SlideShare a Scribd company logo
1 of 33
Download to read offline
JOB COSTING AND BATCH
COSTING
1
JOB COSTING
• Job costing is a method of costing whereby cost is compiled for a job or work
order. The production is against customer’s orders and not for stock.
• The cost is not related to the unit of production but is a cost for the job, e. g
printing of 5000 ledger sheets, repairs of 50 equipment’s, instead of printing
one sheet or repair of one equipment.
• The elements of cost comprising Prime Cost viz. direct materials, direct labor
and direct expenses are charged directly to the jobs concerned, the overhead
charged to a job is an apportioned portion of the departmental overhead.
• Applied in industries where production is measured in terms of completed
jobs like Printing Press, Automobile Garage, Repair workshops, Ship
Building, Foundry and other similar manufacturing units which manufacture
to customers’ specific requirements.
2
DOCUMENTS USED IN A JOB ORDER
COST SYSTEM
(i) Production Order or Manufacturing Order:
This is a works order authorizing the production department to produce a
specified quantity of a product which constitutes the job.
(ii) Cost Sheet:
For recording costs, very often a separate record called a cost sheet is used. The
cost sheet and the works order may also be combined, when costs are recorded on
the production order itself.
(iii) Other Documents:
The other documents which are used as control mechanism by the dispatching
function are: Material Requisitions, Tool Orders, Time Tickets, Inspection Order,
etc.
3
JOB COST ACCOUNTING
PROCEDURE
• Cost of direct materials in respect of a job is obtained from copies of
Material Requisitions costed by the Stores Accounting Section.
• Cost of direct wages is obtained from various Time Tickets costed by the
Payroll Department. Direct Expenses, if any, are also taken up.
• Manufacturing overheads are then applied at predetermined departmental
absorption rates and recorded in the cost-sheet.
• Various overheads may be recorded in the separate columns meant for these
in the cost sheet which are totaled to obtain the total cost of direct material,
direct labour, direct expenses and apportioned manufacturing overheads.
• These four elements of cost together give the production cost or
manufacturing cost of the job.
4
TYPES OF ACTIVITIES
Job costing involves the following accounting activities:
Materials: It accumulates the cost of components and then assigns
these costs to a product or project once the components are used.
Labor: Employees charge their time to specific jobs, which are then
assigned to the jobs based on the labor cost of the employees.
Overhead: It accumulates overhead costs in cost pools, and then
allocates these costs to jobs.
Direct Expenses: Directly charged to individual jobs for which they
are incurred.
5
JOB COSTING ALLOCATION OF
MATERIALS
• In a job costing environment, materials to be used on a product or project
first enter the facility and are stored in the warehouse, after which they are
picked from stock and issued to a specific job.
• If spoilage or scrap is created, then normal amounts are charged to an
overhead cost pool for later allocation, while abnormal amounts are charged
directly to the cost of goods sold.
• Once work is completed on a job, the cost of the entire job is shifted from
work-in-process inventory to finished goods inventory.
• Then, once the goods are sold, the cost of the asset is removed from the
inventory account and shifted into the cost of goods sold, while the company
also records a sale transaction.
6
JOB COSTING ALLOCATION OF
LABOR
• In a job costing environment, labor may be charged directly to individual
jobs, if the labor is directly traceable to those jobs.
• All other manufacturing-related labor is recorded in an overhead cost pool
and is then allocated to the various open jobs.
• The first type of labor is called direct labor, and the second type is known as
indirect labor. When a job is completed, it is then shifted into a finished
goods inventory account.
• Then, once the goods are sold, the cost of the asset is removed from the
inventory account and shifted into the cost of goods sold, while the company
also records a sale transaction.
7
JOB COSTING ALLOCATION OF
OVERHEAD
• In a job costing environment, non-direct costs are accumulated into one or
more overhead cost pools, from which you allocate costs to open jobs based
upon some measure of cost usage.
• The key issues when applying overhead are to consistently charge the same
types of costs to overhead in all reporting periods, and to consistently apply
these costs to jobs. Otherwise, it can be extremely difficult for the cost
accountant to explain why overhead cost allocations vary from one month to
the next.
