SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Iberdrola
Tower
(Source: skyscarpercity; Image by: Unknown)
(Source: google maps)
(Source: panoramio; Image by :Unknown)
1
1
2 3
4
Technical
challenges:
-Foundations
http://www.skyscrapercity.com/showthread.php?t=564601
(Source: Consorcio deAguas Bilbao Bizkaia; Author: unknown;)
2
3
1
4
Stone columns
Deusto Bridge
Foundations
University Siphon
Parking
Major constraints due to the urban environment( Mayo-Martinez,2013);
2
(Source: SkyScrapercity; Author: unknown;)
(Source: Consorcio deAguas Bilbao Bizkaia; Author: unknown;)
3
Diaphragm walls. Provisional containment system. Image property of Torre Iberdrola AIE. ( Mayo-Martinez,2013);
Diaphragm walls. excavation to the level of support from the foundation of the tower. Image property of Torre Iberdrola AIE.
( Mayo-Martinez,2013);
Sustainability
LEED
(Leadership in Energy and Environmental
Design) CS 2.0 Certification
• Public transport- less pollution;
• Better interior environment – low levels of VOCS materials used ;
• 20% of the content is recycled;
• 20% of materials transported come from within a radius of 800 km;
4
5
Energy rate, according to the Rate of Environmental Sustainability Edification in Basque Country, from Environmentally Sustainable
Building Guide in Administrative or Office Buildings 2009.
6
(Source: torreiberdrola.es; Image by: unknown)
The standard floors have a
minimum free height of 2,80
mand hav a 60 cm
suspended ceiling and 20 cm
raised technical flooring,
easing the provision of air-
conditioning, cabling and
telecomunications.
The flexibility of the floors
makes possible to split each
floor into 5 offices
7
(Source: torreiberdrola.es; Image by: unknown)
8
(Source: El Correo © DIARIO EL CORREO, S.A.U. Image by: Unknown;)
• Parking for bicycles and changing facilities
(showers for cyclists!); Low emission and efficient
vehicles – 15 parking places for electric cars;
9
(Source: El Correo © DIARIO EL CORREO, S.A.U., Image by: unknown)
10
(Source: El Correo © DIARIO EL CORREO, S.A.U.; Image by: Unknown;)
• Reduction of 40% in water
consumption ;
• Innovative waste water
technologies;
• 20% of the space
used for green
areas;
• 3 olive trees in
the Lobby;
(Source: eitb; Author: Unknown;)
11
(Source: eitb; Author: Unknown;) ( Source: eitb; Author: Unknown;)
1 2
3
AIR CONDITIONING AND VRV SYSTEM
The common areas of the tower have
been designed with
grids AE,
ceiling diffusers VDW (10,000 pcs.)
and ADLR, and ventilators LVS.
The use of regulators IN and MSA
mufflers ensures that the air supply
to the different spaces is done in a
totally controlled way, noise free and
without annoying drafts.
Through the AWG is introduced
outside air conditioners renewal for
TKM, for KUL gates the foul air is
ejected outside of the buildings and
JZ dampers control the pressure and
flow in the system.
AE Grids
Ceiling diffusers ADLR and VDW
LVS air vents
Conditioners, TKM series
Mufflers MSA
Flow regulators series IN
AWG outdoor grills
JZ dampers
KUL dampers
The air conditioning system has been designed for optimum efficiency,
flexibility and user comfort. This is achieved thanks to the high level of
renewed air in the ventilation system and the synergy with the active facade
ventilation built into the Tower’s architectural design.
The air conditioning is distributed throughout each floor via a large number
of independent VRV units, enabling different temperatures in different areas
and an important energy saving as units in areas with reduced occupancy can
be switched off.
12
Variable Refrigerant Volume
(Source: trox.es; Author: unknown)
13
(Source: eitb; Author: Unknown;)
1
2 3
(Source: eitb; Author: Unknown;)(Source: eitb; Author: Unknown;)
14
Fishmouth detail, at corner and at center of façade; Source: Zemborain (2012),
(Bos et al., Challenging Glass 3:Conference on Architecture and Structural application ;see references)
15
fishmouth
Very transparent glass!
• Ventilated Active Façade
1 2
(Source: Zemborian (2012); Image by: Unknown)
(Bos et al., Challenging Glass 3:Conference on Architecture
