23 October 2014
• EU offshore market
• The UK offshore market
• Cost of energy driver
• Technology changes
Contents
Agenda
Selected clients
BVG Associates
• Market and supply chain
• Analysis and forecasting
• Strategic advice
• Business and supply chain development
• Technology
• Engineering services
• Due diligence
• Strategy and R&D support
• Economics
• Socioeconomics and local benefits
• Technology and project economic modelling
• Policy and local content assessment
2/11© BVG Associates 2014
UK
41%
DE
33%
NL
9%
DK
5%
BE
4%
NO
3%
FR
3%
Other
2%
0
10
20
30
40
0
2
4
6
8
'07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17 '18 '19 '20 '21
Cumulativeinstalled
capacity(GW)
Annualinstalled
capacity(GW)
UK DE NL DK BE NO FR Rest of Europe Cumulative
EU offshore wind market for supply to 2020
© BVG Associates 2014
EU Market
EU market history
• UK most consistent,
growing market
since ‘03 (CAGR 33%).
• UK 3-year slow-down
‘14-’16 impacts whole
market.
• Germany only starts at
scale ‘14.
• Installed capacity to ‘16 now almost set.
3/13
• CAGR in period 21%.
• Leading market is UK. UK and Germany, make up ¾ of the forecast EU market.
• All offshore wind markets are subsidised to a roughly similar extent and support is likely to
be required until at least 2030.
• Typical time from first development activity to first operation of UK projects is about
10 years. FID typically 3 years before first operation.
• Average turbine size moving from 4MW to >6MW by 2020.
Market forecast
4© BVG Associates 2014
Completed or under construction:
Includes projects in which the main
contracts have been placed. 5.1GW
Consented: Projects that have
received planning consent. 5.6GW
Consent applied for: Application has
been submitted. 10.3GW
The UK market
5© BVG Associates 2014
Projects in the planning process
Pre-
application
Acceptance
Pre-
examination
Examination Decision
Post
decision
Navitus Bay
PINS accepted on
09/05/2014
Dogger Bank
Teesside
A&B
PINS first round
of responses
closed 12/06/2014
Dogger Bank
Creyke Beck
PINS recommendation
by 18/11/2014
Hornsea
Project one
PINS examination
closed 10/06/2014
Walney Extension
PINS recommendation
07/08/2014
Decision by 07/11/2014
Burbo Bank
Extension
Decision by
26/09/2014
Neart na
Gaoithe
Marine Scotland
decision expected
Q3 2014
Recently consented
Beatrice March 2014
Moray Firth Phase 1&2 March 2014
East Anglia One June 2014
Rampion July 2014
Firth of Forth
Phase 1
(Seagreen)
Marine Scotland
Inch Cape
Marine Scotland
6© BVG Associates 2014
Completed or under construction:
Includes projects in which the main
contracts have been placed. 5.1GW
Consented: Projects that have received
planning consent. 5.6GW
Consent applied for: Application has
been submitted. 10.3GW
Targeting ROCs: Companies have
published timelines. 1.3GW - 2GW
FIDER contracted: Announced in April
2014. 3.2GW
Targeting CfD?: Projects that meet the
criteria (or are expected to soon):
2.8GW – 4.4GW
Challenge: Government only expected
to support 500-600MW this year
The UK market
5.1
1.5
0.5
1.1
2.1
3.0
7.7
0
5
10
15
20
25
Installedcapacity(GW)
Government range (low)
Government "achieveable"
Government range (high)
7© BVG Associates 2014
The UK market
2014 - 17 2016 - 18 2017 +
ROCs - consented
Galloper
Race Bank
Rampion
ROCs – Applied for
consent
Neart na Gaoithe
FIDER (Provisionally
affordable) - Consented
Beatrice
Dudgeon
FIDER (contracted) -
Applied for consent
Burbo Bank Extension
Hornsea Heron/Njord
Walney Extension
Project progress is
dependent on both
planning consent and
public funding approval .
Achieving a final
investment decision will
still be dependent on the
developer but these
other factors give an
indicative “running order”
16.5
5.1
1.5
0.5
1.1
2.1
3.0
7.7
0
5
10
15
20
25
Installedcapacity(GW)
Government range (low)
Government "achieveable"
Government range (high)
8© BVG Associates 2014
The UK market
Not yet applied for CfD -
Consented
Blyth (demo)
East Anglia 1
EOWDC (demo)
Moray Firth
Triton Knoll
Not yet applied for CfD -
Applied for consent
Dogger Bank Creyke Beck
Dogger Bank Teesside
Inch Cape
Navitus Bay
Seagreen Alpha/Bravo
It is likely Government
will only accept an
increase in offshore wind
activity beyond its 10GW
target if it sees strong
arguments to do so.
These could because of:
- Greater cost reduction
- Increased UK activity
16.5
2014 - 17 2016 - 18 2017 +
0
3
6
9
12
0.0
0.5
1.0
1.5
2.0
'14 '15 '16 '17 '18 '19 '20
Cumulativeinstalled(GW)
Installedcapacity(GW)
Operational/ Underconstruction ROCs FIDER CfD Demo Cumulative
9© BVG Associates 2014
UK market forecast
Gwynt
y Môr
West of
Duddon
Sands
Humber
Gateway
Westermost
Rough
Kentish Flats 2
Neart na
Gaoithe
Rampion
Dudgeon
Dudgeon
Burbo Bank
Extension
Race
Bank
Race
Bank
Rampion
Galloper
Beatrice
Walney
Extension
Beatrice
Hornsea
Heron
Wind
Blyth
EOWDC
Moray
Firth –
Phase 1
Hornsea
Heron
Wind
Inch
Cape
Moray
Firth –
Phase 1
Hywind
Notes
Rampion may not go for ROCs
Uncertainty about Neart na Gaoithe
Forecast gives DONG about 0.5GW/year and