• The overhead allocation process for standard costs is to use historical cost
information to arrive at a standard rate per unit of activity, and then allocate
this standard amount to jobs based on their units of activity.
8
JOB COSTING ALLOCATION OF
OVERHEAD
You then subtract the total amount allocated from the overhead cost pool (which contains
actual overhead costs), and dispose of any remaining amount in the overhead cost pool. You can
use any of the following methods to dispose of the remaining amount:
▪Charge to cost of goods sold. Charge the entire variance to the cost of goods sold. This is
the simplest method.
▪Allocate the variance. Allocate the variance to the accounts for finished goods, work-in-
process, and cost of goods sold, based on the ending balances in these accounts. This approach
is slightly more time-consuming, but is the most theoretically correct method under generally
accepted accounting principles.
▪Charge to jobs. Allocate the variance to those jobs that were open during the reporting
period. This approach is the most time-consuming. It essentially reverts a company back to an
actual costing system, since the results of this method will approximate those created under an
actual cost allocation system.
9
ADVANTAGES OF JOB COSTING
• Profitability of each job can be individually determined.
• It provides a basis for estimating the cost of similar jobs which are to be taken in
future.
• It provides the detailed analysis of the cost of material, labour and overheads for each
job as and when required.
• Plant efficiency can be controlled by confining attention to costs relating to individual
jobs.
• Job costing is essential for cost-plus contract where contract price is determined
directly on the basis of cost.
10
LIMITATIONS OF JOB COSTING
• It requires detailed record-keeping for different jobs.
• It is expensive to operate as it requires considerable detailed clerical work.
• With the increase in the clerical work the chances of errors are increased.
• A job may be charged for inefficiencies, although it has not caused any.
• The costs as ascertained are historical as they compiled after incidence and
therefore does not provide control of cost unless it is used with standard
costing system.
11
ILLUSTRATION:1
• The following information for the year ended
31/12/2008 is obtained from the books & record of a
factory:
• Factory Overhead are 80% of wages, office overheads are
25% of factory cost & selling distribution overheads are
10 % of cost of production.
• The complete jobs realized Rs 4,10,000.
Completed Jobs (Rs) W.I.P. (Rs)
Raw Material supplied from stores 88,000 32,000
Wages 1,00,000 40,000
Chargeable Expenses 10,000 4,000
Materials returned to Stores 1,000 -
12
ILLUSTRATION:1
• Write up:
1. WIP Ledger Control Account
2. Completed Job Ledger Control Account
3. Cost of Sales Account
13
ILLUSTRATION:1-SOLUTION
Consolidated Work-In-Progress A/c
Dr Rs Crs Rs
To Raw Material consumed 32,000
To Wages 40,000
To Chargeable Expenses 4,000
To Factory Overheads (80% Of wages) 32,000
FACTORY COST 1,08,000
To Admin Overhead (25% of Factory Cost) 27,000
1,35,000 1,35,000
Note: Selling & Distribution Overhead is not charged in WIP A/c
14
ILLUSTRATION:1-SOLUTION
Consolidated Completed Job A/c
Dr Rs Cr Rs
To Raw Material consumed 88,000 87,000 By Customer’s A/c (Amt.
of Jobs Completed)
4,10,000
Less: Return to Stores (-) 1000
To Wages 1,00,000
To Chargeable Expenses 10,000
To Factory Overheads (80% Of wages) 80,000
FACTORY COST 2,77,000
To Admin Overhead (25% of Factory Cost) 69,250
Cost of Production 3,46,250
To Selling & Distribution Overhead 34,625
To Transfer to P & L A/c 29,125
4,10,000 4,10,000
15
ILLUSTRATION:1-SOLUTION
Cost of Sales A/c
Dr Rs Cr Rs
To Material consumed 87,000 By Bal. c/d 3,80,875
To Wages 1,00,000
To Chargeable Expenses 10,000
To Factory Overheads (80% Of wages) 80,000
FACTORY COST 2,77,000
To Admin Overhead (25% of Factory Cost) 69,250
3,46,250
To Selling & Distribution Overhead 34,625
COST OF SALES 3,80,875 3,80,875
16
BATCH COSTING
17
BATCH COSTING
• In Batch Costing, a lot of similar units which comprise
the batch may be used as a cost unit for ascertainment of
cost.
• Separate Cost Sheet is maintained for each batch by
assigning a batch number.
• Cost per unit of product is determined by dividing the
total cost of a batch by the number of units of that batch.
• Batch costing is used in number drug industries, ready
made garment industries, electronic components
manufacture, TV sets, radio etc.
18
DETERMINATION OF ECONOMIC
BATCH QUANTITY (EBQ)
• Determination of economic batch lot is the
important work in batch costing.
• The two types of costs involved in batch costing
are
(1) Set up cost
(2) Carrying cost.
• Economic sBatch Quantity will balance both
opposing costs.
19
DETERMINATION OF ECONOMIC
BATCH QUANTITY (EBQ)
