PROJECT INTEGRATION MANAGEMENT
This knowledge area coordinates other areas to work together throughout the project
and includes the processes and activities to identify, define, combine, unify and
coordinate the various processes and project management activities within the project
management process groups. It includes making choices about resource allocation,
making trade-offs among competing objectives and alternatives, and managing the
interdependencies among the project management knowledge areas. This knowledge
area emphasizes the generally accepted role of a Project Manager: performing
coordination and bringing all the pieces (the deliverables of the project) together.
2
PROJECT INTEGRATION MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Develop Project Charter Initiating Project statement of work (SOW) Expert judgment Project charter
Business case Facilitation techniques
Agreements
Enterprise environmental factors (EEF)
Organizational process assets (OPA)
2 Develop Project Management Plan Planning Project charter Expert judgment Project management plan
Outputs from other processes Facilitation techniques
EEF
OPA
3 Direct & Manage Project Work Executing Project management plan Expert judgment Deliverables
Approved change requests Project management information
system
Work performance data
EEF Meetings Change requests
OPA Project management plan
Project documents updates
4 Monitor & Control Project Work Monitoring & Controlling Project management plan Expert judgment Change requests
Schedule forecasts Analytical techniques Work performance reports
cost forecasts Project management information
system
Project management plan
Validated changes Meetings Project documents updates
Work performance information
EEF
OPA
5 Perform Integrated Change Control Monitoring & Controlling Project management plan Expert judgment Approved change requests
Change requests Meetings Change log
Work performance reports Change control tools Project management plan updates
EEF Project documents updates
OPA
6 Close Project or Phase Closing Project management plan Expert judgment Final product, service, or result transition
Accepted deliverables Analytical techniques OPA updates
OPA Meetings
3
PROJECT SCOPE MANAGEMENT
A set of processes is used to ensure that the project includes all the requirements and
that no new requirements are added in a way that could harm the project. This
knowledge area includes the processes required to ensure that the project includes all
the work required, and only the work required, to complete the project successfully and
includes setting clearly defined project objectives, defining major project deliverables,
and controlling changes to those deliverables. Managing the scope primarily concerns
defining and controlling what is and what is not included in the project.
4
PROJECT SCOPE MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Scope Management Planning Project management plan Expert judgment Scope management plan
Project charter Meetings Requirements management plan
EEF
OPA
2 Collect Requirements Planning Scope management plan Interviews Requirements documentation
Requirements management plan Focus groups Requirements traceability matrix
Stakeholder management plan Facilitated workshops
Project charter Group creativity techniques
Stakeholder register Group decision-making techniques
Questionnaires & surveys
Observations
Prototypes
Benchmarking
Context diagrams
Document analysis
3 Define Scope Planning Scope management plan Expert judgment Project scope statement
Project charter Product analysis Project documents updates
Requirements documentation Alternatives generation
OPA Facilitated workshops
4 Create WBS Planning Scope management plan Decomposition Scope baseline
Project scope statement Expert judgment Project documents updates
Requirements documentation
EEF
OPA
5 Validate Scope Monitoring & Controlling Project management plan Inspection Accepted deliverables
Requirements documentation Group decision-making techniques Change requests
Requirements traceability matrix Work performance information
Verified deliverables Project documents updates
Work performance data
5
6 Control Scope Monitoring & Controlling Project management plan Variance analysis Work performance information
Requirements documentation Change requests
Requirements traceability matrix Project management plan updates
Work performance data Project documents updates
OPA OPA updates
6
PROJECT TIME MANAGEMENT
Processes are required to manage the timely completion of the project and to ensure
that the project is completed on schedule. This knowledge area is driven by risk,
resource availability, business value, and the scheduling methods used.
7
PROJECT TIME MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Schedule Management Planning Project management plan Expert judgment Schedule management plan
Project charter Analytical techniques
EEF Meetings
OPA
2 Define Activities Planning Schedule management plan Decomposition Activity list
Scope baseline Rolling wave planning Activity attributes
EEF Expert judgment Milestone list
OPA
3 Sequence Activities Planning Schedule management plan Precedence diagramming method
(PDM)
Project schedule network diagrams
Activity list Dependency determination Project documents updates
Activity attributes Leads & lags
Milestone list
Project scope statement
EEF
OPA
4 Estimate Activity Resources Planning Schedule management plan Expert judgment Activity resource requirements
Activity list Alternative analysis Resource breakdown structure (RBS)
Activity attributes Published estimating data Project documents updates
Resource calendars Bottom-up estimating
Risk register Project management software
Activity cost estimates
EEF
OPA
5 Estimate Activity Durations Planning Schedule management plan Expert judgment Activity duration estimates
Activity list Analogous estimating Project documents updates
Activity attributes Parametric estimating
Activity resource requirements Three-point estimating
Resource calendars Group decision-making techniques
Project scope statement Reserve analysis
Risk register
8
Resource breakdown structure (RBS)
EEF
OPA
6 Develop Schedule Planning Schedule management plan Schedule network analysis Schedule baseline
Activity list Critical path method Project schedule
Activity attributes Critical chain method Schedule data
Project schedule network diagrams Resource optimization techniques Project calendars
Activity resource requirements Modeling techniques Project management plan updates
Resource calendars Leads & lags Project documents updates
Activity duration estimates Schedule compression
Project scope statement Scheduling tool
Risk register
Project staff assignments
Resource breakdown structure (RBS)
EEF
OPA
7 Control Schedule Monitoring & Controlling Project management plan Performance reviews Work performance information
Project schedule Project management software Schedule forecasts
Work performance data Resource optimization techniques Change requests
