This document provides details on the design and concepts for the Yemen and Tonga pavilions at Expo 2020 in Dubai. For the Yemen pavilion, it includes floor plans, elevations, and details showing the layout and design of the exhibition space featuring ancient Yemeni artifacts. For the Tonga pavilion, it shows the layout of seating areas, displays, and ceiling installations like jellyfish paper lanterns and graphics meant to evoke the underwater world of Tonga.
3. 01DUBAI IS GLOBALLY RECOGNISED FOR ITS WORLD FIRSTS, AND THE PALM JUMEIRAH IS
.AN IMPRESSIVE EXAMPLE
VIEWEDFROMABOVE,THEMANMADEISLANDRESEMBLESASTYLISEDPALMTREE,WHICH
.WASBUILTFROMRECLAIMEDLANDMASSANDASERIESOFARTIFICIALARCHIPELAGOS
PALM JUMEIRAH IS HOME TO SOME OF DUBAI’S MOST LUXURIOUS RESORTS, INCLUDING
ATLANTIS THE PALM, JUMEIRAH ZABEEL SARAY, THE ONE&ONLY THE PALM AND MANY
.MORE
THE PALM IS WELL DEVELOPED – WITH ROADS, TUNNELS AND PUBLIC TRANSPORT. SO
YOU CAN EASILY ACCESS THE VARIOUS HOTELS, RESTAURANTS AND ATTRACTIONS ON
.THE ISLAND
private villa
THE CONCEPT
INSPIRED BY
THE MODERN
SKYLINE OF THE
FASHIONABLE
DUBAI, THE
CITY OF GOLD,
THE INTERIORS
PRESENTS A NEW
STANDARD IN
MODERN
LIVING OFFERING
A NEVER BEFORE
SEEN BALANCE OF
UNSURPASSABLE
LUXURY, REFINED
BEAUTY AND
PERSONAL
.STYLE
story
20. 05
expo 2020
THE LARGEST EVENT EVER STAGED IN THE ARAB WORLD – IS SET TO WELCOME 190 PAR-
TICIPATING COUNTRIES, AND MILLIONS OF VISITORS FROM ACROSS THE GLOBE.I
YOUTH ARE AT THE HEART OF OUR WORLD EXPO.J
THAT’S WHY EXPO 2020 ASPIRES TO CREATE A MEANINGFUL LEGACY THAT WILL BEN�
EFIT GENERATIONS TO COME, BOTH LOCALLY AND GLOBALLY, SPANNING EVERYTHING
FROM INNOVATIONS AND ARCHITECTURE TO FRIENDSHIPS AND BUSINESS OPPORTUNI-
TIES. I
I HAD THE OPPORTUNITY TO PARTICIPATE IN 10 PAVILIONS AT DUBAI EXPO 2020.