Siemens about 1GW/year from 2017
Neart na
Gaoithe
Galloper
Neart na
Gaoithe
Rampion
Walney
Extension
Cost of energy
Health warnings
CAPEX has been going up, not down
© BVG Associates 2014
Cost of Energy is more than just CAPEX
LCOE = Revenue (from whatever
source) / MWh required in order to
get sufficient return on investment
LCOE = Annualised CAPEX + OPEX
AEP
~ €160/MWh
Today
£100/MWh (€125)
In 2020
€100/MWh
late 2020’s?
$100/MWh (€80)
in 2040’s?
10/11
4 Dimensional cost model: Time, types of wind farm site,
turbine sizes, industry scenarios
6 Industry day-long workshops (in UK, DK, DE)
20 Deep industry interviews (4 hours +)
125 Industry individuals directly involved
215 Pages – available for download
from our website
Methodology in numbers: technology work stream
The Crown Estate study
Overview
• 2011 UK Government Energy white paper:
• Central scenario 13GW by 2020
• Minded to support to 18GW if cost of energy
reduced – target £100/MWh
• The Crown Estate cost reduction pathways study established to
evidence what industry thinks could be done
• Supply chain, finance and technology work streams
= + +
• Published summer 2012
Context
Cost reduction pathways study: results
• Given right external conditions, industry
can meet target:
• Confidence in market size to beyond 2020
• Smooth and timely transition under EMR
• Planning consent timelines reliably met
• Clear and predictable offshore grid
regulatory framework
• Facilitation of new technology introduction
• To deliver, industry also needs to work together:
• Best practice, standardisation,
risk management, accessing new finance
© BVG Associates 2014 11/11
Technologies
Where are the greatest savings?
Advancements in blade and turbine technologies
70% 75% 80% 85% 90% 95% 100%
LCOE for wind farm with FID in 2011
Increase in turbine power rating
Optimisation of rotor diameter, aerodynamics,
design and manufacture
Introduction of next generation drive trains
Improvements in jacket foundation design and
manufacturing
Improvements in aerodynamic control
Improvements in support structure installation
Greater level of array optimisation and FEED
About 30 other innovations
LCOE for wind farm with FID in 2020
Impact of innovation in on LCOE
Source: BVG Associates
© BVG Associates 2014 12/11
Turbine rating
Larger turbines cost much more, but...
From 4 to 6MW turbines
-10% -5% 0% 5% 10%
Wind farm development
Turbine rotor
Turbine nacelle
Support structure
Array cable
Installation
OMS
Net AEP
DECEX
Impact of change in element on LCOE
-30% -20% -10% 0% 10% 20% 30%
Wind farm development
Turbine rotor
Turbine nacelle
Support structure
Array cable
Installation
OMS
Net AEP
DECEX
Change in element
Source: BVG Associates
© BVG Associates 2014 13/13
Anticipated by 2020 Progress
Turbine
Balance of plant
Installation
OMS
Development
Overall technology
Overall supply chain
Technology Progress
Comparison with other studies
• Similar but simplified approach (budget only 10% of The Crown
Estate study)
• Often identical assumptions – aids comparison
• Similar trends, except:
• Higher energy losses due to aerodynamic wakes
• Higher support structure savings but lower installation savings
• Lower cost of capital
• More sharing of offshore infrastructure
German Stiftung Offshore Windenergie (2013)
KIC InnoEnergy (2014)
• Identical but simplified approach (budget less than 5% of The
Crown Estate study)
• Part of a series to be published on onshore wind and solar, using
same methodology
• Identical assumptions
• Assessment brought up to date
• Forecast extends to FID in 2025
Progress check (technology & supply chain)
-2%
-2%
-
--5%
-17%
© BVG Associates 2014 14/11
-4%
-25%
-15%
• UK market likely to reach c 11GW installed capacity by 2020
• Significant share for Siemens
• Introduction of 7MW and 8MW turbines expected in projects before 2020
• Turbine and rotor developments will carry us beyond 2020
• Jacket foundation developments still to make a big impact
• Improvements in cables, installation and OMS need to be carried on
beyond 2020
15© BVG Associates 2012
Conclusions
Thank you
BVG Associates Ltd.
The Blackthorn Centre
Purton Road
Cricklade, Swindon
SN6 6HY England, UK
tel +44 1793 752 308
info@bvgassociates.co.uk
@bvgassociates
www.bvgassociates.co.uk
The Boathouse
Silversands
Aberdour, Fife
KY3 0TZ Scotland, UK
tel +44 1383 870 014
This presentation and its content is copyright of BVG Associates Limited - © BVG Associates 2014. All rights are reserved.
Any redistribution or reproduction of part or all of the contents in any form is prohibited other than the following:
• You may print or download to a local hard disk extracts for your personal and non-commercial use only.
• You may copy the content to individual third parties for their personal use, but only if you acknowledge BVG Associates as the source of the
material.
You may not, except with our express written permission, distribute or commercially exploit the content.
4444 Second Avenue
Detroit, MI
48201 USA
tel +1 206 459 8506
cjn@bvgassociates.com