Project calendars Modeling techniques Project management plan updates
Schedule data Leads & lags Project documents updates
OPA Schedule compression OPA updates
Scheduling tool
9
COST MANAGEMENT
Project cost management includes the processes involved in planning, estimating,
budgeting, financing, funding, managing, and controlling costs sothat the project can be
completed within the approved budget. In other words, this knowledge area includes
processes to ensure that the project is completed on budget.
10
PROJECT COST MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Cost Management Planning Project management plan Expert judgment Cost management plan
Project charter Analytical techniques
EEF Meetings
OPA
2 Estimate Costs Planning Cost management plan Expert judgment Activity cost estimates
HR management plan Analogous estimating Basis of estimates
Scope baseline Parametric estimating Project documents updates
Project schedule Bottom-up estimating
Risk register Three-point estimating
EEF Reserve analysis
OPA Cost of quality
Project management software
Vendor bid analysis
Group decision-making techniques
3 Determine Budget Planning Cost management plan Cost aggregation Cost baseline
Scope baseline Reserve analysis Project funding requirements
Activity cost estimates Expert judgment Project documents updates
Basis of estimates Historical relationships
Project schedule Funding limit reconciliation
Resource calendars
Risk register
Agreements
OPA
4 Control Costs Monitoring & Controlling Project management plan Earned value management Work performance information
Project funding requirements Forecasting cost forecasts
Work performance data To-complete performance index
(TCPI)
change requests
OPA Performance reviews Project management plan updates
Project management software Project documents updates
Reserve analysis OPA updates
11
PROJECT QUALITY MANAGEMENT
Project Quality Management includes the processes and activities of the performing
organization that determine the quality policies, objectives, and responsibilities so that
the project will satisfy the needs for which it was undertaken. It uses policies and
procedures to implement, within the project’s context, the organization’s quality
management system and supports continuous process improvement activities as
undertaken on behalf of the performing organization. This area also includes developing
plans to ensure that project requirements, including product requirements, are met and
validated. Quality management can ultimately establish a quality policy, help understand
quality principles introduced by quality experts, developing quality assurance processes,
and control the quality of all project deliverables.
12
PROJECT QUALITY MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Quality Management Planning Project management plan Cost-benefit analysis Quality management plan
Stakeholder register Cost of quality Process improvement plan
Risk register Seven basic quality tools Quality metrics
Requirements documentation Benchmarking Quality checklists
EEF Design of experiments Project documents updates
OPA Statistical sampling
Additional quality planning tools
Meetings
2 Perform Quality Assurance Executing Quality management plan Quality management & control tools change requests
Process improvement plan Quality audits Project management plan updates
Quality metrics Process analysis Project documents updates
Quality control measurements OPA updates
Project documents
3 Control Quality Monitoring & Controlling Project management plan Seven basic quality tools Quality control measurements
Quality metrics Statistical sampling Validated changes
Quality checklists Inspection Verified deliverables
Work performance data Approved change requests review Work performance information
Approved change requests change requests
Deliverables Project management plan updates
Project documents Project documents updates
OPA OPA updates
13
PROJECT HR MANAGEMENT
Project Human Resource Management includes the processes that organize, manage,
and lead the project team. This knowledge area includes all the processes used to
develop, manage, and put the project team together. This involves planning HR
management, acquiring and developing the project team, motivating the team, and
understanding management styles and organizational structure.
14
PROJECT HR MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan HR Management Planning Project management plan Organization charts & position
descriptions
Human resource management plan
Activity resource requirements Networking
EEF Organizational theory
OPA Expert judgment
Meetings
2 Acquire Project Team Executing Human resource management plan Pre-assignment Project staff assignments
EEF Negotiation Resource calendars
OPA Acquisition Project management plan updates
Virtual teams
Multi-criteria decision analysis
3 Develop Project Team Executing Human resource management plan Interpersonal skills Team performance assessments
Project staff assignments Training EEF updates
Resource calendars Team-building activities
Ground rules
Co-location
Recognition & rewards
Personnel assessment tools
4 Manage Project Team Executing Human resource management plan Observation & conversation change requests
Project staff assignments Project performance appraisals Project management plan updates
Team performance assessments Conflict management Project documents updates
Issue log Interpersonal skills EEF updates
Work performance reports OPA updates
OPA
15
PROJECT COMMUNICATIONS MANAGEMENT
Project Communications Management includes the processes that are required to
ensure the timely and appropriate planning, collection, creation, distribution, storage,
retrieval management, control, monitoring, and ultimate disposition of project
information. This knowledge area determines what information is needed, how that
information will be sent and managed, and how project performance is reported. This
involves planning and distributing information correctly and to the appropriate
stakeholders, reporting the performance, managing stakeholders, and developing
processes to ensure effective transfer of information. Communications management is
mainly about effective communication among those involved in the project, from
stakeholders to internal project interests at different levels and with differing views.
16
PROJECT COMMUNICATIONS MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Communications Management Planning Project management plan Communication requirements
analysis
Communications management plan
Stakeholder register Communication technology Project documents updates
EEF Communication models
OPA Communication methods
Meetings
2 Manage Communications Executing Communications management plan Communication technology Project communications
Work performance reports Communication models Project management plan updates
EEF Communication methods Project documents updates
OPA Information management systems OPA updates
Performance reporting