and Structural application ;see references)
(Source: vidrioperfil; Image by: Unknown;)
16
“The exterior wall, which acts as the
water barrier, tilts following the building
massing, while the inner wall remains
vertical. This inner wall consists of a
series of operable windows that allows
maintenance of the resulting cavity. It
also acts as the fire and smoke boundary
of the building, which allowed us to
provide 1 meter fire separation required
by code while creating a completely
glazed exterior with minimal transoms as
intended” (Zemborian, A.,2012)
(Bos et al., Challenging Glass 3:Conference on Architecture and
Structural application ;see references)
(Source: imageshackAuthor: Unknown;)
1 2
3
(Source: vidrioperfil; Author: Unknown;)
(Source: imageshackAuthor: Unknown;)
Thank you !
Slide 1:
1)www.panoramio.com/photo/53577884
2) maps.google.co.uk/maps?q=google+maps+bilbao&ie=UTF-
8&hq=&hnear=0xd4e4e27664b89b9:0x6534acc41e95a645,Bilbao,+Biscay,+Spagna&gl=uk&ei=6Md8Uv6TM9
KThQfy1ICwDA&ved=0CCoQ8gEwAA
3) www.skyscrapercity.com/showthread.php?t=564601
Slide 2:
1): www.skyscrapercity.com/showthread.php?t=564601
2),3): www.consorciodeaguas.com/html/pdf/sifuni.pdf
4) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.520
Slide 3:
1) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.520
2) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.521
Slide 5:
1)www.unican.es/NR/rdonlyres/00012251/tohgybnoxbdhmmunfuriqtbudmoxkknk/Guia_edificaci%C3%B3n_
sostenible_edificios_administrativos.pdf
Slide 6:
1) www.torreiberdrola.es/download/es/Dossier_servicios_presentacion_torreiberdrola.pdf , p. 16-17
Slides References
Slides References
Slide 7:
1) www.torreiberdrola.es/download/es/Dossier_servicios_presentacion_torreiberdrola.pdf, p.17-18
Slides 8, 9, 10:
info.elcorreo.com/graficos/2011/transformacion-bilbao/torre-iberdrola.htm
Slide 11:
1) www.eitb.com/multimedia/images/2012/02/16/612846/612846_Imagen_111_foto960.jpg
2) www.eitb.com/multimedia/images/2012/02/16/612848/612848_Imagen_122_foto960.jpg
3) www.eitb.com/multimedia/images/2012/02/16/612839/612839_Imagen_139_foto960.jpg
Slide 12:
www.trox.es/xpool/download/es/pdf/reference_projects/torre_iberdrola.pdf
Slide 13:
1) www.eitb.com/multimedia/images/2012/02/16/612835/612835_Imagen_078_foto960.jpg
2)www.eitb.com/multimedia/images/2012/02/16/612840/612840_Imagen_096_foto960.jpg
3) www.eitb.com/multimedia/images/2012/02/16/612838/612838_Imagen_092_foto960.jpg
Slides References
Slide 14:
1)* Bos, F., Louter, C., Nijisse, R., Veer, Fred, 2012, Challenging Glass 3: Conference on Architecture and
Structural application, Amsterdam: IOS Press, BV . Available at:
books.google.co.uk/books?id=yekrr9Dz2TgC&pg=PA167&lpg=PA167&dq=challenging+glass+3+torre+iberd
rola&source=bl&ots=FYdf3gFkaJ&sig=vjSLYjqyqxEWZ3rR7Dl1SmNa5oc&hl=it&sa=X&ei=7ud2Upf1DKOO
0AXU6YH4Dg&ved=0CCoQ6AEwAA#v=onepage&q=challenging%20glass%203%20torre%20iberdrola&f=
false
Slide 15:
1)*
2)www.vidrioperfil.com/img/noticias/torre-iberdrola-completa-su-fachada-1.jpg
Slide 16:
1) img189.imageshack.us/img189/8232/85608153.jpg
2) desmond.imageshack.us/Himg18/scaled.php?server=18&filename=dsci0011z.jpg&res=medium
3)www.vidrioperfil.com/img/noticias/torre-iberdrola-completa-su-fachada.jpg
Further References
Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.518-524
Challenging Glass 3: Bos, F., Louter, C., Nijisse, R., Veer, Fred, 2012, Conference on Architecture and
Structural application, Amsterdam: IOS Press, BV . Available at:
<books.google.co.uk/books?id=yekrr9Dz2TgC&pg=PA167&lpg=PA167&dq=challenging+glass+3+torre+i
berdrola&source=bl&ots=FYdf3gFkaJ&sig=vjSLYjqyqxEWZ3rR7Dl1SmNa5oc&hl=it&sa=X&ei=7ud2Upf
1DKOO0AXU6YH4Dg&ved=0CCoQ6AEwAA#v=onepage&q=challenging%20glass%203%20torre%20ibe
rdrola&f=false>
www.unican.es/NR/rdonlyres/00012251/tohgybnoxbdhmmunfuriqtbudmoxkknk/Guia_edificaci%C3%B
3n_sostenible_edificios_administrativos.pdf
www.torreiberdrola.es/download/es/dosier_torreiberdrola.pdf
issuu.com/bilbaointernational/docs/iberdrolaen
Video: teknopolis.elhuyar.org/reportajes/torre-iberdola-construccion-de-altura/?lang=es

