Tilt‐up concrete construction advancements and applications
Introduction
Tilt‐Up Concrete Association
• Promoting growth and achievement in tilt‐up design,
construction and innovation for three decades.
• Founded in 1986, the Tilt‐Up Concrete Association was
created by a dedicated group of construction
professionals interested in improving the quality and
acceptance of tilt‐up construction.
• TCA mission is to expand and improve the use of tilt‐up
as the preferred construction method by providing
education and resources that enhance quality and
performance.
James Baty
TCA Technical Director 
ACI 551 ‐ Tilt‐Up Concrete 
Committee, voting 
member and current 
Secretary
ReviewerSpeaker
Mohammed Zaid
Senior Structural Engineer
Chartered Engineer‐ ASCE
Associate member‐
ACI‐551 /ACI‐423 
committees
www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org
Learning objectives
After viewing this program, you will be able to:
•Identify the difference between precast/pre-
stressed concrete and tilt up concrete structures
•Explain the benefits of using tilt up concrete
•Discuss the design considerations for tilt up
concrete structures
•BIM into precast / Tilt up concrete
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Definition
Precast & Tilt up concrete
Precast concrete refers to any type of
concrete structure that is manufactured at
a plant and transported to the construction
site. In contrast, regular concrete
structures are normally molded, poured,
and cured on-site.
Tilt up concrete, are created by
assembling forms and pouring large slabs
of concrete called panels directly at the
job site. The panels are then tilted up into
position around the building's slab.
Because the concrete tilt wall forms are
assembled and poured directly at the job
site, no transportation of panels is
required
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Precast concrete Vs Tilt up
concrete
there are many similarities between precast
concrete construction and tilt-up concrete
construction, there are also many pointed
differences
• Elements sizes
• Transportation
• Weather Conditions
• Connections cost
• Compilation differences
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Tilt up concrete advantages
1. Elimination of expensive formwork and
scaffolding
2. Fast, economical construction cycle time
3. Wide variety of exterior finishes such as
colored , concrete, exposed aggregate,
graphic painting and form liner finishes
4. Easily modified structures for building
expansion
5. Durable, long-life and low maintenance
building
6. Schedule and Early Occupancy
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Tilt up basics
Modern tilt‐up construction is carried out by
erecting site cast panels and temporarily
bracing them to the floor until the roof
structure is in place.
Once complete the concrete panels carry the
building’s vertical loads, while the roof
structure acts as a diaphragm, transferring and
distributing horizontal loads to transverse walls
and creating a self‐supporting structure.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Planning
A successful tilt-up project begins with a
suitable and properly prepared site. Items
affecting the suitability of the site include:
Access
Circulation for cranes and ready-mix trucks
Staging space for materials
Casting areas
Overhead clearance is also important to
facilitate crane operation
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Engineering
Every project starts with selecting a an
Engineer to design the project.
The quality of engineering drawings
has a direct impact on the quantity and
magnitude of issues that can arise in
the field.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Design
Wall panels are generally designed as
load-bearing beam-columns spanning
vertically between the ground floor and
the roof, or intermediate floors
The thickness of a concrete panel
usually is determined by the ratio of
the unsupported panel to the panel
thickness. Tilt-up walls will often
exceed this limitation with lu/h ratios of
40 to 50 or more
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Shop drawings
Many of the details of tilt-up
construction are identified and
documented in the shop drawings.
Panel Elevations
Locations and Details of Lifting Inserts
Locations and Details of Panel
Reinforcement
Specification for Reinforcement Chairs
Concrete Mix Design
Product Information
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Foundation system
Continuous spread footings are the
most economical foundation system
and are used whenever possible.
Footing sides may either be formed
or trenched depending on soil
conditions and the degree of control
needed over the footing size and
elevation.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Floor slabs
Footing locations, heights, and
dimensions should be checked and
verified for correctness
The building floor slab is the most
common surface used for casting
tilt-up wall panels.
The slab should be smooth and
hard and contraction joints should
be positioned where they will have
minimal impact on the pane
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Floor slabs
Stack Casting: Stack cast panels are
typically cast two or three panels
high, but stacking as high as seven
or eight panels is possible.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Panel Forming
The standard practice in laying out
panels is to snap a chalk line on the
floor slab. These lines indicate panel
perimeters and the forms should be
placed against them. Wood are the
most common material used for side
forms.
The form sides can be supported and
secured to the slab by a wood or steel
angle support There are several ways
to form individual panels.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Panel Forming
A variation of this method is to cast a
large slab, then saw joints into the
slab to form individual panels after the
concrete has been troweled.
Form door and window openings after
framing the panel perimeter. Brace
the interior of the openings to prevent
bowing or movement.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Panel Forming
Apply form release agent and bond
breaker to the slab and forms.
The steel grid for reinforcing Tilt-Up
panels is typically tied in-place after the
side forms are erected
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Concrete Placement
The most efficient method of placing
concrete is pumping. Concrete pumps
are available in nearly all parts of the
world and are capable of delivering
large volumes of concrete over
considerable distances.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Panel Erection
The erection sequence should
be determined well in advance
Locate and clean inserts and
embeds and attach braces
before lifting the panels
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Panel Erection
Braces should not be removed
until after the roof and decking
are installed. Once the braces
have been safely removed,
workers can patch holes in the
floor and complete other finish
work.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Connection
Panel to Foundation: The connection of the
panel base to the footing or floor slab is
done with a reinforcement bar in the panel
connected to the floor reinforcement
dowel, by welded angle to an embed in
both panel and footing, or by an anchor
inserted through the panel into the footing.
Panel to Panel: Tilt-up panels are not often
connected to each other because of the
shrinkage forces. Elimination of most
panel-to-panel connections (called
“stitching”) is one of the major differences
between tilt-up and precast construction.
Panel to Roof: Members can either be set
in pockets or flush-mounted to embedded
plates by bolt or weld.
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
Finishing
Panels often appear discolored when they
are first erected. This is due in part to
uncontrollable factors such as moisture on
or in the casting slab, concrete from
different trucks and batches and a host of
other variables. Cleaning and time even
out the coloration
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
THANK YOU
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
THANK YOU FOR
ATTENDING
A wealth of presentations and reports are available at
www.middleeastconcrete/presentations
PLEASE DON’T FORGET TO COLLECT YOUR ATTENDANCE CERTIFICATE
www.esolution‐pt.com www.tiltup.org www.tiltwerk.com

