SlideShare ist ein Scribd-Unternehmen logo
1 von 15
Standard of living
Definition of productivity
Standard of living
 The extent to which a person is able to provide the things that
  are necessary for sustaining and enjoying life.
 Standard of living of a representative family differs greatly in
  different parts of the world.
 What is considered a necessity in one part of the world could
  be considered a luxury in the other.
 Basic necessities of a minimum decent standard of living:
  Food, clothing, housing and hygiene. Also, security and
  education also considered constituents.

 Greater the amount of goods and services produced in any
  community, the higher its the average standard of living.

                                                                     2
Standard of living
 There are two ways of increasing the amount of goods and
  services produced:
- Increase the employment and investment in creating jobs. So
  that more people are producing goods required for the society.
- Increase productivity. Same amount of labor produces more
  goods.
We want:
 More and cheaper food by increase in agricultural productivity
 More and cheaper clothing and housing by increased industrial
  productivity
 More hygiene, security and education by increasing overall
  productivity.

                                                                   3
Productivity
 Ratio between output and input.
 Arithmetic ratio of the amount produced to the amount of any
    resources used in the production.
   The resources may be: land, material, plant, machines, tools,
    labor. It could be combination of all!
   Over a period of time, one can see if the productivity has
    increased.
   How?
   Combination of improved technology, better planning, greater
    skills etc.

                                                                    4
Productivity
 Note that, increased production does not mean increased
  productivity.
 Higher productivity means that more is produced with the same
  expenditure of resources; that is, at the same cost in terms of
  land, material, machine, time or labor.
 Alternatively, same amount is produced at less cost in terms of
  land, labor, material etc; thereby releasing some of these
  resources for the production of other things.




                                                                    5
Productivity and standard of living
    If more is available at the same cost, or the same amount is
     available at lesser cost the whole community benefits.

    As per the ILO, higher productivity provides ways for raising
     the standard of living by:
     Larger supplies of both consumer goods and capital goods at
1.
     lower cost and prices
     Higher real earnings
2.
     Improvement in working conditions, e.g. by reduced working
3.
     hours
     In general, strengthening of the economic foundations of
4.
     human well-being.

                                                                     6
Productivity in industry
 Many factors affecting productivity of each organization; also,
    they are dependent.
   Depending on the individual environments, decisions are to be
    made.
   Industries where labor and capital costs are low compared to
    the material costs, better use of material and plant gives the
    greatest scope of cost reduction.
   In countries where capital and skilled labor are in shortage
    compared to unskilled labor, one should look to increase the
    output per machine or per skilled worker.
   Increasing the number of unskilled workers may be beneficial
    if by doing so an expensive machine or skilled craftsmen are
    enabled to increase production.

                                                                     7
Government’s responsibility
    Government can create conditions favorable to raise
     productivity. It can:
     Have a balanced programs of economic development
1.
     Take steps necessary to maintain employment
2.
     Make opportunities for employment.
3.
    Last step is specifically important for a developing country
     like India.
    Government should make provisions for workers who are
     going to loose jobs because of technology improvement –
     training and education programs.
     Example: India’s First Five-Year Plan (1952).


                                                                    8
Management’s responsibility
 The main responsibility for raising productivity in an
  individual organization lies with the management.
 It can implement productivity programs.
 It can create a positive environment and obtain co-operation of
  the employees.
 Trade unions should encourage its members to provide such
  co-operation when the productivity program is beneficial to
  workers, as well as the organization on the whole.

 We will look at management’s role in increasing productivity
  of individual resource:

                                                                    9
Productivity of material
At the design stage:
 Ensure least consumption of material,
 Purchase equipments and plants such that consumption of
  material is economical.

At the operation stage:
 Use of correct process,
 Right use of the process,
 Operator training,
 Proper handling and storage of products at all stages,
 Proper packaging to reduce damage in transit.


                                                            10
Productivity of land, machines and
manpower
 Effective utilization and maximum productivity is an important
  source of cost reduction.
 Reduction in the original specification, before the land is
  purchased saves capital outlay (as well as interest expenses)
 A savings in material which has to be imported saves import
  duty and excise.