Weitere ähnliche Inhalte

Was ist angesagt?

Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHFadi Maalouf, PMP
 
Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019KeppelCorporation
 
Biffa plc Capital Markets Day Director of Business presentation
Biffa plc Capital Markets Day Director of Business presentationBiffa plc Capital Markets Day Director of Business presentation
Biffa plc Capital Markets Day Director of Business presentationjessbiffa
 
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipset
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar ChipsetMediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipset
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipsetsystem_plus
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongSantos Ltd
 
Biffa plc Capital Markets Day CFO presentation
Biffa plc Capital Markets Day CFO presentationBiffa plc Capital Markets Day CFO presentation
Biffa plc Capital Markets Day CFO presentationjessbiffa
 
Total 2018 Investor Day - Strategy and Outlook
Total 2018 Investor Day - Strategy and Outlook Total 2018 Investor Day - Strategy and Outlook
Total 2018 Investor Day - Strategy and Outlook Total
 
Foyson AGM Presentation to Shareholders
Foyson AGM Presentation to ShareholdersFoyson AGM Presentation to Shareholders
Foyson AGM Presentation to ShareholdersFoyson Resources
 
Macquarie Australia Conference Presentation
Macquarie Australia Conference PresentationMacquarie Australia Conference Presentation
Macquarie Australia Conference PresentationSantos Ltd
 
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationTeekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationAltera Infrastructure
 
SEIG seminar - A Smarter Way to Lower Emissions - Mike Foster
SEIG seminar - A Smarter Way to Lower Emissions - Mike FosterSEIG seminar - A Smarter Way to Lower Emissions - Mike Foster
SEIG seminar - A Smarter Way to Lower Emissions - Mike FosterSTEP_scotland
 
Webinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslagWebinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslagStork
 

Was ist angesagt? (14)

Australia_160212
Australia_160212Australia_160212
Australia_160212
 
Green Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOHGreen Hydrogen Financial Model Toolkit LCOH
Green Hydrogen Financial Model Toolkit LCOH
 
Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019Keppel Corporation Presentation to Investors in Bangkok- September 2019
Keppel Corporation Presentation to Investors in Bangkok- September 2019
 
Biffa plc Capital Markets Day Director of Business presentation
Biffa plc Capital Markets Day Director of Business presentationBiffa plc Capital Markets Day Director of Business presentation
Biffa plc Capital Markets Day Director of Business presentation
 
Dii Toolkit Initiative
Dii Toolkit InitiativeDii Toolkit Initiative
Dii Toolkit Initiative
 
