© 2012 McDermott. All Rights Reserved.
Summary Findings
 Early involvement of fabricators/contractors is key to the process
 Greatest positive impact comes from early definition on engineering,
  material     selection,     constructability,     completions,     optimized
  commissioning, load-out philosophies and sea-fastening
 This is probably the single biggest lesson learnt
Lessons Learnt- Contract Formation
Contracting Model - Owner, EPCM Contractor and Fabricator(s)
   Definition of roles and responsibilities – Clarity in documents and processes
   Fabricator’s relationship with EPCM Contractor and Owner – Single point
    responsibility is key
   Warranty obligations and remedial work executed off SE Asia – Need for
    rationalization
   Governing Law, Dispute resolution provisions etc – Adapt to SE Asia
   Is this the only sustainable contracting model? (EPC, EPCM and Supplier)
Lessons Learnt- Contract Formation
Contracting Strategy
   Fabrication on unit rates based on
    approximate quantities (BOAQ)- Good
    definition is key
   Long bidding cycle due to continuous
    changes in design – Awareness of resources
    and commitment
   BOAQ and models not mature enough for
    bidding – Risk sharing and qualifications
   Materials – Fabricator’s supply usually
    restricted to bulks – Extent of definition and
    scope split
   Commissioning requirements, Load-out
    requirements etc – Early definition and
    planning
Lessons Learnt- Contract Formation
         Australian Requirements
            AQIS or higher – Definition, acceptance criteria and
             specifications usually evolving throughout the
             project.
            Electrical equipment and installation competency –
             Australian certification requirements and workers
             licenses for work executed in SE Asia.
            Australian Industry Participation (AIP) requirements
             – levels of participation, early identification of
             potential and allowance in overall schedule.


         Materials Specifications
            Top-up not readily available in SE Asia, especially
             exotics and other issues such as weld procedures
             qualified previously or on contract material.
Lessons Learnt- Contract Formation
 Awareness of Fabricator’s Risks – Different
 from Owner or EPCM Risks
    Mix of work type – Balanced to reflect the work content
    Materials selection and specifications
    Quantity variations
    Module layouts, foot-print, equipment location
    Construction sequence
    ROS dates for Long Lead equipment
    Connection details – stiffeners, joint connections, weld
     details
    Space requirements
    Testing regimes
    Acceptance criteria
Early involvement ensures better definition of scope split, and mitigation of the risks.
Results in a better contracting arrangement, improved schedule certainty and
possibly lower costs, to all parties.
Lessons Learnt- Contract Execution
        Constructability Studies Early – Impact on
        productivity,   cost,   quarantine    and
        schedule.
           Structural design to cater to fabricator’s build
            sequence E.g. Pancakes Vs Roll-up
           Section sizes and grades to suit existing weld
            procedures, joint configurations and competencies
           Standardization of components such as stiffeners,
            supports etc or proprietary supporting systems.
           Standardization of sections and grades to allow bulk
            buying and interchangeability
           Design for construction - access requirements, water
            traps etc.
           Load-out philosophy and sea-fastening to reduce
            vessel standby time
Lessons Learnt- Contract Execution
Project Organization Set-up
   Adequate level of resourcing specific to each Contract – One size does not fit all
   Clearly defined communication lines and roles – internally and between parties
   Open and healthy relationship between parties – awareness of each other’s drivers
Engineering and Procurement Interfaces
   Dovetail engineering deliverables to suit fabrication requirements rather than
    progress
   Material deliveries to suit fabricator’s build sequence.
   Allow sufficient time for checking inconsistencies in design etc.
   Use of tools like PDMS to reduce fabricator’s engineering interfaces
   Integrated change management process to mitigate impact of design changes on
    fabrication
Lessons Learnt in Execution
Yard Layout and selection process
   Space constraints and workshop capacity – Volume driven pre-fabrication work
    with large requirement for space for assembly.
   Load- out philosophy to be firmed up early – by Trailers, by lifting etc and whether
    side load-out or front load-out.
   As shipping is largely driven by requirement and sequencing in the final location
    (LNG plant), module layouts should allow for change in priorities and shipping
    sequences.
Lessons Learnt in Execution
Quarantine & Build Clean Philosophy
   Quarantine requirements such as proximity to vegetation, seasonal impacts from
    local flora and fauna, rainwater stagnation etc to be considered early.
   Can be difficult to meet requirements in the tropics without being carefully
    managed.
   Can be a larger issue than the fabrication itself – early planning and dove-tailing
    into execution plan a must.
   Designs and supplied equipment are not always quarantine sufficient/compliant.
   Philosophy of build clean starts at design and procurement and not in the
    fabrication yard.
Lessons Learnt in Execution
Insulation Philosophy
   Material & process selection for insulation including cryogenic insulation to
    minimize damage.
   Avoid congestion on assembled modules by insulating more on ground.
   Increase pre-fabrication to remove insulation from critical path and reduce costs.
   Minimize interfaces between proprietary supports and insulation.
Lessons Learnt in Execution
Construction Completion & Testing
   Tolerance levels up to 1mm – onerous and far more stringent than normal offshore
    modules specifications
   SWHU (Single Weld Hook Up) - Preparation for a global regime??
   Advantages and disadvantages of testing as a train versus testing individual modules
    to be concluded early.
   Testing - stored energy versus absolute pressure rating as a basis for exclusion zones.
   Load-out & sea fastening plan to be developed early and standardized.
   Internal sea-fastening is often delayed until the MWS has inspected the modules just
    prior to sail-away.
Summary


