SlideShare ist ein Scribd-Unternehmen logo
1 von 7
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 1
Rev 6 (03-Feb-09)
Linga Murty Koneti
Resume
SUMMARY
40 + years work experience in Materials Management / Procurement / Contracts / Spares Coordination & PMC in
Petrochemical, Hydrocarbon & Rotating Equipment Manufacturing sectors.
EXPERIENCE
Dec 2014-
Present
Construction Superintendent, WorleyParsons, Abu Dhabi, U.A.E
(Takreer Green Diesel Project – 5554-E2, PMC, Abu Dhabi RefineryDivision, UAE)
Main Responsibilities
This is a short term assignment to close the subject sick Project which was prolonging for
years.
1. Work Supervision
 Supervise the work done by Contractor M/S Arison Gulf with respect to re-
starting of Mainline Pump (Flowserve) and re-installation of Booster Pump
(KSB) which was under repair at KSB workshop.
 Necessary coordination with Vendors & End User in successful execution
of the job.
 Prepare Method Statements and Task Risk Analysis for the jobs done, in
association with Contractor and taking care of HSE & Quality
Requirements.
2. Closing of Punch Items
 61 Punch Items were raised by various departments, during the course of
execution of the Project, some of which requiring substantial rework.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2
Rev 6 (03-Feb-09)
Oct 2011 –
Nov 2014
 The task was to get in touch with the concerned personnel, discussing
with them, pushing the Contractor to undertake rectification and getting the
Items signed off by the originators. This activity is in the completion stage.
3. Spare Parts Coordination
 This is one of the outstanding activities for completion of the Project.
Contact various vendors and obtain Recommended Operational Spares
for the major equipment in the form of SPIR (Spare Parts
Interchangeability Report) and Quotes and review the same.
 Consolidate and update Equipment TAG Data from physical verification at
site.
 Coordinate with Materials Engineering Division (MED) of Takreer in
submitting the data in the prescribed formats for MAXIMO inputs.
 Data covering 21 SPIR’s, 164 Equipment TAGs and 312 Spares was
submitted.
4. Submission of Final Documentation & Closeout
 End user was not happy with the Final Documentation submitted earlier by
the Contractor. Hence guided and helped the Contractor in re-submitting
the Final Documentation in the format acceptable to end user.
 Project Closeout and issuance of Provisional Acceptance Certificate are in
the final stages.
Senior Procurement / Spare Parts Engineer, Worley Parsons, Abu Dhabi, U.A.E.
(FERTIL-2 Expansion Project, PMC, Ruwais, UAE)
Main Responsibilities
1. Procurement
 Act as focal point between Client and EPC Contractor, for all
Procurement & Materials Management related activities, including but
not limited to
i. Review and endorse Vendor List for Equipment & Bulk
Materials and assist in Prequalification of Vendors.
ii. Review Enquiry Packages for consistency and compliance with
Contractual and Ethical requirements.
iii. Assist in Technical evaluation of bids and obtain Client’s
approvals.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3
Rev 6 (03-Feb-09)
iv. Review Purchase Orders for correctness & completeness including all
documentation requirements.
v. Assist in developing suitable numbering systems for all Procurement related
Documents to suit Contractor as well as Client’s internal systems.
 Review and track PSR (Procurement Service Status Report), Shipping Notices and SSR
(Shipping Status Report), suggest improvements, point out deficiencies, keep record of
latest status and report to Client as required.
 Expedite Contractor / Vendors in all procurement related activities, where required.
 Evidence check of completion of Receipts, authorize Progress Certificates and facilitate
clearance of Invoices
 Drive the entire Supply Chain Management of the Contractor to meet Project Schedules
and ensure that Equipment, Bulk Materials and Spares are made available on time.
2. SPIR (Spare Parts List & Interchangeability Record) Review
 Review Manual SPIRs provided by various vendors of the Project for correctness and
completeness in form and content. Suggest corrections and get the final SPIRs to the
desired level of perfectness to suit input to E-SPIRs (Electronic SPIRs) / ERP System
 Coordinate with LEPC Contractor SAMSUNG in obtaining the SPIRs and associated
documents such as Sectional Drawings, BOM (Bill Of Materials), Parts Lists, Vendor