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipset
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar ChipsetMediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipset
Mediatek Autus R10 (MT2706) 77/79 GHz eWLB/AiP Radar Chipset
 
Presentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong KongPresentation given at CLSA investors' forum in Hong Kong
Presentation given at CLSA investors' forum in Hong Kong
 
Biffa plc Capital Markets Day CFO presentation
Biffa plc Capital Markets Day CFO presentationBiffa plc Capital Markets Day CFO presentation
Biffa plc Capital Markets Day CFO presentation
 
Total 2018 Investor Day - Strategy and Outlook
Total 2018 Investor Day - Strategy and Outlook Total 2018 Investor Day - Strategy and Outlook
Total 2018 Investor Day - Strategy and Outlook
 
Foyson AGM Presentation to Shareholders
Foyson AGM Presentation to ShareholdersFoyson AGM Presentation to Shareholders
Foyson AGM Presentation to Shareholders
 
Macquarie Australia Conference Presentation
Macquarie Australia Conference PresentationMacquarie Australia Conference Presentation
Macquarie Australia Conference Presentation
 
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings PresentationTeekay Offshore Partners Third Quarter 2014 Earnings Presentation
Teekay Offshore Partners Third Quarter 2014 Earnings Presentation
 
SEIG seminar - A Smarter Way to Lower Emissions - Mike Foster
SEIG seminar - A Smarter Way to Lower Emissions - Mike FosterSEIG seminar - A Smarter Way to Lower Emissions - Mike Foster
SEIG seminar - A Smarter Way to Lower Emissions - Mike Foster
 
Webinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslagWebinar - Innovatie en Asset Management in de tankopslag
Webinar - Innovatie en Asset Management in de tankopslag
 

Ähnlich wie UK offshore wind vision of the market and technology development Giles Hundleby 23 October 2014

Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ StephenGeoMills
 
Innovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windInnovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windBVG Associates
 
Innovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windInnovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windKate Freeman
 
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chainAlan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chainBVG Associates
 
Innovation landscape All Energy 2017
Innovation landscape All Energy 2017Innovation landscape All Energy 2017
Innovation landscape All Energy 2017BVG Associates
 
Offshore wind technology cost reduction one year on Bruce Valpy Feb 2013
Offshore wind technology cost reduction   one year on  Bruce Valpy Feb 2013Offshore wind technology cost reduction   one year on  Bruce Valpy Feb 2013
Offshore wind technology cost reduction one year on Bruce Valpy Feb 2013BVG Associates
 
Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?BVG Associates
 
From Discontent to UK Content
From Discontent to UK ContentFrom Discontent to UK Content
From Discontent to UK ContentBVG Associates
 
Anglesey: Energy Island - Gerallt Llewelyn Jones, Morlais
Anglesey: Energy Island - Gerallt Llewelyn Jones, MorlaisAnglesey: Energy Island - Gerallt Llewelyn Jones, Morlais
Anglesey: Energy Island - Gerallt Llewelyn Jones, MorlaisPlace North West
 
Gerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, MorlaisGerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, MorlaisEmma Pawlowski
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505BVG Associates
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification StephenGeoMills
 
Bigger, larger, heavier
Bigger, larger, heavierBigger, larger, heavier
Bigger, larger, heavierBVG Associates
 
OW_13092023_EN_www.pdf
OW_13092023_EN_www.pdfOW_13092023_EN_www.pdf
OW_13092023_EN_www.pdfBaltic Wind
 
30 bruce valpy - bvg associates
30   bruce valpy - bvg associates30   bruce valpy - bvg associates
30 bruce valpy - bvg associatesjohannaparans
 
OW_13092023_EN_www.pptx
OW_13092023_EN_www.pptxOW_13092023_EN_www.pptx
OW_13092023_EN_www.pptxBaltic Wind
 
Green Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfGreen Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfOECD Environment
 
Where did the "The Saudi Arabia of Renewables' story go wrong?
Where did the "The Saudi Arabia of Renewables' story go wrong?Where did the "The Saudi Arabia of Renewables' story go wrong?
Where did the "The Saudi Arabia of Renewables' story go wrong?BVG Associates
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoSantie Gouws
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceBluesign
 

Ähnlich wie UK offshore wind vision of the market and technology development Giles Hundleby 23 October 2014 (20)

Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’
 
Innovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windInnovation and cost reduction in offshore wind
Innovation and cost reduction in offshore wind
 