3 Control Communications Monitoring & Controlling Project management plan Information management systems Work performance information
Project communications Expert judgment Change requests
Issue log Meetings Project management plan updates
Work performance data Project documents updates
OPA OPA updates
17
PROJECT RISK MANAGEMENT
Project Risk Management includes the processes of conducting risk management
planning, identification, analysis, response planning, and risk control in a project. The
objectives of project risk management are to increase the likelihood and impact of
positive events and decrease the likelihood and impact of negative events in the project.
This area includes identifying potential project risk events, using qualitative and
quantitative analysis to prioritize potential risks, respond to risk situations, and develop
risk monitoring and controlling processes. The PM and the project team actively discuss
potential risk situations that will make difference between a smooth-flowing project and
a project filled with surprises and potential disasters.
18
PROJECT RISK MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Risk Management Planning Project management plan Analytical techniques Risk management plan
Project charter Expert judgment
Stakeholder register Meetings
EEF
OPA
2 Identify Risks Planning Risk management plan Documentation reviews Risk register
Cost management plan Information gathering techniques
Schedule management plan Checklist analysis
Quality management plan Assumptions analysis
HR management plan Diagramming techniques
Scope baseline SWOT analysis
Activity cost estimates Expert judgment
Activity duration estimates
Stakeholder register
Project documents
Procurement documents
EEF
OPA
3 Perform Qualitative Risk Analysis Planning Risk management plan Risk probability & impact assessment Project documents updates
Scope baseline probability & impact matrix
Risk register Risk data quality assessment
EEF Risk categorization
OPA Risk urgency assessment
Expert judgment
4 Perform Quantitative Risk Analysis Planning Risk management plan Data gathering & representation
techniques
Project documents updates
Cost management plan Quantitative risk analysis & modeling
techniques
Schedule management plan Expert judgment
Risk register
EEF
OPA
19
5 Plan Risk Responses Planning Risk management plan Strategies for negative risks or threats Project management plan updates
Risk register Strategies for positive risks or
opportunities
Project documents updates
Contingent response strategies
Expert judgment
6 Control Risks Monitoring & Controlling Project management plan Risk reassessment Work performance information
Risk register Risk audits Change requests
Work performance data Variance & trend analysis Project management plan updates
Work performance reports Technical performance measurement Project documents updates
Reserve analysis OPA updates
Meetings
20
PROJECT PROCUREMENT MANAGEMENT
Project Procurement Management includes the processes necessary to purchase or
acquire products, services, or results needed from outside the project team to complete
the project objectives. This includes determining what goods and services should be
purchased or developed internally by an organization, planning purchases, and
developing procurement documentation such as request for proposals. It also involves
determining appropriate contract types, negotiating terms, selecting sellers, managing
contracts through implementation, and them managing project closure and contractual
closure.
21
PROJECT PROCUREMENT MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Plan Procurement Management Planning Project management plan Make-or-buy analysis Procurement management plan
Requirements documentation Expert judgment Procurement statement of work
Risk register Market research Procurement documents
Activity resource requirements Meetings Source selection criteria
Project schedule Make-or-buy decisions
Activity cost estimates Change requests
Stakeholder register Project documents updates
EEF
OPA
2 Conduct Procurements Executing Procurement management plan Bidder conference Selected sellers
Procurement documents Proposal evaluation techniques Agreements
Source selection criteria Independent estimates Resource calendars
Seller proposals Expert judgment Change requests
Project documents Analytical techniques Project management plan updates
Make-or-buy decisions Procurement negotiations Project documents updates
Procurement statement of work
OPA
3 Control Procurements Monitoring & Controlling Project management plan Contract change control system Work performance information
Procurement documents Procurement performance reviews Change requests
Agreements Inspections & audits Project management plan updates
Approved change requests Performance reporting Project documents updates
Work performance data Payment systems OPA updates
Work performance reports Claims administration
Records management system
4 Close Procurements Closing Project management plan Procurement audits Closed procurements
Procurement documents Procurement negotiations OPA updates
Records management system
22
PROJECT STAKEHOLDER MANAGEMENT
Project stakeholders include anyone influenced by or influencing the result of a project.
Project Stakeholder Management includes the processes to ensure the identification of
stakeholders and to plan, manage, and control their engagement, which is required to
identify the people, groups, or organizations that could impact or be impacted by the
project, to analyze stakeholder expectations and their impact on the project, and to
develop appropriate management strategies for effectively engaging stakeholders in
project decisions and execution. Stakeholder management also focuses on continuous
communication with stakeholders to understand their needs and expectations,
addressing issues as they occur, managing conflicting interests, and fostering appropriate
stakeholder engagement in project decisions and activities.
23
PROJECT STAKEHOLDER MANAGEMENT OVERVIEW
PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS
1 Identify Stakeholders Initiating Project charter Stakeholder analysis Stakeholder register
Procurement documents Expert judgment
EEF Meetings
OPA
2 Plan Stakeholder Management Planning Project management plan Expert judgment Stakeholder management plan
Stakeholder register Meetings Project documents updates
EEF Analytical techniques
OPA
3 Manage Stakeholder Engagement Executing Stakeholder management plan Communication methods Issue log
Communications management plan Interpersonal skills Change requests
Change log Management skills Project management plan updates
OPA Project documents updates
OPA updates
4 Control Stakeholder Engagement Monitoring & Controlling Project management plan Information management systems Work performance information
Issue log Expert judgment Change requests
Work performance data Meetings Project management plan updates
Project documents Project documents updates
OPA updates

