PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP QnA
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
PMP certified project managers
command 25% more salaries than their peers
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
Project Management Professional® (PMP) Certification
Globally acknowledged professional certification
program in Project Management
Legalizes a professional’s education and
experience in Project Management
PMP certified project managers
command 25% more salaries than their peers
PMP Certificate is very prestigious and is
considered to be the golden standard of Project Management
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Job Opportunities
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PM Role wise Salaries
35k 70k 105k 140k0
Director of PM/PMO
Portfolio Manager
Program Manager
Project Management Consultant
Project Manager III
Project Manager II
Project Manager I
Project Management Specialist
Copyright © 2018, edureka and/or its affiliates. All rights reserved.
Questions & Answers
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Define Project Scope.
It is the design of experiments that is used to complete the project work.
It is the combination of the cost and the schedule which is required to complete the project work.
It is the description of the required work that is necessary to complete the project.
It is the description of the required work and resources that are needed to complete the project.
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Define Project Scope.
It is the design of experiments that is used to complete the project work.
It is the combination of the cost and the schedule which is required to complete the project work.
It is the description of the required work that is necessary to complete the project.
It is the description of the required work and resources that are needed to complete the project.
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
What is a Program?
A very large and complex project
A collection of projects which have common resources
A collection of sub-projects having a common goal
A collection of subprojects having a common customer
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
What is a Program?
A very large and complex project
A collection of projects which have common resources
A collection of sub-projects having a common goal
A collection of subprojects having a common customer
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Which of the following comprises the Project Life Cycle?
Phases
Milestones
Estimates
Activities
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Which of the following comprises the Project Life Cycle?
Phases
Milestones
Estimates
Activities
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Being the project manager of the ABC Project , you have allowed subsequent project phase to
begin even before the predecessor phase completes. Which of the following relates to this
scenario?
Crashing
Fast tracking
Risk management
Tandem scheduling
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Being the project manager of the ABC Project , you have allowed subsequent project phase to
begin even before the predecessor phase completes. Which of the following relates to this
scenario?
Crashing
Fast tracking
Risk management
Tandem scheduling
Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Project Manager
Senior Management
Sponsor
Client
The person or group providing the resources and support for the project, program or portfolio
and is also responsible for enabling success is called the:Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Project Manager
Senior Management
Sponsor
Client
The person or group providing the resources and support for the project, program or portfolio
and is also responsible for enabling success is called the:Q.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Vendor Bid Analysis
Brainstorming
Affinity Diagram
Nominal Group Technique
Which of the following cannot be the part of Group creativity techniques:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Vendor Bid Analysis
Brainstorming
Affinity Diagram
Nominal Group Technique
Which of the following cannot be the part of Group creativity techniques:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Analogous Estimating
Parametric Estimating
Historical Estimating
Expert Judgement
Being the project manager of a thermal power plant project you need to manage the construction
of an administrative unit building. Which of the following technique will you use to quickly
estimate and decide the use of historic estimate and expert judgement.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Analogous Estimating
Parametric Estimating
Historical Estimating
Expert Judgement
Being the project manager of a thermal power plant project you need to manage the construction
of an administrative unit building. Which of the following technique will you use to quickly
estimate and decide the use of historic estimate and expert judgement.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Level of Accuracy
Units of Measure
Level of Precision
Cost Management Plan
What is the acceptable range used for determining the realistic activity cost estimates?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Level of Accuracy
Units of Measure
Level of Precision
Cost Management Plan
What is the acceptable range used for determining the realistic activity cost estimates?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
0.73
1.2
0.8
1
What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
0.73
1.2
0.8
1
What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Plan Cost Management
Estimate Costs
Determine Budget
Control costs
Cost baseline is the output of which of the following?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Plan Cost Management
Estimate Costs
Determine Budget
Control costs
Cost baseline is the output of which of the following?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Organize meetings to resolve misunderstanding and agree on a common solution
Defer the decision to procure turbine components as much as possible
Copy the design of turbine from a similar past project
Procure the turbine parts from the nearest located vendor
Suppose you are the project manager on a thermal power plant project. How will you manage
your team members, if there is a difference in opinion over the design of turbine?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Organize meetings to resolve misunderstanding and agree on a common solution
Defer the decision to procure turbine components as much as possible
Copy the design of turbine from a similar past project
Procure the turbine parts from the nearest located vendor
Suppose you are the project manager on a thermal power plant project. How will you manage
your team members, if there is a difference in opinion over the design of turbine?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Using variance analysis
Using Sensitivity analysis
Using PERT formula
Using Performance Reports
You find that an activity in your project is very risky. How will you estimate the duration for this
activity when your team member has given the optimistic, most likely and pessimistic duration for
the activity?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Using variance analysis
Using Sensitivity analysis
Using PERT formula
Using Performance Reports
You find that an activity in your project is very risky. How will you estimate the duration for this
activity when your team member has given the optimistic, most likely and pessimistic duration for
the activity?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Employees seek to be directed
Employees avoid work
Employees are self-centered
Employees are self-motivated
Which among the following is not valid according to McGreger's Theory X?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Employees seek to be directed
Employees avoid work
Employees are self-centered
Employees are self-motivated
Which among the following is not valid according to McGreger's Theory X?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Retainage
FPEPA
Cost Reimbursable contract
Letter of Intent
You are the project manager on a software development project. Your CPI drops to 0.93 when one
of your key developers suddenly falls ill. To make up for your effected work, you have decided to
outsource it to a vendor. What will be the most appropriate contract type in this case:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Retainage
FPEPA
Cost Reimbursable contract
Letter of Intent
You are the project manager on a software development project. Your CPI drops to 0.93 when one
of your key developers suddenly falls ill. To make up for your effected work, you have decided to
outsource it to a vendor. What will be the most appropriate contract type in this case:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Maslow
Ouchi
McGregor
Herzberg
Who among the following said, “People will be interested in their safety needs only after their
physiological needs have been fulfilled.”:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Maslow
Ouchi
McGregor
Herzberg
Who among the following said, “People will be interested in their safety needs only after their
physiological needs have been fulfilled.”:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Project Resources
Project Schedule
Project Scope
Project Risks