• EBQ is calculated by using the following
formula:
where:
Q = Batch size
D = Demand per annum
Ch = Cost of holding one unit for one year
Co = Cost of setting up a batch ready to be produced
R = Annual rate of production
20
DETERMINATION OF ECONOMIC
BATCH QUANTITY (EBQ)
• If the production of the batch is done over a
short period, D/R loses its significance.
• For short period, EBQ is given by:
where:
D = Demand per annum
Co = Cost of placing one order
Ch = Cost of holding one unit for one year
Q = Reorder quantity (EOQ)
21
NEED TO DETERMINE EBQ
• EBQ can be determined to calculate the
optimum size of the batch.
• If the batch size is high, set up cost per unit may
tend to decline and the carrying cost will
increase.
• Size of the batch also influences the clerical and
other machine set–up costs.
• Therefore, it is necessary to detrmine EBQ.
22
BATCH COSTING
• ADVANTAGES:
▫ Reduces the initial capital outlay.
▫ Batch production reduces per unit cost.
▫ Reduction in time to produce single unit.
▫ Labor cost is reduced.
▫ Useful for smaller businesses.
• DISADVANTAGES:
▫ Machine breakdown may stop whole production.
23
ILLUSTRATION:1
Following information relates to the manufacturing of a
component X - III in a cost centre :
Cost of materials 6 paise per component
Operator's wages 72 paise an hour
Machine hour Rs. 1.50
Setting up time of the machine 2 hours and 20 minutes
Manufacturing time 10 minutes per component
Prepare cost sheets showing both production and setting up
costs-total and per unit when a batch consists of 1,000
components.
Cost Sheet for a Batch of 1000 Components
24
ILLUSTRATION:1-SOLUTION
Particulars Amount (Rs) Amount (Rs)
Setting up costs:
Operator’s wages for 2 hrs 20 min @
75 paise an hour
Machine overheads for 2 hrs and 20
min @ Rs. 1.50 an hour
1.74
3.50
Total Setting up costs 0.005 5.25
Add: Production Costs
Material costs for 1000 units @ 6
paise per unit
Operator’s wages for 10,000 mins
(100x10) @ 72 paise an hour
Machine Overheads for 10,000 mins
@ Rs.1.50 an hour
0.06 60
0.120 120
0.250 250
Total Production Costs 0.430 430
Total Costs 0.435 435.25
Cost Sheet for a batch of 1000 components
25
ILLUSTRATION: 2
From the following information, you are
required to calculate Economic Batch Quantity:
Annual demand for the product= 40,000 units
Setup cost per batch= Rs. 750
Carrying cost per unit annum= Rs. 15
26
ILLUSTRATION:2-SOLUTION
Calculation Economic Batch Quantity :
Economic Batch Quantity = √(2DS)/C
Where,
D = Annual Demand in Units
S = Set up Cost per batch
C = Carrying Cost per unit per annum
Economic Batch Quantity = √(2 x 40,000 x 750)/15
= 2,000 units
27
ILLUSTRATION:3
A Ltd. is committed to supply 24,000 bearings per
annum to B Ltd. on a steady basis. It is estimated
that it costs 10 paise as inventory holding cost per
bearing per month and that the set up cost per run
of bearing manufacture is Rs.324.
(1) What should be the optimum run size for bearing
manufacture?
(2) What would be the interval between two
consecutive optimum runs?
(3) Find out the minimum inventory cost per annum.
28
ILLUSTRATION:3-SOLUTION
(i) Economic Batch or run size :
EBQ= √(2DS)/C
Where,
D = Annual Demand or production in units
S = Setup cost per batch
C = Annual carrying or holding cost per unit
E B Q = -. √(2 x 24,000 x 324)/12
= 3,600 units
29
ILLUSTRATION:3-SOLUTION
Alternative Solution:
The Economic batch size figure can also be
obtained by taking monthly figure as under:
= √(2 x 2000 units x Rs. 324)/0.10
= 3,600 units
30
ILLUSTRATION:3-SOLUTION
(ii) Number of set up per annum:
=(Annual production)/(Economic Batch Quantity)
=(24,000)/(3600)
= (20)/(3)
Interval between two consecutive optimum runs
=(12/(20/3))
= 1.8 months
(iii) Minimum Inventory Cost Per Year :
= [ (24,000/3600)*324]+[(3600/2)*12]
=Rs. 2,160+ Rs. 2,160
=Rs. 4,320
31
Difference between Job Costing and
Batch Costing
JOB COSTING BATCH COSTING
Costs are collected and accumulated
according to Jobs, Contracts or Work Order.
Lot of similar units which comprise the
batch may be used as a cost unit for
ascertainment of cost.
Each job is treated as a separate entity for
the purpose of costing.
Separate cost sheet is maintained for each
batch by assigning a batch number.
The materials and labour costs are complied
through the respective abstracts and
overheads are charged on predetermined
basis.
Separate cost sheet is maintained for each
batch by assigning a batch manner.
Costs are found out at the stage of
completion of the job.
Cost per unit of product is determined by
dividing the total cost of a batch by the
number of units of that batch.
Job costing is used in Printing, Furniture
making, Ship Building etc.
Batch costing is used in drug industries,
readymade garments, T.V. sets, Radio's and
Electronic Components Manufacture.
32
THANK YOU
33