21. yemen pavilion
ZONE 01
THE WITNESSES OF
ANCIENT
KNOWLEDGE
PAVILION STORY
2080
C
1535
PAVILION STORY
AREA FOR 7 ANCIENT OBJECTS
WITH BACKLIT CUTOUT TITLES
06-MF-009
05-SN-005
06-AC-007
06-MF-009
05-SN-005
AOUD
06-MF-009
05-SN-005
10 inch
MINI LCD
PATTERN
+05.000
±00.000 (FFL)
+04.000
+02.000
+03.000
5005005005005005001000
+01.000
09-PA-002
1000
MEP
09-PA-002
A5 IMAGES
6GF605
4
6GF605
3
40001000
1 SCALE 1:50 @ A3
PLAN
1 SCALE 1:50 @ A3
SECTION ELEVATION 3 SCALE 1:2 @ A3
DETAIL
5
45
5
20
STEEL HEX. NUT STOPPER
ST
TO
MDF C-CHANNEL MAP FORM
WITH LED LIGHT AND DIFFUSER
1245
500
435
805
4650
2345
280
315
140
210
275
1395
ZONE 01
THE WITNESSES OF
ANCIENT
KNOWLEDGE
PAVILION STORY
2080
C
1535
PAVILION STORY
AREA FOR 7 ANCIENT OBJECTS
WITH BACKLIT CUTOUT TITLES
06-MF-009
05-SN-005
06-AC-007
06-MF-009
05-SN-005
AOUD
06-MF-009
05-SN-005
10 inch
MINI LCD
PATTERN
±00.000 (FFL)
+04.000
+02.000
+03.000
5005005005005005001000
+01.000
09-PA-002
1000
MEP
09-PA-002
A5 IMAGES
6GF605
4
6GF605
3
40001000
1 SCALE 1:50 @ A3
PLAN
1 SCALE 1:50 @ A3
SECTION ELEVATION 3 SCALE 1:2 @ A3
DETAIL
20
5
5
40
20
5
45
5
20
5
STEEL HEX. NUT STOPPER
MDF
STEEL HEX. NUT STOPPER
HDF C- CHANNEL
HOLDING THE LED
INTEGRATED
LIGHT
STEEL HOOK FIXED
TO SLAB
STEEL HOOK FIXED
TO SLAB
INTEGRATED LED LIGHT
DIFFUSER
5
30
---
VARIES---
ZONE 1 - CEILING YEMENI
FEATURE MAP DETAIL
APD
6GF605
1 ISSUED FOR APPROVAL -- -- 08/03/2020
MDF C-CHANNEL MAP FORM
WITH LED LIGHT AND DIFFUSER
4 SCALE 1:2 @ A3
DETAIL
1245
500
435
805
4650
2345
280
315
140
210
275
1395
--- IA
---
APD
of this document or the information contained therein.
DO NOT SCALE THIS DRAWING.
THEMATIC DISTRICT PAVILIONS
General Notes
Client
Programme Management Consultant
Design Consultant
Project Title
Drawing Title
Approved
Designed Drawn Checked
Model File Ref: Scale A3 (297x420)
Seal Date
Drawing No
Revision No
Project Address
Rev Description Apvr Chk'd Date
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.
Exhibition Contractor
Sub-Contractor
Key Plan
ACCIONA Producciones y Diseño
905, API Trio Commercial Tower,
Al Barsha 1 Novotel Al Barsha Building
Sheikh Zayed Road PO Box 118820
info.apd@acciona.com
www.acciona-apd.com
--- IK
10/05/2020
2---
APD
94001-DWG-IPA0035215-FO-
1 ISSUED FOR APPROVAL -- -- 08/03/2020
2 st. Al-kess Sergious, off merghany st.,
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Building 1A,
Office 401
T +971 4240 0991
www.zaroarchitects.com
info@zaroarchitects.com
EXPO EVENT
U00 / IPA003 / 5215 / GF
RIBA STAGE - 4
YEMEN - SA06-B "L" SHAPE
02
03
01
ABC
TH
FA
TH
FA
TH
FA
2
D 2
2
D
2
D
D2
D
2
D2
C
CC
C
C
2
RECEPTION
COUNTER
RETAIL AREA
2 ISSUED FOR APPROVAL -- -- 10/05/2020
1_AV drawings supersede all the FO drawings. For
all the AV equipments their locations and
specification refer to the AV package.
2_New electrical equipment their locations,
specification refer to the electrical package.
3_SCI = Subject to Cost Impact.
4_All partition wall will have an access on the top.
5_Voids (furniture) will be provided with open panel
for inspection.