Catalogues etc. required for finalization of the 2-Year Operational Spares
 Identify priorities for ordering of spares on the basis of commissioning schedule, in order
to meet the Company’s objective of having the 2-Year Spares in possession to meet any
exigencies during commissioning and mechanical completion of the project
 Chalk out a time table for completion of various activities involved and monitor the same
to meet target dates, through tracking formats, weekly meetings and expediting
 Coordinate with the client FERTIL’s Materials Department in processing and approving
the SPIRs for procurement of optimum number and quantity of Spares
 Coordinate with Contractor, Vendors and Client in finalizing E-SPIRs (Electronic SPIRs)
and completing structured Buying Descriptions in E-SPIR system and MAXIMO
 Note: In the particular context of Fertil-2 Expansion Project, during initial engineering and
procurement stage, only Manual SPIRs were envisaged. E-SPIR system based on
MAXIMO-7 was introduced during execution of the project. Hence a decision was taken
to procure spares on the basis of manual SPIRs and subsequently complete E-SPIRs for
the purpose of uploading the data to operating system of Fertil, MAXIMO.
2. Ordering of Spares
 Process approved SPIRs for placing orders by SAMSUNG as well as their Licensee,
UHDE and resolve any issues in order placement
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 4
Rev 6 (03-Feb-09)
 Review the Orders placed for correctness of the Buying Descriptions and other
commercial data
3. Receiving of Spares
 Maintain records of PO dates, delivery dates, Shipping information and receiving status, in
order to provide up-to-date information to project team, as and when required.
 Expedite deliveries in line with committed delivery dates and requirements of the project.
 Review receiving documentation such as Packing lists, Material Conformity Certificates etc.
and authorize the same.
 Coordinate with QA&QC departments, Contractor as well as Company in inspection of
spares according to SPIR descriptions and liaise with Materials department of the company
and project warehouse in resolving non-conformances.
 Evidence check and confirmation of receipts for close out of PO’s and billing.
May 2010 -
Sep 2011
InventorySpecialist, OXY (Occidental PetroleumCorporation – USA)- Oman Unit
Department- Supply Chain
OXY is a multi-unit Oil, Gas & Chemicals Company headquartered in Houston, USA with
operations in USA, South America, North Africa and Middle East. It is the second largest Natural Gas
Producer in USA.
Oman operations comprise of Mukhaizna & Safah Oil fields with headquarters at Muscat.
Main Responsibilities:
 Inventory Analysis, Control, Reduction and Management Reporting
 Assigning, monitoring and updating MIN/MAX levels for stock items
 Stock replenishment through regular PR’s, Agreements and Contracts
 Coding & cataloguing of new items in formatted text using IHS-Struxure system.
 Coding & Cataloguing of Project Materials before raising PR/RQ’s
 Operation of Inventory Management System in ORACLE-R12
 Coordination with Corporate Office with respect to ONEOXY initiative, implemented
recently.
 Enhancement of Buying Descriptions on continuous basis.
 Technical Evaluation and updating of Descriptions at ordering / receiving stages.
 Operation of Agreements for all stock items, including Drilling Items with well known
suppliers like Casewell, Weatherford, Halliburton & Sledgehammer
 Coordination with Drilling, Maintenance, Projects & Operations Teams
 Coordination with Warehouse in resolving stocking issues.
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 5
Rev 6 (03-Feb-09)
May 1992 –
Sep 2009
Materials Engineer , ZADCO (Zakum Development Company) – Abu Dhabi - UAE
Department - Materials Management Team– Commercial Department
Duration: 19-05-1992 (regular since 05-01-1995) to 03-09-2009 – 17 Years
ZADCO is an ADNOC group of Company for off-shore Oil Fields of the Emirate of Abu Dhabi. It
covers Upper Zakum, Umm Al Dalkh, Satah & Arzanah fields.
Central processing and shipping of the oil is done from Zirku Island.
Main Responsibilities:
 SPIR (Spare Parts and Interchangeability Record) review for new Projects and identify
optimum number & quantities of Spares to be stocked
 SCAD (Stock Creation/Amendment/Deactivation) preparation for new materials
 Coding & Cataloguing – Using adapted SHELL-MESC system as well as Auto generated