 Clear contracting model.
 Early definition of detailed requirements and specifications.
 Clarity of commercial arrangements and pricing philosophy.
 Early engagement with contractors to incorporate Lessons
  Learned into Design phase.
 Design for construction and completion.

Plan Early and Engage Early to Reap benefits
Our Delivery Locations in SE Asia

                            Batam
                            60,000MT per annum
                            110 hectares




Qingdao McDermott Wuchuan
30,000MT per annum
43 hectares

Weitere ähnliche Inhalte

Was ist angesagt?

MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEAKSHAY SHARMA
 
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Philippe Porta
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningMohamed Mustafa
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpSURENDRA BABU
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparisonhelensuni
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionJaswin Sood
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerSoriya Mitesh
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Roland_Nikles
 
Assessment of Risks in International EPC Projects Reference Current Global Ec...
Assessment of Risks in International EPC Projects Reference Current Global Ec...Assessment of Risks in International EPC Projects Reference Current Global Ec...
Assessment of Risks in International EPC Projects Reference Current Global Ec...HIMADRI BANERJI
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.Madhava Rao V
 
Why megaprojects are overbudget and late Giorgio Locatelli
Why megaprojects are overbudget and late Giorgio LocatelliWhy megaprojects are overbudget and late Giorgio Locatelli
Why megaprojects are overbudget and late Giorgio LocatelliPMIUKChapter
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping EngineerPopovici Adrian
 
08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt08-Project-Control-ppt.ppt
08-Project-Control-ppt.pptTecnicoItca
 

Was ist angesagt? (20)

MECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUMEMECHANICAL PROJECT ENGINEER RESUME
MECHANICAL PROJECT ENGINEER RESUME
 
Modularizationpresentationfor Hbr
Modularizationpresentationfor HbrModularizationpresentationfor Hbr
Modularizationpresentationfor Hbr
 
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
Oil and-gas-facilities-and-pipelines-110906055120-phpapp01
 
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & CommissioningSenior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
Senior Pipeline/ Piping Mechanical Engineer Construction & Commissioning
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparison
 
EPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling renditionEPC_EPCM Business process modelling rendition
EPC_EPCM Business process modelling rendition
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
Why EPC
Why EPCWhy EPC
Why EPC
 
Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)Criterium epc project risks (5.28.13)
Criterium epc project risks (5.28.13)
 
Assessment of Risks in International EPC Projects Reference Current Global Ec...
Assessment of Risks in International EPC Projects Reference Current Global Ec...Assessment of Risks in International EPC Projects Reference Current Global Ec...
Assessment of Risks in International EPC Projects Reference Current Global Ec...
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
 
Why megaprojects are overbudget and late Giorgio Locatelli
Why megaprojects are overbudget and late Giorgio LocatelliWhy megaprojects are overbudget and late Giorgio Locatelli
Why megaprojects are overbudget and late Giorgio Locatelli
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
MEP ENGINEER
MEP ENGINEER MEP ENGINEER
MEP ENGINEER
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
CV Field Mechanical and Piping Engineer
CV Field  Mechanical  and Piping EngineerCV Field  Mechanical  and Piping Engineer
CV Field Mechanical and Piping Engineer
 
08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt08-Project-Control-ppt.ppt
08-Project-Control-ppt.ppt
 