More Related Content

What's hot (20)

LIFT SLAB .pdf
LIFT SLAB .pdfLIFT SLAB .pdf
LIFT SLAB .pdf
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Lift form slab construction
Lift form slab constructionLift form slab construction
Lift form slab construction
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
High rise building construction
High rise building constructionHigh rise building construction
High rise building construction
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Waterproofing in structure
Waterproofing in structureWaterproofing in structure
Waterproofing in structure
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Advance structural system. pptx
Advance structural system. pptxAdvance structural system. pptx
Advance structural system. pptx
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
CONSTRUCTION OF DOMES
CONSTRUCTION OF DOMESCONSTRUCTION OF DOMES
CONSTRUCTION OF DOMES
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
Waffle slab
Waffle slabWaffle slab
Waffle slab
 
Panel system
Panel systemPanel system
Panel system
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Floor and slab system design and construction
Floor and slab system design and constructionFloor and slab system design and construction
Floor and slab system design and construction
 
Folded plate structure
Folded plate structureFolded plate structure
Folded plate structure
 
Folded Plate structures
Folded Plate structures Folded Plate structures
Folded Plate structures
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Filler slab
Filler slabFiller slab
Filler slab
 

Similar to Tilt up concrete structures

Slipform construction
Slipform constructionSlipform construction
Slipform constructionErankajKumar
 
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxPRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxatiulla001
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction TechnologyDarshit
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxLokeswarSaha1
 
Pci dwp binder_ch4
Pci dwp binder_ch4Pci dwp binder_ch4
Pci dwp binder_ch4Ramin Vaghei
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabDivineGraceFernando
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptxAmol Pawar
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxVinayak247538
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfGourhariBiswas1
 
Mat foundation.pdf
Mat foundation.pdfMat foundation.pdf
Mat foundation.pdfnayanaNMH
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimneyAxay Sharma
 
Construction Technology
Construction TechnologyConstruction Technology
Construction TechnologySwapnilGorade1
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 reportAh Lai
 

Similar to Tilt up concrete structures (20)