Weitere ähnliche Inhalte

Was ist angesagt?

Swiss re building london
Swiss re building londonSwiss re building london
Swiss re building londonAda Darmon
 
Grp site analysis
Grp site analysisGrp site analysis
Grp site analysisYaseen Syed
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1J-Sern Phua
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science ReportDexter Ng
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Adila Zaas
 
The Edge,Smart Building
The Edge,Smart BuildingThe Edge,Smart Building
The Edge,Smart BuildingDivleen Narula
 
Walian house case study
Walian house case studyWalian house case study
Walian house case studyJoshua Lee
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignBryan Yeoh
 
Sydney opera house acoustical features
Sydney opera house acoustical featuresSydney opera house acoustical features
Sydney opera house acoustical featuresRohit Bhatt
 
WALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLWALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLAyushi Gupta
 
Report on Hotel
Report on HotelReport on Hotel
Report on HotelPreetam89
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case studyrohan joshi
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Adila Zaas
 

Was ist angesagt? (20)

اسس تصميم المتاحف
اسس تصميم المتاحفاسس تصميم المتاحف
اسس تصميم المتاحف
 
Swiss re building london
Swiss re building londonSwiss re building london
Swiss re building london
 
Grp site analysis
Grp site analysisGrp site analysis
Grp site analysis
 
Namaste tower final ppt
Namaste tower final pptNamaste tower final ppt
Namaste tower final ppt
 
Lighting Analysis Project 1
Lighting Analysis Project 1Lighting Analysis Project 1
Lighting Analysis Project 1
 
LIGHTING IN HOSPITALS
LIGHTING IN HOSPITALSLIGHTING IN HOSPITALS
LIGHTING IN HOSPITALS
 
High rise structure & core
High rise  structure & coreHigh rise  structure & core
High rise structure & core
 
Park Royal Building Science Report
Park Royal Building Science ReportPark Royal Building Science Report
Park Royal Building Science Report
 
Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report Menara Mesiniaga Building Science Report
Menara Mesiniaga Building Science Report
 
The Edge,Smart Building
The Edge,Smart BuildingThe Edge,Smart Building
The Edge,Smart Building
 
Walian house case study
Walian house case studyWalian house case study
Walian house case study
 
Al bahar
Al baharAl bahar
Al bahar
 
Project 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic DesignProject 1 : Auditorium - A Case Study of Acoustic Design
Project 1 : Auditorium - A Case Study of Acoustic Design
 