Ähnlich wie Onshore modules construction – a fabricator’s view

Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ finalScott Coombes
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical EngineerVishnu Mohan
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...IRJET Journal
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Indonesia
 
Ddm Workshop Summary 052810
Ddm Workshop Summary 052810Ddm Workshop Summary 052810
Ddm Workshop Summary 052810frazierwe
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh
 
TCE Paper on Modular Engineering
TCE Paper on Modular EngineeringTCE Paper on Modular Engineering
TCE Paper on Modular EngineeringPrashant Kumar
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design petroEDGE
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSrinivas Sirigineedi
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydNitin Sethi
 
Why modularization should not be based on cost and size alone
Why modularization should not be based on cost and size aloneWhy modularization should not be based on cost and size alone
Why modularization should not be based on cost and size aloneMerrylyn Yeo
 
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...ICSA, LLC
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineerAlfred Joe
 

Ähnlich wie Onshore modules construction – a fabricator’s view (20)

Integration of modules on site _ final
Integration of modules on site _ finalIntegration of modules on site _ final
Integration of modules on site _ final
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
CV-Mechanical Engineer
CV-Mechanical EngineerCV-Mechanical Engineer
CV-Mechanical Engineer
 
Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...Structural Audit and Selection of Contractor for Building by Using Analytical...
Structural Audit and Selection of Contractor for Building by Using Analytical...
 
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
EMLI Training-An introduction to epc contract-clause by clause-Prepared by: D...
 
Ddm Workshop Summary 052810
Ddm Workshop Summary 052810Ddm Workshop Summary 052810
Ddm Workshop Summary 052810
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
TCE Paper on Modular Engineering
TCE Paper on Modular EngineeringTCE Paper on Modular Engineering
TCE Paper on Modular Engineering
 
Advanced Casing Design
Advanced Casing Design Advanced Casing Design
Advanced Casing Design
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
Petrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj LloydPetrotech Presenttaion- Punj Lloyd
Petrotech Presenttaion- Punj Lloyd
 
Why modularization should not be based on cost and size alone
Why modularization should not be based on cost and size aloneWhy modularization should not be based on cost and size alone
Why modularization should not be based on cost and size alone
 
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...
AIRCDRE Leon Phillips on Shaping a New Acquisition Model for Joint Force Deve...
 
Topside
TopsideTopside
Topside
 
Instrumentation and telecom engineer
Instrumentation and telecom  engineerInstrumentation and telecom  engineer
Instrumentation and telecom engineer
 

Kürzlich hochgeladen

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Jiastral oracle
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Aggregage
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 

Kürzlich hochgeladen (20)

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh JiPsychic Reading | Spiritual Guidance – Astro Ganesh Ji
Psychic Reading | Spiritual Guidance – Astro Ganesh Ji
 
Paul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate ProfessionalPaul Turovsky - Real Estate Professional
Paul Turovsky - Real Estate Professional
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
Strategic Project Finance Essentials: A Project Manager’s Guide to Financial ...
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 