Innovation and cost reduction in offshore wind
Innovation and cost reduction in offshore windInnovation and cost reduction in offshore wind
Innovation and cost reduction in offshore wind
 
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chainAlan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
Alan Duncan's All Energy 2017 Offshore wind: the importance of the supply chain
 
Innovation landscape All Energy 2017
Innovation landscape All Energy 2017Innovation landscape All Energy 2017
Innovation landscape All Energy 2017
 
Offshore wind technology cost reduction one year on Bruce Valpy Feb 2013
Offshore wind technology cost reduction   one year on  Bruce Valpy Feb 2013Offshore wind technology cost reduction   one year on  Bruce Valpy Feb 2013
Offshore wind technology cost reduction one year on Bruce Valpy Feb 2013
 
Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?Does the permitting process in France need a further overhaul?
Does the permitting process in France need a further overhaul?
 
From Discontent to UK Content
From Discontent to UK ContentFrom Discontent to UK Content
From Discontent to UK Content
 
Anglesey: Energy Island - Gerallt Llewelyn Jones, Morlais
Anglesey: Energy Island - Gerallt Llewelyn Jones, MorlaisAnglesey: Energy Island - Gerallt Llewelyn Jones, Morlais
Anglesey: Energy Island - Gerallt Llewelyn Jones, Morlais
 
Gerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, MorlaisGerallt Llewelyn Jones, managing director, Morlais
Gerallt Llewelyn Jones, managing director, Morlais
 
Adu all energy diversification 160505
Adu all energy diversification 160505Adu all energy diversification 160505
Adu all energy diversification 160505
 
Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification Spreading the risk, piling up the opportunities - offshore wind diversification
Spreading the risk, piling up the opportunities - offshore wind diversification
 
Bigger, larger, heavier
Bigger, larger, heavierBigger, larger, heavier
Bigger, larger, heavier
 
OW_13092023_EN_www.pdf
OW_13092023_EN_www.pdfOW_13092023_EN_www.pdf
OW_13092023_EN_www.pdf
 
30 bruce valpy - bvg associates
30   bruce valpy - bvg associates30   bruce valpy - bvg associates
30 bruce valpy - bvg associates
 
OW_13092023_EN_www.pptx
OW_13092023_EN_www.pptxOW_13092023_EN_www.pptx
OW_13092023_EN_www.pptx
 
Green Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdfGreen Giraffe Advisory: Offshore wind market today.pdf
Green Giraffe Advisory: Offshore wind market today.pdf
 
Where did the "The Saudi Arabia of Renewables' story go wrong?
Where did the "The Saudi Arabia of Renewables' story go wrong?Where did the "The Saudi Arabia of Renewables' story go wrong?
Where did the "The Saudi Arabia of Renewables' story go wrong?
 
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC videoASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
ASPASA Eastern Cape Regional Committee Meeting_20151008-without SCC video
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore France
 

Mehr von BVG Associates

Graham Gow DWEA event September 2018
 Graham Gow DWEA event September 2018 Graham Gow DWEA event September 2018
Graham Gow DWEA event September 2018BVG Associates
 
Rationing offshore wind in a post-subsidy world
Rationing offshore wind in a post-subsidy worldRationing offshore wind in a post-subsidy world
Rationing offshore wind in a post-subsidy worldBVG Associates
 
Floating offshore wind and LCOE Giles Hundleby
Floating offshore wind and LCOE Giles HundlebyFloating offshore wind and LCOE Giles Hundleby
Floating offshore wind and LCOE Giles HundlebyBVG Associates
 
Learning to love supply chain plans
Learning to love supply chain plansLearning to love supply chain plans
Learning to love supply chain plansBVG Associates
 
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KIC
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KICOffshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KIC
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KICBVG Associates
 
Atlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationAtlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationBVG Associates
 
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?BVG Associates
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growthBVG Associates
 
Bvga hundleby icoe 2016
Bvga hundleby icoe 2016Bvga hundleby icoe 2016
Bvga hundleby icoe 2016BVG Associates
 
Stepping stones for floating foundations r02
Stepping stones for floating foundations r02Stepping stones for floating foundations r02
Stepping stones for floating foundations r02BVG Associates
 
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...BVG Associates
 
Between a ROC and a hard place : UK content and EMR Alun Roberts 12 June 2014
Between a ROC and a hard place :  UK content and EMR Alun Roberts 12 June 2014Between a ROC and a hard place :  UK content and EMR Alun Roberts 12 June 2014
Between a ROC and a hard place : UK content and EMR Alun Roberts 12 June 2014BVG Associates
 