Sydney opera house acoustical features
Sydney opera house acoustical featuresSydney opera house acoustical features
Sydney opera house acoustical features
 
WALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLWALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALL
 
Nubian museum
Nubian museumNubian museum
Nubian museum
 
Report on Hotel
Report on HotelReport on Hotel
Report on Hotel
 
Jin Mao Tower
Jin Mao TowerJin Mao Tower
Jin Mao Tower
 
London aquatic center Case study
London aquatic center Case studyLondon aquatic center Case study
London aquatic center Case study
 
Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...Nanyang Technological University School of Art Design and Media Building Scie...
Nanyang Technological University School of Art Design and Media Building Scie...
 

Ähnlich wie Iberdrola tower

Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate buildingNayan Rao
 
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...SimScale
 
Building integrated photovoltaic panels
Building integrated photovoltaic panelsBuilding integrated photovoltaic panels
Building integrated photovoltaic panelsaudrey Manga
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleKomal Arora
 
Protective coating for concrete
Protective coating for concreteProtective coating for concrete
Protective coating for concreteMouayed Zeadan
 
imec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenimec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenecoTips
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building envelopingArnav Mathur
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Towerhiewyennee
 
The Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFThe Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFManan Sethi
 
What is the eden project
What is the eden project What is the eden project
What is the eden project Youngman Kim
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Sustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfSustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfMOHDFIRRDHAUSBINMOHD
 
Sustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingSustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingMOHDFIRRDHAUSBINMOHD
 
Park turquoise presentation
Park turquoise presentationPark turquoise presentation
Park turquoise presentationDastagir bhatare
 

Ähnlich wie Iberdrola tower (20)

Presentation1
Presentation1Presentation1
Presentation1
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
 
Building integrated photovoltaic panels
Building integrated photovoltaic panelsBuilding integrated photovoltaic panels
Building integrated photovoltaic panels
 
Btech
BtechBtech
Btech
 
Bioclimatic design at the site planning scale
Bioclimatic design at the site planning scaleBioclimatic design at the site planning scale
Bioclimatic design at the site planning scale
 
Protective coating for concrete
Protective coating for concreteProtective coating for concrete
Protective coating for concrete
 
Technosphere
TechnosphereTechnosphere
Technosphere
 
imec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellenimec ecoTips Bizzclub over duurzame energie en zonnecellen
imec ecoTips Bizzclub over duurzame energie en zonnecellen
 
Cool Roofing and Building enveloping
Cool Roofing and Building envelopingCool Roofing and Building enveloping
Cool Roofing and Building enveloping
 
Building Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- TowerBuilding Science 1: Project 1 G- Tower
Building Science 1: Project 1 G- Tower
 
Gtower report
Gtower reportGtower report
Gtower report
 
The Advanced Facade Technology – CCF
The Advanced Facade Technology – CCFThe Advanced Facade Technology – CCF
The Advanced Facade Technology – CCF
 
What is the eden project
What is the eden project What is the eden project
What is the eden project
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
C25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikasC25 wg1 dimitrios_bikas
C25 wg1 dimitrios_bikas
 
Sustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdfSustainable Design Strategies Lecture (10.4.23).pdf
Sustainable Design Strategies Lecture (10.4.23).pdf
 
Sustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & DaylightingSustainable Design : Ventilation & Daylighting
Sustainable Design : Ventilation & Daylighting
 
Facade Research Document
Facade Research DocumentFacade Research Document
Facade Research Document
 
Park turquoise presentation
Park turquoise presentationPark turquoise presentation
Park turquoise presentation
 

Kürzlich hochgeladen

办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书zdzoqco
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRdollysharma2066
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in designnooreen17
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证nhjeo1gg
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubaikojalkojal131
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 

Kürzlich hochgeladen (20)