 Productivity of manpower and machines is typically measured
  in terms of time (man-hours; machine-hours).


                                                                  11
Factors tending to reduce productivity
Work content added due to the product design for a
  manufacturing firm:
 The product or its components are designed such that it is
  impossible to use most economical manufacturing processes.
 Excessive variety or lack of standardization.
 Incorrect quality standards.
 Excessive amount of material removal required.




                                                               12
Factors tending to reduce productivity
Work content added due to process:
 Incorrect production process (and/or machine) used
 Process not operated properly
 Non-optimal layout with wasted movements.
 Working methods of operation causing wasted movements,
  time and efforts.




                                                           13
Factors tending to reduce productivity
Ineffective time due to management
 Marketing policy which demands unnecessarily large number
  of products.
 No standardization of components between as well as within
  products.
 Failing to meet customer’s requirement from the beginning.
 No plan for flow of work.
 Improper supply of material, equipment.
 Improper maintenance of plant and machines.
 Insufficient safety measures.
 Improper working conditions resulting in interrupted work.
                                                               14
Factors tending to reduce productivity
Ineffective time within the control of worker:
 Taking time off without good cause: by lateness, by idling at
  work etc.
 Careless workmanship causing scrap or rework.
 Failing to observe safety standards.




                                                                  15

Weitere ähnliche Inhalte

Was ist angesagt?

human resource management for construction projects
 human resource management for construction projects human resource management for construction projects
human resource management for construction projectsSelf-employed
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organizationAswii007
 
Productivity measurement approaches
Productivity measurement approachesProductivity measurement approaches
Productivity measurement approachesAmit Verma
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancingMANJUNATH N
 
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...Ahmad Samy M.Sc.
 
Single and double sampling
Single and double samplingSingle and double sampling
Single and double samplingShivani Garg
 
production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...SWATI SAXENA
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxsurekha1287
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPTKEVINMISTRY8
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 

Was ist angesagt? (20)

human resource management for construction projects
 human resource management for construction projects human resource management for construction projects
human resource management for construction projects
 
Ch6 resources
Ch6 resourcesCh6 resources
Ch6 resources
 
Productivity and performance in an organization
Productivity and performance in an organizationProductivity and performance in an organization
Productivity and performance in an organization
 
Productivity measurement approaches
Productivity measurement approachesProductivity measurement approaches
Productivity measurement approaches
 
labour management
labour managementlabour management
labour management
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
IDENTIFYING AND ASSESSING THE CAUSES OF COST OVERRUN AT THE DESIGN AND PRECON...
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
PLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTSPLANT LAYOUT AND TYPES OF LAYOUTS
PLANT LAYOUT AND TYPES OF LAYOUTS
 
Single and double sampling
Single and double samplingSingle and double sampling
Single and double sampling
 
093 Productivity Measurement
093 Productivity Measurement093 Productivity Measurement
093 Productivity Measurement
 
Extension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed IbarhimExtension of time (E.O.T) By Ahmed Ibarhim
Extension of time (E.O.T) By Ahmed Ibarhim
 
production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...production management, objectives ,PPC and its functions ,types of production...
production management, objectives ,PPC and its functions ,types of production...
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Plant layouts(presentation)
Plant layouts(presentation)Plant layouts(presentation)
Plant layouts(presentation)
 
material handling equipment
material handling equipmentmaterial handling equipment
material handling equipment
 
contract administration PPT
 contract administration PPT contract administration PPT
contract administration PPT
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 

Andere mochten auch

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturingAkhil Bhatia
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1hgalinova
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company Dhrubaji Mandal ♛
 
segmentation & indian automobile industry
segmentation & indian automobile industrysegmentation & indian automobile industry
segmentation & indian automobile industrySanjay Verma
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYJAGADISH REDDY KP
 
Lean manufacturing in apparel industries
Lean manufacturing in apparel industriesLean manufacturing in apparel industries
Lean manufacturing in apparel industriesBharath Krishna
 
Lean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient ClinicsLean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient Clinicslaganga
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)newHakeem-Ur- Rehman
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsNon Stop Portals
 