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010BVG Associates
 
Offshore renewables minimising OPEX Bruce Valpy Nantes 21 May 2015
Offshore renewables  minimising OPEX Bruce Valpy Nantes 21 May 2015Offshore renewables  minimising OPEX Bruce Valpy Nantes 21 May 2015
Offshore renewables minimising OPEX Bruce Valpy Nantes 21 May 2015BVG Associates
 

Mehr von BVG Associates (14)

Graham Gow DWEA event September 2018
 Graham Gow DWEA event September 2018 Graham Gow DWEA event September 2018
Graham Gow DWEA event September 2018
 
Rationing offshore wind in a post-subsidy world
Rationing offshore wind in a post-subsidy worldRationing offshore wind in a post-subsidy world
Rationing offshore wind in a post-subsidy world
 
Floating offshore wind and LCOE Giles Hundleby
Floating offshore wind and LCOE Giles HundlebyFloating offshore wind and LCOE Giles Hundleby
Floating offshore wind and LCOE Giles Hundleby
 
Learning to love supply chain plans
Learning to love supply chain plansLearning to love supply chain plans
Learning to love supply chain plans
 
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KIC
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KICOffshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KIC
Offshore wind innovation for cost reduction Wind Europe Summit 2016 Freeman/KIC
 
Atlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentationAtlantic stakeholder platform conference MARIBE presentation
Atlantic stakeholder platform conference MARIBE presentation
 
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?
Can Combining with Other Blue Sectors Further Reduce Offshore Wind's LCOE?
 
Will combining sectors deliver blue growth
Will combining sectors deliver blue growthWill combining sectors deliver blue growth
Will combining sectors deliver blue growth
 
Bvga hundleby icoe 2016
Bvga hundleby icoe 2016Bvga hundleby icoe 2016
Bvga hundleby icoe 2016
 
Stepping stones for floating foundations r02
Stepping stones for floating foundations r02Stepping stones for floating foundations r02
Stepping stones for floating foundations r02
 
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...
Creating data harmonisation between seven wind farms Martin Elliot 20 Novembe...
 
Between a ROC and a hard place : UK content and EMR Alun Roberts 12 June 2014
Between a ROC and a hard place :  UK content and EMR Alun Roberts 12 June 2014Between a ROC and a hard place :  UK content and EMR Alun Roberts 12 June 2014
Between a ROC and a hard place : UK content and EMR Alun Roberts 12 June 2014
 
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010
Offshore wind farms - can the industry deliver (again) Bruce Valpy October 2010
 
Offshore renewables minimising OPEX Bruce Valpy Nantes 21 May 2015
Offshore renewables  minimising OPEX Bruce Valpy Nantes 21 May 2015Offshore renewables  minimising OPEX Bruce Valpy Nantes 21 May 2015
Offshore renewables minimising OPEX Bruce Valpy Nantes 21 May 2015
 

Kürzlich hochgeladen

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 

Kürzlich hochgeladen (20)

CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 

UK offshore wind vision of the market and technology development Giles Hundleby 23 October 2014