办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
办理卡尔顿大学毕业证成绩单|购买加拿大文凭证书
 
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCRCall In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
Call In girls Bhikaji Cama Place 🔝 ⇛8377877756 FULL Enjoy Delhi NCR
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Design principles on typography in design
Design principles on typography in designDesign principles on typography in design
Design principles on typography in design
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
在线办理ohio毕业证俄亥俄大学毕业证成绩单留信学历认证
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services DubaiDubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
Dubai Calls Girl Tapes O525547819 Real Tapes Escort Services Dubai
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 

Iberdrola tower

  • 1. Iberdrola Tower (Source: skyscarpercity; Image by: Unknown) (Source: google maps) (Source: panoramio; Image by :Unknown) 1 1 2 3 4
  • 2. Technical challenges: -Foundations http://www.skyscrapercity.com/showthread.php?t=564601 (Source: Consorcio deAguas Bilbao Bizkaia; Author: unknown;) 2 3 1 4 Stone columns Deusto Bridge Foundations University Siphon Parking Major constraints due to the urban environment( Mayo-Martinez,2013); 2 (Source: SkyScrapercity; Author: unknown;) (Source: Consorcio deAguas Bilbao Bizkaia; Author: unknown;)
  • 3. 3 Diaphragm walls. Provisional containment system. Image property of Torre Iberdrola AIE. ( Mayo-Martinez,2013); Diaphragm walls. excavation to the level of support from the foundation of the tower. Image property of Torre Iberdrola AIE. ( Mayo-Martinez,2013);
  • 4. Sustainability LEED (Leadership in Energy and Environmental Design) CS 2.0 Certification • Public transport- less pollution; • Better interior environment – low levels of VOCS materials used ; • 20% of the content is recycled; • 20% of materials transported come from within a radius of 800 km; 4
  • 5. 5 Energy rate, according to the Rate of Environmental Sustainability Edification in Basque Country, from Environmentally Sustainable Building Guide in Administrative or Office Buildings 2009.
  • 7. The standard floors have a minimum free height of 2,80 mand hav a 60 cm suspended ceiling and 20 cm raised technical flooring, easing the provision of air- conditioning, cabling and telecomunications. The flexibility of the floors makes possible to split each floor into 5 offices 7 (Source: torreiberdrola.es; Image by: unknown)
  • 8. 8 (Source: El Correo © DIARIO EL CORREO, S.A.U. Image by: Unknown;) • Parking for bicycles and changing facilities (showers for cyclists!); Low emission and efficient vehicles – 15 parking places for electric cars;
  • 9. 9 (Source: El Correo © DIARIO EL CORREO, S.A.U., Image by: unknown)
  • 10. 10 (Source: El Correo © DIARIO EL CORREO, S.A.U.; Image by: Unknown;) • Reduction of 40% in water consumption ; • Innovative waste water technologies;