More Related Content

What's hot

Price level Accounting
Price level AccountingPrice level Accounting
Price level AccountingAijaz Aryan
 
Overview of cost & Management Accounting
Overview of cost & Management AccountingOverview of cost & Management Accounting
Overview of cost & Management AccountingUniversity of Jaffna
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysisSumit Malhotra
 
UNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGUNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGambarish_9
 
Budget and Budgetary Control
Budget and Budgetary ControlBudget and Budgetary Control
Budget and Budgetary ControlAshish Nangla
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based CostingVikas Gupta
 
Chapter 01 introduction OF Cost Accounting
Chapter 01   introduction OF Cost AccountingChapter 01   introduction OF Cost Accounting
Chapter 01 introduction OF Cost Accountingayanthimadhumali
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptmayank mulchandani
 
Chapter 03 Material Costing
Chapter 03   Material CostingChapter 03   Material Costing
Chapter 03 Material Costingayanthimadhumali
 
Cost accounting
Cost accountingCost accounting
Cost accountingEkta Patel
 
Accounts : Marginal Costing
Accounts : Marginal CostingAccounts : Marginal Costing
Accounts : Marginal CostingSanchit
 
Method of costing
Method of costingMethod of costing
Method of costingskillssoft
 

What's hot (20)

Price level Accounting
Price level AccountingPrice level Accounting
Price level Accounting
 
Job costing
Job costingJob costing
Job costing
 
Overview of cost & Management Accounting
Overview of cost & Management AccountingOverview of cost & Management Accounting
Overview of cost & Management Accounting
 
Process costing
Process costingProcess costing
Process costing
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
UNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTINGUNDERSTANDING MARGINAL COSTING
UNDERSTANDING MARGINAL COSTING
 
Marginal costing
Marginal costingMarginal costing
Marginal costing
 
Budget and Budgetary Control
Budget and Budgetary ControlBudget and Budgetary Control
Budget and Budgetary Control
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Chapter 01 introduction OF Cost Accounting
Chapter 01   introduction OF Cost AccountingChapter 01   introduction OF Cost Accounting
Chapter 01 introduction OF Cost Accounting
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction ppt
 
Overhead cost
Overhead costOverhead cost
Overhead cost
 
Chapter 03 Material Costing
Chapter 03   Material CostingChapter 03   Material Costing
Chapter 03 Material Costing
 
Marginal Costing
Marginal CostingMarginal Costing
Marginal Costing
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Accounting standard 2
Accounting standard   2Accounting standard   2
Accounting standard 2
 
Marginal costing
Marginal costing Marginal costing
Marginal costing
 
Accounts : Marginal Costing
Accounts : Marginal CostingAccounts : Marginal Costing
Accounts : Marginal Costing
 
Method of costing
Method of costingMethod of costing
Method of costing
 

Similar to Job and batch costing

Chapter 3 : Overhead Analysis
Chapter 3 : Overhead AnalysisChapter 3 : Overhead Analysis
Chapter 3 : Overhead AnalysisPeleZain
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designBeaDelaPenia1
 
job oder cost system part one.pptx
job oder cost system part one.pptxjob oder cost system part one.pptx
job oder cost system part one.pptxMohamedAbdi347025
 
Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Mvs Krishna
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point showMaliha Jahan
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...Mashfiq Albartross
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysisgk44
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysisgk44
 
Chapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxChapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxshawalhamzah
 
CA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdfCA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdfsandiibrahim3
 