Item Numbers in MAXIMO, and develop structured Buying Descriptions
 Procurement – Raising of Purchase Requisitions, Using LVP (Low Value Purchase
Orders), Agreements, Call-Off Orders
 Technical evaluation of bids for Purchase Orders & Agreements
 Inventory Control – Periodical review of SRR (Stock Replenishment Report), monitor stock
parameters (MIN-ROP-MAX) and replenish optimum quantities of materials. Deal with
negative balances & follow-up to meet site requirements
 Project Materials – Review of BOM/MTO/PR’s and offer available materials from stock
 Material Inspection – Coordination with Inspectors for Inspection and acceptance of
materials received, for compliance with specifications
 Standardization & Rationalization of various grades, ratings, specifications of stock items
for variety control & reduction
 Deal with obsolescence and source alternate items
 Identify slow/non-moving/unwanted materials and coordinate for their disposal
Jan 1987 –
May 1992
Materials Analysis Specialist, RASCO (Ras-Lanuf Oil & Gas Processing Company)
– LIBYA
Department- Systems & InventoryControl Section – Materials Department
RASCO has a refinery of capacity 120,000 barrels/day and Ethylene Plant of capacity 1000 metric
tons/day.
Other downstream products are being added. About 1, 80,000 items of value 130 Million Dollars are
being stocked.
Main Responsibilities:
 Material Coding using SHELL-MESC system
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 6
Rev 6 (03-Feb-09)
 Cataloguing (free text) and generation of Buying Descriptions as per Headers, Sub-Headers
and Item descriptions, using ARCOMAS (Azzawiya Refining Company – Materials
Administration System).
 Undertaken a project for streamlining of computerized descriptions for Piping Materials and
Valves
 Inventory Control – Fixing & Review of stock Parameters and ordering optimum quantities
 Standardization & Rationalization – A special project was undertaken for rationalization of
Gaskets
 Integration of Project Surplus Materials into the system after physical verification and
analysis
 Receiving Inspection of all stock materials for compliance with specifications
Oct 1968 –
Jan 1987
Manager – Standards, BHEL (Bharat HeavyElectricals Limited) – Hyderabad, INDIA
Department: Standards Section – Quality Assurance Department
BHEL is one of the blue-chip Public Sector Undertakings in India.
Hyderabad division is engaged in the manufacture of Industrial & Utility Turbo Generator sets (steam
& gas), Pumps, Compressors, Heat Exchangers, Bowl Mills, Oil Field Equipment and switchgear in
collaboration with SKODA, SIEMENS, OILWELL and others.
Main Responsibilities:
 Material Coding – On the basis of Westinghouse Classification System. Coding was done at
Product / Plant / Corporate levels. I have participated in evolving and implementing Inter-
Plant Material codes of BHEL and headed some of the sub-committees created for that
purpose
 Computerization – Coordinated computerization of material data and undertook a massive
program of online conversion of 10 Digit Plant Codes to 12 Digit Corporate Codes
 Standardization & Rationalization – Being in-charge of the section executed several projects
and showed tangible financial benefits
 Import Substitution – Unified material specs which came into existence as a result of multiple
collaborations and substituted with indigenous ones to the extent possible
 Awards – BHEL got National award for “Best Company Standardization” for which I have
made significant contribution
002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 7
Rev 6 (03-Feb-09)
PERSONAL DATA
Full Name Koneti Linga Murty
Last Name (surname) Koneti
First Name (given name) Linga Murty
Father’s Name Koneti Nooka Raju
Mother’s Name Koneti Varahalamma
Date of Birth 03-09-1945
Place of Birth Anakapalli, Andhra Pradesh, India
Qualifications Bachelor of Engineering - Mechanical
University Andhra University, Visakhapatnam, India
Marital Status Married with two children
Passport No. Z2836053
Place of Issue Abu Dhabi, U.A.E
Date of Issue / Expiry 23-06-2014 / 22-06-2024
UAE Resident Visa No. 101/2011/2/0281329
Date of Issue / Expiry 26-08-2014 / 25-08-2016
Permanent Address Plot No.326, Vivekananda Nagar, Kukatpalli,
Hyderabad, 500072, India
Contacts-India 0091-40-23067304 / 0091-9000772705
Contacts-UAE 0097150-7210231
E-Mail lingamurtyk@hotmail.com
linga.koneti@worleyparsons.com