More Related Content

What's hot

Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementSM Parvej Islam
 
Project management
Project managementProject management
Project managementSimran Kaur
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource ManagementDavidMcLachlan1
 
Project Management Software
Project Management SoftwareProject Management Software
Project Management SoftwareMartin Sillaots
 
Scope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesScope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesSlideTeam
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...GlobalSkillup
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...Anand Bobade
 
2. project initiation
2. project initiation2. project initiation
2. project initiationMad Jutt
 
Ten Slides in Ten Minutes - Bid Management versus Project Management
Ten Slides in Ten Minutes - Bid Management versus Project ManagementTen Slides in Ten Minutes - Bid Management versus Project Management
Ten Slides in Ten Minutes - Bid Management versus Project ManagementBill Graham CP.APMP
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Software Project Management: Project Planning
Software Project Management: Project PlanningSoftware Project Management: Project Planning
Software Project Management: Project PlanningMinhas Kamal
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkDemand Metric
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 

What's hot (20)

Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Project management
Project managementProject management
Project management
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
9.1 Plan Resource Management
9.1 Plan Resource Management9.1 Plan Resource Management
9.1 Plan Resource Management
 
What is a PMO
What is a PMOWhat is a PMO
What is a PMO
 
Project Management Software
Project Management SoftwareProject Management Software
Project Management Software
 
Scope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation SlidesScope Management Powerpoint Presentation Slides
Scope Management Powerpoint Presentation Slides
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
Complete Online PMP Study Training Material for PMP Exam Provided Free for PM...
 
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
PMP - Download 49 Processes Chart | PMBOK6 | Links to all Slides | Link to Yo...
 
2. project initiation
2. project initiation2. project initiation
2. project initiation
 
Ten Slides in Ten Minutes - Bid Management versus Project Management
Ten Slides in Ten Minutes - Bid Management versus Project ManagementTen Slides in Ten Minutes - Bid Management versus Project Management
Ten Slides in Ten Minutes - Bid Management versus Project Management
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Software Project Management: Project Planning
Software Project Management: Project PlanningSoftware Project Management: Project Planning
Software Project Management: Project Planning
 
project management
project managementproject management
project management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
Project management
Project managementProject management
Project management
 
PMP_Project Cost Management
PMP_Project Cost ManagementPMP_Project Cost Management
PMP_Project Cost Management
 

Viewers also liked

Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areasguestfe6ad
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge AreasMais Jauhary, PMP
 
PM Knowledge Areas
PM Knowledge AreasPM Knowledge Areas
PM Knowledge AreasDerya Milner
 
A vision on knowledge management
A vision on knowledge managementA vision on knowledge management
A vision on knowledge managementMark Geljon
 
The Development of a Storytelling Framework to Support Knowledge Management P...
The Development of a Storytelling Framework to Support Knowledge Management P...The Development of a Storytelling Framework to Support Knowledge Management P...
The Development of a Storytelling Framework to Support Knowledge Management P...Khairul Shafee Kalid
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS Akash Prasanna
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slidesdotesch
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process GroupsTechNoleGirl
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 

Viewers also liked (13)

Project Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge AreasProject Management Process Groups And Knowledge Areas
Project Management Process Groups And Knowledge Areas
 
Project Management Knowledge Areas
Project Management Knowledge AreasProject Management Knowledge Areas
Project Management Knowledge Areas
 
PM Knowledge Areas
PM Knowledge AreasPM Knowledge Areas
PM Knowledge Areas
 
Capm time 150 question final key
Capm time 150 question final keyCapm time 150 question final key
Capm time 150 question final key
 
A vision on knowledge management
A vision on knowledge managementA vision on knowledge management
A vision on knowledge management
 
The Development of a Storytelling Framework to Support Knowledge Management P...
The Development of a Storytelling Framework to Support Knowledge Management P...The Development of a Storytelling Framework to Support Knowledge Management P...
The Development of a Storytelling Framework to Support Knowledge Management P...
 