CA Ch.4-Job Costing-part 2-Nureni.pdf
CA Ch.4-Job Costing-part 2-Nureni.pdfCA Ch.4-Job Costing-part 2-Nureni.pdf
CA Ch.4-Job Costing-part 2-Nureni.pdfsandiibrahim3
 
Chapter 06 Costing Methods
Chapter 06   Costing MethodsChapter 06   Costing Methods
Chapter 06 Costing Methodsayanthimadhumali
 
Production Cost Concepts (ppt)
Production Cost Concepts (ppt) Production Cost Concepts (ppt)
Production Cost Concepts (ppt) Priyanshu
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxObsaKamil
 

Similar to Job and batch costing (20)

Chapter 3 : Overhead Analysis
Chapter 3 : Overhead AnalysisChapter 3 : Overhead Analysis
Chapter 3 : Overhead Analysis
 
cost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service designcost accounting chapter 6, fundamentals of product and service design
cost accounting chapter 6, fundamentals of product and service design
 
job oder cost system part one.pptx
job oder cost system part one.pptxjob oder cost system part one.pptx
job oder cost system part one.pptx
 
Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)Jiambalvo text book solutions (1)
Jiambalvo text book solutions (1)
 
Job costing power point show
Job costing power point showJob costing power point show
Job costing power point show
 
Lo3 overheads
Lo3 overheadsLo3 overheads
Lo3 overheads
 
Chapter4.ppt
Chapter4.pptChapter4.ppt
Chapter4.ppt
 
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
WHY IS THE ALLOCATION METHOD USED IN ACCOUNTING FOR THE DIFFERENCE BETWEEN AP...
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
 
Overhead analysis
Overhead analysisOverhead analysis
Overhead analysis
 
Chapter 05 Overhead Costs
Chapter 05   Overhead CostsChapter 05   Overhead Costs
Chapter 05 Overhead Costs
 
Chapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptxChapter 5 Costing Methods Part 1 (1).pptx
Chapter 5 Costing Methods Part 1 (1).pptx
 
CA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdfCA Ch.4-Job Costing-part 1-Nureni.pdf
CA Ch.4-Job Costing-part 1-Nureni.pdf
 
CA Ch.4-Job Costing-part 2-Nureni.pdf
CA Ch.4-Job Costing-part 2-Nureni.pdfCA Ch.4-Job Costing-part 2-Nureni.pdf
CA Ch.4-Job Costing-part 2-Nureni.pdf
 
Chapter 06 Costing Methods
Chapter 06   Costing MethodsChapter 06   Costing Methods
Chapter 06 Costing Methods
 
Production Cost Concepts (ppt)
Production Cost Concepts (ppt) Production Cost Concepts (ppt)
Production Cost Concepts (ppt)
 
Unit Costing.pptx
Unit Costing.pptxUnit Costing.pptx
Unit Costing.pptx
 
Job order costing
Job order costingJob order costing
Job order costing
 
Cost Accounting
Cost AccountingCost Accounting
Cost Accounting
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 

Recently uploaded

Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Amil baba
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdfchess188chess188
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier Fernández Muñoz
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...gerogepatton
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...KrishnaveniKrishnara1
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackinghadarpinhas1
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliNimot Muili
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 

Recently uploaded (20)

Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
Uk-NO1 Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Exp...
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdf
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Javier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptxJavier_Fernandez_CARS_workshop_presentation.pptx
Javier_Fernandez_CARS_workshop_presentation.pptx
 
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
March 2024 - Top 10 Read Articles in Artificial Intelligence and Applications...
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
22CYT12 & Chemistry for Computer Systems_Unit-II-Corrosion & its Control Meth...
 
Detection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and trackingDetection&Tracking - Thermal imaging object detection and tracking
Detection&Tracking - Thermal imaging object detection and tracking
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot MuiliStructural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
Structural Integrity Assessment Standards in Nigeria by Engr Nimot Muili
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 

