SE423 SPI
CH-4 ISO29110:
Project Management
process
Kittitouch Suteeca
Outline
 PM. process Overview
 PM. Process objectives
ISO/IEC 29110
0
10
20
30
40
50
60
1990 1992 1994 1996 1998 2000 2002 2004 2006
Size of Software Project
KLOC of Windows source code since 1992-2006
Customer needs
High Quality
On time
Cheap
Complete
expectation
Better Quality
Faster
Cheaper
Over
expectation
Today Future
Why Project Fail
1994 1996 1998 2000 2002 2004 2006 2008
succeed 16% 27% 26% 28% 34% 29% 35% 32%
cancelled 31% 40% 28% 23% 15% 18% 19% 24%
Has
problem
(finished)
53% 33% 46% 49% 51% 53% 46% 44%
Problem in Software project
Ref. Standish Report 1995, 1997, 1999, 2001,
2003, 2005, 2007, and 2009
 Late.(Fail)
 Incomplete customer expectation.
 Low quality, reliability.
 Over budget.
 …
Problem in Software
project<Classic>
Project Management (PM)
Process
The purpose of the Project Management
process is to establish and carry out in a
systematic way the tasks of the software
implementation project, which allows
complying with the project’s objectives in
the expected quality, time and costs.
ISO/IEC29110
PROJECT
MANAGEMENT
PM.O1 PM.O5 PM.O6PM.O2 PM.O3 PM.O4 PM.O7
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
TaskTask
Task
WP
WP
WP
WP
WP
Project Management process
PM.1 Project Planning
PM.2 Project Plan Execution
PM.3 Project Assessment and Control
PM.4 Project Closure
PM.Objective1.
The Project Plan for the execution of the
project is developed according to the
Statement of Work and reviewed and
accepted by the Customer. The tasks and
resources necessary to complete the work
are sized and estimated.
PM.01 Documentation
 Statement of Work
 Document for communicate between customer
and manufacturer (Software company) with
agreements such as..
 Product description
 Scope
 Objectives
 Deliverables
#Other name Proposal, Term of Reference: TOR,
Quotation
Planning is to know
 Project characteristics
 Product Characteristics
 the process and activities
 their sequences and components.
 Project Plan
 The collection of plans that describe the
activities to be performed for the project.
 It governs the management of the activities
performed by the engineering group for a
project.
PM.O1 Documentation
Resource of Project (4M+1E)
Material
Man(People)
Machine
Method
Environment
Material
Man
Environmen
t
Machine
Method Product
Service
Includes:
 Product Description
 Scope
 Objectives
 Deliverables
 Tasks, including verification, validation and reviews with
Customer and Work Team, to assure the quality of work
products. Tasks may be represented as a Work
Breakdown Structure (WBS).
 Relationship and Dependence of the Tasks
 Estimated Duration of tasks
 Resources (humans, materials, equipment and tools)
including the required training, and the schedule when
the resources are needed.
Project Plan
 Composition of Work Team
 Schedule of the Project Tasks, the expected start and
completion date, for each task.
 Estimated Effort and Cost
 Identification of Project Risks
 Version Control Strategy
 Delivery Instructions
Project Plan(cont.)
PM.Objective 2.
Progress of the project is monitored against
the Project Plan and recorded in the
Progress Status Record. Corrections to
remediate problems and deviations from
the plan are taken when project targets are
not achieved. Closure of the project is
performed to get the Customer
acceptance documented in the
Acceptance Record.
How to measure project?
Project
duration
Duration in
each task
task
Size of project
Plan
Actual duration
Revision 3.3
05 PSP Basic Measurement
24
Project monitoring
Project progress
Plan
Actual
time
Actual progress
“Record of any deviations ” Why?
Plan Work
Plan Work
Plan Work
Post
mortem
Plan Work
Post
mortem
PM.Objective 3.
The Change Requests are addressed
through their reception and analysis.
Changes to software requirements are
evaluated for cost, schedule and technical
impact.
PM.Objective 4.
Review meetings with the Work Team and
the Customer are held. Agreements are
registered and tracked.(Meeting record)
PM.Objective 5.
Risks are identified as they develop and
during the conduct of the project.
PM.Objective 6.
A software Version Control Strategy is
developed. Items of Software Configuration
are identified, defined and baselined.
Modifications and releases of the items are
controlled and made available to the
Customer and Work Team. The storage,
handling and delivery of the items are
controlled.
PM.Objective 7.
Software Quality Assurance is performed to
provide assurance that work products and
processes comply with the Project Plan and
Requirements Specification.
 Note: The implementation of the Software Quality
Assurance process is through the performance of the
verifications, validations and review tasks performed in
Project Management and Software Implementation
processes.
Summary of PM.
 PM.O1.>>Plan vs. Proposal (Statement of
work).
 PM.O2>>Progress monitoring vs. Plan and
solving problem.
 PM.O3>>Changing
 PM.O4>>meeting and communication
 PM.O5>>Avoid Risks
 PM.O6>>Configuration management
 PM.O7>> QA. In Project.
References
ISO/IEC29110 part 3,5.

