CONTENTS
Introduction
Scope
Systems
Advantage & Disadvantage
Literature Review
Case Study
Conclusion
INTRODUCTION
“Prefabrication is the practice of assembling components of
a structure in a factory or other manufacturing site, and
transporting complete assemblies to the construction site
where the structure is to be located’’.
LITERATURE REVIEW
AUTHOR TITLE YEAR DESCRIPTION
Akshaya A
,Et al
'Prefabrication,
Sustainable Technique in
Building Construction
2017 This type of construction is
especially constructed for
inaccessible areas.
Providing for quick installation
support
These structures are easy to
dismantle and relocate.
Neetu B
,Et.al
'Pre-Cast Technology: An
Initial Step to
Sustainable Development
2013 Demand of mass housing targets
can be achieved by precast
construction technique.
To improve structural performance
as well as to maintain quality of
the work.
PREFABRICATION SYSTEM
• Prefabricated building is a type
of building that consists of several
systems. Open
prefab
Box type
construction
Large
prefab
PREFABRICATION HOUSE COMPONENTS
Panels
Capping channel
Post
Roof
Floor system
Base channel
WALL PANELS
Precast wall panel is an independently supported
vertical member in a prefabricated structure.
size of the panels depends on client
requirements
Wall assembly usually contains insulation, wiring, and
pre-cut openings for windows and doors
Using an assemblage of metal joints
components and anchors.
Generally four types of precast panels used
Cladding or curtain walls
Load-bearing wall units
Shear walls
Formwork for cast-in-place concrete
FLOORS
• Precast flooring units could be homogeneous or non
homogenous.
• Homogeneous floors : solid slabs, hollow core slabs.
• Non-homogeneous floors : multilayered ones with
combinations of light weight concrete
PREFABRICATION DESIGN
GUIDELINES
• Material resistance and stability.
• Safety in case of fire.
• Hygience ,health and environment.
• Protection against noise.
• Energy saving and heat insulation.
These are the parameters which probably might in addition to
normal design of the elements
MATERIAL USED
Concrete
Steel
Treated Wood
Aluminium
Light weight elements
Ceramic product
MANUFACTURE PROCESS
Manufacturing of Prefabrication will be done in two stages
1) Factory Prefabrication.
2)Site Prefabrication.
Factory Prefabrication
Factory prefabrication is restored in a centrally
located plant for manufacture of standardized
components on a long form basis.
Production of components throughout the year
Site Prefabrication.
components are manufactured at site near the
site of work as possible.
The work is normally carried out in open space
with locally a valuable labour
The equipment machinery and moulds are of mobile nature.
CASTING
Precast components are casted with controlled cement concrete in moulds of
required shape and sizes.
Vibrator is used to vibrate concrete and this removes any honeycombing inside
the components
After complete curing is done the components are transported to the site with
heavy trucks and erection will be done using cranes with skilled labours
TRANSPORTATION
Transport of prefab elements inside the factory depends on the method of
production selected for the manufacture.
Availability of suitable transport equipment, such as tractor ,truck etc, to suits
the load and dimension of the member
Care should be taken in negotiating sharp beds uneven of slushy roads to avoid
undesirable stresses in elements and in transport vehicles.
Care should be taken at base packing for supporting the elements.
ERECTION OR ASSEMBLING
Set reference line and determine the position of precast elements to be
installed
Level pads should be provided for setting the level of the element.
Check alignment and verticality of the element
For corrugated pipe sleeve or splice sleeve connection, proper and pour non
shrink grout into the pipe inlets provided.
Keep the installation panels undisturbed for at least 24 hours.
Joints casting & sealing.
TRANSPORTATION
ERECTION
ADVANTAGES
• Provides complex thermal insulation
• Improved quality over on-site construction
• Saves time where weather conditions allow
brief periods of construction
• It helps in safety of workers, environmental
impact, constructability.
DISADVANTAGES
• Handling may cause breakage of member.
• Difficulty in connecting precast units.
• Skilled workmanship is required.
• It requires erection equipment.
CASE STUDY : DREAM VALLEY PROJECT
(AMRAPALI GROUP)
• 7 buildings of 2B+G+18 floors were completed in 18 months of timeline was
made possible through precast technology.
• Achieved a slab cycle of 10-12 days for a slab area of 7000 Sqft.
• Superior quality & finish of construction.
• Cost & time optimisation with the use of hollow-core slabs.
• Reduction in concrete & steel factor per Sqft of built-up area.
• Elimination of brick work and plaster by the use of precast wall panels &
cladding.
• Automation & mechanisation of construction project improved overall
productivity.
• Improved site safety & considerable reduction in wastage, dust & noise on
site, thus reduced ecological
CONCLUSION
• Due to the flexibility of the structure in expandability and appearance this
prefab houses are the choice.
• Less construction time
• The prefabrication components and prefab structure eliminate space and
time over convectional construction
• The use of precast concrete construction can significantly reduce the
amount of construction waste generated on construction sites
• Reduce adverse environment impact on sites
• Enhance quality control of concreting work
REFERENCE
• Abhishek K, Akshaya A '' Prefabrication, Sustainable Technique in
Building Construction'' (2017) IJSE Volume 1, Issue 2
• Krish R. Villaitramani, Dhruv P. Hirani ''Prefabricated Construction
For Mass Housing In Mumbai'' (2014) (IJIRAE) ISSN: 2349-2163
Volume 1 Issue 9
• Neetu B. Yadav Rushabh A. Shah "Pre-Cast Technology: An Initial
Step to Sustainable Development''(2013) | Vol. 1, Issue 7, 2013 |
ISSN (online): 2321-0613

Weitere ähnliche Inhalte

Was ist angesagt?

Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated componentsSofia Rajesh
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated StructuresBoopathi Raja
 
Precast construction
Precast constructionPrecast construction
Precast constructionDivya Vishnoi
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation processUdayram Patil
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...nishant patyal
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniquesSayali Darakh
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioningCharlie Gupta
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteUdisha15
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement pptjvaghani
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionMadan Mohan Jana
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE524001
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated ColumnAnees Khan
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed ConcreteRavi Savani
 

Was ist angesagt? (20)

Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
Precast construction
Precast constructionPrecast construction
Precast construction
 
Prefabricated Structure and its installation process
Prefabricated Structure and its installation processPrefabricated Structure and its installation process
Prefabricated Structure and its installation process
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Joints in concrete
Joints in concreteJoints in concrete
Joints in concrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
 
Cost effective construction techniques
Cost effective construction techniquesCost effective construction techniques
Cost effective construction techniques
 
What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Precast concrete
Precast concretePrecast concrete
Precast concrete
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Steel trusses
Steel trussesSteel trusses
Steel trusses
 
Ferrocement ppt
Ferrocement pptFerrocement ppt
Ferrocement ppt
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
PRE STRESSED CONCRETE
PRE STRESSED CONCRETEPRE STRESSED CONCRETE
PRE STRESSED CONCRETE
 
Prefabricated Column
Prefabricated ColumnPrefabricated Column
Prefabricated Column
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
Prestressed Concrete
Prestressed ConcretePrestressed Concrete
Prestressed Concrete
 

Ähnlich wie Prefabrication​ structure ppt

PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptxdharmveersingh60
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concreteAshik Ásh
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfGourhariBiswas1
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction TechnologiesRahul Saraswat
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Developmentijsrd.com
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction systemchirag aggarwal
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for constPradeepPandya1
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication systemArun Arun
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1chongyih2
 
Precast structure
Precast structurePrecast structure
Precast structurepiyush9392
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.pptssusera0ac221
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEDr K M SONI
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete StructureArchit Ahmad
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques Deepak Pradhan
 

Ähnlich wie Prefabrication​ structure ppt (20)

PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
Prefab Building CR ppt.pptx
Prefab Building CR ppt.pptxPrefab Building CR ppt.pptx
Prefab Building CR ppt.pptx
 
Presentation of precast concrete
Presentation of precast concretePresentation of precast concrete
Presentation of precast concrete
 
PREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdfPREFAB CONSTRUCTION .pdf
PREFAB CONSTRUCTION .pdf
 
Precast
PrecastPrecast
Precast
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
 
neotech.pptx
neotech.pptxneotech.pptx
neotech.pptx
 
Pre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable DevelopmentPre-Cast Technology: An Initial Step to Sustainable Development
Pre-Cast Technology: An Initial Step to Sustainable Development
 
Monolithic concrete construction system
Monolithic concrete construction systemMonolithic concrete construction system
Monolithic concrete construction system
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
 
Prefabrication system
Prefabrication systemPrefabrication system
Prefabrication system
 
Precast Construction
Precast ConstructionPrecast Construction
Precast Construction
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Precast structure
Precast structurePrecast structure
Precast structure
 
Ct3 presentation slides
Ct3 presentation slidesCt3 presentation slides
Ct3 presentation slides
 
02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt02_Precast-and-Cast-in-Place.ppt
02_Precast-and-Cast-in-Place.ppt
 
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVEMODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
MODERN CONSTRUCTION TECHNOLOGIES IN ENGINEERING PERSPECTIVE
 
Precast Concrete Structure
Precast Concrete StructurePrecast Concrete Structure
Precast Concrete Structure
 
Rapid construction techniques
Rapid construction techniques Rapid construction techniques
Rapid construction techniques
 
Abhishek presentation.pptx
Abhishek presentation.pptxAbhishek presentation.pptx
Abhishek presentation.pptx
 

Kürzlich hochgeladen

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 

Kürzlich hochgeladen (20)

Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 

Prefabrication​ structure ppt

  • 1. PREFABRICATION STRUCTURE Presented by: Abhishek. M Under the Guidance of SRINIVAS K .S Assistant Prof. Dept. of civil Engg, SJBIT
  • 3. INTRODUCTION “Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies to the construction site where the structure is to be located’’.
  • 4. LITERATURE REVIEW AUTHOR TITLE YEAR DESCRIPTION Akshaya A ,Et al 'Prefabrication, Sustainable Technique in Building Construction 2017 This type of construction is especially constructed for inaccessible areas. Providing for quick installation support These structures are easy to dismantle and relocate. Neetu B ,Et.al 'Pre-Cast Technology: An Initial Step to Sustainable Development 2013 Demand of mass housing targets can be achieved by precast construction technique. To improve structural performance as well as to maintain quality of the work.
  • 5. PREFABRICATION SYSTEM • Prefabricated building is a type of building that consists of several systems. Open prefab Box type construction Large prefab
  • 6. PREFABRICATION HOUSE COMPONENTS Panels Capping channel Post Roof Floor system Base channel
  • 7. WALL PANELS Precast wall panel is an independently supported vertical member in a prefabricated structure. size of the panels depends on client requirements Wall assembly usually contains insulation, wiring, and pre-cut openings for windows and doors Using an assemblage of metal joints components and anchors. Generally four types of precast panels used Cladding or curtain walls Load-bearing wall units Shear walls Formwork for cast-in-place concrete
  • 8. FLOORS • Precast flooring units could be homogeneous or non homogenous. • Homogeneous floors : solid slabs, hollow core slabs. • Non-homogeneous floors : multilayered ones with combinations of light weight concrete
  • 9. PREFABRICATION DESIGN GUIDELINES • Material resistance and stability. • Safety in case of fire. • Hygience ,health and environment. • Protection against noise. • Energy saving and heat insulation. These are the parameters which probably might in addition to normal design of the elements
  • 11. MANUFACTURE PROCESS Manufacturing of Prefabrication will be done in two stages 1) Factory Prefabrication. 2)Site Prefabrication. Factory Prefabrication Factory prefabrication is restored in a centrally located plant for manufacture of standardized components on a long form basis. Production of components throughout the year Site Prefabrication. components are manufactured at site near the site of work as possible. The work is normally carried out in open space with locally a valuable labour The equipment machinery and moulds are of mobile nature.
  • 12. CASTING Precast components are casted with controlled cement concrete in moulds of required shape and sizes. Vibrator is used to vibrate concrete and this removes any honeycombing inside the components After complete curing is done the components are transported to the site with heavy trucks and erection will be done using cranes with skilled labours TRANSPORTATION Transport of prefab elements inside the factory depends on the method of production selected for the manufacture. Availability of suitable transport equipment, such as tractor ,truck etc, to suits the load and dimension of the member Care should be taken in negotiating sharp beds uneven of slushy roads to avoid undesirable stresses in elements and in transport vehicles. Care should be taken at base packing for supporting the elements.
  • 13. ERECTION OR ASSEMBLING Set reference line and determine the position of precast elements to be installed Level pads should be provided for setting the level of the element. Check alignment and verticality of the element For corrugated pipe sleeve or splice sleeve connection, proper and pour non shrink grout into the pipe inlets provided. Keep the installation panels undisturbed for at least 24 hours. Joints casting & sealing. TRANSPORTATION ERECTION
  • 14. ADVANTAGES • Provides complex thermal insulation • Improved quality over on-site construction • Saves time where weather conditions allow brief periods of construction • It helps in safety of workers, environmental impact, constructability. DISADVANTAGES • Handling may cause breakage of member. • Difficulty in connecting precast units. • Skilled workmanship is required. • It requires erection equipment.
  • 15. CASE STUDY : DREAM VALLEY PROJECT (AMRAPALI GROUP) • 7 buildings of 2B+G+18 floors were completed in 18 months of timeline was made possible through precast technology. • Achieved a slab cycle of 10-12 days for a slab area of 7000 Sqft. • Superior quality & finish of construction. • Cost & time optimisation with the use of hollow-core slabs. • Reduction in concrete & steel factor per Sqft of built-up area. • Elimination of brick work and plaster by the use of precast wall panels & cladding. • Automation & mechanisation of construction project improved overall productivity. • Improved site safety & considerable reduction in wastage, dust & noise on site, thus reduced ecological
  • 16. CONCLUSION • Due to the flexibility of the structure in expandability and appearance this prefab houses are the choice. • Less construction time • The prefabrication components and prefab structure eliminate space and time over convectional construction • The use of precast concrete construction can significantly reduce the amount of construction waste generated on construction sites • Reduce adverse environment impact on sites • Enhance quality control of concreting work
  • 17.
  • 18. REFERENCE • Abhishek K, Akshaya A '' Prefabrication, Sustainable Technique in Building Construction'' (2017) IJSE Volume 1, Issue 2 • Krish R. Villaitramani, Dhruv P. Hirani ''Prefabricated Construction For Mass Housing In Mumbai'' (2014) (IJIRAE) ISSN: 2349-2163 Volume 1 Issue 9 • Neetu B. Yadav Rushabh A. Shah "Pre-Cast Technology: An Initial Step to Sustainable Development''(2013) | Vol. 1, Issue 7, 2013 | ISSN (online): 2321-0613