Lean project management
Lean project management Lean project management
Lean project management John Bun
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvementHemant Patil
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity Waleed Attalla
 

Andere mochten auch (20)

just in time and lean manufacturing
just in time and lean manufacturingjust in time and lean manufacturing
just in time and lean manufacturing
 
Improving Productivity
Improving ProductivityImproving Productivity
Improving Productivity
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1
 
Business Process Management in IT company
Business Process Management  in IT company Business Process Management  in IT company
Business Process Management in IT company
 
segmentation & indian automobile industry
segmentation & indian automobile industrysegmentation & indian automobile industry
segmentation & indian automobile industry
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
LEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRYLEAN MANUFACTURING IN APPAREL INDUSTRY
LEAN MANUFACTURING IN APPAREL INDUSTRY
 
Lean manufacturing in apparel industries
Lean manufacturing in apparel industriesLean manufacturing in apparel industries
Lean manufacturing in apparel industries
 
Lean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient ClinicsLean Process Improvement In Outpatient Clinics
Lean Process Improvement In Outpatient Clinics
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Lean six sigma (green belt)new
Lean six sigma (green belt)newLean six sigma (green belt)new
Lean six sigma (green belt)new
 
Lean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry HelmsLean Manufacturing 2009 - By Jerry Helms
Lean Manufacturing 2009 - By Jerry Helms
 
Lean project management
Lean project management Lean project management
Lean project management
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Factors affecting productivity
Factors affecting productivity Factors affecting productivity
Factors affecting productivity
 
Productivity
ProductivityProductivity
Productivity
 
Lean ppt
Lean pptLean ppt
Lean ppt
 

Ähnlich wie Productivity

Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivityPacific Cotton
 
Session 1.pptx Introduction to Production planning and control Semester IV
Session 1.pptx Introduction to Production planning and control Semester IVSession 1.pptx Introduction to Production planning and control Semester IV
Session 1.pptx Introduction to Production planning and control Semester IVDrDeeptiSharma12
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations managementdarious demus
 
01 Production_part_2.pdf
01 Production_part_2.pdf01 Production_part_2.pdf
01 Production_part_2.pdfSugumarSarDurai
 
production planning & control
production planning & controlproduction planning & control
production planning & controlDeepshikha
 
Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Dr. Parveen Kaur Nagpal
 
Productivity Measurement, Types with solved Examples.pptx
Productivity Measurement, Types with solved Examples.pptxProductivity Measurement, Types with solved Examples.pptx
Productivity Measurement, Types with solved Examples.pptxasad urrehman
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLAttiMurugan
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptNittamallik216
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Brian Balayan
 
Products & processes
Products & processesProducts & processes
Products & processesEbtehalTamer1
 
Specialisation & the division of labour
Specialisation & the division of labourSpecialisation & the division of labour
Specialisation & the division of labourmattbentley34
 
Operations Int 2
Operations Int 2Operations Int 2
Operations Int 2Marcus9000
 

Ähnlich wie Productivity (20)

Productivity
ProductivityProductivity
Productivity
 
Executive summary of production and productivity
Executive summary of production and productivityExecutive summary of production and productivity
Executive summary of production and productivity
 
Session 1.pptx Introduction to Production planning and control Semester IV
Session 1.pptx Introduction to Production planning and control Semester IVSession 1.pptx Introduction to Production planning and control Semester IV
Session 1.pptx Introduction to Production planning and control Semester IV
 
Production and operations management
Production and operations managementProduction and operations management
Production and operations management
 
Production Methods& Kaizen
Production Methods& KaizenProduction Methods& Kaizen
Production Methods& Kaizen
 
01 Production_part_2.pdf
01 Production_part_2.pdf01 Production_part_2.pdf
01 Production_part_2.pdf
 
Theory of Production
Theory of ProductionTheory of Production
Theory of Production
 
production planning & control
production planning & controlproduction planning & control
production planning & control
 
Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3Productivity and Total Quality Management unit 3
Productivity and Total Quality Management unit 3
 