WBS is an excellent and most effective tool that is used for tracking of:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Project Resources
Project Schedule
Project Scope
Project Risks
WBS is an excellent and most effective tool that is used for tracking of:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Matrix Organization
Functional Organization
The best project organization structure for a small but highly technical project will be:
Mixed Organization
Projectized Organization
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Matrix Organization
Functional Organization
Mixed Organization
Projectized Organization
The best project organization structure for a small but highly technical project will be:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Work breakdown structure
Staffing Plan
Cohabitation
Colocation
Being a project manager is you need to manage a project where there will be a number of persons
working together. If you want to enhance the ability of the team to work together and perform as
a team which one of the following things you need to do to maximize the ability of the team?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Work breakdown structure
Staffing Plan
Cohabitation
Colocation
Being a project manager is you need to manage a project where there will be a number of persons
working together. If you want to enhance the ability of the team to work together and perform as
a team which one of the following things you need to do to maximize the ability of the team?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Assessing the impact of the change on Project objectives
Defining requirements for the customer
Doing performance appraisal for team members involved in implementing changes
Encouraging team members to raise more change requests
What is the role of the change control board?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Assessing the impact of the change on Project objectives
Defining requirements for the customer
Doing performance appraisal for team members involved in implementing changes
Encouraging team members to raise more change requests
What is the role of the change control board?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
CPFF
FFP
CPPC
T&M
Being the project manager on a STP project, you decide to respond to an identified risk by
contracting out work. Which of the following will lead to the minimum risk of buyer?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
CPFF
FFP
CPPC
T&M
Being the project manager on a STP project, you decide to respond to an identified risk by
contracting out work. Which of the following will lead to the minimum risk of buyer?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Identify Stakeholders
Manage Stakeholder Engagement
Control Stakeholder Engagement
Plan Stakeholder management
For which process the stakeholder’s engagement assessment matrix is prepared as a part?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Identify Stakeholders
Manage Stakeholder Engagement
Control Stakeholder Engagement
Plan Stakeholder management
For which process the stakeholder’s engagement assessment matrix is prepared as a part?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Verbal, Nonverbal and Written
Sender, receiver and message
Text, drawing and picture
Manager, worker and instructions
Being a project manager you need to spend a significant amount of time in communications.
Which of the following option contains the three basic elements of a communications mode?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Verbal, Nonverbal and Written
Sender, receiver and message
Text, drawing and picture
Manager, worker and instructions
Being a project manager you need to spend a significant amount of time in communications.
Which of the following option contains the three basic elements of a communications mode?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Find the root cause of the disagreement
Resolve the conflict in favor of the senior most technical expert
Hire an external consultant to enforce his decision
Remove this technical work from the scope of project work
Suppose you are assigned as the project manager of a 30 months project which is in the executing
phase. What will be the best way to resolve a conflict among the technical experts in your team?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Find the root cause of the disagreement
Resolve the conflict in favor of the senior most technical expert
Hire an external consultant to enforce his decision
Remove this technical work from the scope of project work
Suppose you are assigned as the project manager of a 30 months project which is in the executing
phase. What will be the best way to resolve a conflict among the technical experts in your team?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Effect of adding resources on project end date
Effect of adding resources on S curve
Effect of adding resources on RAM
Effect of adding resources on Cost and Schedule
What should be your primary concern while adding resources to your project?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Effect of adding resources on project end date
Effect of adding resources on S curve
Effect of adding resources on RAM
Effect of adding resources on Cost and Schedule
What should be your primary concern while adding resources to your project?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Units of measure
Level of Precision
Level of accuracy
Control Thresholds
If John is working with his team to decide the degree to which cost estimates should be rounded
up or down, then he is working to establish which of the following:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Units of measure
Level of Precision
Level of accuracy
Control Thresholds
If John is working with his team to decide the degree to which cost estimates should be rounded
up or down, then he is working to establish which of the following:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Keep Satisfied
Keep Informed
Manage Closely
Monitor
Being a Project Manager, how will you deal with a stakeholder who has high power and high
interest?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Keep Satisfied
Keep Informed
Manage Closely
Monitor
Being a Project Manager, how will you deal with a stakeholder who has high power and high
interest?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Lack of Quality Policy
Lack of Communications management plan
Internet connection not reliable
Lack of Historical Information
While estimating the cost of work in a very new technology, being a project manager which of the
following will concern you the most?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Lack of Quality Policy
Lack of Communications management plan
Internet connection not reliable
Lack of Historical Information
While estimating the cost of work in a very new technology, being a project manager which of the
following will concern you the most?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$4,000
$2,000
$8,000
$6,000
A road project was planned to be completed in 8 months. Calculate the SV when the earned value
information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$4,000
$2,000
$8,000
$6,000
A road project was planned to be completed in 8 months. Calculate the SV when the earned value
information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
($200)
$200
($600)
$600
What will be incentive amount for a contractor, who is working on a cost plus incentive fee
contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the
maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
($200)
$200
($600)
$600
What will be incentive amount for a contractor, who is working on a cost plus incentive fee
contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the
maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Activities
Interrelationship
Time
Activities assigned to
Which of the following a resource histogram shows but a responsibility assignment matrix does
not?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Activities
Interrelationship
Time
Activities assigned to
Which of the following a resource histogram shows but a responsibility assignment matrix does
not?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sensitivity Diagram
Data Flow Diagram
Decision Tree
Tornado Diagram
Which of the following is used to display sensitivity analysis?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sensitivity Diagram
Data Flow Diagram
Decision Tree
Tornado Diagram
Which of the following is used to display sensitivity analysis?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
SV = $3750
CV = $4000
TCPI = 0.8
The project is likely need more money than planned to complete
If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
SV = $3750
CV = $4000
TCPI = 0.8
The project is likely need more money than planned to complete
If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Initiating, designing, planning, executing, controlling, and closing
Designing, developing, testing, and implementing
Initiating, planning, executing, monitoring and controlling, and closing
Initiating, planning, executing, monitoring, and closing
According to PMBOK, project management processes are organized into which of the following
order of process groups?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Initiating, designing, planning, executing, controlling, and closing
Designing, developing, testing, and implementing
Initiating, planning, executing, monitoring and controlling, and closing
