Plan document for a project. The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values specific to the project.  Blue italicized text enclosed in square brackets ([text]) provides instructions to the document author, or describes the intent, assumptions and context for content included in this document.  Blue italicized text enclosed in angle brackets (<text>) indicates a field that should be replaced with information specific to a particular project.  Text and tables in black are provided as boilerplate examples of wording and formats that may be used or modified as appropriate to a specific project. These are offered only as suggestions to assist in developing project documents; they are not mandatory formats. When using this template for your project document, it is recommended that you follow these steps: 1. Replace all text enclosed in angle brackets (e.g.,, <Project Name>) with the correct field values. These angle brackets appear in both the body of the document and in headers and footers. To customize fields in Microsoft Word (which display a gray background when selected): a. Select File>Properties>Summary and fill in the Title field with the Document Name and the Subject field with the Project Name. b. Select File>Properties>Custom and fill in the Last Modified, Status, and Version fields with the appropriate information for this document. c. After you click OK to close the dialog box, update the fields throughout the document with these values by selecting Edit>Select All (or Ctrl-A) and pressing F9. Or you can update an individual field by clicking on it and pressing F9. This must be done separately for Headers and Footers. 2. Modify boilerplate text as appropriate to the specific project. 3. To add any new sections to the document, ensure that the appropriate header and body text styles are maintained. Styles used for the Section Headings are Heading 1, Heading 2 and Heading 3. Style used for boilerplate text is Body Text. 4. To update the Table of Contents, right-click and select “Update field” and choose the option- “Update entire table” 5. Before submission of the first draft of this document, delete this “Notes to the Author” page and all instructions to the author, which appear throughout the document as blue italicized text enclosed in square brackets.]
  • 4. <Project Name> Page 4 of 11 [Insert appropriate disclaimer(s)] TABLE OF CONTENTS 1 INTRODUCTION .....................................................................................................................5 1.1 Purpose ....................................................................................................................5 1.2 Scope........................................................................................................................5 1.2.1 Planning Principles............................................................................................5 1.2.2 Assumptions.......................................................................................................5 1.2.3 Constraints .........................................................................................................5 2 ROLES & RESPONSIBILITIES............................................................................................5 3 REQUIREMENT & PREREQUISITES.................................................................................5 4 STRATEGY & APPROACH ..................................................................................................5 4.1 Training Sources.....................................................................................................6 4.2 Delivery Method ......................................................................................................6 4.3 Dependencies and Limitations..............................................................................6 5 TRAINING RESOURCES......................................................................................................6 5.1 Materials...................................................................................................................6 5.2 Staffing......................................................................................................................6 5.3 Equipment................................................................................................................6 5.4 Environment.............................................................................................................6 6 TRAINING SCHEDULE .........................................................................................................7 7 TRAINING EVALUATION .....................................................................................................7 8 TRAINING SECURITY & UPDATES...................................................................................7 8.1 Access to Training Material...................................................................................7 8.2 Access to Training Environment...........................................................................7 8.3 Updating Training Resources ...............................................................................7 APPENDIX A: TRAINING PLAN APPROVAL ....................................................................... 8 APPENDIX B: TRAINING CURRICULUM.............................................................................. 9 APPENDIX C: REFERENCES................................................................................................10 APPENDIX D: KEY TERMS....................................................................................................11
  • 5. <Project Name> Page 5 of 11 [Insert appropriate disclaimer(s)] 1 INTRODUCTION 1.1 PURPOSE This <Project Name> Training Plan establishes procedures to plan, develop, implement, and maintain the <Project Name> training program and curriculum. The following objectives have been established for this plan:  [Enter objectives as appropriate] 1.2 SCOPE 1.2.1 Planning Principles Various scenarios were considered to form a basis for the plan, and multiple assumptions were made. The applicability of the plan is predicated on: [Enter various assumptions/variables taken into account when developing this plan, or that the successful execution of this plan is dependent upon] 1.2.2 Assumptions This section identifies the statements believed to be true and from which a conclusion was drawn to define this plan. 1. [Insert description of the first assumption.] 2. [Insert description of the second assumption.] 1.2.3 Constraints This section identifies any limitation that must be taken into consideration regarding the content of this plan. 1.[Insert description of the first constraint.] 2.[Insert description of the second constraint.] 2 ROLES & RESPONSIBILITIES [Describe roles and responsibilities of training staff and associated stakeholders, as it relates to the effort outlined in this training plan.] 3 REQUIREMENT & PREREQUISITES [Describe general requirements as they relate to the planned training program. Include requirements relevant to items such as training environment, prerequisite skills, the training audience, individuals or positions needing specific training, training time frame, expectations, evaluation criteria, success factors, etc. Describe any required prerequisite skills required to support project lifecycle activities. Match those requirements to the existing personnel skill sets to determine the training need for the project or provide a reference to where it is stored.] 4 STRATEGY & APPROACH [Describe the training approach, schedule, duration, location, dates, etc or provide a reference to where it is stored.]