Project control
Project controlProject control
Project control
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Chapter 3 Lecture Slides
Chapter 3 Lecture SlidesChapter 3 Lecture Slides
Chapter 3 Lecture Slides
 
Project control
Project controlProject control
Project control
 
Project Management Process Groups
Project Management Process GroupsProject Management Process Groups
Project Management Process Groups
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Project management
Project managementProject management
Project management
 

Similar to Project Management Knowledge Areas and Processes Overview

Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Amr Miqdadi
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management areaZaur Ahmadov, PMP
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...Arlene Smith
 
L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdfMUST
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changesPeg Duggan
 
Project Management Planning training in hyderabad
Project Management Planning training in hyderabadProject Management Planning training in hyderabad
Project Management Planning training in hyderabadKelly Technologies
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaEdureka!
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management areaZaur Ahmadov, PMP
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management OverviewDavidMcLachlan1
 
Managingtripleconstraint aam
Managingtripleconstraint aamManagingtripleconstraint aam
Managingtripleconstraint aamAldo Arecco
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management FrameworkAarti Dahiya PMP
 
PMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishPMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishRicardo Viana Vargas
 

Similar to Project Management Knowledge Areas and Processes Overview (20)

Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4
 
04 project integration management
04 project integration management04 project integration management
04 project integration management
 
PMP-Scope Management area
PMP-Scope Management areaPMP-Scope Management area
PMP-Scope Management area
 
PMP-Schedule Management area
PMP-Schedule Management areaPMP-Schedule Management area
PMP-Schedule Management area
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
L1-Project Integration Management.pdf
L1-Project Integration Management.pdfL1-Project Integration Management.pdf
L1-Project Integration Management.pdf
 
PMBoK V5 changes
PMBoK V5 changesPMBoK V5 changes
PMBoK V5 changes
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
05 project scope management
05 project scope management05 project scope management
05 project scope management
 
Project Management Planning training in hyderabad
Project Management Planning training in hyderabadProject Management Planning training in hyderabad
Project Management Planning training in hyderabad
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
PMP-Integration Management area
PMP-Integration Management  areaPMP-Integration Management  area
PMP-Integration Management area
 
7.0 Project Cost Management Overview
7.0 Project Cost Management Overview7.0 Project Cost Management Overview
7.0 Project Cost Management Overview
 
Managingtripleconstraint aam
Managingtripleconstraint aamManagingtripleconstraint aam
Managingtripleconstraint aam
 
6.5 Develop Schedule
6.5 Develop Schedule6.5 Develop Schedule
6.5 Develop Schedule
 
6396901
63969016396901
6396901
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
Real example of PMO deployment
Real example of PMO deploymentReal example of PMO deployment
Real example of PMO deployment
 
PMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in EnglishPMBOK® Guide 5th edition Processes Flow in English
PMBOK® Guide 5th edition Processes Flow in English
 
Itto slide share
Itto slide shareItto slide share
Itto slide share
 

Recently uploaded

Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 

Recently uploaded (20)

Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 

Project Management Knowledge Areas and Processes Overview

  • 1. OVERVIEW OF PROJECT MANAGEMENT KNOWLEDGE AREAS AND PROCESSES (BASED ON PMBOK 5TH EDITION) Animasaun Idris, PMP, SFC
  • 2. PROJECT INTEGRATION MANAGEMENT This knowledge area coordinates other areas to work together throughout the project and includes the processes and activities to identify, define, combine, unify and coordinate the various processes and project management activities within the project management process groups. It includes making choices about resource allocation, making trade-offs among competing objectives and alternatives, and managing the interdependencies among the project management knowledge areas. This knowledge area emphasizes the generally accepted role of a Project Manager: performing coordination and bringing all the pieces (the deliverables of the project) together.
  • 3. 2 PROJECT INTEGRATION MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Develop Project Charter Initiating Project statement of work (SOW) Expert judgment Project charter Business case Facilitation techniques Agreements Enterprise environmental factors (EEF) Organizational process assets (OPA) 2 Develop Project Management Plan Planning Project charter Expert judgment Project management plan Outputs from other processes Facilitation techniques EEF OPA 3 Direct & Manage Project Work Executing Project management plan Expert judgment Deliverables Approved change requests Project management information system Work performance data EEF Meetings Change requests OPA Project management plan Project documents updates 4 Monitor & Control Project Work Monitoring & Controlling Project management plan Expert judgment Change requests Schedule forecasts Analytical techniques Work performance reports cost forecasts Project management information system Project management plan Validated changes Meetings Project documents updates Work performance information EEF OPA 5 Perform Integrated Change Control Monitoring & Controlling Project management plan Expert judgment Approved change requests Change requests Meetings Change log Work performance reports Change control tools Project management plan updates EEF Project documents updates OPA 6 Close Project or Phase Closing Project management plan Expert judgment Final product, service, or result transition Accepted deliverables Analytical techniques OPA updates OPA Meetings
  • 4. 3 PROJECT SCOPE MANAGEMENT A set of processes is used to ensure that the project includes all the requirements and that no new requirements are added in a way that could harm the project. This knowledge area includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully and includes setting clearly defined project objectives, defining major project deliverables, and controlling changes to those deliverables. Managing the scope primarily concerns defining and controlling what is and what is not included in the project.
  • 5. 4 PROJECT SCOPE MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Scope Management Planning Project management plan Expert judgment Scope management plan Project charter Meetings Requirements management plan EEF OPA 2 Collect Requirements Planning Scope management plan Interviews Requirements documentation Requirements management plan Focus groups Requirements traceability matrix Stakeholder management plan Facilitated workshops Project charter Group creativity techniques Stakeholder register Group decision-making techniques Questionnaires & surveys Observations Prototypes Benchmarking Context diagrams Document analysis 3 Define Scope Planning Scope management plan Expert judgment Project scope statement Project charter Product analysis Project documents updates Requirements documentation Alternatives generation OPA Facilitated workshops 4 Create WBS Planning Scope management plan Decomposition Scope baseline Project scope statement Expert judgment Project documents updates Requirements documentation EEF OPA 5 Validate Scope Monitoring & Controlling Project management plan Inspection Accepted deliverables Requirements documentation Group decision-making techniques Change requests Requirements traceability matrix Work performance information Verified deliverables Project documents updates Work performance data
  • 6. 5 6 Control Scope Monitoring & Controlling Project management plan Variance analysis Work performance information Requirements documentation Change requests Requirements traceability matrix Project management plan updates Work performance data Project documents updates OPA OPA updates
  • 7. 6 PROJECT TIME MANAGEMENT Processes are required to manage the timely completion of the project and to ensure that the project is completed on schedule. This knowledge area is driven by risk, resource availability, business value, and the scheduling methods used.
  • 8. 7 PROJECT TIME MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Schedule Management Planning Project management plan Expert judgment Schedule management plan Project charter Analytical techniques EEF Meetings OPA 2 Define Activities Planning Schedule management plan Decomposition Activity list Scope baseline Rolling wave planning Activity attributes EEF Expert judgment Milestone list OPA 3 Sequence Activities Planning Schedule management plan Precedence diagramming method (PDM) Project schedule network diagrams Activity list Dependency determination Project documents updates Activity attributes Leads & lags Milestone list Project scope statement EEF OPA 4 Estimate Activity Resources Planning Schedule management plan Expert judgment Activity resource requirements Activity list Alternative analysis Resource breakdown structure (RBS) Activity attributes Published estimating data Project documents updates Resource calendars Bottom-up estimating Risk register Project management software Activity cost estimates EEF OPA 5 Estimate Activity Durations Planning Schedule management plan Expert judgment Activity duration estimates Activity list Analogous estimating Project documents updates Activity attributes Parametric estimating Activity resource requirements Three-point estimating Resource calendars Group decision-making techniques Project scope statement Reserve analysis Risk register
  • 9. 8 Resource breakdown structure (RBS) EEF OPA 6 Develop Schedule Planning Schedule management plan Schedule network analysis Schedule baseline Activity list Critical path method Project schedule Activity attributes Critical chain method Schedule data Project schedule network diagrams Resource optimization techniques Project calendars Activity resource requirements Modeling techniques Project management plan updates Resource calendars Leads & lags Project documents updates Activity duration estimates Schedule compression Project scope statement Scheduling tool Risk register Project staff assignments Resource breakdown structure (RBS) EEF OPA 7 Control Schedule Monitoring & Controlling Project management plan Performance reviews Work performance information Project schedule Project management software Schedule forecasts Work performance data Resource optimization techniques Change requests Project calendars Modeling techniques Project management plan updates Schedule data Leads & lags Project documents updates OPA Schedule compression OPA updates Scheduling tool