Weitere ähnliche Inhalte

Was ist angesagt?

AVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resumeAVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resumeAvit Imang
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-Harry Ramos
 
Joseph Hinkle Resume 01_2015 Visual Resume
Joseph Hinkle Resume 01_2015  Visual ResumeJoseph Hinkle Resume 01_2015  Visual Resume
Joseph Hinkle Resume 01_2015 Visual ResumeJoseph Hinkle
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Abdulkader Sayed
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5shreyas Shah
 
Eng. Ayham Sami C.V. Feb 2016 AIO
Eng. Ayham Sami C.V. Feb 2016 AIOEng. Ayham Sami C.V. Feb 2016 AIO
Eng. Ayham Sami C.V. Feb 2016 AIOAyham Sami
 
Edwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalEdwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalNickicole40
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - CopyJesse Lopez
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016NITIN VAIDYA
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsLloyd's Register Energy
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projectsweshumba
 
Ajai K. Asthana CV
Ajai K. Asthana CVAjai K. Asthana CV
Ajai K. Asthana CVAjay Asthana
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitaeHarvey Sarda
 

Was ist angesagt? (19)

AVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resumeAVIT JOK IMANG-latest resume
AVIT JOK IMANG-latest resume
 
KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-KEO CV Rev. 1 of Harry Ramos-PMCM-
KEO CV Rev. 1 of Harry Ramos-PMCM-
 
Joseph Hinkle Resume 01_2015 Visual Resume
Joseph Hinkle Resume 01_2015  Visual ResumeJoseph Hinkle Resume 01_2015  Visual Resume
Joseph Hinkle Resume 01_2015 Visual Resume
 
Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -Curriculum Vitae - Sayed Abdul Kader -
Curriculum Vitae - Sayed Abdul Kader -
 
CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5CV-Shreyas Shah 9.5
CV-Shreyas Shah 9.5
 
Eng. Ayham Sami C.V. Feb 2016 AIO
Eng. Ayham Sami C.V. Feb 2016 AIOEng. Ayham Sami C.V. Feb 2016 AIO
Eng. Ayham Sami C.V. Feb 2016 AIO
 
Edwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_FinalEdwards, Nicole_Resume_Comm_Dec_2015_Final
Edwards, Nicole_Resume_Comm_Dec_2015_Final
 
Jesse Lopez Resume inspector revised - Copy
Jesse Lopez Resume  inspector revised - CopyJesse Lopez Resume  inspector revised - Copy
Jesse Lopez Resume inspector revised - Copy
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
Gerald L. Adarlo CV
Gerald L. Adarlo CVGerald L. Adarlo CV
Gerald L. Adarlo CV
 
Norwegian subsea
Norwegian subseaNorwegian subsea
Norwegian subsea
 
WARREN2016AFebResume
WARREN2016AFebResumeWARREN2016AFebResume
WARREN2016AFebResume
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)Mostafa Dawood Ali (National)
Mostafa Dawood Ali (National)
 