06-MF-006
05-SN-005
5 X 10 INCH TABLET
CUSTOM LED SCREENS
3
6GF609
2
6GF609
R1800
300
1315
645 645
3300
09-PA-002
R1480
3015
3600
8003002000480320
3900
1025 1550 1025
+05.000
6GF609
5
09-MT-006
05-SN-005
100
09-PA-002
1025 1550 1025
2300
05-SN-005
09-PA-002
3600
2500
06-MF-006 06-MF-006
CUSTOM LED SCREENS
SKIRTING
100
5000
+05.000
±00.000 (FFL)
+04.000
1000
MEP
+02.500
1500
+03.000
2500
6GF609
4
06-MF-006
05-SN-005
±00.000 (FFL)
8501650
2500
+02.500
PROVISION FOR
10 INCH TABLET
09-PA-002
800 2000 800
3600
CUSTOM LED SCREENS
SKIRTING
5000
+05.000
±00.000 (FFL)
+04.000
1000
MEP
+02.500
1500
+03.000
2500
6GF609
4
6GF609
5
LED SCREEN DIGITAL EXPERIENCE
7820
60 700 700 700 700 700 700 700 700 700 700 760
100688405100
5000
+05.000
±00.000 (FFL)
+04.000
1000
MEP
+02.500
+03.000
15002500
1 SCALE 1:50 @ A3
PLAN
2 SCALE 1:50 @ A3
ELEVATION 3 SCALE 1:50 @ A3
SECTION
ZONE 2 - TRANSFER OF KNOWLEDGE
6GF609
6 SCALE 1:50 @ A3
ELEVATION
VARIES
STEEL PLATE FIXATION BOLTS
STAINLESS STEEL
HEX. NUT
STEEL
STRING
POWER CABLE
5 SCALE 1:5 @ A3
DETAIL
10'' TABLET
POWER CABLE
FROM THE CEILING
MDF
4 SCALE 1:5 @ A3
DETAIL
--- IA
---
APD
Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This document
may not, in whole or in part, be reproduced, stored, transmitted or distributed in any
form or by any means, whether electronic, mechanical, by photocopy, recording or
otherwise, without the prior written permission of EX20. Except where otherwise
expressly agreed in writing by EX20, EX20 shall have no responsibility or liability for
any loss (direct, consequential or otherwise) which may arise from reliance on or use
of this document or the information contained therein.
DO NOT SCALE THIS DRAWING.
THEMATIC DISTRICT PAVILIONS
General Notes
Client
Programme Management Consultant
Design Consultant
Project Title
Drawing Title
Approved
Designed Drawn Checked
Model File Ref: Scale A3 (297x420)
Seal Date
Drawing No
Revision No
Project Address
Rev Description Apvr Chk'd Date
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.
Exhibition Contractor
Sub-Contractor
Key Plan
ACCIONA Producciones y Diseño
905, API Trio Commercial Tower,
Al Barsha 1 Novotel Al Barsha Building
Sheikh Zayed Road PO Box 118820
info.apd@acciona.com
www.acciona-apd.com
--- IK
10/05/2020
2---
APD
94001-DWG-IPA0035215-FO-
1 ISSUED FOR APPROVAL -- -- 08/03/2020
2 st. Al-kess Sergious, off merghany st.,
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Building 1A,
Office 401
T +971 4240 0991
www.zaroarchitects.com
info@zaroarchitects.com
EXPO EVENT
U00 / IPA003 / 5215 / GF
RIBA STAGE - 4
YEMEN - SA06-B "L" SHAPE
02
03
01
ABC
TH
FA
TH
FA
TH
FA
2
D 2
2
D
2
D
D2
D
2
D2
C
CC
C
C
2
RECEPTION
COUNTER
RETAIL AREA
2 ISSUED FOR APPROVAL -- -- 10/05/2020
1_AV drawings supersede all the FO drawings. For
all the AV equipments their locations and
specification refer to the AV package.
2_New electrical equipment their locations,
specification refer to the electrical package.
3_SCI = Subject to Cost Impact.
4_All partition wall will have an access on the top.
5_Voids (furniture) will be provided with open panel
for inspection.