  • 1. UK Offshore Wind: latest vision of market and technology development Giles Hundleby BVG Associates 23 October 2014
  • 2. • EU offshore market • The UK offshore market • Cost of energy driver • Technology changes Contents Agenda Selected clients BVG Associates • Market and supply chain • Analysis and forecasting • Strategic advice • Business and supply chain development • Technology • Engineering services • Due diligence • Strategy and R&D support • Economics • Socioeconomics and local benefits • Technology and project economic modelling • Policy and local content assessment 2/11© BVG Associates 2014
  • 3. UK 41% DE 33% NL 9% DK 5% BE 4% NO 3% FR 3% Other 2% 0 10 20 30 40 0 2 4 6 8 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17 '18 '19 '20 '21 Cumulativeinstalled capacity(GW) Annualinstalled capacity(GW) UK DE NL DK BE NO FR Rest of Europe Cumulative EU offshore wind market for supply to 2020 © BVG Associates 2014 EU Market EU market history • UK most consistent, growing market since ‘03 (CAGR 33%). • UK 3-year slow-down ‘14-’16 impacts whole market. • Germany only starts at scale ‘14. • Installed capacity to ‘16 now almost set. 3/13 • CAGR in period 21%. • Leading market is UK. UK and Germany, make up ¾ of the forecast EU market. • All offshore wind markets are subsidised to a roughly similar extent and support is likely to be required until at least 2030. • Typical time from first development activity to first operation of UK projects is about 10 years. FID typically 3 years before first operation. • Average turbine size moving from 4MW to >6MW by 2020. Market forecast
  • 4. 4© BVG Associates 2014 Completed or under construction: Includes projects in which the main contracts have been placed. 5.1GW Consented: Projects that have received planning consent. 5.6GW Consent applied for: Application has been submitted. 10.3GW The UK market
  • 5. 5© BVG Associates 2014 Projects in the planning process Pre- application Acceptance Pre- examination Examination Decision Post decision Navitus Bay PINS accepted on 09/05/2014 Dogger Bank Teesside A&B PINS first round of responses closed 12/06/2014 Dogger Bank Creyke Beck PINS recommendation by 18/11/2014 Hornsea Project one PINS examination closed 10/06/2014 Walney Extension PINS recommendation 07/08/2014 Decision by 07/11/2014 Burbo Bank Extension Decision by 26/09/2014 Neart na Gaoithe Marine Scotland decision expected Q3 2014 Recently consented Beatrice March 2014 Moray Firth Phase 1&2 March 2014 East Anglia One June 2014 Rampion July 2014 Firth of Forth Phase 1 (Seagreen) Marine Scotland Inch Cape Marine Scotland
  • 6. 6© BVG Associates 2014 Completed or under construction: Includes projects in which the main contracts have been placed. 5.1GW Consented: Projects that have received planning consent. 5.6GW Consent applied for: Application has been submitted. 10.3GW Targeting ROCs: Companies have published timelines. 1.3GW - 2GW FIDER contracted: Announced in April 2014. 3.2GW Targeting CfD?: Projects that meet the criteria (or are expected to soon): 2.8GW – 4.4GW Challenge: Government only expected to support 500-600MW this year The UK market
  • 7. 5.1 1.5 0.5 1.1 2.1 3.0 7.7 0 5 10 15 20 25 Installedcapacity(GW) Government range (low) Government "achieveable" Government range (high) 7© BVG Associates 2014 The UK market 2014 - 17 2016 - 18 2017 + ROCs - consented Galloper Race Bank Rampion ROCs – Applied for consent Neart na Gaoithe FIDER (Provisionally affordable) - Consented Beatrice Dudgeon FIDER (contracted) - Applied for consent Burbo Bank Extension Hornsea Heron/Njord Walney Extension Project progress is dependent on both planning consent and public funding approval . Achieving a final investment decision will still be dependent on the developer but these other factors give an indicative “running order” 16.5
  • 8. 5.1 1.5 0.5 1.1 2.1 3.0 7.7 0 5 10 15 20 25 Installedcapacity(GW) Government range (low) Government "achieveable" Government range (high) 8© BVG Associates 2014 The UK market Not yet applied for CfD - Consented Blyth (demo) East Anglia 1 EOWDC (demo) Moray Firth Triton Knoll Not yet applied for CfD - Applied for consent Dogger Bank Creyke Beck Dogger Bank Teesside Inch Cape Navitus Bay Seagreen Alpha/Bravo It is likely Government will only accept an increase in offshore wind activity beyond its 10GW target if it sees strong arguments to do so. These could because of: - Greater cost reduction - Increased UK activity 16.5 2014 - 17 2016 - 18 2017 +
  • 9. 0 3 6 9 12 0.0 0.5 1.0 1.5 2.0 '14 '15 '16 '17 '18 '19 '20 Cumulativeinstalled(GW) Installedcapacity(GW) Operational/ Underconstruction ROCs FIDER CfD Demo Cumulative 9© BVG Associates 2014 UK market forecast Gwynt y Môr West of Duddon Sands Humber Gateway Westermost Rough Kentish Flats 2 Neart na Gaoithe Rampion Dudgeon Dudgeon Burbo Bank Extension Race Bank Race Bank Rampion Galloper Beatrice Walney Extension Beatrice Hornsea Heron Wind Blyth EOWDC Moray Firth – Phase 1 Hornsea Heron Wind Inch Cape Moray Firth – Phase 1 Hywind Notes Rampion may not go for ROCs Uncertainty about Neart na Gaoithe Forecast gives DONG about 0.5GW/year and Siemens about 1GW/year from 2017 Neart na Gaoithe Galloper Neart na Gaoithe Rampion Walney Extension