Job and batch costing

  • 1. JOB COSTING AND BATCH COSTING 1
  • 2. JOB COSTING • Job costing is a method of costing whereby cost is compiled for a job or work order. The production is against customer’s orders and not for stock. • The cost is not related to the unit of production but is a cost for the job, e. g printing of 5000 ledger sheets, repairs of 50 equipment’s, instead of printing one sheet or repair of one equipment. • The elements of cost comprising Prime Cost viz. direct materials, direct labor and direct expenses are charged directly to the jobs concerned, the overhead charged to a job is an apportioned portion of the departmental overhead. • Applied in industries where production is measured in terms of completed jobs like Printing Press, Automobile Garage, Repair workshops, Ship Building, Foundry and other similar manufacturing units which manufacture to customers’ specific requirements. 2
  • 3. DOCUMENTS USED IN A JOB ORDER COST SYSTEM (i) Production Order or Manufacturing Order: This is a works order authorizing the production department to produce a specified quantity of a product which constitutes the job. (ii) Cost Sheet: For recording costs, very often a separate record called a cost sheet is used. The cost sheet and the works order may also be combined, when costs are recorded on the production order itself. (iii) Other Documents: The other documents which are used as control mechanism by the dispatching function are: Material Requisitions, Tool Orders, Time Tickets, Inspection Order, etc. 3
  • 4. JOB COST ACCOUNTING PROCEDURE • Cost of direct materials in respect of a job is obtained from copies of Material Requisitions costed by the Stores Accounting Section. • Cost of direct wages is obtained from various Time Tickets costed by the Payroll Department. Direct Expenses, if any, are also taken up. • Manufacturing overheads are then applied at predetermined departmental absorption rates and recorded in the cost-sheet. • Various overheads may be recorded in the separate columns meant for these in the cost sheet which are totaled to obtain the total cost of direct material, direct labour, direct expenses and apportioned manufacturing overheads. • These four elements of cost together give the production cost or manufacturing cost of the job. 4
  • 5. TYPES OF ACTIVITIES Job costing involves the following accounting activities: Materials: It accumulates the cost of components and then assigns these costs to a product or project once the components are used. Labor: Employees charge their time to specific jobs, which are then assigned to the jobs based on the labor cost of the employees. Overhead: It accumulates overhead costs in cost pools, and then allocates these costs to jobs. Direct Expenses: Directly charged to individual jobs for which they are incurred. 5
  • 6. JOB COSTING ALLOCATION OF MATERIALS • In a job costing environment, materials to be used on a product or project first enter the facility and are stored in the warehouse, after which they are picked from stock and issued to a specific job. • If spoilage or scrap is created, then normal amounts are charged to an overhead cost pool for later allocation, while abnormal amounts are charged directly to the cost of goods sold. • Once work is completed on a job, the cost of the entire job is shifted from work-in-process inventory to finished goods inventory. • Then, once the goods are sold, the cost of the asset is removed from the inventory account and shifted into the cost of goods sold, while the company also records a sale transaction. 6
  • 7. JOB COSTING ALLOCATION OF LABOR • In a job costing environment, labor may be charged directly to individual jobs, if the labor is directly traceable to those jobs. • All other manufacturing-related labor is recorded in an overhead cost pool and is then allocated to the various open jobs. • The first type of labor is called direct labor, and the second type is known as indirect labor. When a job is completed, it is then shifted into a finished goods inventory account. • Then, once the goods are sold, the cost of the asset is removed from the inventory account and shifted into the cost of goods sold, while the company also records a sale transaction. 7
  • 8. JOB COSTING ALLOCATION OF OVERHEAD • In a job costing environment, non-direct costs are accumulated into one or more overhead cost pools, from which you allocate costs to open jobs based upon some measure of cost usage. • The key issues when applying overhead are to consistently charge the same types of costs to overhead in all reporting periods, and to consistently apply these costs to jobs. Otherwise, it can be extremely difficult for the cost accountant to explain why overhead cost allocations vary from one month to the next. • The overhead allocation process for standard costs is to use historical cost information to arrive at a standard rate per unit of activity, and then allocate this standard amount to jobs based on their units of activity. 8