Weitere ähnliche Inhalte

Was ist angesagt?

Software quality assurance activites
Software quality assurance activitesSoftware quality assurance activites
Software quality assurance activitesGolu Gupta
 
Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Farkhanda Kiran
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution ProcessC K Vishwakarma
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa systemKittitouch Suteeca
 
Project Closing Process
Project Closing ProcessProject Closing Process
Project Closing ProcessNishant Munjal
 
(Student assignment) riordan manufacturing process improvement final
(Student assignment) riordan manufacturing process improvement final(Student assignment) riordan manufacturing process improvement final
(Student assignment) riordan manufacturing process improvement finalCharles James
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software qualityKittitouch Suteeca
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 
Software Quality Assurance SQA
Software Quality Assurance SQASoftware Quality Assurance SQA
Software Quality Assurance SQAFizah Ali
 
Introduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsIntroduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsQUONTRASOLUTIONS
 

Was ist angesagt? (20)

Software quality assurance activites
Software quality assurance activitesSoftware quality assurance activites
Software quality assurance activites
 
ICT Projectselection
ICT ProjectselectionICT Projectselection
ICT Projectselection
 
Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Software Quality Assurance(SQA)
Software Quality Assurance(SQA)
 
Ch 11(spi)relationship pa
Ch 11(spi)relationship paCh 11(spi)relationship pa
Ch 11(spi)relationship pa
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
Ch 4 components of the sqa system
Ch 4 components of the sqa systemCh 4 components of the sqa system
Ch 4 components of the sqa system
 
Project Closing Process
Project Closing ProcessProject Closing Process
Project Closing Process
 
(Student assignment) riordan manufacturing process improvement final
(Student assignment) riordan manufacturing process improvement final(Student assignment) riordan manufacturing process improvement final
(Student assignment) riordan manufacturing process improvement final
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Pmp quality chapter 8
Pmp quality chapter 8Pmp quality chapter 8
Pmp quality chapter 8
 
Ch 10 cost of software quality
Ch 10 cost of software qualityCh 10 cost of software quality
Ch 10 cost of software quality
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
Software Quality Assurance SQA
Software Quality Assurance SQASoftware Quality Assurance SQA
Software Quality Assurance SQA
 
SQA Components
SQA ComponentsSQA Components
SQA Components
 
Ch 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqaCh 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqa
 
Free PMP Sample Q & A
Free PMP Sample Q & AFree PMP Sample Q & A
Free PMP Sample Q & A
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Introduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutionsIntroduction to software quality assurance by QuontraSolutions
Introduction to software quality assurance by QuontraSolutions
 
3-0 PROJECT PLANNING
3-0 PROJECT PLANNING3-0 PROJECT PLANNING
3-0 PROJECT PLANNING
 
Qa qc
Qa qcQa qc
Qa qc
 

Andere mochten auch

Software Entrepreneurship
Software EntrepreneurshipSoftware Entrepreneurship
Software EntrepreneurshipKrit Kamtuo
 
Mapping a Privacy Framework to a Reference Model of Learning Analytics
Mapping a Privacy Framework to  a Reference Model of Learning AnalyticsMapping a Privacy Framework to  a Reference Model of Learning Analytics
Mapping a Privacy Framework to a Reference Model of Learning AnalyticsOpen Cyber University of Korea
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0Kittitouch Suteeca
 