Onshore modules construction – a fabricator’s view

  • 1. Onshore Modules Construction – A Fabricator’s View Lessons Learnt and Pitfalls to Avoid in: Contract Formation Contract Execution © 2012 McDermott. All Rights Reserved.
  • 2. Summary Findings  Early involvement of fabricators/contractors is key to the process  Greatest positive impact comes from early definition on engineering, material selection, constructability, completions, optimized commissioning, load-out philosophies and sea-fastening  This is probably the single biggest lesson learnt
  • 3. Lessons Learnt- Contract Formation Contracting Model - Owner, EPCM Contractor and Fabricator(s)  Definition of roles and responsibilities – Clarity in documents and processes  Fabricator’s relationship with EPCM Contractor and Owner – Single point responsibility is key  Warranty obligations and remedial work executed off SE Asia – Need for rationalization  Governing Law, Dispute resolution provisions etc – Adapt to SE Asia  Is this the only sustainable contracting model? (EPC, EPCM and Supplier)
  • 4. Lessons Learnt- Contract Formation Contracting Strategy  Fabrication on unit rates based on approximate quantities (BOAQ)- Good definition is key  Long bidding cycle due to continuous changes in design – Awareness of resources and commitment  BOAQ and models not mature enough for bidding – Risk sharing and qualifications  Materials – Fabricator’s supply usually restricted to bulks – Extent of definition and scope split  Commissioning requirements, Load-out requirements etc – Early definition and planning
  • 5. Lessons Learnt- Contract Formation Australian Requirements  AQIS or higher – Definition, acceptance criteria and specifications usually evolving throughout the project.  Electrical equipment and installation competency – Australian certification requirements and workers licenses for work executed in SE Asia.  Australian Industry Participation (AIP) requirements – levels of participation, early identification of potential and allowance in overall schedule. Materials Specifications  Top-up not readily available in SE Asia, especially exotics and other issues such as weld procedures qualified previously or on contract material.
  • 6. Lessons Learnt- Contract Formation Awareness of Fabricator’s Risks – Different from Owner or EPCM Risks  Mix of work type – Balanced to reflect the work content  Materials selection and specifications  Quantity variations  Module layouts, foot-print, equipment location  Construction sequence  ROS dates for Long Lead equipment  Connection details – stiffeners, joint connections, weld details  Space requirements  Testing regimes  Acceptance criteria Early involvement ensures better definition of scope split, and mitigation of the risks. Results in a better contracting arrangement, improved schedule certainty and possibly lower costs, to all parties.
  • 7. Lessons Learnt- Contract Execution Constructability Studies Early – Impact on productivity, cost, quarantine and schedule.  Structural design to cater to fabricator’s build sequence E.g. Pancakes Vs Roll-up  Section sizes and grades to suit existing weld procedures, joint configurations and competencies  Standardization of components such as stiffeners, supports etc or proprietary supporting systems.  Standardization of sections and grades to allow bulk buying and interchangeability  Design for construction - access requirements, water traps etc.  Load-out philosophy and sea-fastening to reduce vessel standby time
  • 8. Lessons Learnt- Contract Execution Project Organization Set-up  Adequate level of resourcing specific to each Contract – One size does not fit all  Clearly defined communication lines and roles – internally and between parties  Open and healthy relationship between parties – awareness of each other’s drivers Engineering and Procurement Interfaces  Dovetail engineering deliverables to suit fabrication requirements rather than progress  Material deliveries to suit fabricator’s build sequence.  Allow sufficient time for checking inconsistencies in design etc.  Use of tools like PDMS to reduce fabricator’s engineering interfaces  Integrated change management process to mitigate impact of design changes on fabrication
  • 9. Lessons Learnt in Execution Yard Layout and selection process  Space constraints and workshop capacity – Volume driven pre-fabrication work with large requirement for space for assembly.  Load- out philosophy to be firmed up early – by Trailers, by lifting etc and whether side load-out or front load-out.  As shipping is largely driven by requirement and sequencing in the final location (LNG plant), module layouts should allow for change in priorities and shipping sequences.
  • 10. Lessons Learnt in Execution Quarantine & Build Clean Philosophy  Quarantine requirements such as proximity to vegetation, seasonal impacts from local flora and fauna, rainwater stagnation etc to be considered early.  Can be difficult to meet requirements in the tropics without being carefully managed.  Can be a larger issue than the fabrication itself – early planning and dove-tailing into execution plan a must.  Designs and supplied equipment are not always quarantine sufficient/compliant.  Philosophy of build clean starts at design and procurement and not in the fabrication yard.
  • 11. Lessons Learnt in Execution Insulation Philosophy  Material & process selection for insulation including cryogenic insulation to minimize damage.  Avoid congestion on assembled modules by insulating more on ground.  Increase pre-fabrication to remove insulation from critical path and reduce costs.  Minimize interfaces between proprietary supports and insulation.
  • 12. Lessons Learnt in Execution Construction Completion & Testing  Tolerance levels up to 1mm – onerous and far more stringent than normal offshore modules specifications  SWHU (Single Weld Hook Up) - Preparation for a global regime??  Advantages and disadvantages of testing as a train versus testing individual modules to be concluded early.  Testing - stored energy versus absolute pressure rating as a basis for exclusion zones.  Load-out & sea fastening plan to be developed early and standardized.  Internal sea-fastening is often delayed until the MWS has inspected the modules just prior to sail-away.
  • 13. Summary  Clear contracting model.  Early definition of detailed requirements and specifications.  Clarity of commercial arrangements and pricing philosophy.  Early engagement with contractors to incorporate Lessons Learned into Design phase.  Design for construction and completion. Plan Early and Engage Early to Reap benefits
  • 14. Our Delivery Locations in SE Asia Batam 60,000MT per annum 110 hectares Qingdao McDermott Wuchuan 30,000MT per annum 43 hectares