22. Tonga pavilion
TABLE
TABLE
09-PV-001
SEATS
06-MF-006
09-PV-002
06-MF-008
09-PV-002
06-MF-008
06-MF-006
09-PV-001
09-PA-017
43'' LCD
±03.000_FFL
±04.000_FFL
±00.000_FFL
±05.000_FFL
43'' LCD
1 SCALE 1:20 @ A3
PLAN
2 SCALE 1:50 @ A3
ELEVATION
6008703530
600
56040
STATIONARY CYLINDER
WITH COMPARTMENTS FOR
DIFFERENT UTENSILS
3 SCALE 1:50 @ A3
DETAIL
CAMERA
A3 PAPERS
SCANNER MACHINE
TRASH
±05.00_FFL
±00.00_FFL
±04.00_FFL
±03.00_FFL
2
6GF607
2 SCALE 1:50 @ A3
ELEVATION
1 SCALE 1:50 @ A3
PLAN 5 SCALE 1:10 @ A3
FAN DETAIL
SWIM WITH DOLPHINS
GRAPHIC
CEILING MOUNTED
FAN
JELLY FISH PAPER LANTERNS
WITH WIRE STRUCTURE
VIDEO
PROJECTOR
CEILING MOUNTED
FAN
JELLY FISH PAPER LANTERNS
SWIM WITH DOLPHINS GRAPHIC
37001300
4000
EXPLORING SECRET
CAVES PROJECTION
3 SCALE 1:20 @ A3
PROTOTYPE-1 SECTION DETAIL
4 SCALE 1:20 @ A3
PROTOTYPE-2 SECTION DETAIL
METAL HOOK
METAL CABLE
WIRE STRUCTURE
PAPER LANTERN WITH
WIRE STRUCTURE
PAPER LANTERN WITH
WIRE STRUCTURE
METAL HOOK
METAL CABLE
390
105
60
35
20
30
55
20 MM METAL ROD
FIXATION SCREWS
3000500001000
1000
OK S
VAR
0
1
DETAILS
1 ISSUED FOR APPROVAL --
DO NOT SCALE THIS DRAWING.
General Notes
Client
Programme Management Consultant
Design Consultant
Drawing Title
Approved
Designed Drawn C
Model File Ref: Scale A3 (297x420)
S
Drawing No
R
Rev Description Apvr C
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the
hazards / risks are listed above.
Exhibition Contractor
Key Plan
OA01-A _TONGA (L-shape)
THEMATIC DISTRICT PAVI
Project Title
Project Address
ACCIONA Produccio
905, API Trio Comme
Al Barsha 1 Novotel
Sheikh Zayed Road P
info.apd@acciona.co
www.acciona-apd.co
EXPO EVENT
U00 / IPA003 / 5430 / GF
RIBA STAGE - 03
---
---
APD
1_AV drawings succeed all the FO drawi
the AV equipments their locations and s
refer to the AV package.
2_New electrical equipment their locatio
specification refer to the electrical packa
3_SCI = Subject to Cost Impact
2 st. Al-kess Sergious, of
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Bu
Office 401
T +971 4240 0991
info@zaroarchitects.com
www.zaroarchitects.com
2350
1150
235
50
645
720
395
CEILING MOUNTED
FAN
710
NYLON
NYLON
±05.00_FFL
±00.00_FFL
±04.00_FFL
±03.00_FFL
E 1:50 @ A3
EVATION
E 1:50 @ A3
AN 5 SCALE 1:10 @ A3
FAN DETAIL
SWIM WITH DOLPHINS
GRAPHIC
CEILING MOUNTED
FAN
JELLY FISH PAPER LANTERNS
WITH WIRE STRUCTURE
VIDEO
PROJECTOR
CEILING MOUNTED
FAN
ELLY FISH PAPER LANTERNS
SWIM WITH DOLPHINS GRAPHIC
37001300
4000
EXPLORING SECRET
CAVES PROJECTION
3 SCALE 1:20 @ A3
PROTOTYPE-1 SECTION DETAIL
4 SCALE 1:20 @ A3
PROTOTYPE-2 SECTION DETAIL
METAL HOOK
METAL CABLE
WIRE STRUCTURE
PAPER LANTERN WITH
WIRE STRUCTURE
PAPER LANTERN WITH
WIRE STRUCTURE
METAL HOOK
METAL CABLE
390
105
60
35
20
30
55
20 MM METAL ROD
FIXATION SCREWS
1000
OK SD
VAR
09/03/2020
1
DETAILS
1 ISSUED FOR APPROVAL -- -- 09/03/2020
Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This document
may not, in whole or in part, be reproduced, stored, transmitted or distributed in any
form or by any means, whether electronic, mechanical, by photocopy, recording or
otherwise, without the prior written permission of EX20. Except where otherwise
expressly agreed in writing by EX20, EX20 shall have no responsibility or liability for
any loss (direct, consequential or otherwise) which may arise from reliance on or use
of this document or the information contained therein.