Introduction to ISO29110
Introduction to ISO29110Introduction to ISO29110
Introduction to ISO29110Krit Kamtuo
 
Personally Identifiable Information Protection
Personally Identifiable Information ProtectionPersonally Identifiable Information Protection
Personally Identifiable Information ProtectionPECB
 
Cpd ch 4 vision of career
Cpd ch 4 vision of careerCpd ch 4 vision of career
Cpd ch 4 vision of careerKamlesh Joshi
 
Cpd ch 4 vision of career
Cpd ch 4 vision of careerCpd ch 4 vision of career
Cpd ch 4 vision of careerKamlesh Joshi
 
Cpd ch 1 contributor
Cpd ch 1 contributorCpd ch 1 contributor
Cpd ch 1 contributorKamlesh Joshi
 
Cpd ch 3 vision of success
Cpd ch 3 vision of successCpd ch 3 vision of success
Cpd ch 3 vision of successKamlesh Joshi
 

Andere mochten auch (15)

Ch1 introduction to spi1.0
Ch1 introduction to spi1.0Ch1 introduction to spi1.0
Ch1 introduction to spi1.0
 
Software Entrepreneurship
Software EntrepreneurshipSoftware Entrepreneurship
Software Entrepreneurship
 
Ch2 introduction to standard
Ch2 introduction to standardCh2 introduction to standard
Ch2 introduction to standard
 
Mapping a Privacy Framework to a Reference Model of Learning Analytics
Mapping a Privacy Framework to  a Reference Model of Learning AnalyticsMapping a Privacy Framework to  a Reference Model of Learning Analytics
Mapping a Privacy Framework to a Reference Model of Learning Analytics
 
Ch3 introduction to iso29110
Ch3 introduction to iso29110Ch3 introduction to iso29110
Ch3 introduction to iso29110
 
Se423mid term preview
Se423mid term previewSe423mid term preview
Se423mid term preview
 
Ch0 se423 outline
Ch0 se423 outlineCh0 se423 outline
Ch0 se423 outline
 
Ch5 software imprementation1.0
Ch5 software imprementation1.0Ch5 software imprementation1.0
Ch5 software imprementation1.0
 
Introduction to ISO29110
Introduction to ISO29110Introduction to ISO29110
Introduction to ISO29110
 
Personally Identifiable Information Protection
Personally Identifiable Information ProtectionPersonally Identifiable Information Protection
Personally Identifiable Information Protection
 
Cpd ch 4 vision of career
Cpd ch 4 vision of careerCpd ch 4 vision of career
Cpd ch 4 vision of career
 
Cpd ch 4 vision of career
Cpd ch 4 vision of careerCpd ch 4 vision of career
Cpd ch 4 vision of career
 
CPD CHAPTER ( 1 to 4)
CPD CHAPTER ( 1 to 4)CPD CHAPTER ( 1 to 4)
CPD CHAPTER ( 1 to 4)
 
Cpd ch 1 contributor
Cpd ch 1 contributorCpd ch 1 contributor
Cpd ch 1 contributor
 
Cpd ch 3 vision of success
Cpd ch 3 vision of successCpd ch 3 vision of success
Cpd ch 3 vision of success
 

Ähnlich wie ISO29110 Project Management Process Summary

Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxjoellemurphey
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
Quality_Management_Plan Template.docx
Quality_Management_Plan Template.docxQuality_Management_Plan Template.docx
Quality_Management_Plan Template.docxZiyad Zaidi
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.pptMehediHasan636262
 
Nesma event June '23 - NEN Practice Guideline - NPR.pdf
Nesma event June '23 - NEN Practice Guideline - NPR.pdfNesma event June '23 - NEN Practice Guideline - NPR.pdf
Nesma event June '23 - NEN Practice Guideline - NPR.pdfNesma
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)Pamela Garrett
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - IntroductionAlbert Poghosyan
 
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdfNanoSana
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementAbbas Ali
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project ManagementNoman Aftab
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pmbhashem007
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectSharad Srivastava
 

Ähnlich wie ISO29110 Project Management Process Summary (20)