  • 10. Cost of energy Health warnings CAPEX has been going up, not down © BVG Associates 2014 Cost of Energy is more than just CAPEX LCOE = Revenue (from whatever source) / MWh required in order to get sufficient return on investment LCOE = Annualised CAPEX + OPEX AEP ~ €160/MWh Today £100/MWh (€125) In 2020 €100/MWh late 2020’s? $100/MWh (€80) in 2040’s? 10/11
  • 11. 4 Dimensional cost model: Time, types of wind farm site, turbine sizes, industry scenarios 6 Industry day-long workshops (in UK, DK, DE) 20 Deep industry interviews (4 hours +) 125 Industry individuals directly involved 215 Pages – available for download from our website Methodology in numbers: technology work stream The Crown Estate study Overview • 2011 UK Government Energy white paper: • Central scenario 13GW by 2020 • Minded to support to 18GW if cost of energy reduced – target £100/MWh • The Crown Estate cost reduction pathways study established to evidence what industry thinks could be done • Supply chain, finance and technology work streams = + + • Published summer 2012 Context Cost reduction pathways study: results • Given right external conditions, industry can meet target: • Confidence in market size to beyond 2020 • Smooth and timely transition under EMR • Planning consent timelines reliably met • Clear and predictable offshore grid regulatory framework • Facilitation of new technology introduction • To deliver, industry also needs to work together: • Best practice, standardisation, risk management, accessing new finance © BVG Associates 2014 11/11
  • 12. Technologies Where are the greatest savings? Advancements in blade and turbine technologies 70% 75% 80% 85% 90% 95% 100% LCOE for wind farm with FID in 2011 Increase in turbine power rating Optimisation of rotor diameter, aerodynamics, design and manufacture Introduction of next generation drive trains Improvements in jacket foundation design and manufacturing Improvements in aerodynamic control Improvements in support structure installation Greater level of array optimisation and FEED About 30 other innovations LCOE for wind farm with FID in 2020 Impact of innovation in on LCOE Source: BVG Associates © BVG Associates 2014 12/11
  • 13. Turbine rating Larger turbines cost much more, but... From 4 to 6MW turbines -10% -5% 0% 5% 10% Wind farm development Turbine rotor Turbine nacelle Support structure Array cable Installation OMS Net AEP DECEX Impact of change in element on LCOE -30% -20% -10% 0% 10% 20% 30% Wind farm development Turbine rotor Turbine nacelle Support structure Array cable Installation OMS Net AEP DECEX Change in element Source: BVG Associates © BVG Associates 2014 13/13
  • 14. Anticipated by 2020 Progress Turbine Balance of plant Installation OMS Development Overall technology Overall supply chain Technology Progress Comparison with other studies • Similar but simplified approach (budget only 10% of The Crown Estate study) • Often identical assumptions – aids comparison • Similar trends, except: • Higher energy losses due to aerodynamic wakes • Higher support structure savings but lower installation savings • Lower cost of capital • More sharing of offshore infrastructure German Stiftung Offshore Windenergie (2013) KIC InnoEnergy (2014) • Identical but simplified approach (budget less than 5% of The Crown Estate study) • Part of a series to be published on onshore wind and solar, using same methodology • Identical assumptions • Assessment brought up to date • Forecast extends to FID in 2025 Progress check (technology & supply chain) -2% -2% - --5% -17% © BVG Associates 2014 14/11 -4% -25% -15%
  • 15. • UK market likely to reach c 11GW installed capacity by 2020 • Significant share for Siemens • Introduction of 7MW and 8MW turbines expected in projects before 2020 • Turbine and rotor developments will carry us beyond 2020 • Jacket foundation developments still to make a big impact • Improvements in cables, installation and OMS need to be carried on beyond 2020 15© BVG Associates 2012 Conclusions
  • 16. Thank you BVG Associates Ltd. The Blackthorn Centre Purton Road Cricklade, Swindon SN6 6HY England, UK tel +44 1793 752 308 info@bvgassociates.co.uk @bvgassociates www.bvgassociates.co.uk The Boathouse Silversands Aberdour, Fife KY3 0TZ Scotland, UK tel +44 1383 870 014 This presentation and its content is copyright of BVG Associates Limited - © BVG Associates 2014. All rights are reserved. Any redistribution or reproduction of part or all of the contents in any form is prohibited other than the following: • You may print or download to a local hard disk extracts for your personal and non-commercial use only. • You may copy the content to individual third parties for their personal use, but only if you acknowledge BVG Associates as the source of the material. You may not, except with our express written permission, distribute or commercially exploit the content. 4444 Second Avenue Detroit, MI 48201 USA tel +1 206 459 8506 cjn@bvgassociates.com