Master template for MEC 2014 Workshop
Master template for MEC 2014 WorkshopMaster template for MEC 2014 Workshop
Master template for MEC 2014 Workshop
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptxPRE-CAST-CONSTRUCTION-Expertcivil.pptx
PRE-CAST-CONSTRUCTION-Expertcivil.pptx
 
Slip form Construction Technology
Slip form Construction TechnologySlip form Construction Technology
Slip form Construction Technology
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
Pci dwp binder_ch4
Pci dwp binder_ch4Pci dwp binder_ch4
Pci dwp binder_ch4
 
Ct report
Ct reportCt report
Ct report
 
Ct report
Ct reportCt report
Ct report
 
Ct report
Ct reportCt report
Ct report
 
Concrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slabConcrete cast in_place_and_pre_cast_slab
Concrete cast in_place_and_pre_cast_slab
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
Mat foundation.pdf
Mat foundation.pdfMat foundation.pdf
Mat foundation.pdf
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Slipform
SlipformSlipform
Slipform
 
Construction Technology
Construction TechnologyConstruction Technology
Construction Technology
 
Ct 1 report
Ct 1 reportCt 1 report
Ct 1 report
 
Ct report
Ct reportCt report
Ct report
 
Ct report
Ct reportCt report
Ct report
 

More from MECandPMV

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...MECandPMV
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresMECandPMV
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutantsMECandPMV
 
Standards for mobile towers
Standards for mobile towersStandards for mobile towers
Standards for mobile towersMECandPMV
 
Risk management
Risk managementRisk management
Risk managementMECandPMV
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesMECandPMV
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & prioritiesMECandPMV
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at heightMECandPMV
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durabilityMECandPMV
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential developmentMECandPMV
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesMECandPMV
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet managementMECandPMV
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & costMECandPMV
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureMECandPMV
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistanceMECandPMV
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...MECandPMV
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to serviceMECandPMV
 
Assests Increas Cash Flow
Assests Increas Cash FlowAssests Increas Cash Flow
Assests Increas Cash FlowMECandPMV
 
Thermal Insulation in UAE
Thermal Insulation in UAEThermal Insulation in UAE
Thermal Insulation in UAEMECandPMV
 

More from MECandPMV (20)

Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...Optimization of preventive maintenance to reduce maintenance costs and increa...
Optimization of preventive maintenance to reduce maintenance costs and increa...
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Chemical attack on the durability of underground structures
Chemical attack on the durability of underground structuresChemical attack on the durability of underground structures
Chemical attack on the durability of underground structures
 
Building materials & pollutants
Building materials & pollutantsBuilding materials & pollutants
Building materials & pollutants
 
Standards for mobile towers
Standards for mobile towersStandards for mobile towers
Standards for mobile towers
 
Risk management
Risk managementRisk management
Risk management
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificates
 
Greening of concrete trends & priorities
Greening of concrete trends & prioritiesGreening of concrete trends & priorities
Greening of concrete trends & priorities
 
Emergency procedure at height
Emergency procedure at heightEmergency procedure at height
Emergency procedure at height
 
Concrete durability
Concrete durabilityConcrete durability
Concrete durability
 
Al hail greens residential development
Al hail greens residential developmentAl hail greens residential development
Al hail greens residential development
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniques
 
Vehicle tracking & fleet management
Vehicle tracking & fleet managementVehicle tracking & fleet management
Vehicle tracking & fleet management
 
Working Safely while saving time & cost
Working Safely while saving time & costWorking Safely while saving time & cost
Working Safely while saving time & cost
 
Structural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructureStructural health monitoring of intelligent infrastructure
Structural health monitoring of intelligent infrastructure
 
Concrete Durability and water resistance
Concrete Durability and water resistanceConcrete Durability and water resistance
Concrete Durability and water resistance
 
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
Evaluating the application limits of Unreinforced & Steel Fiber Reinforced Co...
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to service
 
Assests Increas Cash Flow
Assests Increas Cash FlowAssests Increas Cash Flow
Assests Increas Cash Flow
 
Thermal Insulation in UAE
Thermal Insulation in UAEThermal Insulation in UAE
Thermal Insulation in UAE
 