Wellington Shumba CV projects
Wellington Shumba CV projectsWellington Shumba CV projects
Wellington Shumba CV projects
 
Ajai K. Asthana CV
Ajai K. Asthana CVAjai K. Asthana CV
Ajai K. Asthana CV
 
harveysarda-curriculum vitae
harveysarda-curriculum vitaeharveysarda-curriculum vitae
harveysarda-curriculum vitae
 

Ähnlich wie K.L.Murty_Resume_2015-07-12

Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation EngineerZafar Ali
 
Material controller cv anas
Material controller cv  anasMaterial controller cv  anas
Material controller cv anasAjeeb Hamsa
 
Paula Giordano - Master Scheduler
Paula Giordano - Master SchedulerPaula Giordano - Master Scheduler
Paula Giordano - Master Schedulerpaula giordano
 
Harish Resume.pdf
Harish Resume.pdfHarish Resume.pdf
Harish Resume.pdfNaga Harish
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERShafeek Nazar
 
CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatHarender Sahrawat
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resumearnel moncada
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas Rushi Pru Dhvi
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docxZiyad Zaidi
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu, CIPM/CrtPRM
 
Resume_Sachin Mhatre
Resume_Sachin MhatreResume_Sachin Mhatre
Resume_Sachin MhatreSachin Mhatre
 

Ähnlich wie K.L.Murty_Resume_2015-07-12 (20)

M.I.KHAN RESUME.
M.I.KHAN RESUME.M.I.KHAN RESUME.
M.I.KHAN RESUME.
 
resume
resumeresume
resume
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
Material controller cv anas
Material controller cv  anasMaterial controller cv  anas
Material controller cv anas
 
Paula Giordano - Master Scheduler
Paula Giordano - Master SchedulerPaula Giordano - Master Scheduler
Paula Giordano - Master Scheduler
 
Harish Resume.pdf
Harish Resume.pdfHarish Resume.pdf
Harish Resume.pdf
 
Karthick mm
Karthick  mmKarthick  mm
Karthick mm
 
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEERRESUME FOR PROCUREMENT & CONTRACTS ENGINEER
RESUME FOR PROCUREMENT & CONTRACTS ENGINEER
 
SURESH JAMBHULKAR RESUME ( LATEST UPDT )
SURESH JAMBHULKAR RESUME ( LATEST UPDT )SURESH JAMBHULKAR RESUME ( LATEST UPDT )
SURESH JAMBHULKAR RESUME ( LATEST UPDT )
 
Sameer CV-DC
Sameer CV-DCSameer CV-DC
Sameer CV-DC
 
Raju Ragi
Raju RagiRaju Ragi
Raju Ragi
 
CV for Procurement_Harender Sahrawat
CV for Procurement_Harender SahrawatCV for Procurement_Harender Sahrawat
CV for Procurement_Harender Sahrawat
 
Arnel Moncada Resume
Arnel Moncada ResumeArnel Moncada Resume
Arnel Moncada Resume
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docx
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
CV-Toneygm
CV-ToneygmCV-Toneygm
CV-Toneygm
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
 
Resume_Sachin Mhatre
Resume_Sachin MhatreResume_Sachin Mhatre
Resume_Sachin Mhatre
 