DO NOT SCALE THIS DRAWING.
General Notes
Client
Programme Management Consultant
Design Consultant
Drawing Title
Approved
Designed Drawn Checked
Model File Ref: Scale A3 (297x420)
Seal Date
Drawing No
Revision No
Rev Description Apvr Chk'd Date
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.
Exhibition Contractor
Key Plan
OA01-A _TONGA (L-shape)
THEMATIC DISTRICT PAVILIONS
Project Title
Project Address
ACCIONA Producciones y Diseño
905, API Trio Commercial Tower,
Al Barsha 1 Novotel Al Barsha Building
Sheikh Zayed Road PO Box 118820
info.apd@acciona.com
www.acciona-apd.com
EXPO EVENT
U00 / IPA003 / 5430 / GF
RIBA STAGE - 03
---
---
APD
1_AV drawings succeed all the FO drawings. For all
the AV equipments their locations and specification
refer to the AV package.
2_New electrical equipment their locations,
specification refer to the electrical package.
3_SCI = Subject to Cost Impact
2 st. Al-kess Sergious, off merghany st.,
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Building 1A,
Office 401
T +971 4240 0991
info@zaroarchitects.com
www.zaroarchitects.com
2350
1150
235
50
645
720
395
CEILING MOUNTED
FAN
710
NYLON
NYLON
23. tanzania pavilion 200
1475
200
1775
+05.000
±00.000 (FFL)
+04.000
1000
MEP
1000
+03.000
5000
3000
2000
935
570
R1705
R580
535535
1075
6GF604
4
SHADOW GAP
10
+00.000 FFL
05-SN-005
06-MF-001
AC-VR-004
AC-PA-003
AC-TX-101
AC-PA-005
AC-PR-027
200
1475
200
R1705
R580
535535
1075
200
1475
200
R1705
R580
535535
1075
200 1475 200 1475 1475200 1475200
3
6GF604
2
6GF604
4
6GF604
05-SN-005
06-MF-001
AC-VR-004
AC-TX-101
AC-PA-003
AC-PA-005
AC-PR-027
200
150
170
CONCEALED P
THAT HIDE ME
PLAYER
WITH HOLES F
JACKS
AND POWER
BASKET
50
1832
HOLES
FOR JACKS
HOLE
FOR POWER
10
SHADOW
GAP
6GF604
5
+05.000
±00.000 (FFL)
+04.000
1000
MEP
1000
+03.000
5000
3000
1 SCALE 1:40@ A3
PLAN
2 SCALE 1:40 @ A3
ELEVATION
3 SCALE 1:40 @ A3
SECTION
MOCK UP IMAGE AVAILA
+03.000
+05.000
1000
MEP
FFL ±00.000
10003000
+04.000
+00.900
+00.500
DRIVE
13120
VIDEO
PROJECTION
1300
975
1200
1220 1220
12001000800
OPENABLE PANEL
OPENABLE PANEL1005
SHADOW GAP 10MM
ACCESS PANEL
ACCESS PANEL
AC-PA-003
06-MF-001
4
6GF613
6
6GF613
ZONE 04
DRIVE
PEOPLE IMAGE
1220
840
1005
1995
1005
AC-PA-003
06-MF-001
3
6GF613
2
6GF613
5
6GF613
7
6GF613
3000
1200
ACCESS PANEL
4
6GF613
900900
6
6GF613
HINGEHANDLE
MDF
CLIP
FRAME
SHUTTER