Initiating, planning, executing, monitoring, and closing
According to PMBOK, project management processes are organized into which of the following
order of process groups?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
The project manager should try to remove negative float by crashing or fast tracking
There cannot be any negative float in the project
The project manager should try to remove negative float by reducing scope
It is desirable to have negative float in the project
Which of the following statements is true regarding negative float?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
The project manager should try to remove negative float by crashing or fast tracking
There cannot be any negative float in the project
The project manager should try to remove negative float by reducing scope
It is desirable to have negative float in the project
Which of the following statements is true regarding negative float?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Deliverables List
Test Plan
Acceptance Criteria
Punch List
Which of the following represents a set of conditions that should be satisfied before deliverables
are accepted?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Deliverables List
Test Plan
Acceptance Criteria
Punch List
Which of the following represents a set of conditions that should be satisfied before deliverables
are accepted?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Understand the trend of deviations
Prioritization
Complete all activities on time
Identify root causes
How will a Pareto Chart will help in a project with lot of identified action items?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Understand the trend of deviations
Prioritization
Complete all activities on time
Identify root causes
How will a Pareto Chart will help in a project with lot of identified action items?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Start-to-Start
Start-to-Finish
Finish-to-Finish
Finish-to-Start
The activity relationship between the start of cleaning and the start of digging is represented by
which of the following?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Start-to-Start
Start-to-Finish
Finish-to-Finish
Finish-to-Start
The activity relationship between the start of cleaning and the start of digging is represented by
which of the following?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
This always affects the CV
This never affects the CV
A negative value means that the project will likely be delayed
A positive value means that the project will likely be delayed
Schedule Variance is:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
This always affects the CV
This never affects the CV
A negative value means that the project will likely be delayed
A positive value means that the project will likely be delayed
Schedule Variance is:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
High Power - Low Interest
High Power - High Interest
Low Power - Low Interest
Low Power - High Interest
You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for
moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders
of your project. Based on the Power/Interest Grid that you have created, which of the following types of
stakeholders' expectation should be managed closely?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
High Power - Low Interest
High Power - High Interest
Low Power - Low Interest
Low Power - High Interest
You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for
moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders
of your project. Based on the Power/Interest Grid that you have created, which of the following types of
stakeholders' expectation should be managed closely?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
ISO 9000
Quality planning
Quality control
Quality policy
What is the company-wide policy which mandates all project quality known as?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
ISO 9000
Quality planning
Quality control
Quality policy
What is the company-wide policy which mandates all project quality known as?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Standards are optional but regulations are not
Standards are mandatory but regulations are not
Regulations are mandatory but standards may be seen as guidelines
Regulations and Standards are essentially the same
Which one of the following describes the difference between a Standard and a Deviation
accurately?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Standards are optional but regulations are not
Standards are mandatory but regulations are not
Regulations are mandatory but standards may be seen as guidelines
Regulations and Standards are essentially the same
Which one of the following describes the difference between a Standard and a Deviation
accurately?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$1,000,000.00
$1,012,660.00
$1,582,281.00
None of the above
What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
$1,000,000.00
$1,012,660.00
$1,582,281.00
None of the above
What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Manual Forecasting of cost of remaining work
BAC - AC
EAC - AC
(BAC EV) / CPI
The BEST way of making an accurate forecasting of ETC is:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Manual Forecasting of cost of remaining work
BAC - AC
EAC - AC
(BAC EV) / CPI
The BEST way of making an accurate forecasting of ETC is:
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
There are no defects
Project Manager should move to the next process as everything is ok
The process is out of control
The process is in control
How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and
control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control
line?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
There are no defects
Project Manager should move to the next process as everything is ok
The process is out of control
The process is in control
How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and
control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control
line?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Control Charts
Cause and Effect Diagram
Run Chart
Pareto Chart
Which of the following can be used for Trend Analysis?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Control Charts
Cause and Effect Diagram
Run Chart
Pareto Chart
Which of the following can be used for Trend Analysis?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Theory X and Theory Y
Theory Z
Contingency Theory
Expectancy Theory
In which of theory, Douglas McGregor has defined two models of worker behaviour?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Theory X and Theory Y
Theory Z
Contingency Theory
Expectancy Theory
In which of theory, Douglas McGregor has defined two models of worker behaviour?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Interest, influence and involvement
Interest, influence and impact
Interest, influence and importance
Importance, inquiry and influence
What are the three 'I's' of stakeholders?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Interest, Influence and Involvement
Interest, Influence and Impact
Interest, Influence and Importance
Importance, Inquiry and Influence
What are the three 'I's' of stakeholders?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
To make sure that all questions from potential sellers are answered privately
To make sure that potential sellers are treated as per the type of questions asked
To make sure that all potential sellers are treated equally and have access to the same information
To ensure that all parties get answers to their questions
Which of the following is the objective of conducting Bidder Conferences?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
To make sure that all questions from potential sellers are answered privately
To make sure that potential sellers are treated as per the type of questions asked
To make sure that all potential sellers are treated equally and have access to the same information
To ensure that all parties get answers to their questions
Which of the following is the objective of conducting Bidder Conferences?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Kanban
Kaizen
Deming Cycle
PDCA
What is the Japanese method of modern quality management called, which relies on continuing
small improvements involving everyone from the top management to the lowest level worker in
the organization?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Kanban
Kaizen
Deming Cycle
PDCA
What is the Japanese method of modern quality management called, which relies on continuing
small improvements involving everyone from the top management to the lowest level worker in
the organization?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sense of personal achievement, work satisfaction
Plush office space, performance-based salary raise
Work satisfaction, fringe benefit
Vacation time, assignment of a personal staff assistant
Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the
following are the examples of satisfiers then?
PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp
PMP Questions & Answers
Q.
Sense of personal achievement, work satisfaction
Plush office space, performance-based salary raise
Work satisfaction, fringe benefit
Vacation time, assignment of a personal staff assistant
Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the
following are the examples of satisfiers then?