  • 11. • 20% of the space used for green areas; • 3 olive trees in the Lobby; (Source: eitb; Author: Unknown;) 11 (Source: eitb; Author: Unknown;) ( Source: eitb; Author: Unknown;) 1 2 3
  • 12. AIR CONDITIONING AND VRV SYSTEM The common areas of the tower have been designed with grids AE, ceiling diffusers VDW (10,000 pcs.) and ADLR, and ventilators LVS. The use of regulators IN and MSA mufflers ensures that the air supply to the different spaces is done in a totally controlled way, noise free and without annoying drafts. Through the AWG is introduced outside air conditioners renewal for TKM, for KUL gates the foul air is ejected outside of the buildings and JZ dampers control the pressure and flow in the system. AE Grids Ceiling diffusers ADLR and VDW LVS air vents Conditioners, TKM series Mufflers MSA Flow regulators series IN AWG outdoor grills JZ dampers KUL dampers The air conditioning system has been designed for optimum efficiency, flexibility and user comfort. This is achieved thanks to the high level of renewed air in the ventilation system and the synergy with the active facade ventilation built into the Tower’s architectural design. The air conditioning is distributed throughout each floor via a large number of independent VRV units, enabling different temperatures in different areas and an important energy saving as units in areas with reduced occupancy can be switched off. 12 Variable Refrigerant Volume (Source: trox.es; Author: unknown)
  • 13. 13 (Source: eitb; Author: Unknown;) 1 2 3 (Source: eitb; Author: Unknown;)(Source: eitb; Author: Unknown;)
  • 14. 14 Fishmouth detail, at corner and at center of façade; Source: Zemborain (2012), (Bos et al., Challenging Glass 3:Conference on Architecture and Structural application ;see references)
  • 15. 15 fishmouth Very transparent glass! • Ventilated Active Façade 1 2 (Source: Zemborian (2012); Image by: Unknown) (Bos et al., Challenging Glass 3:Conference on Architecture and Structural application ;see references) (Source: vidrioperfil; Image by: Unknown;)
  • 16. 16 “The exterior wall, which acts as the water barrier, tilts following the building massing, while the inner wall remains vertical. This inner wall consists of a series of operable windows that allows maintenance of the resulting cavity. It also acts as the fire and smoke boundary of the building, which allowed us to provide 1 meter fire separation required by code while creating a completely glazed exterior with minimal transoms as intended” (Zemborian, A.,2012) (Bos et al., Challenging Glass 3:Conference on Architecture and Structural application ;see references) (Source: imageshackAuthor: Unknown;) 1 2 3 (Source: vidrioperfil; Author: Unknown;) (Source: imageshackAuthor: Unknown;)