Wk-8-dll-7.docx
Wk-8-dll-7.docxWk-8-dll-7.docx
Wk-8-dll-7.docx
 
Productivity Measurement, Types with solved Examples.pptx
Productivity Measurement, Types with solved Examples.pptxProductivity Measurement, Types with solved Examples.pptx
Productivity Measurement, Types with solved Examples.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Production_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.pptProduction_Planning_and_Control_1.ppt
Production_Planning_and_Control_1.ppt
 
Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)Chapter 4 production and productivity (revised)
Chapter 4 production and productivity (revised)
 
Products & processes
Products & processesProducts & processes
Products & processes
 
Arjun Negi
Arjun NegiArjun Negi
Arjun Negi
 
Specialisation & the division of labour
Specialisation & the division of labourSpecialisation & the division of labour
Specialisation & the division of labour
 
Operations Int 2
Operations Int 2Operations Int 2
Operations Int 2
 
Terminologies
TerminologiesTerminologies
Terminologies
 
Pom1
Pom1Pom1
Pom1
 

Mehr von J.T.A.JONES

Mehr von J.T.A.JONES (20)

Seismic
SeismicSeismic
Seismic
 
Fire Detection and Alarm Systems
Fire Detection and Alarm SystemsFire Detection and Alarm Systems
Fire Detection and Alarm Systems
 
Public Switched Telephone Network (PSTN)
Public Switched Telephone Network (PSTN)Public Switched Telephone Network (PSTN)
Public Switched Telephone Network (PSTN)
 
Video phone
Video phoneVideo phone
Video phone
 
navigation
navigationnavigation
navigation
 
Radar
RadarRadar
Radar
 
safety belts
safety beltssafety belts
safety belts
 
Safety
SafetySafety
Safety
 
Powder Metallurgy
Powder Metallurgy Powder Metallurgy
Powder Metallurgy
 
Die Casting
Die Casting Die Casting
Die Casting
 
Casting
CastingCasting
Casting
 
Fuel Systems
Fuel SystemsFuel Systems
Fuel Systems
 
Carburetor Theory
Carburetor TheoryCarburetor Theory
Carburetor Theory
 
Software Development Life Cycle Model
Software Development Life Cycle ModelSoftware Development Life Cycle Model
Software Development Life Cycle Model
 
Types of os
Types of osTypes of os
Types of os
 
IO Management
IO ManagementIO Management
IO Management
 
Disk scheduling
Disk schedulingDisk scheduling
Disk scheduling
 
Sorting & Linked Lists
Sorting & Linked ListsSorting & Linked Lists
Sorting & Linked Lists
 
php
phpphp
php
 
Transformer
TransformerTransformer
Transformer
 

Kürzlich hochgeladen

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptxmary850239
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptxJonalynLegaspi2
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseCeline George
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsPooky Knightsmith
 

Kürzlich hochgeladen (20)

Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx4.11.24 Poverty and Inequality in America.pptx
4.11.24 Poverty and Inequality in America.pptx
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
week 1 cookery 8 fourth - quarter .pptx
week 1 cookery 8  fourth  -  quarter .pptxweek 1 cookery 8  fourth  -  quarter .pptx
week 1 cookery 8 fourth - quarter .pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
How to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 DatabaseHow to Make a Duplicate of Your Odoo 17 Database
How to Make a Duplicate of Your Odoo 17 Database
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Mental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young mindsMental Health Awareness - a toolkit for supporting young minds
Mental Health Awareness - a toolkit for supporting young minds
 