5mm CLEARANCE
FOR SEALANT & BACK UP ROD
5mm CLEARANCE
FOR SEALANT & BACK UP ROD
FRAME
WEATHERSTRIP
WEATHERSTRIP
OUTSIDE
ACCESS PANEL
PRINTED GRAPHIC
ON VINYL STICKER
LIGHTS
MDF
DRAWER
SOFT CLOSING
RAILS
200
170
32
18
HOLES
FOR JACKS
100200
WOODEN STAND
FOR HEAD PHONE
FIXED WITH SCREWS
CONCEALED POCKET
THAT HIDE MEDIA PLAYER
WITH HOLES FOR JACKS
AND POWER
HOLES
FOR JACKS
HOLE
FOR POWER
10mm FROSTED
ACRYLIC ROD
WITH ROUND
METAL STOPPER
300
20
Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This document
may not, in whole or in part, be reproduced, stored, transmitted or distributed in any
form or by any means, whether electronic, mechanical, by photocopy, recording or
otherwise, without the prior written permission of EX20. Except where otherwise
expressly agreed in writing by EX20, EX20 shall have no responsibility or liability for
any loss (direct, consequential or otherwise) which may arise from reliance on or use
of this document or the information contained therein.
DO NOT SCALE THIS DRAWING.
THEMATIC DISTRICT PAVILIONS
General Notes
Client
Programme Management Consultant
Design Consultant
Project Title
Drawing Title
Approved
Designed Drawn Checked
Model File Ref: Scale A3 (297x420)
Seal Date
Drawing No
Revision No
Project Address
Rev Description Apvr Chk'd Date
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.
Exhibition Contractor
Key Plan
ACCIONA Producciones y Diseño
905, API Trio Commercial Tower,
Al Barsha 1 Novotel Al Barsha Building
Sheikh Zayed Road PO Box 118820
info.apd@acciona.com
www.acciona-apd.com
Sub-Consultant
2 st. Al-kess Sergious, off merghany st.,
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Building 1A,
Office 401
T +971 4240 0991
info@zaroarchitects.com
www.zaroarchitects.com
---
---
APD
1 ISSUED FOR APPROVAL -- -- 13/02/2020
EXPO EVENT
U00 / IPA003/5612 / GF
RIBA STAGE - 04
MA12-A_TANZANIA (L - shape)
02 0301
A
B
C
ENTRY
EXIT
ZONE 02
WALK
ZONE 01
FLY
ZONE 04
DRIVE
BIG 5
ZONE 03
RIDE
1_AV drawings supersede all the FO drawings. For
all the AV equipments their locations and
specification refer to the AV package.
2_New electrical equipment their locations,
specification refer to the electrical package.
3_SCI = Subject to Cost Impact.
4_All partition wall will have an access on the top.
5_Voids (furniture) will be provided with open panel
for inspection.