  • 18. Slide 1: 1)www.panoramio.com/photo/53577884 2) maps.google.co.uk/maps?q=google+maps+bilbao&ie=UTF- 8&hq=&hnear=0xd4e4e27664b89b9:0x6534acc41e95a645,Bilbao,+Biscay,+Spagna&gl=uk&ei=6Md8Uv6TM9 KThQfy1ICwDA&ved=0CCoQ8gEwAA 3) www.skyscrapercity.com/showthread.php?t=564601 Slide 2: 1): www.skyscrapercity.com/showthread.php?t=564601 2),3): www.consorciodeaguas.com/html/pdf/sifuni.pdf 4) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.520 Slide 3: 1) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.520 2) Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.521 Slide 5: 1)www.unican.es/NR/rdonlyres/00012251/tohgybnoxbdhmmunfuriqtbudmoxkknk/Guia_edificaci%C3%B3n_ sostenible_edificios_administrativos.pdf Slide 6: 1) www.torreiberdrola.es/download/es/Dossier_servicios_presentacion_torreiberdrola.pdf , p. 16-17 Slides References
  • 19. Slides References Slide 7: 1) www.torreiberdrola.es/download/es/Dossier_servicios_presentacion_torreiberdrola.pdf, p.17-18 Slides 8, 9, 10: info.elcorreo.com/graficos/2011/transformacion-bilbao/torre-iberdrola.htm Slide 11: 1) www.eitb.com/multimedia/images/2012/02/16/612846/612846_Imagen_111_foto960.jpg 2) www.eitb.com/multimedia/images/2012/02/16/612848/612848_Imagen_122_foto960.jpg 3) www.eitb.com/multimedia/images/2012/02/16/612839/612839_Imagen_139_foto960.jpg Slide 12: www.trox.es/xpool/download/es/pdf/reference_projects/torre_iberdrola.pdf Slide 13: 1) www.eitb.com/multimedia/images/2012/02/16/612835/612835_Imagen_078_foto960.jpg 2)www.eitb.com/multimedia/images/2012/02/16/612840/612840_Imagen_096_foto960.jpg 3) www.eitb.com/multimedia/images/2012/02/16/612838/612838_Imagen_092_foto960.jpg
  • 20. Slides References Slide 14: 1)* Bos, F., Louter, C., Nijisse, R., Veer, Fred, 2012, Challenging Glass 3: Conference on Architecture and Structural application, Amsterdam: IOS Press, BV . Available at: books.google.co.uk/books?id=yekrr9Dz2TgC&pg=PA167&lpg=PA167&dq=challenging+glass+3+torre+iberd rola&source=bl&ots=FYdf3gFkaJ&sig=vjSLYjqyqxEWZ3rR7Dl1SmNa5oc&hl=it&sa=X&ei=7ud2Upf1DKOO 0AXU6YH4Dg&ved=0CCoQ6AEwAA#v=onepage&q=challenging%20glass%203%20torre%20iberdrola&f= false Slide 15: 1)* 2)www.vidrioperfil.com/img/noticias/torre-iberdrola-completa-su-fachada-1.jpg Slide 16: 1) img189.imageshack.us/img189/8232/85608153.jpg 2) desmond.imageshack.us/Himg18/scaled.php?server=18&filename=dsci0011z.jpg&res=medium 3)www.vidrioperfil.com/img/noticias/torre-iberdrola-completa-su-fachada.jpg
  • 21. Further References Mayo-Martinez M. "Iberdrola Tower. Structure." DYNA. September 2013. Vol. 88-5 p.518-524 Challenging Glass 3: Bos, F., Louter, C., Nijisse, R., Veer, Fred, 2012, Conference on Architecture and Structural application, Amsterdam: IOS Press, BV . Available at: <books.google.co.uk/books?id=yekrr9Dz2TgC&pg=PA167&lpg=PA167&dq=challenging+glass+3+torre+i berdrola&source=bl&ots=FYdf3gFkaJ&sig=vjSLYjqyqxEWZ3rR7Dl1SmNa5oc&hl=it&sa=X&ei=7ud2Upf 1DKOO0AXU6YH4Dg&ved=0CCoQ6AEwAA#v=onepage&q=challenging%20glass%203%20torre%20ibe rdrola&f=false> www.unican.es/NR/rdonlyres/00012251/tohgybnoxbdhmmunfuriqtbudmoxkknk/Guia_edificaci%C3%B 3n_sostenible_edificios_administrativos.pdf www.torreiberdrola.es/download/es/dosier_torreiberdrola.pdf issuu.com/bilbaointernational/docs/iberdrolaen Video: teknopolis.elhuyar.org/reportajes/torre-iberdola-construccion-de-altura/?lang=es