  • 9. JOB COSTING ALLOCATION OF OVERHEAD You then subtract the total amount allocated from the overhead cost pool (which contains actual overhead costs), and dispose of any remaining amount in the overhead cost pool. You can use any of the following methods to dispose of the remaining amount: ▪Charge to cost of goods sold. Charge the entire variance to the cost of goods sold. This is the simplest method. ▪Allocate the variance. Allocate the variance to the accounts for finished goods, work-in- process, and cost of goods sold, based on the ending balances in these accounts. This approach is slightly more time-consuming, but is the most theoretically correct method under generally accepted accounting principles. ▪Charge to jobs. Allocate the variance to those jobs that were open during the reporting period. This approach is the most time-consuming. It essentially reverts a company back to an actual costing system, since the results of this method will approximate those created under an actual cost allocation system. 9
  • 10. ADVANTAGES OF JOB COSTING • Profitability of each job can be individually determined. • It provides a basis for estimating the cost of similar jobs which are to be taken in future. • It provides the detailed analysis of the cost of material, labour and overheads for each job as and when required. • Plant efficiency can be controlled by confining attention to costs relating to individual jobs. • Job costing is essential for cost-plus contract where contract price is determined directly on the basis of cost. 10
  • 11. LIMITATIONS OF JOB COSTING • It requires detailed record-keeping for different jobs. • It is expensive to operate as it requires considerable detailed clerical work. • With the increase in the clerical work the chances of errors are increased. • A job may be charged for inefficiencies, although it has not caused any. • The costs as ascertained are historical as they compiled after incidence and therefore does not provide control of cost unless it is used with standard costing system. 11
  • 12. ILLUSTRATION:1 • The following information for the year ended 31/12/2008 is obtained from the books & record of a factory: • Factory Overhead are 80% of wages, office overheads are 25% of factory cost & selling distribution overheads are 10 % of cost of production. • The complete jobs realized Rs 4,10,000. Completed Jobs (Rs) W.I.P. (Rs) Raw Material supplied from stores 88,000 32,000 Wages 1,00,000 40,000 Chargeable Expenses 10,000 4,000 Materials returned to Stores 1,000 - 12
  • 13. ILLUSTRATION:1 • Write up: 1. WIP Ledger Control Account 2. Completed Job Ledger Control Account 3. Cost of Sales Account 13
  • 14. ILLUSTRATION:1-SOLUTION Consolidated Work-In-Progress A/c Dr Rs Crs Rs To Raw Material consumed 32,000 To Wages 40,000 To Chargeable Expenses 4,000 To Factory Overheads (80% Of wages) 32,000 FACTORY COST 1,08,000 To Admin Overhead (25% of Factory Cost) 27,000 1,35,000 1,35,000 Note: Selling & Distribution Overhead is not charged in WIP A/c 14
  • 15. ILLUSTRATION:1-SOLUTION Consolidated Completed Job A/c Dr Rs Cr Rs To Raw Material consumed 88,000 87,000 By Customer’s A/c (Amt. of Jobs Completed) 4,10,000 Less: Return to Stores (-) 1000 To Wages 1,00,000 To Chargeable Expenses 10,000 To Factory Overheads (80% Of wages) 80,000 FACTORY COST 2,77,000 To Admin Overhead (25% of Factory Cost) 69,250 Cost of Production 3,46,250 To Selling & Distribution Overhead 34,625 To Transfer to P & L A/c 29,125 4,10,000 4,10,000 15
  • 16. ILLUSTRATION:1-SOLUTION Cost of Sales A/c Dr Rs Cr Rs To Material consumed 87,000 By Bal. c/d 3,80,875 To Wages 1,00,000 To Chargeable Expenses 10,000 To Factory Overheads (80% Of wages) 80,000 FACTORY COST 2,77,000 To Admin Overhead (25% of Factory Cost) 69,250 3,46,250 To Selling & Distribution Overhead 34,625 COST OF SALES 3,80,875 3,80,875 16
  • 18. BATCH COSTING • In Batch Costing, a lot of similar units which comprise the batch may be used as a cost unit for ascertainment of cost. • Separate Cost Sheet is maintained for each batch by assigning a batch number. • Cost per unit of product is determined by dividing the total cost of a batch by the number of units of that batch. • Batch costing is used in number drug industries, ready made garment industries, electronic components manufacture, TV sets, radio etc. 18
  • 19. DETERMINATION OF ECONOMIC BATCH QUANTITY (EBQ) • Determination of economic batch lot is the important work in batch costing. • The two types of costs involved in batch costing are (1) Set up cost (2) Carrying cost. • Economic sBatch Quantity will balance both opposing costs. 19
  • 20. DETERMINATION OF ECONOMIC BATCH QUANTITY (EBQ) • EBQ is calculated by using the following formula: where: Q = Batch size D = Demand per annum Ch = Cost of holding one unit for one year Co = Cost of setting up a batch ready to be produced R = Annual rate of production 20