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptxPMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptxAmjadAlk
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...Edureka!
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionMnbianchi
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP) Ahmad Maharma, PMP,RMP
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionJohn Khateeb
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaEdureka!
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)Anand Bobade
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMOBusiness Beam
 

Was ist angesagt? (20)

PMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptxPMP Exam Prep Module 1.pptx
PMP Exam Prep Module 1.pptx
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
Pmbok6 to 7 transformation
Pmbok6 to 7 transformationPmbok6 to 7 transformation
Pmbok6 to 7 transformation
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
PMBOK® Guide Sixth Edition | Project Management Certification | PMP® Certific...
 
Instructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th EditionInstructor Slides - PMP/CAPM PMBOK 6th Edition
Instructor Slides - PMP/CAPM PMBOK 6th Edition
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
 
1. project integration management
1. project integration management1. project integration management
1. project integration management
 
Pmp handbook
Pmp handbookPmp handbook
Pmp handbook
 
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th EditionProject Management Professional PMI-PMP Based on PMBOK 6th Edition
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
 
The PMO journey
The PMO journeyThe PMO journey
The PMO journey
 
Project Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | EdurekaProject Time Management | Project Schedule Management | Edureka
Project Time Management | Project Schedule Management | Edureka
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
PMBOK PROCESS FLOW.pdf
PMBOK PROCESS FLOW.pdfPMBOK PROCESS FLOW.pdf
PMBOK PROCESS FLOW.pdf
 
1_PMI-RMP_Project Risk Management Plan
1_PMI-RMP_Project Risk Management Plan1_PMI-RMP_Project Risk Management Plan
1_PMI-RMP_Project Risk Management Plan
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
Establishing an Effective PMO
Establishing an Effective PMOEstablishing an Effective PMO
Establishing an Effective PMO
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 

Ähnlich wie PMP Certification Exam Training Guide

Path to PMP!
Path to PMP!Path to PMP!
Path to PMP!Edureka!
 
Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...Edureka!
 
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...Edureka!
 
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...Edureka!
 
PMP Exam Preparation Workshop
PMP Exam Preparation WorkshopPMP Exam Preparation Workshop
PMP Exam Preparation WorkshopCeltem Learning
 
I pass4sures pmp certification
I pass4sures pmp certificationI pass4sures pmp certification
I pass4sures pmp certificationadam_jhon
 
PMBOK® Guide Edition 5 vs 6 | Edureka
PMBOK® Guide Edition 5 vs 6 | EdurekaPMBOK® Guide Edition 5 vs 6 | Edureka
PMBOK® Guide Edition 5 vs 6 | EdurekaEdureka!
 
Session 7 Everything You Should Know About PMP & CAPM Certifications
Session 7 Everything You Should Know About PMP & CAPM CertificationsSession 7 Everything You Should Know About PMP & CAPM Certifications
Session 7 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
PMP Practice Tests
PMP Practice TestsPMP Practice Tests
PMP Practice TestsGanesh P
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaEdureka!
 
Session 2 Everything You Should Know About PMP & CAPM Certifications
Session 2 Everything You Should Know About PMP & CAPM CertificationsSession 2 Everything You Should Know About PMP & CAPM Certifications
Session 2 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
PMP Certification Training in Cologne
PMP Certification Training in ColognePMP Certification Training in Cologne
PMP Certification Training in Cologneunichroneltd
 
PMP Certification Training in Szczecin
PMP Certification Training in SzczecinPMP Certification Training in Szczecin
PMP Certification Training in Szczecinunichroneltd
 
PMP Certification Training in Lille
 PMP Certification Training in Lille PMP Certification Training in Lille
PMP Certification Training in Lilleunichroneltd
 
PMP Certification Training in Milan
PMP Certification Training in MilanPMP Certification Training in Milan
PMP Certification Training in Milanunichroneltd
 
PMP Certification Training in Malmo
 PMP Certification Training in Malmo PMP Certification Training in Malmo
PMP Certification Training in Malmounichroneltd
 
PMP Certification Training in Rotterdam
 PMP Certification Training in Rotterdam PMP Certification Training in Rotterdam
PMP Certification Training in Rotterdamunichroneltd
 
PMP Certification Training in Heraklion
PMP Certification Training in HeraklionPMP Certification Training in Heraklion
PMP Certification Training in Heraklionunichroneltd
 

Ähnlich wie PMP Certification Exam Training Guide (20)

Path to PMP!
Path to PMP!Path to PMP!
Path to PMP!
 
Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...Project Scope Management | Project Management Tutorial | PMP® Certification T...
Project Scope Management | Project Management Tutorial | PMP® Certification T...
 
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...
PMP® Certification | PMP® Certification Exam Preparation | PMP® Training Vide...
 
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
Top 30 Project Manager Interview Questions and Answers | PMP Certification Tr...
 
PMP Exam Preparation Workshop
PMP Exam Preparation WorkshopPMP Exam Preparation Workshop
PMP Exam Preparation Workshop
 
I pass4sures pmp certification
I pass4sures pmp certificationI pass4sures pmp certification
I pass4sures pmp certification
 
PMBOK® Guide Edition 5 vs 6 | Edureka
PMBOK® Guide Edition 5 vs 6 | EdurekaPMBOK® Guide Edition 5 vs 6 | Edureka
PMBOK® Guide Edition 5 vs 6 | Edureka
 
Session 7 Everything You Should Know About PMP & CAPM Certifications
Session 7 Everything You Should Know About PMP & CAPM CertificationsSession 7 Everything You Should Know About PMP & CAPM Certifications
Session 7 Everything You Should Know About PMP & CAPM Certifications
 
PMP Certification - An Overview 2021
PMP Certification - An Overview 2021PMP Certification - An Overview 2021
PMP Certification - An Overview 2021
 
PMP Practice Tests
PMP Practice TestsPMP Practice Tests
PMP Practice Tests
 
Project Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | EdurekaProject Quality Management | Project Quality Control | Edureka
Project Quality Management | Project Quality Control | Edureka
 
Session 2 Everything You Should Know About PMP & CAPM Certifications
Session 2 Everything You Should Know About PMP & CAPM CertificationsSession 2 Everything You Should Know About PMP & CAPM Certifications
Session 2 Everything You Should Know About PMP & CAPM Certifications
 
About the PMP Credential
About the PMP CredentialAbout the PMP Credential
About the PMP Credential
 
PMP Certification Training in Cologne
PMP Certification Training in ColognePMP Certification Training in Cologne
PMP Certification Training in Cologne
 
PMP Certification Training in Szczecin
PMP Certification Training in SzczecinPMP Certification Training in Szczecin
PMP Certification Training in Szczecin
 
PMP Certification Training in Lille
 PMP Certification Training in Lille PMP Certification Training in Lille
PMP Certification Training in Lille
 
PMP Certification Training in Milan
PMP Certification Training in MilanPMP Certification Training in Milan
PMP Certification Training in Milan
 
PMP Certification Training in Malmo
 PMP Certification Training in Malmo PMP Certification Training in Malmo
PMP Certification Training in Malmo
 
PMP Certification Training in Rotterdam
 PMP Certification Training in Rotterdam PMP Certification Training in Rotterdam
PMP Certification Training in Rotterdam
 
PMP Certification Training in Heraklion
PMP Certification Training in HeraklionPMP Certification Training in Heraklion
PMP Certification Training in Heraklion
 

Mehr von Edureka!