Hinweis der Redaktion

  1. Sifon de la Universidad (University Siphon, an incredible construction to collect residual waters), a tunnel of 5 meters diameter, that passes through the site in the West zone with North-South direction. The tower ‘s foundation is situated 2 meters from the gable of the tunnel. The site is located on land formed by alluvial silts and clays of very soft consistency and great compressibility. The persistent presence in the soil surface of piezometric level almost associated tidal range . Existing structures : a) foundations of Deusto bridge , west of the site, b ) retaining walls Square parking Euskadi , south of the parcel; c ) the stone columns North zone made ​​in the so called Campa de los Ingleses to accelerate the consolidation of silt ,prior to the execution of the urbanization.
  2. SUSTAINABILITYTorre Iberdrola have the prestigious LEED (Leadership in Energy and Environmental Design) CS 2.0 Certification, awarded by the USGBC (US Green Building Council) which assesses and recognises projects using more environmentally-friendly practices, ones that are therefore healthier, more respectful of the environment and with more cost effective structures. As a result, attention has been paid to the regeneration of the area around the building, its public transport links, its parking capacity, parking for bicycles, the maximization of spaces, etc. Public transport. To reduce the pollution generated by transport, Torre Iberdrola is located in an urban area very well connected with the public transport network, including the underground, tram and local buses. Parking for bicycles and changing facilities. To reduce pollution and the impact of the use of cars, those renting offices have access to parking spaces for bicycles (98 places) and changing facilities with showers that cyclists can use. Low emission and efficient vehicles. It also has 15 parking places for electric vehicles with a charging point. Maximisation of open spaces. The design of the Torre Iberdrola development guarantees that at least 20% of the free space is used for green areas. WATEREFFICIENCY Reduction of 40% in consumption. To reduce the demand for drinking water in the building it has been equipped with innovative technologies, such as electronic taps and limits on the volume of water used in the toilets, with the result being a reduction of 40% compared to standard consumption. Innovative waste water technologies. To reduce the demand for drinking water, the floor M1 houses a system for recovering greywater. Water coming from the basins and toilets on floors 2 to 35 is recovered and treated so that it can be reused for the toilets and urinals on the floors with rented offices (4 to 29) and M1. Rainwater in the downpipes from the roof is also reused and before joining the water recovery system it passes through a filter which removes 80% of the solids in suspension. BETTER INTERIOR ENVIRONMENT To improve the health conditions for those working there, the construction of the Torre Iberdrola has used materials with low levels of volatile organics so that their components are not dissipated over the lifetime of the building. ENERGY EFFICIENCY AND USE OFRENEWABLESTorre Iberdrola is a sustainable and energy efficient building which uses renewable energies that allow for significant savings for the companies based there. Green energy. Torre Iberdrola buys all its energy in the form of IBERDROLA Green Power that comes exclusively from energy sources certified 100% renewable, characterized by being as environmentally friendly as possible and avoiding CO2 emissions and other pollutants, thereby reducing the greenhouse effect in the atmosphere. On buying IBERDROLA Green Energy it is using energy that is cleaner, more environmentally friendly and more suitable for protecting nature. Energy optimisation. The air conditioning system has been designed to maximise efficiency, flexibility and the comfort of users. This is achieved thanks to the high air renewal rate for ventilation and to the synergy with the architecture of the tower itself through a Ventilated Active Façade. On each of the floors, the air conditioning is distributed through a large number of independent units (VRV - Variable Refrigerant Volume), which allows for different temperatures at different points of the floor and for money to be saved by switching off those located in less heavily used areas. All of this results in savings of around 20% in energy consumption. MATERIALS AND RESOURCES Recycled content, 20%. To conserve natural resources, it can be demonstrated that at least 20% of the materials used in constructing Torre Iberdrola are recycled. Materials from the area, 20%. To reduce the environmental impact of transporting goods, at least 20% of all the materials used in the construction of the Torre Iberdrola have come from within a radius of 800km. INNOVATION IN TECHNOLOGY AND PROCESSESThis system also allows companies renting offices in the building to benefit from the developer's sustainable strategies, since they can obtain their own Leed Certificate for interiors, with all the advantages this brings. EFFICIENT AIR CONDITIONINGAND ENERGY SAVING The air conditioning system has been designed to maximise efficiency, flexibility and the comfort of users. This is achieved thanks to the high air renewal rate for ventilation and to the synergy with the architecture of the tower itself through a Ventilated Active Façade. On each of the floors, the air conditioning is distributed through a large number of independent units (VRV), which allows for different temperatures at different points of the floor and for money to be saved by switching off those located in less heavily used areas. www.iberdrola.es
  3. The floors in the offices have been painted with special anti-dust paint and the offices also have a false ceiling and raised floor, guaranteeing the full functional flexibility of the space. The false ceiling, with 60 cm of free space to the framework, is of the perforated metal tray type, and both the lights and the other utilities are integrated into this. For its part, the modular floor, raised to offer 20 cm free height, is of fire resistant anhydrite.
  4. “The spandrel was designed as angled metal panels that absorb the geometrical differences between the two walls, forming a shape that we called "fishmouth". As the stack joints of the exterior panels arch towards the center of each facade from a low point at the corners, the angles of the fishmouth vary from module to module creating a warped surface. Automatic motorized blinds inside the wall catch the heat that enters in the cavity, which is then mechanically removed. That heat can be later recovered to pre-treat the fresh air in winter time. This double skin solution was instrumental to the energy efficiency of the building, which is expected to achieve a LEED Platinum certification from the United States Green Building Council.” Book: Challenging Glass3 – Conference on Architecture and Structural application. 2012 Article by: Axel Zemborain
  5. “The exterior wall, which acts as the water barrier, tilts following the building massing, while the inner wall remains vertical. This inner wall consists of a series of operable windows that allows maintenance of the resulting cavity. It also acts as the fire and smoke boundary of the building, which allowed us to provide the solid 1 meter fire separation required by code while creating a completely glazed exterior with minimal transoms as intended.” Book: Challenging Glass3 – Conference on Architecture and Structural application. 2012 Article by: Axel Zemborain