K.L.Murty_Resume_2015-07-12

  • 1. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 1 Rev 6 (03-Feb-09) Linga Murty Koneti Resume SUMMARY 40 + years work experience in Materials Management / Procurement / Contracts / Spares Coordination & PMC in Petrochemical, Hydrocarbon & Rotating Equipment Manufacturing sectors. EXPERIENCE Dec 2014- Present Construction Superintendent, WorleyParsons, Abu Dhabi, U.A.E (Takreer Green Diesel Project – 5554-E2, PMC, Abu Dhabi RefineryDivision, UAE) Main Responsibilities This is a short term assignment to close the subject sick Project which was prolonging for years. 1. Work Supervision  Supervise the work done by Contractor M/S Arison Gulf with respect to re- starting of Mainline Pump (Flowserve) and re-installation of Booster Pump (KSB) which was under repair at KSB workshop.  Necessary coordination with Vendors & End User in successful execution of the job.  Prepare Method Statements and Task Risk Analysis for the jobs done, in association with Contractor and taking care of HSE & Quality Requirements. 2. Closing of Punch Items  61 Punch Items were raised by various departments, during the course of execution of the Project, some of which requiring substantial rework.
  • 2. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 2 Rev 6 (03-Feb-09) Oct 2011 – Nov 2014  The task was to get in touch with the concerned personnel, discussing with them, pushing the Contractor to undertake rectification and getting the Items signed off by the originators. This activity is in the completion stage. 3. Spare Parts Coordination  This is one of the outstanding activities for completion of the Project. Contact various vendors and obtain Recommended Operational Spares for the major equipment in the form of SPIR (Spare Parts Interchangeability Report) and Quotes and review the same.  Consolidate and update Equipment TAG Data from physical verification at site.  Coordinate with Materials Engineering Division (MED) of Takreer in submitting the data in the prescribed formats for MAXIMO inputs.  Data covering 21 SPIR’s, 164 Equipment TAGs and 312 Spares was submitted. 4. Submission of Final Documentation & Closeout  End user was not happy with the Final Documentation submitted earlier by the Contractor. Hence guided and helped the Contractor in re-submitting the Final Documentation in the format acceptable to end user.  Project Closeout and issuance of Provisional Acceptance Certificate are in the final stages. Senior Procurement / Spare Parts Engineer, Worley Parsons, Abu Dhabi, U.A.E. (FERTIL-2 Expansion Project, PMC, Ruwais, UAE) Main Responsibilities 1. Procurement  Act as focal point between Client and EPC Contractor, for all Procurement & Materials Management related activities, including but not limited to i. Review and endorse Vendor List for Equipment & Bulk Materials and assist in Prequalification of Vendors. ii. Review Enquiry Packages for consistency and compliance with Contractual and Ethical requirements. iii. Assist in Technical evaluation of bids and obtain Client’s approvals.
  • 3. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 3 Rev 6 (03-Feb-09) iv. Review Purchase Orders for correctness & completeness including all documentation requirements. v. Assist in developing suitable numbering systems for all Procurement related Documents to suit Contractor as well as Client’s internal systems.  Review and track PSR (Procurement Service Status Report), Shipping Notices and SSR (Shipping Status Report), suggest improvements, point out deficiencies, keep record of latest status and report to Client as required.  Expedite Contractor / Vendors in all procurement related activities, where required.  Evidence check of completion of Receipts, authorize Progress Certificates and facilitate clearance of Invoices  Drive the entire Supply Chain Management of the Contractor to meet Project Schedules and ensure that Equipment, Bulk Materials and Spares are made available on time. 2. SPIR (Spare Parts List & Interchangeability Record) Review  Review Manual SPIRs provided by various vendors of the Project for correctness and completeness in form and content. Suggest corrections and get the final SPIRs to the desired level of perfectness to suit input to E-SPIRs (Electronic SPIRs) / ERP System  Coordinate with LEPC Contractor SAMSUNG in obtaining the SPIRs and associated documents such as Sectional Drawings, BOM (Bill Of Materials), Parts