Productivity

  • 2. Standard of living  The extent to which a person is able to provide the things that are necessary for sustaining and enjoying life.  Standard of living of a representative family differs greatly in different parts of the world.  What is considered a necessity in one part of the world could be considered a luxury in the other.  Basic necessities of a minimum decent standard of living: Food, clothing, housing and hygiene. Also, security and education also considered constituents.  Greater the amount of goods and services produced in any community, the higher its the average standard of living. 2
  • 3. Standard of living  There are two ways of increasing the amount of goods and services produced: - Increase the employment and investment in creating jobs. So that more people are producing goods required for the society. - Increase productivity. Same amount of labor produces more goods. We want:  More and cheaper food by increase in agricultural productivity  More and cheaper clothing and housing by increased industrial productivity  More hygiene, security and education by increasing overall productivity. 3
  • 4. Productivity  Ratio between output and input.  Arithmetic ratio of the amount produced to the amount of any resources used in the production.  The resources may be: land, material, plant, machines, tools, labor. It could be combination of all!  Over a period of time, one can see if the productivity has increased.  How?  Combination of improved technology, better planning, greater skills etc. 4
  • 5. Productivity  Note that, increased production does not mean increased productivity.  Higher productivity means that more is produced with the same expenditure of resources; that is, at the same cost in terms of land, material, machine, time or labor.  Alternatively, same amount is produced at less cost in terms of land, labor, material etc; thereby releasing some of these resources for the production of other things. 5
  • 6. Productivity and standard of living  If more is available at the same cost, or the same amount is available at lesser cost the whole community benefits.  As per the ILO, higher productivity provides ways for raising the standard of living by: Larger supplies of both consumer goods and capital goods at 1. lower cost and prices Higher real earnings 2. Improvement in working conditions, e.g. by reduced working 3. hours In general, strengthening of the economic foundations of 4. human well-being. 6
  • 7. Productivity in industry  Many factors affecting productivity of each organization; also, they are dependent.  Depending on the individual environments, decisions are to be made.  Industries where labor and capital costs are low compared to the material costs, better use of material and plant gives the greatest scope of cost reduction.  In countries where capital and skilled labor are in shortage compared to unskilled labor, one should look to increase the output per machine or per skilled worker.  Increasing the number of unskilled workers may be beneficial if by doing so an expensive machine or skilled craftsmen are enabled to increase production. 7
  • 8. Government’s responsibility  Government can create conditions favorable to raise productivity. It can: Have a balanced programs of economic development 1. Take steps necessary to maintain employment 2. Make opportunities for employment. 3.  Last step is specifically important for a developing country like India.  Government should make provisions for workers who are going to loose jobs because of technology improvement – training and education programs. Example: India’s First Five-Year Plan (1952).  8
  • 9. Management’s responsibility  The main responsibility for raising productivity in an individual organization lies with the management.  It can implement productivity programs.  It can create a positive environment and obtain co-operation of the employees.  Trade unions should encourage its members to provide such co-operation when the productivity program is beneficial to workers, as well as the organization on the whole.  We will look at management’s role in increasing productivity of individual resource: 9
  • 10. Productivity of material At the design stage:  Ensure least consumption of material,  Purchase equipments and plants such that consumption of material is economical. At the operation stage:  Use of correct process,  Right use of the process,  Operator training,  Proper handling and storage of products at all stages,  Proper packaging to reduce damage in transit. 10
  • 11. Productivity of land, machines and manpower  Effective utilization and maximum productivity is an important source of cost reduction.  Reduction in the original specification, before the land is purchased saves capital outlay (as well as interest expenses)  A savings in material which has to be imported saves import duty and excise.  Productivity of manpower and machines is typically measured in terms of time (man-hours; machine-hours). 11
  • 12. Factors tending to reduce productivity Work content added due to the product design for a manufacturing firm:  The product or its components are designed such that it is impossible to use most economical manufacturing processes.  Excessive variety or lack of standardization.  Incorrect quality standards.  Excessive amount of material removal required. 12
  • 13. Factors tending to reduce productivity Work content added due to process:  Incorrect production process (and/or machine) used  Process not operated properly  Non-optimal layout with wasted movements.  Working methods of operation causing wasted movements, time and efforts. 13
  • 14. Factors tending to reduce productivity Ineffective time due to management  Marketing policy which demands unnecessarily large number of products.  No standardization of components between as well as within products.  Failing to meet customer’s requirement from the beginning.  No plan for flow of work.  Improper supply of material, equipment.  Improper maintenance of plant and machines.  Insufficient safety measures.  Improper working conditions resulting in interrupted work. 14
  • 15. Factors tending to reduce productivity Ineffective time within the control of worker:  Taking time off without good cause: by lateness, by idling at work etc.  Careless workmanship causing scrap or rework.  Failing to observe safety standards. 15