What to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaWhat to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaEdureka!
 
Top 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaTop 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaEdureka!
 
Top 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaTop 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaEdureka!
 
Tableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaTableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaEdureka!
 
Python Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaPython Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaEdureka!
 
Top 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaTop 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaEdureka!
 
Top Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaTop Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaEdureka!
 
Linux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaLinux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaEdureka!
 
How to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaHow to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaEdureka!
 
Importance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaImportance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaEdureka!
 
RPA in 2020 | Edureka
RPA in 2020 | EdurekaRPA in 2020 | Edureka
RPA in 2020 | EdurekaEdureka!
 
Email Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEmail Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEdureka!
 
EA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEdureka!
 
Cognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaCognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaEdureka!
 
AWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaAWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaEdureka!
 
Blue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaBlue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaEdureka!
 
Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Edureka!
 
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaA star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaEdureka!
 
Kubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaKubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaEdureka!
 
Introduction to DevOps | Edureka
Introduction to DevOps | EdurekaIntroduction to DevOps | Edureka
Introduction to DevOps | EdurekaEdureka!
 

Mehr von Edureka! (20)

What to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | EdurekaWhat to learn during the 21 days Lockdown | Edureka
What to learn during the 21 days Lockdown | Edureka
 
Top 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | EdurekaTop 10 Dying Programming Languages in 2020 | Edureka
Top 10 Dying Programming Languages in 2020 | Edureka
 
Top 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | EdurekaTop 5 Trending Business Intelligence Tools | Edureka
Top 5 Trending Business Intelligence Tools | Edureka
 
Tableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | EdurekaTableau Tutorial for Data Science | Edureka
Tableau Tutorial for Data Science | Edureka
 
Python Programming Tutorial | Edureka
Python Programming Tutorial | EdurekaPython Programming Tutorial | Edureka
Python Programming Tutorial | Edureka
 
Top 5 PMP Certifications | Edureka
Top 5 PMP Certifications | EdurekaTop 5 PMP Certifications | Edureka
Top 5 PMP Certifications | Edureka
 
Top Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | EdurekaTop Maven Interview Questions in 2020 | Edureka
Top Maven Interview Questions in 2020 | Edureka
 
Linux Mint Tutorial | Edureka
Linux Mint Tutorial | EdurekaLinux Mint Tutorial | Edureka
Linux Mint Tutorial | Edureka
 
How to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| EdurekaHow to Deploy Java Web App in AWS| Edureka
How to Deploy Java Web App in AWS| Edureka
 
Importance of Digital Marketing | Edureka
Importance of Digital Marketing | EdurekaImportance of Digital Marketing | Edureka
Importance of Digital Marketing | Edureka
 
RPA in 2020 | Edureka
RPA in 2020 | EdurekaRPA in 2020 | Edureka
RPA in 2020 | Edureka
 
Email Notifications in Jenkins | Edureka
Email Notifications in Jenkins | EdurekaEmail Notifications in Jenkins | Edureka
Email Notifications in Jenkins | Edureka
 
EA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | EdurekaEA Algorithm in Machine Learning | Edureka
EA Algorithm in Machine Learning | Edureka
 
Cognitive AI Tutorial | Edureka
Cognitive AI Tutorial | EdurekaCognitive AI Tutorial | Edureka
Cognitive AI Tutorial | Edureka
 
AWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | EdurekaAWS Cloud Practitioner Tutorial | Edureka
AWS Cloud Practitioner Tutorial | Edureka
 
Blue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | EdurekaBlue Prism Top Interview Questions | Edureka
Blue Prism Top Interview Questions | Edureka
 
Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka Big Data on AWS Tutorial | Edureka
Big Data on AWS Tutorial | Edureka
 
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | EdurekaA star algorithm | A* Algorithm in Artificial Intelligence | Edureka
A star algorithm | A* Algorithm in Artificial Intelligence | Edureka
 
Kubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | EdurekaKubernetes Installation on Ubuntu | Edureka
Kubernetes Installation on Ubuntu | Edureka
 
Introduction to DevOps | Edureka
Introduction to DevOps | EdurekaIntroduction to DevOps | Edureka
Introduction to DevOps | Edureka
 

Kürzlich hochgeladen

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 

Kürzlich hochgeladen (20)

Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 

PMP Certification Exam Training Guide

  • 1. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP QnA
  • 2. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp Project Management Professional® (PMP) Certification Globally acknowledged professional certification program in Project Management
  • 3. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp Project Management Professional® (PMP) Certification Globally acknowledged professional certification program in Project Management Legalizes a professional’s education and experience in Project Management
  • 4. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp Project Management Professional® (PMP) Certification Globally acknowledged professional certification program in Project Management Legalizes a professional’s education and experience in Project Management PMP certified project managers command 25% more salaries than their peers
  • 5. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp Project Management Professional® (PMP) Certification Globally acknowledged professional certification program in Project Management Legalizes a professional’s education and experience in Project Management PMP certified project managers command 25% more salaries than their peers PMP Certificate is very prestigious and is considered to be the golden standard of Project Management
  • 6. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Job Opportunities
  • 7. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PM Role wise Salaries 35k 70k 105k 140k0 Director of PM/PMO Portfolio Manager Program Manager Project Management Consultant Project Manager III Project Manager II Project Manager I Project Management Specialist
  • 8. Copyright © 2018, edureka and/or its affiliates. All rights reserved. Questions & Answers
  • 9. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Define Project Scope. It is the design of experiments that is used to complete the project work. It is the combination of the cost and the schedule which is required to complete the project work. It is the description of the required work that is necessary to complete the project. It is the description of the required work and resources that are needed to complete the project. Q.
  • 10. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Define Project Scope. It is the design of experiments that is used to complete the project work. It is the combination of the cost and the schedule which is required to complete the project work. It is the description of the required work that is necessary to complete the project. It is the description of the required work and resources that are needed to complete the project. Q.
  • 11. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers What is a Program? A very large and complex project A collection of projects which have common resources A collection of sub-projects having a common goal A collection of subprojects having a common customer Q.
  • 12. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers What is a Program? A very large and complex project A collection of projects which have common resources A collection of sub-projects having a common goal A collection of subprojects having a common customer Q.
  • 13. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Which of the following comprises the Project Life Cycle? Phases Milestones Estimates Activities Q.
  • 14. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Which of the following comprises the Project Life Cycle? Phases Milestones Estimates Activities Q.
  • 15. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Being the project manager of the ABC Project , you have allowed subsequent project phase to begin even before the predecessor phase completes. Which of the following relates to this scenario? Crashing Fast tracking Risk management Tandem scheduling Q.
  • 16. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Being the project manager of the ABC Project , you have allowed subsequent project phase to begin even before the predecessor phase completes. Which of the following relates to this scenario? Crashing Fast tracking Risk management Tandem scheduling Q.
  • 17. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Project Manager Senior Management Sponsor Client The person or group providing the resources and support for the project, program or portfolio and is also responsible for enabling success is called the:Q.
  • 18. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Project Manager Senior Management Sponsor Client The person or group providing the resources and support for the project, program or portfolio and is also responsible for enabling success is called the:Q.
  • 19. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Vendor Bid Analysis Brainstorming Affinity Diagram Nominal Group Technique Which of the following cannot be the part of Group creativity techniques:
  • 20. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Vendor Bid Analysis Brainstorming Affinity Diagram Nominal Group Technique Which of the following cannot be the part of Group creativity techniques:
  • 21. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Analogous Estimating Parametric Estimating Historical Estimating Expert Judgement Being the project manager of a thermal power plant project you need to manage the construction of an administrative unit building. Which of the following technique will you use to quickly estimate and decide the use of historic estimate and expert judgement.
  • 22. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Analogous Estimating Parametric Estimating Historical Estimating Expert Judgement Being the project manager of a thermal power plant project you need to manage the construction of an administrative unit building. Which of the following technique will you use to quickly estimate and decide the use of historic estimate and expert judgement.
  • 23. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Level of Accuracy Units of Measure Level of Precision Cost Management Plan What is the acceptable range used for determining the realistic activity cost estimates?
  • 24. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Level of Accuracy Units of Measure Level of Precision Cost Management Plan What is the acceptable range used for determining the realistic activity cost estimates?
  • 25. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. 0.73 1.2 0.8 1 What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
  • 26. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. 0.73 1.2 0.8 1 What is the SPI of a Software development Project where EV = $6,000, PV = $5,000, AC = $4,000?
  • 27. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Plan Cost Management Estimate Costs Determine Budget Control costs Cost baseline is the output of which of the following?
  • 28. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Plan Cost Management Estimate Costs Determine Budget Control costs Cost baseline is the output of which of the following?
  • 29. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Organize meetings to resolve misunderstanding and agree on a common solution Defer the decision to procure turbine components as much as possible Copy the design of turbine from a similar past project Procure the turbine parts from the nearest located vendor Suppose you are the project manager on a thermal power plant project. How will you manage your team members, if there is a difference in opinion over the design of turbine?
  • 30. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Organize meetings to resolve misunderstanding and agree on a common solution Defer the decision to procure turbine components as much as possible Copy the design of turbine from a similar past project Procure the turbine parts from the nearest located vendor Suppose you are the project manager on a thermal power plant project. How will you manage your team members, if there is a difference in opinion over the design of turbine?
  • 31. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Using variance analysis Using Sensitivity analysis Using PERT formula Using Performance Reports You find that an activity in your project is very risky. How will you estimate the duration for this activity when your team member has given the optimistic, most likely and pessimistic duration for the activity?
  • 32. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Using variance analysis Using Sensitivity analysis Using PERT formula Using Performance Reports You find that an activity in your project is very risky. How will you estimate the duration for this activity when your team member has given the optimistic, most likely and pessimistic duration for the activity?
  • 33. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Employees seek to be directed Employees avoid work Employees are self-centered Employees are self-motivated Which among the following is not valid according to McGreger's Theory X?
  • 34. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Employees seek to be directed Employees avoid work Employees are self-centered Employees are self-motivated Which among the following is not valid according to McGreger's Theory X?
  • 35. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Retainage FPEPA Cost Reimbursable contract Letter of Intent You are the project manager on a software development project. Your CPI drops to 0.93 when one of your key developers suddenly falls ill. To make up for your effected work, you have decided to outsource it to a vendor. What will be the most appropriate contract type in this case:
  • 36. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Retainage FPEPA Cost Reimbursable contract Letter of Intent You are the project manager on a software development project. Your CPI drops to 0.93 when one of your key developers suddenly falls ill. To make up for your effected work, you have decided to outsource it to a vendor. What will be the most appropriate contract type in this case:
  • 37. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Maslow Ouchi McGregor Herzberg Who among the following said, “People will be interested in their safety needs only after their physiological needs have been fulfilled.”:
  • 38. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Maslow Ouchi McGregor Herzberg Who among the following said, “People will be interested in their safety needs only after their physiological needs have been fulfilled.”:
  • 39. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Project Resources Project Schedule Project Scope Project Risks WBS is an excellent and most effective tool that is used for tracking of:
  • 40. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Project Resources Project Schedule Project Scope Project Risks WBS is an excellent and most effective tool that is used for tracking of:
  • 41. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Matrix Organization Functional Organization The best project organization structure for a small but highly technical project will be: Mixed Organization Projectized Organization
  • 42. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Matrix Organization Functional Organization Mixed Organization Projectized Organization The best project organization structure for a small but highly technical project will be:
  • 43. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Work breakdown structure Staffing Plan Cohabitation Colocation Being a project manager is you need to manage a project where there will be a number of persons working together. If you want to enhance the ability of the team to work together and perform as a team which one of the following things you need to do to maximize the ability of the team?
  • 44. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Work breakdown structure Staffing Plan Cohabitation Colocation Being a project manager is you need to manage a project where there will be a number of persons working together. If you want to enhance the ability of the team to work together and perform as a team which one of the following things you need to do to maximize the ability of the team?
  • 45. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Assessing the impact of the change on Project objectives Defining requirements for the customer Doing performance appraisal for team members involved in implementing changes Encouraging team members to raise more change requests What is the role of the change control board?
  • 46. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Assessing the impact of the change on Project objectives Defining requirements for the customer Doing performance appraisal for team members involved in implementing changes Encouraging team members to raise more change requests What is the role of the change control board?
  • 47. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. CPFF FFP CPPC T&M Being the project manager on a STP project, you decide to respond to an identified risk by contracting out work. Which of the following will lead to the minimum risk of buyer?
  • 48. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. CPFF FFP CPPC T&M Being the project manager on a STP project, you decide to respond to an identified risk by contracting out work. Which of the following will lead to the minimum risk of buyer?
  • 49. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Identify Stakeholders Manage Stakeholder Engagement Control Stakeholder Engagement Plan Stakeholder management For which process the stakeholder’s engagement assessment matrix is prepared as a part?
  • 50. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Identify Stakeholders Manage Stakeholder Engagement Control Stakeholder Engagement Plan Stakeholder management For which process the stakeholder’s engagement assessment matrix is prepared as a part?
  • 51. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Verbal, Nonverbal and Written Sender, receiver and message Text, drawing and picture Manager, worker and instructions Being a project manager you need to spend a significant amount of time in communications. Which of the following option contains the three basic elements of a communications mode?
  • 52. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Verbal, Nonverbal and Written Sender, receiver and message Text, drawing and picture Manager, worker and instructions Being a project manager you need to spend a significant amount of time in communications. Which of the following option contains the three basic elements of a communications mode?
  • 53. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Find the root cause of the disagreement Resolve the conflict in favor of the senior most technical expert Hire an external consultant to enforce his decision Remove this technical work from the scope of project work Suppose you are assigned as the project manager of a 30 months project which is in the executing phase. What will be the best way to resolve a conflict among the technical experts in your team?
  • 54. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Find the root cause of the disagreement Resolve the conflict in favor of the senior most technical expert Hire an external consultant to enforce his decision Remove this technical work from the scope of project work Suppose you are assigned as the project manager of a 30 months project which is in the executing phase. What will be the best way to resolve a conflict among the technical experts in your team?
  • 55. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Effect of adding resources on project end date Effect of adding resources on S curve Effect of adding resources on RAM Effect of adding resources on Cost and Schedule What should be your primary concern while adding resources to your project?
  • 56. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Effect of adding resources on project end date Effect of adding resources on S curve Effect of adding resources on RAM Effect of adding resources on Cost and Schedule What should be your primary concern while adding resources to your project?
  • 57. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Units of measure Level of Precision Level of accuracy Control Thresholds If John is working with his team to decide the degree to which cost estimates should be rounded up or down, then he is working to establish which of the following:
  • 58. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Units of measure Level of Precision Level of accuracy Control Thresholds If John is working with his team to decide the degree to which cost estimates should be rounded up or down, then he is working to establish which of the following:
  • 59. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Keep Satisfied Keep Informed Manage Closely Monitor Being a Project Manager, how will you deal with a stakeholder who has high power and high interest?
  • 60. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Keep Satisfied Keep Informed Manage Closely Monitor Being a Project Manager, how will you deal with a stakeholder who has high power and high interest?
  • 61. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Lack of Quality Policy Lack of Communications management plan Internet connection not reliable Lack of Historical Information While estimating the cost of work in a very new technology, being a project manager which of the following will concern you the most?
  • 62. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Lack of Quality Policy Lack of Communications management plan Internet connection not reliable Lack of Historical Information While estimating the cost of work in a very new technology, being a project manager which of the following will concern you the most?
  • 63. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. $4,000 $2,000 $8,000 $6,000 A road project was planned to be completed in 8 months. Calculate the SV when the earned value information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
  • 64. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. $4,000 $2,000 $8,000 $6,000 A road project was planned to be completed in 8 months. Calculate the SV when the earned value information at the end of six months is given as: BAC = $8000 , AC = $12000, % complete = 100%.
  • 65. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. ($200) $200 ($600) $600 What will be incentive amount for a contractor, who is working on a cost plus incentive fee contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
  • 66. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. ($200) $200 ($600) $600 What will be incentive amount for a contractor, who is working on a cost plus incentive fee contract? The project’s target cost is $5,000 with a target fee of $800, minimum fee is $500 & the maximum fee is $1,000. Also, the buyer seller share ratio is 80:20 with an actual cost of $6000.
  • 67. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Activities Interrelationship Time Activities assigned to Which of the following a resource histogram shows but a responsibility assignment matrix does not?
  • 68. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Activities Interrelationship Time Activities assigned to Which of the following a resource histogram shows but a responsibility assignment matrix does not?
  • 69. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Sensitivity Diagram Data Flow Diagram Decision Tree Tornado Diagram Which of the following is used to display sensitivity analysis?
  • 70. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Sensitivity Diagram Data Flow Diagram Decision Tree Tornado Diagram Which of the following is used to display sensitivity analysis?
  • 71. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. SV = $3750 CV = $4000 TCPI = 0.8 The project is likely need more money than planned to complete If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
  • 72. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. SV = $3750 CV = $4000 TCPI = 0.8 The project is likely need more money than planned to complete If SPI = 0.75 and CPI = 0.8, then which of the following reports is correct?
  • 73. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Initiating, designing, planning, executing, controlling, and closing Designing, developing, testing, and implementing Initiating, planning, executing, monitoring and controlling, and closing Initiating, planning, executing, monitoring, and closing According to PMBOK, project management processes are organized into which of the following order of process groups?