Lists, Vendor Catalogues etc. required for finalization of the 2-Year Operational Spares  Identify priorities for ordering of spares on the basis of commissioning schedule, in order to meet the Company’s objective of having the 2-Year Spares in possession to meet any exigencies during commissioning and mechanical completion of the project  Chalk out a time table for completion of various activities involved and monitor the same to meet target dates, through tracking formats, weekly meetings and expediting  Coordinate with the client FERTIL’s Materials Department in processing and approving the SPIRs for procurement of optimum number and quantity of Spares  Coordinate with Contractor, Vendors and Client in finalizing E-SPIRs (Electronic SPIRs) and completing structured Buying Descriptions in E-SPIR system and MAXIMO  Note: In the particular context of Fertil-2 Expansion Project, during initial engineering and procurement stage, only Manual SPIRs were envisaged. E-SPIR system based on MAXIMO-7 was introduced during execution of the project. Hence a decision was taken to procure spares on the basis of manual SPIRs and subsequently complete E-SPIRs for the purpose of uploading the data to operating system of Fertil, MAXIMO. 2. Ordering of Spares  Process approved SPIRs for placing orders by SAMSUNG as well as their Licensee, UHDE and resolve any issues in order placement
  • 4. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 4 Rev 6 (03-Feb-09)  Review the Orders placed for correctness of the Buying Descriptions and other commercial data 3. Receiving of Spares  Maintain records of PO dates, delivery dates, Shipping information and receiving status, in order to provide up-to-date information to project team, as and when required.  Expedite deliveries in line with committed delivery dates and requirements of the project.  Review receiving documentation such as Packing lists, Material Conformity Certificates etc. and authorize the same.  Coordinate with QA&QC departments, Contractor as well as Company in inspection of spares according to SPIR descriptions and liaise with Materials department of the company and project warehouse in resolving non-conformances.  Evidence check and confirmation of receipts for close out of PO’s and billing. May 2010 - Sep 2011 InventorySpecialist, OXY (Occidental PetroleumCorporation – USA)- Oman Unit Department- Supply Chain OXY is a multi-unit Oil, Gas & Chemicals Company headquartered in Houston, USA with operations in USA, South America, North Africa and Middle East. It is the second largest Natural Gas Producer in USA. Oman operations comprise of Mukhaizna & Safah Oil fields with headquarters at Muscat. Main Responsibilities:  Inventory Analysis, Control, Reduction and Management Reporting  Assigning, monitoring and updating MIN/MAX levels for stock items  Stock replenishment through regular PR’s, Agreements and Contracts  Coding & cataloguing of new items in formatted text using IHS-Struxure system.  Coding & Cataloguing of Project Materials before raising PR/RQ’s  Operation of Inventory Management System in ORACLE-R12  Coordination with Corporate Office with respect to ONEOXY initiative, implemented recently.  Enhancement of Buying Descriptions on continuous basis.  Technical Evaluation and updating of Descriptions at ordering / receiving stages.  Operation of Agreements for all stock items, including Drilling Items with well known suppliers like Casewell, Weatherford, Halliburton & Sledgehammer  Coordination with Drilling, Maintenance, Projects & Operations Teams  Coordination with Warehouse in resolving stocking issues.
  • 5. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 5 Rev 6 (03-Feb-09) May 1992 – Sep 2009 Materials Engineer , ZADCO (Zakum Development Company) – Abu Dhabi - UAE Department - Materials Management Team– Commercial Department Duration: 19-05-1992 (regular since 05-01-1995) to 03-09-2009 – 17 Years ZADCO is an ADNOC group of Company for off-shore Oil Fields of the Emirate of Abu Dhabi. It covers Upper Zakum, Umm Al Dalkh, Satah & Arzanah fields. Central processing and shipping of the oil is done from Zirku Island. Main Responsibilities:  SPIR (Spare Parts and Interchangeability Record) review for new Projects and identify optimum number & quantities of Spares to be stocked  SCAD (Stock Creation/Amendment/Deactivation) preparation for new materials  Coding & Cataloguing – Using adapted SHELL-MESC