  • 10. 9 COST MANAGEMENT Project cost management includes the processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs sothat the project can be completed within the approved budget. In other words, this knowledge area includes processes to ensure that the project is completed on budget.
  • 11. 10 PROJECT COST MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Cost Management Planning Project management plan Expert judgment Cost management plan Project charter Analytical techniques EEF Meetings OPA 2 Estimate Costs Planning Cost management plan Expert judgment Activity cost estimates HR management plan Analogous estimating Basis of estimates Scope baseline Parametric estimating Project documents updates Project schedule Bottom-up estimating Risk register Three-point estimating EEF Reserve analysis OPA Cost of quality Project management software Vendor bid analysis Group decision-making techniques 3 Determine Budget Planning Cost management plan Cost aggregation Cost baseline Scope baseline Reserve analysis Project funding requirements Activity cost estimates Expert judgment Project documents updates Basis of estimates Historical relationships Project schedule Funding limit reconciliation Resource calendars Risk register Agreements OPA 4 Control Costs Monitoring & Controlling Project management plan Earned value management Work performance information Project funding requirements Forecasting cost forecasts Work performance data To-complete performance index (TCPI) change requests OPA Performance reviews Project management plan updates Project management software Project documents updates Reserve analysis OPA updates
  • 12. 11 PROJECT QUALITY MANAGEMENT Project Quality Management includes the processes and activities of the performing organization that determine the quality policies, objectives, and responsibilities so that the project will satisfy the needs for which it was undertaken. It uses policies and procedures to implement, within the project’s context, the organization’s quality management system and supports continuous process improvement activities as undertaken on behalf of the performing organization. This area also includes developing plans to ensure that project requirements, including product requirements, are met and validated. Quality management can ultimately establish a quality policy, help understand quality principles introduced by quality experts, developing quality assurance processes, and control the quality of all project deliverables.
  • 13. 12 PROJECT QUALITY MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Quality Management Planning Project management plan Cost-benefit analysis Quality management plan Stakeholder register Cost of quality Process improvement plan Risk register Seven basic quality tools Quality metrics Requirements documentation Benchmarking Quality checklists EEF Design of experiments Project documents updates OPA Statistical sampling Additional quality planning tools Meetings 2 Perform Quality Assurance Executing Quality management plan Quality management & control tools change requests Process improvement plan Quality audits Project management plan updates Quality metrics Process analysis Project documents updates Quality control measurements OPA updates Project documents 3 Control Quality Monitoring & Controlling Project management plan Seven basic quality tools Quality control measurements Quality metrics Statistical sampling Validated changes Quality checklists Inspection Verified deliverables Work performance data Approved change requests review Work performance information Approved change requests change requests Deliverables Project management plan updates Project documents Project documents updates OPA OPA updates
  • 14. 13 PROJECT HR MANAGEMENT Project Human Resource Management includes the processes that organize, manage, and lead the project team. This knowledge area includes all the processes used to develop, manage, and put the project team together. This involves planning HR management, acquiring and developing the project team, motivating the team, and understanding management styles and organizational structure.
  • 15. 14 PROJECT HR MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan HR Management Planning Project management plan Organization charts & position descriptions Human resource management plan Activity resource requirements Networking EEF Organizational theory OPA Expert judgment Meetings 2 Acquire Project Team Executing Human resource management plan Pre-assignment Project staff assignments EEF Negotiation Resource calendars OPA Acquisition Project management plan updates Virtual teams Multi-criteria decision analysis 3 Develop Project Team Executing Human resource management plan Interpersonal skills Team performance assessments Project staff assignments Training EEF updates Resource calendars Team-building activities Ground rules Co-location Recognition & rewards Personnel assessment tools 4 Manage Project Team Executing Human resource management plan Observation & conversation change requests Project staff assignments Project performance appraisals Project management plan updates Team performance assessments Conflict management Project documents updates Issue log Interpersonal skills EEF updates Work performance reports OPA updates OPA
  • 16. 15 PROJECT COMMUNICATIONS MANAGEMENT Project Communications Management includes the processes that are required to ensure the timely and appropriate planning, collection, creation, distribution, storage, retrieval management, control, monitoring, and ultimate disposition of project information. This knowledge area determines what information is needed, how that information will be sent and managed, and how project performance is reported. This involves planning and distributing information correctly and to the appropriate stakeholders, reporting the performance, managing stakeholders, and developing processes to ensure effective transfer of information. Communications management is mainly about effective communication among those involved in the project, from stakeholders to internal project interests at different levels and with differing views.
  • 17. 16 PROJECT COMMUNICATIONS MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Communications Management Planning Project management plan Communication requirements analysis Communications management plan Stakeholder register Communication technology Project documents updates EEF Communication models OPA Communication methods Meetings 2 Manage Communications Executing Communications management plan Communication technology Project communications Work performance reports Communication models Project management plan updates EEF Communication methods Project documents updates OPA Information management systems OPA updates Performance reporting 3 Control Communications Monitoring & Controlling Project management plan Information management systems Work performance information Project communications Expert judgment Change requests Issue log Meetings Project management plan updates Work performance data Project documents updates OPA OPA updates