  • 74. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Initiating, designing, planning, executing, controlling, and closing Designing, developing, testing, and implementing Initiating, planning, executing, monitoring and controlling, and closing Initiating, planning, executing, monitoring, and closing According to PMBOK, project management processes are organized into which of the following order of process groups?
  • 75. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. The project manager should try to remove negative float by crashing or fast tracking There cannot be any negative float in the project The project manager should try to remove negative float by reducing scope It is desirable to have negative float in the project Which of the following statements is true regarding negative float?
  • 76. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. The project manager should try to remove negative float by crashing or fast tracking There cannot be any negative float in the project The project manager should try to remove negative float by reducing scope It is desirable to have negative float in the project Which of the following statements is true regarding negative float?
  • 77. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Deliverables List Test Plan Acceptance Criteria Punch List Which of the following represents a set of conditions that should be satisfied before deliverables are accepted?
  • 78. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Deliverables List Test Plan Acceptance Criteria Punch List Which of the following represents a set of conditions that should be satisfied before deliverables are accepted?
  • 79. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Understand the trend of deviations Prioritization Complete all activities on time Identify root causes How will a Pareto Chart will help in a project with lot of identified action items?
  • 80. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Understand the trend of deviations Prioritization Complete all activities on time Identify root causes How will a Pareto Chart will help in a project with lot of identified action items?
  • 81. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Start-to-Start Start-to-Finish Finish-to-Finish Finish-to-Start The activity relationship between the start of cleaning and the start of digging is represented by which of the following?
  • 82. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Start-to-Start Start-to-Finish Finish-to-Finish Finish-to-Start The activity relationship between the start of cleaning and the start of digging is represented by which of the following?
  • 83. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. This always affects the CV This never affects the CV A negative value means that the project will likely be delayed A positive value means that the project will likely be delayed Schedule Variance is:
  • 84. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. This always affects the CV This never affects the CV A negative value means that the project will likely be delayed A positive value means that the project will likely be delayed Schedule Variance is:
  • 85. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. High Power - Low Interest High Power - High Interest Low Power - Low Interest Low Power - High Interest You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders of your project. Based on the Power/Interest Grid that you have created, which of the following types of stakeholders' expectation should be managed closely?
  • 86. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. High Power - Low Interest High Power - High Interest Low Power - Low Interest Low Power - High Interest You are currently working as a Project Manager in Realty Logistics. You have been given responsibility for moving Infrastructure of ABC Software LTD to a new location. For that you need to identify the stakeholders of your project. Based on the Power/Interest Grid that you have created, which of the following types of stakeholders' expectation should be managed closely?
  • 87. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. ISO 9000 Quality planning Quality control Quality policy What is the company-wide policy which mandates all project quality known as?
  • 88. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. ISO 9000 Quality planning Quality control Quality policy What is the company-wide policy which mandates all project quality known as?
  • 89. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Standards are optional but regulations are not Standards are mandatory but regulations are not Regulations are mandatory but standards may be seen as guidelines Regulations and Standards are essentially the same Which one of the following describes the difference between a Standard and a Deviation accurately?
  • 90. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Standards are optional but regulations are not Standards are mandatory but regulations are not Regulations are mandatory but standards may be seen as guidelines Regulations and Standards are essentially the same Which one of the following describes the difference between a Standard and a Deviation accurately?
  • 91. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. $1,000,000.00 $1,012,660.00 $1,582,281.00 None of the above What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
  • 92. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. $1,000,000.00 $1,012,660.00 $1,582,281.00 None of the above What will be the BAC of your project, if it has a CPI of 0.80 and an EAC of $ 1265825?
  • 93. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Manual Forecasting of cost of remaining work BAC - AC EAC - AC (BAC EV) / CPI The BEST way of making an accurate forecasting of ETC is:
  • 94. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Manual Forecasting of cost of remaining work BAC - AC EAC - AC (BAC EV) / CPI The BEST way of making an accurate forecasting of ETC is:
  • 95. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. There are no defects Project Manager should move to the next process as everything is ok The process is out of control The process is in control How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control line?
  • 96. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. There are no defects Project Manager should move to the next process as everything is ok The process is out of control The process is in control How will you assess a situation where six observations are within the UPPER CONTROL LIMIT and control line while the seventh observation is observed within UPPER CONTROL LIMIT and Control line?
  • 97. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Control Charts Cause and Effect Diagram Run Chart Pareto Chart Which of the following can be used for Trend Analysis?
  • 98. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Control Charts Cause and Effect Diagram Run Chart Pareto Chart Which of the following can be used for Trend Analysis?
  • 99. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Theory X and Theory Y Theory Z Contingency Theory Expectancy Theory In which of theory, Douglas McGregor has defined two models of worker behaviour?
  • 100. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Theory X and Theory Y Theory Z Contingency Theory Expectancy Theory In which of theory, Douglas McGregor has defined two models of worker behaviour?
  • 101. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Interest, influence and involvement Interest, influence and impact Interest, influence and importance Importance, inquiry and influence What are the three 'I's' of stakeholders?
  • 102. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Interest, Influence and Involvement Interest, Influence and Impact Interest, Influence and Importance Importance, Inquiry and Influence What are the three 'I's' of stakeholders?
  • 103. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. To make sure that all questions from potential sellers are answered privately To make sure that potential sellers are treated as per the type of questions asked To make sure that all potential sellers are treated equally and have access to the same information To ensure that all parties get answers to their questions Which of the following is the objective of conducting Bidder Conferences?
  • 104. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. To make sure that all questions from potential sellers are answered privately To make sure that potential sellers are treated as per the type of questions asked To make sure that all potential sellers are treated equally and have access to the same information To ensure that all parties get answers to their questions Which of the following is the objective of conducting Bidder Conferences?
  • 105. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Kanban Kaizen Deming Cycle PDCA What is the Japanese method of modern quality management called, which relies on continuing small improvements involving everyone from the top management to the lowest level worker in the organization?
  • 106. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Kanban Kaizen Deming Cycle PDCA What is the Japanese method of modern quality management called, which relies on continuing small improvements involving everyone from the top management to the lowest level worker in the organization?
  • 107. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Sense of personal achievement, work satisfaction Plush office space, performance-based salary raise Work satisfaction, fringe benefit Vacation time, assignment of a personal staff assistant Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the following are the examples of satisfiers then?
  • 108. PMP® CERTIFICATION EXAM TRAINING www.edureka.co/pmp PMP Questions & Answers Q. Sense of personal achievement, work satisfaction Plush office space, performance-based salary raise Work satisfaction, fringe benefit Vacation time, assignment of a personal staff assistant Herzberg divided motivation factors into two classes: satisfiers and dissatisfies. Which of the following are the examples of satisfiers then?