system as well as Auto generated Item Numbers in MAXIMO, and develop structured Buying Descriptions  Procurement – Raising of Purchase Requisitions, Using LVP (Low Value Purchase Orders), Agreements, Call-Off Orders  Technical evaluation of bids for Purchase Orders & Agreements  Inventory Control – Periodical review of SRR (Stock Replenishment Report), monitor stock parameters (MIN-ROP-MAX) and replenish optimum quantities of materials. Deal with negative balances & follow-up to meet site requirements  Project Materials – Review of BOM/MTO/PR’s and offer available materials from stock  Material Inspection – Coordination with Inspectors for Inspection and acceptance of materials received, for compliance with specifications  Standardization & Rationalization of various grades, ratings, specifications of stock items for variety control & reduction  Deal with obsolescence and source alternate items  Identify slow/non-moving/unwanted materials and coordinate for their disposal Jan 1987 – May 1992 Materials Analysis Specialist, RASCO (Ras-Lanuf Oil & Gas Processing Company) – LIBYA Department- Systems & InventoryControl Section – Materials Department RASCO has a refinery of capacity 120,000 barrels/day and Ethylene Plant of capacity 1000 metric tons/day. Other downstream products are being added. About 1, 80,000 items of value 130 Million Dollars are being stocked. Main Responsibilities:  Material Coding using SHELL-MESC system
  • 6. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 6 Rev 6 (03-Feb-09)  Cataloguing (free text) and generation of Buying Descriptions as per Headers, Sub-Headers and Item descriptions, using ARCOMAS (Azzawiya Refining Company – Materials Administration System).  Undertaken a project for streamlining of computerized descriptions for Piping Materials and Valves  Inventory Control – Fixing & Review of stock Parameters and ordering optimum quantities  Standardization & Rationalization – A special project was undertaken for rationalization of Gaskets  Integration of Project Surplus Materials into the system after physical verification and analysis  Receiving Inspection of all stock materials for compliance with specifications Oct 1968 – Jan 1987 Manager – Standards, BHEL (Bharat HeavyElectricals Limited) – Hyderabad, INDIA Department: Standards Section – Quality Assurance Department BHEL is one of the blue-chip Public Sector Undertakings in India. Hyderabad division is engaged in the manufacture of Industrial & Utility Turbo Generator sets (steam & gas), Pumps, Compressors, Heat Exchangers, Bowl Mills, Oil Field Equipment and switchgear in collaboration with SKODA, SIEMENS, OILWELL and others. Main Responsibilities:  Material Coding – On the basis of Westinghouse Classification System. Coding was done at Product / Plant / Corporate levels. I have participated in evolving and implementing Inter- Plant Material codes of BHEL and headed some of the sub-committees created for that purpose  Computerization – Coordinated computerization of material data and undertook a massive program of online conversion of 10 Digit Plant Codes to 12 Digit Corporate Codes  Standardization & Rationalization – Being in-charge of the section executed several projects and showed tangible financial benefits  Import Substitution – Unified material specs which came into existence as a result of multiple collaborations and substituted with indigenous ones to the extent possible  Awards – BHEL got National award for “Best Company Standardization” for which I have made significant contribution
  • 7. 002-000-CPF-016 (007848) HRF-0033 Corporate Base Page 7 Rev 6 (03-Feb-09) PERSONAL DATA Full Name Koneti Linga Murty Last Name (surname) Koneti First Name (given name) Linga Murty Father’s Name Koneti Nooka Raju Mother’s Name Koneti Varahalamma Date of Birth 03-09-1945 Place of Birth Anakapalli, Andhra Pradesh, India Qualifications Bachelor of Engineering - Mechanical University Andhra University, Visakhapatnam, India Marital Status Married with two children Passport No. Z2836053 Place of Issue Abu Dhabi, U.A.E Date of Issue / Expiry 23-06-2014 / 22-06-2024 UAE Resident Visa No. 101/2011/2/0281329 Date of Issue / Expiry 26-08-2014 / 25-08-2016 Permanent Address Plot No.326, Vivekananda Nagar, Kukatpalli, Hyderabad, 500072, India Contacts-India 0091-40-23067304 / 0091-9000772705 Contacts-UAE 0097150-7210231 E-Mail lingamurtyk@hotmail.com linga.koneti@worleyparsons.com