Recently uploaded

دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderjuancarlos286641
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxwendy cai
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...amrabdallah9
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Amil baba
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Akarthi keyan
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid BodyAhmadHajasad2
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationMohsinKhanA
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvementVijayMuni2
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptxSaiGouthamSunkara
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfRedhwan Qasem Shaddad
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsYusuf Yıldız
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...sahb78428
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...soginsider
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxKISHAN KUMAR
 

Recently uploaded (20)

دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
ASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entenderASME BPVC 2023 Section I para leer y entender
ASME BPVC 2023 Section I para leer y entender
 
Nodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptxNodal seismic construction requirements.pptx
Nodal seismic construction requirements.pptx
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
 
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
Popular-NO1 Kala Jadu Expert Specialist In Germany Kala Jadu Expert Specialis...
 
me3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part Ame3493 manufacturing technology unit 1 Part A
me3493 manufacturing technology unit 1 Part A
 
Lecture 2 .pdf
Lecture 2                           .pdfLecture 2                           .pdf
Lecture 2 .pdf
 
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
Engineering Mechanics  Chapter 5  Equilibrium of a Rigid BodyEngineering Mechanics  Chapter 5  Equilibrium of a Rigid Body
Engineering Mechanics Chapter 5 Equilibrium of a Rigid Body
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
A Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software SimulationA Seminar on Electric Vehicle Software Simulation
A Seminar on Electric Vehicle Software Simulation
 
Landsman converter for power factor improvement
Landsman converter for power factor improvementLandsman converter for power factor improvement
Landsman converter for power factor improvement
 
Phase noise transfer functions.pptx
Phase noise transfer      functions.pptxPhase noise transfer      functions.pptx
Phase noise transfer functions.pptx
 
How to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdfHow to Write a Good Scientific Paper.pdf
How to Write a Good Scientific Paper.pdf
 
Modelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovationsModelling Guide for Timber Structures - FPInnovations
Modelling Guide for Timber Structures - FPInnovations
 
Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...Clutches and brkesSelect any 3 position random motion out of real world and d...
Clutches and brkesSelect any 3 position random motion out of real world and d...
 
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...Transforming Process Safety Management: Challenges, Benefits, and Transition ...
Transforming Process Safety Management: Challenges, Benefits, and Transition ...
 
Mohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptxMohs Scale of Hardness, Hardness Scale.pptx
Mohs Scale of Hardness, Hardness Scale.pptx
 
Présentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdfPrésentation IIRB 2024 Chloe Dufrane.pdf
Présentation IIRB 2024 Chloe Dufrane.pdf
 