6 pma salehuddin - pqp & 3 core process procedures
6   pma salehuddin - pqp & 3 core process procedures6   pma salehuddin - pqp & 3 core process procedures
6 pma salehuddin - pqp & 3 core process procedures
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
RUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docxRUNNING HEAD Customer Care Website Implementation1Customer .docx
RUNNING HEAD Customer Care Website Implementation1Customer .docx
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Quality_Management_Plan Template.docx
Quality_Management_Plan Template.docxQuality_Management_Plan Template.docx
Quality_Management_Plan Template.docx
 
Lecture 3 Project Management.ppt
Lecture 3 Project Management.pptLecture 3 Project Management.ppt
Lecture 3 Project Management.ppt
 
Nesma event June '23 - NEN Practice Guideline - NPR.pdf
Nesma event June '23 - NEN Practice Guideline - NPR.pdfNesma event June '23 - NEN Practice Guideline - NPR.pdf
Nesma event June '23 - NEN Practice Guideline - NPR.pdf
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
 
Project management slide - Introduction
Project management slide - IntroductionProject management slide - Introduction
Project management slide - Introduction
 
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf
42da6c0a8a35bb6c9e0bbb89ad429678_MIT1_040s09_lec01.pdf
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
Intro to Project Management
Intro to Project ManagementIntro to Project Management
Intro to Project Management
 
Pmp scope chapter 5
Pmp scope chapter 5Pmp scope chapter 5
Pmp scope chapter 5
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
 
Presentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics ProjectPresentation - Scope and Schedule Management of Business Analytics Project
Presentation - Scope and Schedule Management of Business Analytics Project
 

Mehr von Kittitouch Suteeca

Mehr von Kittitouch Suteeca (14)

Ch 9 traceability and verification
Ch 9 traceability and verificationCh 9 traceability and verification
Ch 9 traceability and verification
 
Ch 8 configuration management
Ch 8 configuration managementCh 8 configuration management
Ch 8 configuration management
 
Ch 3 software quality factor
Ch 3 software quality factorCh 3 software quality factor
Ch 3 software quality factor
 
Ch 2 what is software quality
Ch 2 what is software qualityCh 2 what is software quality
Ch 2 what is software quality
 
Ch 1 the software quality assurance challange
Ch 1 the software quality assurance challangeCh 1 the software quality assurance challange
Ch 1 the software quality assurance challange
 
Ch 0 introduction to se422
Ch 0 introduction to se422Ch 0 introduction to se422
Ch 0 introduction to se422
 
Ch 12(spi)cm mi scampi
Ch 12(spi)cm mi scampiCh 12(spi)cm mi scampi
Ch 12(spi)cm mi scampi
 
Ch 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqaCh 10(spi)cm mi-cm-ppqa
Ch 10(spi)cm mi-cm-ppqa
 
Ch 9(spi)cm mi reqm
Ch 9(spi)cm mi reqmCh 9(spi)cm mi reqm
Ch 9(spi)cm mi reqm
 
Ch 8(spi)cm mi-pp
Ch 8(spi)cm mi-ppCh 8(spi)cm mi-pp
Ch 8(spi)cm mi-pp
 
Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013Ch 7(spi)intro tocm-mi2013
Ch 7(spi)intro tocm-mi2013
 
Se423mid term preview
Se423mid term previewSe423mid term preview
Se423mid term preview
 
Data collection
Data collectionData collection
Data collection
 
Ch6 performinng to asessment
Ch6 performinng to asessmentCh6 performinng to asessment
Ch6 performinng to asessment
 