  • 18. 17 PROJECT RISK MANAGEMENT Project Risk Management includes the processes of conducting risk management planning, identification, analysis, response planning, and risk control in a project. The objectives of project risk management are to increase the likelihood and impact of positive events and decrease the likelihood and impact of negative events in the project. This area includes identifying potential project risk events, using qualitative and quantitative analysis to prioritize potential risks, respond to risk situations, and develop risk monitoring and controlling processes. The PM and the project team actively discuss potential risk situations that will make difference between a smooth-flowing project and a project filled with surprises and potential disasters.
  • 19. 18 PROJECT RISK MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Risk Management Planning Project management plan Analytical techniques Risk management plan Project charter Expert judgment Stakeholder register Meetings EEF OPA 2 Identify Risks Planning Risk management plan Documentation reviews Risk register Cost management plan Information gathering techniques Schedule management plan Checklist analysis Quality management plan Assumptions analysis HR management plan Diagramming techniques Scope baseline SWOT analysis Activity cost estimates Expert judgment Activity duration estimates Stakeholder register Project documents Procurement documents EEF OPA 3 Perform Qualitative Risk Analysis Planning Risk management plan Risk probability & impact assessment Project documents updates Scope baseline probability & impact matrix Risk register Risk data quality assessment EEF Risk categorization OPA Risk urgency assessment Expert judgment 4 Perform Quantitative Risk Analysis Planning Risk management plan Data gathering & representation techniques Project documents updates Cost management plan Quantitative risk analysis & modeling techniques Schedule management plan Expert judgment Risk register EEF OPA
  • 20. 19 5 Plan Risk Responses Planning Risk management plan Strategies for negative risks or threats Project management plan updates Risk register Strategies for positive risks or opportunities Project documents updates Contingent response strategies Expert judgment 6 Control Risks Monitoring & Controlling Project management plan Risk reassessment Work performance information Risk register Risk audits Change requests Work performance data Variance & trend analysis Project management plan updates Work performance reports Technical performance measurement Project documents updates Reserve analysis OPA updates Meetings
  • 21. 20 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes necessary to purchase or acquire products, services, or results needed from outside the project team to complete the project objectives. This includes determining what goods and services should be purchased or developed internally by an organization, planning purchases, and developing procurement documentation such as request for proposals. It also involves determining appropriate contract types, negotiating terms, selecting sellers, managing contracts through implementation, and them managing project closure and contractual closure.
  • 22. 21 PROJECT PROCUREMENT MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Plan Procurement Management Planning Project management plan Make-or-buy analysis Procurement management plan Requirements documentation Expert judgment Procurement statement of work Risk register Market research Procurement documents Activity resource requirements Meetings Source selection criteria Project schedule Make-or-buy decisions Activity cost estimates Change requests Stakeholder register Project documents updates EEF OPA 2 Conduct Procurements Executing Procurement management plan Bidder conference Selected sellers Procurement documents Proposal evaluation techniques Agreements Source selection criteria Independent estimates Resource calendars Seller proposals Expert judgment Change requests Project documents Analytical techniques Project management plan updates Make-or-buy decisions Procurement negotiations Project documents updates Procurement statement of work OPA 3 Control Procurements Monitoring & Controlling Project management plan Contract change control system Work performance information Procurement documents Procurement performance reviews Change requests Agreements Inspections & audits Project management plan updates Approved change requests Performance reporting Project documents updates Work performance data Payment systems OPA updates Work performance reports Claims administration Records management system 4 Close Procurements Closing Project management plan Procurement audits Closed procurements Procurement documents Procurement negotiations OPA updates Records management system
  • 23. 22 PROJECT STAKEHOLDER MANAGEMENT Project stakeholders include anyone influenced by or influencing the result of a project. Project Stakeholder Management includes the processes to ensure the identification of stakeholders and to plan, manage, and control their engagement, which is required to identify the people, groups, or organizations that could impact or be impacted by the project, to analyze stakeholder expectations and their impact on the project, and to develop appropriate management strategies for effectively engaging stakeholders in project decisions and execution. Stakeholder management also focuses on continuous communication with stakeholders to understand their needs and expectations, addressing issues as they occur, managing conflicting interests, and fostering appropriate stakeholder engagement in project decisions and activities.
  • 24. 23 PROJECT STAKEHOLDER MANAGEMENT OVERVIEW PROCESS PROCESS GROUP INPUTS TOOLS & TECHNIQUES OUTPUTS 1 Identify Stakeholders Initiating Project charter Stakeholder analysis Stakeholder register Procurement documents Expert judgment EEF Meetings OPA 2 Plan Stakeholder Management Planning Project management plan Expert judgment Stakeholder management plan Stakeholder register Meetings Project documents updates EEF Analytical techniques OPA 3 Manage Stakeholder Engagement Executing Stakeholder management plan Communication methods Issue log Communications management plan Interpersonal skills Change requests Change log Management skills Project management plan updates OPA Project documents updates OPA updates 4 Control Stakeholder Engagement Monitoring & Controlling Project management plan Information management systems Work performance information Issue log Expert judgment Change requests Work performance data Meetings Project management plan updates Project documents Project documents updates OPA updates