2 ISSUED FOR APPROVAL -- -- 10/05/2020
IA IK
10/05/2020
2VARIES
ZONE 4 - PEOPLE IMAGES
WALL DETAILS
94001-DWG-IPA0035612-FO-6GF613
2 SCALE 1:50@ A3
ELEVATION
1 SCALE 1:50 @ A3
PLAN
3 SCALE 1:50 @ A3
SECTION
4 SCALE 1:10 @ A3
DETAIL
5 SCALE 0:00 @ A3
DETAIL
6 SCALE 1:10 @ A3
DETAIL
7 SCALE 1:10 @ A3
DETAIL
1390460
1590
1230
600
1885
1275
1410
560
3000
3785
420
1080
935
905
R180
R2
05
R200
R195
R180
R2
10
R200
R20
0
R2
00
R200
R2
60
R1
00
R1
00
R100
R100
R100
R100
R100
R100
R100
R100
R2
00
±00.000 (FFL)
R20
0
R2
00
R200
R200
R1
00
R100
R100
R100
R1
00
VINYL STICKER FIX ON
MILKY ACRYLIC THE WALL
LED BACKLIGHT: COOL
WHITE 6000K
VINYL CUTOUT
LETTERS
+ 0.00
- 0.20
- 0.20
- 0.20
- 0.20
- 0.20
- 0.20
AC-PA-004
06-MF-001
05-SN-005 3
6GF611
4
6GF611
+05.000
±00.000 (FFL)
+04.000
1000
MEP
1000
+03.000
5000
3000
515
550
780
650
815
1155
1305
3785
100
3
6GF611
2
6GF611
10-PF-100
LIGHT BOX
06-MF-001
05-SN-005
AC-PA-004
±00.000 (FFL)
100
20
LED LIGHT
LIGHT BOX
VINYL CUTOUT
LETTERS
4
6GF611
+05.000
±00.000 (FFL)
+04.000
1000
MEP
1000
+03.000
5000
3000
6451400485
LED BACKLIGHT
LIGHT BOX
05-SN-005 - frame support
MDF
AC-PA-004 - Washable
acrylic-based painting system
Pantone 715 CP Satin
VINYL STICKER FIX ON
MILKY ACRYLIC THE
WALL
1 SCALE 1:30@ A3
PLAN
2 SCALE 1:30 @ A3
ELEVATION
3 SCALE 1:30 @ A3
SECTION
VARIES
ZONE 3 - TOURISM IN
TANZANIA
94001-DWG-IPA0035612-FO-6GF611
4 SCALE 1:5 @ A3
DETAIL
DO NOT SCALE THIS DRAWING.
THEMATIC DISTRICT PAVILIONS
General Notes
Client
Programme Management Consultant
Design Consultant
Project Title
Drawing Title
Approved
Designed Drawn Checked
Model File Ref: Scale A3 (297x420)
Seal Date
Drawing No
Revision No
Project Address
Rev Description Apvr Chk'd Date
No Description
SAFETY, HEALTH AND ENVIRONMENT INFORMATION
Brief details on the identified hazard symbol referencing the unusual residual
hazards / risks are listed above.
Exhibition Contractor
Key Plan
ACCIONA Producciones y Diseño
905, API Trio Commercial Tower,
Al Barsha 1 Novotel Al Barsha Building
Sheikh Zayed Road PO Box 118820
info.apd@acciona.com
www.acciona-apd.com
Sub-Consultant
2 st. Al-kess Sergious, off merghany st.,
Heliopolis, Cairo, Egypt
T +2(02)2 418 3516
Dubai Design District, Building 1A,
Office 401
T +971 4240 0991
info@zaroarchitects.com
www.zaroarchitects.com
---
---
APD
1 ISSUED FOR APPROVAL -- -- 13/02/2020
EXPO EVENT
U00 / IPA003/5612 / GF
RIBA STAGE - 04
MA12-A_TANZANIA (L - shape)
02 0301
A
B
C
ENTRY
EXIT
ZONE 02
WALK
ZONE 01
FLY
ZONE 04
DRIVE
BIG 5
ZONE 03
RIDE
1_AV drawings supersede all the FO drawings. For
all the AV equipments their locations and
specification refer to the AV package.
2_New electrical equipment their locations,
specification refer to the electrical package.
3_SCI = Subject to Cost Impact.
4_All partition wall will have an access on the top.
5_Voids (furniture) will be provided with open panel
for inspection.
2 ISSUED FOR APPROVAL -- -- 10/05/2020
IA IK
10/05/2020
2