ISO29110 Project Management Process Summary

  • 1. SE423 SPI CH-4 ISO29110: Project Management process Kittitouch Suteeca
  • 2. Outline  PM. process Overview  PM. Process objectives
  • 4. 0 10 20 30 40 50 60 1990 1992 1994 1996 1998 2000 2002 2004 2006 Size of Software Project KLOC of Windows source code since 1992-2006
  • 5. Customer needs High Quality On time Cheap Complete expectation Better Quality Faster Cheaper Over expectation Today Future
  • 7. 1994 1996 1998 2000 2002 2004 2006 2008 succeed 16% 27% 26% 28% 34% 29% 35% 32% cancelled 31% 40% 28% 23% 15% 18% 19% 24% Has problem (finished) 53% 33% 46% 49% 51% 53% 46% 44% Problem in Software project Ref. Standish Report 1995, 1997, 1999, 2001, 2003, 2005, 2007, and 2009
  • 8.  Late.(Fail)  Incomplete customer expectation.  Low quality, reliability.  Over budget.  … Problem in Software project<Classic>
  • 9. Project Management (PM) Process The purpose of the Project Management process is to establish and carry out in a systematic way the tasks of the software implementation project, which allows complying with the project’s objectives in the expected quality, time and costs.
  • 10. ISO/IEC29110 PROJECT MANAGEMENT PM.O1 PM.O5 PM.O6PM.O2 PM.O3 PM.O4 PM.O7 Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task Task TaskTask Task WP WP WP WP WP
  • 11. Project Management process PM.1 Project Planning PM.2 Project Plan Execution PM.3 Project Assessment and Control PM.4 Project Closure
  • 12.
  • 13. PM.Objective1. The Project Plan for the execution of the project is developed according to the Statement of Work and reviewed and accepted by the Customer. The tasks and resources necessary to complete the work are sized and estimated.
  • 14.
  • 15. PM.01 Documentation  Statement of Work  Document for communicate between customer and manufacturer (Software company) with agreements such as..  Product description  Scope  Objectives  Deliverables #Other name Proposal, Term of Reference: TOR, Quotation
  • 16. Planning is to know  Project characteristics  Product Characteristics  the process and activities  their sequences and components.
  • 17.  Project Plan  The collection of plans that describe the activities to be performed for the project.  It governs the management of the activities performed by the engineering group for a project. PM.O1 Documentation
  • 18. Resource of Project (4M+1E) Material Man(People) Machine Method Environment Material Man Environmen t Machine Method Product Service
  • 19. Includes:  Product Description  Scope  Objectives  Deliverables  Tasks, including verification, validation and reviews with Customer and Work Team, to assure the quality of work products. Tasks may be represented as a Work Breakdown Structure (WBS).  Relationship and Dependence of the Tasks  Estimated Duration of tasks  Resources (humans, materials, equipment and tools) including the required training, and the schedule when the resources are needed. Project Plan
  • 20.  Composition of Work Team  Schedule of the Project Tasks, the expected start and completion date, for each task.  Estimated Effort and Cost  Identification of Project Risks  Version Control Strategy  Delivery Instructions Project Plan(cont.)
  • 21. PM.Objective 2. Progress of the project is monitored against the Project Plan and recorded in the Progress Status Record. Corrections to remediate problems and deviations from the plan are taken when project targets are not achieved. Closure of the project is performed to get the Customer acceptance documented in the Acceptance Record.
  • 22.
  • 23. How to measure project? Project duration Duration in each task task Size of project Plan Actual duration
  • 24. Revision 3.3 05 PSP Basic Measurement 24 Project monitoring Project progress Plan Actual time Actual progress
  • 25. “Record of any deviations ” Why? Plan Work Plan Work Plan Work Post mortem Plan Work Post mortem
  • 26. PM.Objective 3. The Change Requests are addressed through their reception and analysis. Changes to software requirements are evaluated for cost, schedule and technical impact.
  • 27.
  • 28.
  • 29. PM.Objective 4. Review meetings with the Work Team and the Customer are held. Agreements are registered and tracked.(Meeting record)
  • 30.
  • 31. PM.Objective 5. Risks are identified as they develop and during the conduct of the project.
  • 32. PM.Objective 6. A software Version Control Strategy is developed. Items of Software Configuration are identified, defined and baselined. Modifications and releases of the items are controlled and made available to the Customer and Work Team. The storage, handling and delivery of the items are controlled.
  • 33.
  • 34. PM.Objective 7. Software Quality Assurance is performed to provide assurance that work products and processes comply with the Project Plan and Requirements Specification.  Note: The implementation of the Software Quality Assurance process is through the performance of the verifications, validations and review tasks performed in Project Management and Software Implementation processes.
  • 35.
  • 36. Summary of PM.  PM.O1.>>Plan vs. Proposal (Statement of work).  PM.O2>>Progress monitoring vs. Plan and solving problem.  PM.O3>>Changing  PM.O4>>meeting and communication  PM.O5>>Avoid Risks  PM.O6>>Configuration management  PM.O7>> QA. In Project.