  • 21. DETERMINATION OF ECONOMIC BATCH QUANTITY (EBQ) • If the production of the batch is done over a short period, D/R loses its significance. • For short period, EBQ is given by: where: D = Demand per annum Co = Cost of placing one order Ch = Cost of holding one unit for one year Q = Reorder quantity (EOQ) 21
  • 22. NEED TO DETERMINE EBQ • EBQ can be determined to calculate the optimum size of the batch. • If the batch size is high, set up cost per unit may tend to decline and the carrying cost will increase. • Size of the batch also influences the clerical and other machine set–up costs. • Therefore, it is necessary to detrmine EBQ. 22
  • 23. BATCH COSTING • ADVANTAGES: ▫ Reduces the initial capital outlay. ▫ Batch production reduces per unit cost. ▫ Reduction in time to produce single unit. ▫ Labor cost is reduced. ▫ Useful for smaller businesses. • DISADVANTAGES: ▫ Machine breakdown may stop whole production. 23
  • 24. ILLUSTRATION:1 Following information relates to the manufacturing of a component X - III in a cost centre : Cost of materials 6 paise per component Operator's wages 72 paise an hour Machine hour Rs. 1.50 Setting up time of the machine 2 hours and 20 minutes Manufacturing time 10 minutes per component Prepare cost sheets showing both production and setting up costs-total and per unit when a batch consists of 1,000 components. Cost Sheet for a Batch of 1000 Components 24
  • 25. ILLUSTRATION:1-SOLUTION Particulars Amount (Rs) Amount (Rs) Setting up costs: Operator’s wages for 2 hrs 20 min @ 75 paise an hour Machine overheads for 2 hrs and 20 min @ Rs. 1.50 an hour 1.74 3.50 Total Setting up costs 0.005 5.25 Add: Production Costs Material costs for 1000 units @ 6 paise per unit Operator’s wages for 10,000 mins (100x10) @ 72 paise an hour Machine Overheads for 10,000 mins @ Rs.1.50 an hour 0.06 60 0.120 120 0.250 250 Total Production Costs 0.430 430 Total Costs 0.435 435.25 Cost Sheet for a batch of 1000 components 25
  • 26. ILLUSTRATION: 2 From the following information, you are required to calculate Economic Batch Quantity: Annual demand for the product= 40,000 units Setup cost per batch= Rs. 750 Carrying cost per unit annum= Rs. 15 26
  • 27. ILLUSTRATION:2-SOLUTION Calculation Economic Batch Quantity : Economic Batch Quantity = √(2DS)/C Where, D = Annual Demand in Units S = Set up Cost per batch C = Carrying Cost per unit per annum Economic Batch Quantity = √(2 x 40,000 x 750)/15 = 2,000 units 27
  • 28. ILLUSTRATION:3 A Ltd. is committed to supply 24,000 bearings per annum to B Ltd. on a steady basis. It is estimated that it costs 10 paise as inventory holding cost per bearing per month and that the set up cost per run of bearing manufacture is Rs.324. (1) What should be the optimum run size for bearing manufacture? (2) What would be the interval between two consecutive optimum runs? (3) Find out the minimum inventory cost per annum. 28
  • 29. ILLUSTRATION:3-SOLUTION (i) Economic Batch or run size : EBQ= √(2DS)/C Where, D = Annual Demand or production in units S = Setup cost per batch C = Annual carrying or holding cost per unit E B Q = -. √(2 x 24,000 x 324)/12 = 3,600 units 29
  • 30. ILLUSTRATION:3-SOLUTION Alternative Solution: The Economic batch size figure can also be obtained by taking monthly figure as under: = √(2 x 2000 units x Rs. 324)/0.10 = 3,600 units 30
  • 31. ILLUSTRATION:3-SOLUTION (ii) Number of set up per annum: =(Annual production)/(Economic Batch Quantity) =(24,000)/(3600) = (20)/(3) Interval between two consecutive optimum runs =(12/(20/3)) = 1.8 months (iii) Minimum Inventory Cost Per Year : = [ (24,000/3600)*324]+[(3600/2)*12] =Rs. 2,160+ Rs. 2,160 =Rs. 4,320 31
  • 32. Difference between Job Costing and Batch Costing JOB COSTING BATCH COSTING Costs are collected and accumulated according to Jobs, Contracts or Work Order. Lot of similar units which comprise the batch may be used as a cost unit for ascertainment of cost. Each job is treated as a separate entity for the purpose of costing. Separate cost sheet is maintained for each batch by assigning a batch number. The materials and labour costs are complied through the respective abstracts and overheads are charged on predetermined basis. Separate cost sheet is maintained for each batch by assigning a batch manner. Costs are found out at the stage of completion of the job. Cost per unit of product is determined by dividing the total cost of a batch by the number of units of that batch. Job costing is used in Printing, Furniture making, Ship Building etc. Batch costing is used in drug industries, readymade garments, T.V. sets, Radio's and Electronic Components Manufacture. 32

Editor's Notes

  1. Similarly, If the batch size is reduced, set up cost per unit will increase and the carrying cost will come down.