1. GROUP MEMBERS:
MELVIN LIM
VOON SZE LUN
JAKE SIA
ERVING TIONG
SHEILA ANN
Building Economics
Group Presentation
Land Parcel @ Cecil Telok Ayer Street
2. 20-storey office floors, 3 commercial floors and 1
underground basement floors.
Total GFA of overall project 77,162 m2
100 m2 F&B Kiosk located at Open Space area.
Pedestrian walkway is constructed to connect plot A1
with A2
Project Brief
1.
5. Cost Plan
4.
Description Percentage (%) Contract Sum (RM)
Preliminaries 10.0% 35,485,540.00
Architecture & Finishes Works 30.0% 106,456,620.00
Structural Cost 28.0% 99,359,512.00
M & E Works 24.0% 85,165,296.00
External Work 3.0% 10,645,662.00
Green certification 5.0% 17,742,770.00
TOTAL 100.0% 354,855,400.00
6. Benchmark Project
5.
Project : Kuala Lumpur Petronas Twin Towers
Location : Kuala Lumpur City Centre
Total Gross Development Cost : RM7.05billion
Gross Floor Area : 1,672,254.72 m2
Unit Cost per m2 : RM4,215.86 /m2
Green Re Rating : Gold
7. Benchmark Project
6.
Green Features
i. Storm water design
KLCC has retention tank basin with water treatment system which able to
clean the debris from the rainwater and allow them flow back into the
ground.
ii. Light Pollution Reduction
KLCC has reduced exterior lighting to prevent the light sent up into the sky.
This is better for the nocturnal animal and also better stars view in the sky.
8. Benchmark Project
7.
iii. Lighting System Design and Controllability
The light in KLCC is controlled by occupancy sensors and daylight sensors.
When the surrounding is filled with sunlight, the light will turn off
automatically.
iv. Low Impact Cleaning & Maintenance Equipment
KLCC cleaning department only use environmentally –friendly cleaning
equipments to keep the air clean and fresh.
Green Features
13. Proposed Materials
Internal Doors
INTERNAL DOORS
GLAZING
GLASS IN OPENINGS
Clear float glass as specified
6mm Thick to metal rebates with glazing compound
0.50m2 – 1.0m2
RM 65 per m2
12.
14. Proposed Materials
Glass Wall
INTERNAL WALLS & PARTITIONS
GLAZING
GLASS IN OPENINGS
Clear float glass as specified
6mm Thick to metal rebates with glazing compound
Over 1.00m2
RM 67 per m2
13.
15. Carpet
INTERNAL FLOOR FINISHES
FLOOR, WALL AND CEILING FINISHINGS
FLOOR
Fitted Carpeting
Approved carpet tile synthetic fibre heavy duty 500mm x 500mm multi level texture loop pile
780gm/m2 including adhesive to PVC fibre glass reinforcement backing and all joint thermo welded
to form a seemless flooring all in accordance with manufacturer's instruction to floor
RM 80 per m2
Proposed Materials
Floor Finishes
14.
19. RM 536.00 RM 4591.30
Proposed Materials
Park Furniture
18.
20. Softscape (Plant)
TURFING AND SOFT LANDSCAPING
FENCING, TURFING AND PLANTING
PLANTING
Supply, plant and maintain as specified, the following
landscaping work as shown in the drawing
Tree
Bauhinia Purpurea; 75mm diameter x 2.00m height.
RM 258.31 per number of tree
Proposed Materials
Softscapes
19.
21. Softscape (Turve)
TURFING AND SOFT LANDSCAPING
FENCING, TURFING AND PLANTING
SEEDING AND TURFING
Close Turfing
225mm x 225mm approved cow grass turves as specified
obtained from Contractor's own source; trimming, levelling and
grading surfaces; 50mm thick top soil as specified, watering and
tendering until well established; replacing badly grow turves to
slopes and embankments
RM6 per m2
Proposed Materials
Softscapes
20.
22. Proposed Materials
Water Features
7.3JF 3 Phase Lake and
Pond Aerating Fountai0n
RM 36,543.74
• Multiple patterns in one unit
• Efficient/low power use
• Clog resistant
• Rugged motor: environmentally friendly design with a hard-
face internal mechanical seal and external lip seal for protection
against leaks; seals are silicone carbide for long life; long-life
top and bottom ball bearings; flood oil lubricated for excellent
heat dissipation
• Corrosion resistant: superior all external metal motor, float,
and hardware components are of stainless steel composition
and protected by a sacrificial zinc anode
• Low maintenance: clean the motor housing once or twice per
year and replacing the sacrificial zinc anode when visibly
corroded
21.