  • 6. <Project Name> Page 6 of 11 [Insert appropriate disclaimer(s)] 4.1 TRAINING SOURCES [Identify the source of the training (developed in-house, contracted to external agency, commercial off the shelf (COTS), etc. If in-house development is chosen, expand upon this training plan to include associated development activities and timeline for task completion and delivery of source materials.] 4.2 DELIVERY METHOD [Describe the method of delivery selected for the training program. Include reference to any plans to pilot test training. If multiple delivery methods are planned, provide an explanation detailing this or provide a reference to where it is stored.] 4.3 DEPENDENCIES AND LIMITATIONS [Identify any dependencies and/or limitations that may impact the training strategy/program, course curriculum, materials, schedule, etc or provide a reference to where it is stored.] 5 TRAINING RESOURCES [Identify resources necessary to support the training program. This should include human resources as well as hardware, software, facilities, etc or provide a reference to where it is stored.] 5.1 MATERIALS [Identify the types of training materials required to support the training requirements outlined within this plan. Include reference to training items such as instructor and student guides, presentation materials, visual aids, hand outs, workbooks, manuals, demonstrations, etc or provide a reference to where it is stored.] 5.2 STAFFING [Identify resources necessary to support the training program. Include any specific requirements related to items such as skill set, knowledge, education, experience, etc or provide a reference to where it is stored.] 5.3 EQUIPMENT [Identify resources necessary to support the training program and the environment in which it will be implemented. Include specific requirements related to items such as hardware, software, networking, vendor selection, product type, version number, etc or provide a reference to where it is stored.] 5.4 ENVIRONMENT [Describe any conditions, facilities requirements, size, location, temperature, etc needed to perform the training or provide a reference to where it is stored.]
  • 7. <Project Name> Page 7 of 11 [Insert appropriate disclaimer(s)] 6 TRAINING SCHEDULE [Include a training schedule that is as comprehensive as possible. The schedule may change later to reflect new/updated information and project progress. This section should be organized to best illustrate for the reader of this document the planned training program or provide a reference to where it is stored.] ID Course Name Instructor Location Date/Time Duration <ID> <Course One> <Instructor> <Location> <Date/Time> <Duration> <ID> <Course Two> <Instructor> <Location> <Date/Time> <Duration> <ID> <Course Three> <Instructor> <Location> <Date/Time> <Duration> 7 TRAINING EVALUATION [Describe how the overall training program and curriculums will be evaluated. Describe evaluation metrics and tools. Define how they will be evaluated. Explain how they may influence changes in the program, curriculums, course materials, and training approaches or provide a reference to where it is stored.] 8 TRAINING SECURITY & UPDATES 8.1 ACCESS TO TRAINING MATERIAL [Identify resources, access, permissions, and access duration allowed to training materials. Describe the process for obtaining and changing access permissions and any resources used to secure such materials or provide a reference to where it is stored.] 8.2 ACCESS TO TRAINING ENVIRONMENT [Identify resources, access, permissions, and access duration allowed to training environment. Describe the process for obtaining and changing access permissions and any resources used to secure the environment or provide a reference to where it is stored.] 8.3 UPDATING TRAINING RESOURCES [Describe the process for updating training programs, curriculums, environments, and supporting materials. Include the process for identifying and collecting required/requested changes, how prospective change will be evaluated, prioritized, and incorporated into future iterations of training. Explain how revision history will be maintained and tracked or provide a reference to where it is stored.]
  • 8. <Project Name> Page 8 of 11 [Insert appropriate disclaimer(s)] Appendix A: Training Plan Approval The undersigned acknowledge they have reviewed the <Project Name> Training Plan and agree with the approach it presents. Changes to this Training Plan will be coordinated with and approved by the undersigned or their designated representatives. [List the individuals whose signatures are desired. Examples of such individuals are Business Steward, Implementation Manager or Project Sponsor. Add additional lines for signature as necessary. Although signatures are desired, they are not always required to move forward with the practices outlined within this document.] Signature: Date: Print Name: Title: Role: Signature: Date: Print Name: Title: Role: Signature: Date: Print Name: Title: Role:
  • 9. <Project Name> Page 9 of 11 [Insert appropriate disclaimer(s)] APPENDIX B: TRAINING CURRICULUM [Describe the curriculum for each proposed training class or provide a reference to where it is stored.] Curriculum One [Describe training curriculum one or provide a reference to where it is stored.] Curriculum Two [Describe training curriculum two or provide a reference to where it is stored.] Curriculum Three [Describe training curriculum three or provide a reference to where it is stored.]
  • 10. <Project Name> Page 10 of 11 [Insert appropriate disclaimer(s)] APPENDIX C: REFERENCES [Insert the name, version number, description, and physical location of any documents referenced in this document. Add rows to the table as necessary.] The following table summarizes the documents referenced in this document. Document Name and Version Description Location <Document Name and Version Number> [Provide description of the document] <URL or Network path where document is located>
  • 11. <Project Name> Page 11 of 11 [Insert appropriate disclaimer(s)] APPENDIX D: KEY TERMS [Insert terms and definitions used in this document. Add rows to the table as necessary. Follow the link below to for definitions of project management terms and acronyms used in this and other documents. http://www2.cdc.gov/cdcup/library/other/help.htm The following table provides definitions for terms relevant to this document. Term Definition [Insert Term] [Provide definition of the term used in this document.] [Insert Term] [Provide definition of the term used in this document.] [Insert Term] [Provide definition of the term used in this document.]