計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 

Tilt up concrete structures

  • 1. Tilt up concrete structures Tilt‐up concrete construction advancements and applications
  • 2. Introduction Tilt‐Up Concrete Association • Promoting growth and achievement in tilt‐up design, construction and innovation for three decades. • Founded in 1986, the Tilt‐Up Concrete Association was created by a dedicated group of construction professionals interested in improving the quality and acceptance of tilt‐up construction. • TCA mission is to expand and improve the use of tilt‐up as the preferred construction method by providing education and resources that enhance quality and performance. James Baty TCA Technical Director  ACI 551 ‐ Tilt‐Up Concrete  Committee, voting  member and current  Secretary ReviewerSpeaker Mohammed Zaid Senior Structural Engineer Chartered Engineer‐ ASCE Associate member‐ ACI‐551 /ACI‐423  committees www.tiltwerk.com www.esolution‐pt.com www.tiltup.org
  • 3. Learning objectives After viewing this program, you will be able to: •Identify the difference between precast/pre- stressed concrete and tilt up concrete structures •Explain the benefits of using tilt up concrete •Discuss the design considerations for tilt up concrete structures •BIM into precast / Tilt up concrete www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 4. Definition Precast & Tilt up concrete Precast concrete refers to any type of concrete structure that is manufactured at a plant and transported to the construction site. In contrast, regular concrete structures are normally molded, poured, and cured on-site. Tilt up concrete, are created by assembling forms and pouring large slabs of concrete called panels directly at the job site. The panels are then tilted up into position around the building's slab. Because the concrete tilt wall forms are assembled and poured directly at the job site, no transportation of panels is required www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 5. Precast concrete Vs Tilt up concrete there are many similarities between precast concrete construction and tilt-up concrete construction, there are also many pointed differences • Elements sizes • Transportation • Weather Conditions • Connections cost • Compilation differences www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 6. Tilt up concrete advantages 1. Elimination of expensive formwork and scaffolding 2. Fast, economical construction cycle time 3. Wide variety of exterior finishes such as colored , concrete, exposed aggregate, graphic painting and form liner finishes 4. Easily modified structures for building expansion 5. Durable, long-life and low maintenance building 6. Schedule and Early Occupancy www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 7. Tilt up basics Modern tilt‐up construction is carried out by erecting site cast panels and temporarily bracing them to the floor until the roof structure is in place. Once complete the concrete panels carry the building’s vertical loads, while the roof structure acts as a diaphragm, transferring and distributing horizontal loads to transverse walls and creating a self‐supporting structure. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 8. Planning A successful tilt-up project begins with a suitable and properly prepared site. Items affecting the suitability of the site include: Access Circulation for cranes and ready-mix trucks Staging space for materials Casting areas Overhead clearance is also important to facilitate crane operation www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 9. Engineering Every project starts with selecting a an Engineer to design the project. The quality of engineering drawings has a direct impact on the quantity and magnitude of issues that can arise in the field. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 10. Design Wall panels are generally designed as load-bearing beam-columns spanning vertically between the ground floor and the roof, or intermediate floors The thickness of a concrete panel usually is determined by the ratio of the unsupported panel to the panel thickness. Tilt-up walls will often exceed this limitation with lu/h ratios of 40 to 50 or more www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 11. Shop drawings Many of the details of tilt-up construction are identified and documented in the shop drawings. Panel Elevations Locations and Details of Lifting Inserts Locations and Details of Panel Reinforcement Specification for Reinforcement Chairs Concrete Mix Design Product Information www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 12. Foundation system Continuous spread footings are the most economical foundation system and are used whenever possible. Footing sides may either be formed or trenched depending on soil conditions and the degree of control needed over the footing size and elevation. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 13. Floor slabs Footing locations, heights, and dimensions should be checked and verified for correctness The building floor slab is the most common surface used for casting tilt-up wall panels. The slab should be smooth and hard and contraction joints should be positioned where they will have minimal impact on the pane www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 14. Floor slabs Stack Casting: Stack cast panels are typically cast two or three panels high, but stacking as high as seven or eight panels is possible. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 15. Panel Forming The standard practice in laying out panels is to snap a chalk line on the floor slab. These lines indicate panel perimeters and the forms should be placed against them. Wood are the most common material used for side forms. The form sides can be supported and secured to the slab by a wood or steel angle support There are several ways to form individual panels. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 16. Panel Forming A variation of this method is to cast a large slab, then saw joints into the slab to form individual panels after the concrete has been troweled. Form door and window openings after framing the panel perimeter. Brace the interior of the openings to prevent bowing or movement. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 17. Panel Forming Apply form release agent and bond breaker to the slab and forms. The steel grid for reinforcing Tilt-Up panels is typically tied in-place after the side forms are erected www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 19. Concrete Placement The most efficient method of placing concrete is pumping. Concrete pumps are available in nearly all parts of the world and are capable of delivering large volumes of concrete over considerable distances. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 20. Panel Erection The erection sequence should be determined well in advance Locate and clean inserts and embeds and attach braces before lifting the panels www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 21. Panel Erection Braces should not be removed until after the roof and decking are installed. Once the braces have been safely removed, workers can patch holes in the floor and complete other finish work. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 22. Connection Panel to Foundation: The connection of the panel base to the footing or floor slab is done with a reinforcement bar in the panel connected to the floor reinforcement dowel, by welded angle to an embed in both panel and footing, or by an anchor inserted through the panel into the footing. Panel to Panel: Tilt-up panels are not often connected to each other because of the shrinkage forces. Elimination of most panel-to-panel connections (called “stitching”) is one of the major differences between tilt-up and precast construction. Panel to Roof: Members can either be set in pockets or flush-mounted to embedded plates by bolt or weld. www.esolution‐pt.com www.tiltup.org www.tiltwerk.com
  • 23. Finishing Panels often appear discolored when they are first erected. This is due in part to uncontrollable factors such as moisture on or in the casting slab, concrete from different trucks and batches and a host of other variables. Cleaning and time even out the coloration www.esolution‐pt.com www.tiltup.org www.tiltwerk.com